Contract 46252-CO6
FORT WORTH City of Fort Worth Cp,i'rRpCTNO.Llk� C��D Change Order Request Project Name: Bellaire Drive Water,Sewer and Drainage Improvements City Sec No.: 46252 Project No.(s): 56002-060043010700430-CO1783 DOE No. 7092 City Proj.No.: 02144 59651-0200431-CO 1081-0O2883 :1 Project Description: Water,Sanitary Sewer and Storm Drain Improvements on Bellaire South Drive,Bellaire West Drive,Overton Park East Drive and Bellaire Park Court Contractor: Conatser Construction TX,LP. Change Order# © Date: 10/23/2018 City Project Mgr.J Tony Sholola City Inspector: I John Crowley Phone Number: 817-392-6054 Phone Number: 817-994-0975 Dept. Water Sewer TPW Totals Contract Time (Calender days) Original Contract Amount $1,875,647.20 $2,323,654.00 $3,560,287.50 $7,759,588.70 845 Extras to Date $264,170.00 $169,293.00 $182,977.00 $616,440.00 120 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,139,817.20 $2,492,947.00 $3,743,264,50 $8,376,028.70 965 Amount of Proposed Change Order $0.00 $9,727.75 $52,696.85 $62,424.60 060 Revised Contract Amount $2,139,817.20 $2,502,674.75 $3,795,961.35 $8,438,453.30 1,025 Original Funds Available for Change Orders $56,269.00 $69,710.00 $180,000.00 $305,979.00 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Additional Funding(if necessary) $9,727.75 $52,696,85 $62,424.60 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 8.75% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $9,699,485.88 The change order will provide for the following that were necessary on the project: • The installation of a 20-inch gate valve and to lower the 20-inch water main under the project 30-inch sanitary sewer main. • The installation of rock boulders for erosion control on the at 36- inch steel casing fora 24—inch sanitary sewer main crossing the creek at Overton Park. p��, r�O • Clean up and fence installation at storm drain outfall. 1 ' • Replace of exposed aggregate driveways at 9 locations on Bellaire Park Court. • Removal and replacement of conflicting 28 5-inch storm drain grate inlet. J, er, ity Se • Removal of project debris from private drainage pond. Staff concurs with the contractor's request for 60 additional calendar days on the change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Ord r. Con '-_9T5r:r t,or�:''ucl-o;i w�:SSB 141�nIn�Z I ❑r DIM�Vv� Assistant � ,TP Caur►r�7 M&C Number NIA M&C Date Approved " ' FORT w6wril City of Fort Worth ' Change Order Additions Project Name Bellaire Drive Water,Sewer and Drainage Improvements City Sec No.: 46252 Project No.(s): 56002-0600430/0700430-C01783 59651- DOE No. 7092 City Proj. No.: 02144 Project Water,Sanitary Sewer and Storm Drain Improvements on Bellaire South Drive, Bellaire West Drive,Overton Park East Description Drive and Bellaire Park Court Contractor Conatser Construction TX,LP. hange Order® Date:F 10/23/2018 City Project Mgr. Tony Sholola City Inspector F John Crowley ADDITIONS _ - DEPT - �1 68 Cut in a 20-inch Gate valve Water 1.00 LS $42,152.00 $42,152.00 69 installl whip down on 20-inch water line Water 1.00 LS $18,000.00 $18,000.00 70 1-inch blow off with MH Water 1.00 LS $5,500.00 $5,500.00 60 Rock boulders at SS crossing for erosion control Sewer 1.00 LS $62,410.00 $62,410.00 61 Exposed aggregate at 900 Bellaire Dr.S. Sewer 46.50 SF $13.50 $627.75 62 Brick sidewalk at 4004 Bellaire Dr&3117 E. Overton Park Sewer 2.00 EA $650.00 $1,300.00 63 Pond Cleaning Sewer 1.00 LS $7,800.00 $7,800.00 118 Move in&rmv fence regrd arnd hdwl, haul off ex.dirt, place fence Pt ridge line, and prep for grass TPW 1.00 LS $18,000,00 $18,000.00 119 6 chain link temp fence arnd hdwl TPW 250.00 LF $22.00 $5,500.00 120 Expose aggregate at 3409 Bellaire Park Ct TPW 59.90 SF $13.50 $808.65 121 Expose aggregate at 3401 Bellaire Park Ct TPW 128.40 SF $13.50 $1,733.40 122 Expose aggregate at 3312 Bellaire Park Ct TPW 48.30 SF $13.50 $652.05 123 Expose aggregate at 3308 Bellaire Park Ct TPW 56.50 SF 1$13.50 $762.75 124 Brick sdwlk at 3304 Bellaire Park TPW 1.00 LS $650.00 $650.00 125 Rmv 28.5 drain grate by garage TPW 1.00 LS $12,800,00 $12,800.00 126 Replace 28.5 drain grate TPW 1.00 LS $3,990.00 $3,990.00 127 Pond Cleaning TPW 1.00 LS $7,800.00 $7,800.00 Water $65,652.00 Sewer $72,137.75 TPW $52,696.85 Page 2 of 4 Additions Sub Total 1$190,486.60 FCJRT WORTIFI City of Fort Worth Change Order Deletions Project Name Bellaire Drive Water,Sewer and Drainage Improvements City Sec No.: 46252 Project No.(s): DOE No.59651-0200431-Q01 081-0O28837092 City Proj.No.: 02144 Project Description Water,Sanitary Sewer and Storm Drain Improvements on Bellaire South Drive,Bellaire West Drive,Overton Park FEast Drive and Bellaire Park Court Contractor Conatser Construction TX,LP. Change Order: © Date 10/23/2018 City Project Mgr. Tony Sholola City Inspector: John Crowley71 DELETIONS ITEM DESCRIPTION DEPT Qty jUnit Unit Cost ff$48,825.00 48 Concrete pavement repair Water 1,094.20 SY $60.00 32 Epoxy Manhole Liner Sewer 279.000 VF . $175.00 38 5 foot wide asphalt pavement repair Sewer 271.70 LF $50.00 $13,585.00 Water $65,652.00 Sewer $62,410.00 TPW Page 3 of 4 jDeletions Sub Total $128,062.00 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 Page 4 of 4 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature Name of Employee Se Title OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX