HomeMy WebLinkAboutResolution 1075TUESDAY, JULY 30, 1985
On motion of Council Member Lancaster, seconded by Council Member Wetherby, the
recommendations, as contained in Mayor and Council Communication No C-9143, were
adopted.
Introduced Resolution Council Member Lancaster introduced a resolution and made a motion that it be
adopted. The motion was seconded by Council Member Wetherby The resolution was read
by the City Secretary The motion, carrying with it the adoption of said resolution,
prevailed by the following vote
AYES Mayor Pro tempore Williams, Council Members Zapata, Garrison,
Lancaster, Wetherby, Bagsby, Newkirk, and Vance
NOES None
ABSENT Mayor Bolen
The resolution, as adopted, is as follows
Resolution No 1075 RESOLUTION 1075
A resolution approving the agreement dated
between the State of Texas and the City of Fort ort or t e
installation, construction, existence, use, operation and
maintenance of a highway illumination project on Interstate Highway
30 at the interchange with Interstate Highway 35W and being further
described as the elevated widening of said interchange, in the City
of Fort Worth; and providing for the execution of said agreement.
BE IS RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH
Section 1 That the certain agreement dated ,
between the State of Texas and the City of Fort Wo'rFe
installation, construction, existence, use, operation and
maintenance of certain highway illumination located on interstate
Highway 30 at the interchange with Interstate Highway 35W and being
further described as the elevated widening of said interchange in
the City of Fort Worth be, and the same is hereby approved, and
that Douglas Harman, City Manager is hereby authorized to execute
said agreement on behalf of the City of Fort Worth and to transmit
the same to the State of Texas for appropriate action
Auth an agreement for There was presented Mayor and Council Communication C-9144, dated July 23,
the installation of the 1985, from the City Manager as follows
Highway Illumination
for the north increment SUBJECT Illumination and Maintenance Agreement For I-35W Interchange With
(U S 287 interchange) I-30 North Increment (U S 287 Interchange)
of the widening of I-35
at the interchange with
I-30, auth execution RECOMMENDATIONS
of a contraction,
maintenance and operati It is recommended that
agreement with the Stat
of Texas on behalf of t 1, The City Council approve the attached Agreement for the
City and adopted Resolu ion installation of the highway illumination system for the north
No 1076 for the instal increment (U S 287 interchange) of the widening of I-35W at
ation, construction the interchange with I-30
existence, use, operati i
and maintenance of a 2 The City Manager be authorized to execute the attached
Highway Illumination Construction, Maintenance and Operation Agreement with the
Project on I-35W at the State of Texas on behalf of the City
interchange with' I-30
north increment 3 The City Council adopt the attached Resolution for the
installation, construction, existence, use, operation and
maintenance of a highway illumination project on I-35W at the
interchange with I-30, North Increment (U S 287 interchange)
DISCUSSION
The State Department of Highways and Public Transportation (SDHPT)
is reconstructing and widening 1-35W at the interchange with I-30,
known as the North Increment (U S 287 interchange) Included in
this construction is the installation of a complete highway
illumination system. The SDHPT has requested that the City enter
into an agreement for the construction, maintenance and operation
of the illumination system.
The agreement provides that
1 The State will prepare and provide for the plans and
specifications, advertise for bids, and let the construction
contract. Prior to letting the contract, the State will
obtain the City's consent to construct the facilities
according to the proposed plans
4'
TUESDAY, JULY 30, 1985
2 All costs of constructing the complete illumination system
will be borne by the State
3 The City will furnish the electrical energy required for
proper operation of the illumination system and further agrees
to maintain and operate the system at no cost to the State, to
include furnishing electrical energy during trial operation of
the system during construction
4 The City will assume maintenance and operation of the system
on a date to correspond with the date construction is
completed and the project is accepted by the State
On motion of Council Member Lancaster, seconded by Council Member Wetherby, the
recommendations, as contained in Mayor and Council Communication No. C-9144, were
adopted.
Introduced Resolution Council Member Lancaster introduced a resolution and made a motion that it be
adopted The motion was seconded.by Council Member Wetherby The resolution was read
by the City Secretary The motion, carrying with it the adoption of said resolution,
prevailed by the following vote
AYES Mayor Pro tempore Williams, Council Members Zapata, Garrison,
Lancaster, Wetherby, Bagsby, Newkirk, and Vance
NOES None
ABSENT Mayor Bolen
The resolution, as adopted, is as follows
Resolution No 1076 RESOLUTION NO 1076
A Resolution approving the agreement dated
between the State of Texas and the City of Fort ort or t e
installation, construction, existence, use, operation and
maintenance of a highway illumination project on Interstate Highway
35W at the interchange with Interstate Highway 30 and being further
described as the north increment of said interchange, in the City
of Fort Worth, and providing for the execution of said agreement.
Be it resolved by the City Council of the City of Fort
Worth
Section I That certain agreement date
between the State of Texas and the City of of rG1o-rtF o
installation, construction, existence, use, operation and
maintenance of certain highway illumination located in Interstate
Highway 35W at the interchange with Interstate Highway 30 and being
further described as the north increment of said interchange in the
City of Fort Worth be, and the same is, hereby approved, and that
Douglas Harman, City Manager is hereby authorized to execute said
agreement on behalf of the City of Fort Worth and to transmit the
same to the State of Texas for appropriate action
'uth an engineering There was presented Mayor and Council Communication No C-9154 from the City
agreement/contract with Manager, as follows
,arter & Burgess INc
for the preparation of SUBJECT Engineering Agreement for the Preparation of Plans and
Mans and specifications Specifications For 36" Water Main From Alta Mesa Pump Station to
for the 36-inch water Columbus Trail and Hulen (1984/85 CIP)
nain from Alta Mesa
)ump'Station to Columbus Recommendation
Frail and Hulen
It is recommended that the City Council
1 Authorize the City Manager to execute an engineering
agreement/contract with Carter and Burgess, Inc , for the
preparation of plans and specifications for the below
described project of a total fixed fee of $105,000
Background
This project was included in the 1985 Capital Improvement Program
to allow the Alta Mesa Pump Station to deliver more water to the
Southside III Pressure Plane
It is necessary to enter into an engineering agreement for the
engineering design and preparation of construction plans and
specifications for the installation of a 36" water main from the
Alta Mesa Pump Station to the intersection of Columbus Trail and
Hulen Street.
Project No 09-014001-00
Need For a Consultinq Firm