HomeMy WebLinkAboutContract 32525 s CITY SECRETARY D.O.E. FILE FoRT Q RT H 4 CONTRACTOR'S BONDING CO. CITY SECPFTARY ?r�- CONSTRUCTION'S COPY CONTRAC , .J '�c .. CLIENT DEPARTMENT SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 2004 CAPITAL IMPROVEMENTS PROGRAM PAVING, DRAINAGE, WATER, AND SANITARY SEWER IMPROVEMENTS FOR NW 25TH STREET (MACIE AVE. TO MCCANDLESS ST.) NW 26TH STREET (ROBINSON ST. TO TITUS ST.) T/PW No. C200-541200-020240-0001480 Water No. P264-541200-060217-0001480 .. Sewer No. P274-541200-070217-0001480 D.O.E. No. 4567 File No. K-1880 & X-16487 — IN THE CITY OF FORT WORTH, TEXAS JUNE 2005 CHARLES R. BOSWELL MIKE MONCRIEF CITY MANAGER MAYOR ROBERT D. GOODE, P.E. S. FRANK CRUMB, P.E. DIRECTOR ACTING DIRECTOR TRANSPORTATION AND WATER DEPARTMENT PUBLIC WORKS MARC OTT A. DOUGLAS RADEMAKER, P.E. ASST. CITY MANAGER DIRECTOR DEPARTMENT OF ENGINEERING I� l Freese and Nichols 4055 INTERNATIONAL PLAZA, SUITE 200 FORT WORTH, TEXAS 76109-4895 Ff. WORTH, TEX, (817) 735-7300, F&N No. FTW04284 �- Home I Council Agenda I M&C I Employee Directory I Morning Report I Ads I PRS I IT Online I Departments Print M&C COUNCIL ACTION: Approved on 9/27/2005 - Ordinance No. 16617-09-2005 DATE: 9/27/2005 REFERENCE NO.: **C-21024 LOG NAME: 30NW25 00014 CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Adopt Appropriation Ordinance and Authorize Execution of Contract with Stabile &Winn, Inc., for Pavement Reconstruction and Water and Sanitary Sewer Replacement on NW 25th Street from Macie Avenue to McCandless Street and NW 26th Street from Robinson Street to Titus Street (CIP Project No. 00014) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$539,339.00 from the Water and Sewer Operating Fund to the Water Capital Project Fund in the amount of$349,612.00 and Sewer Capital Project Fund in the amount of$189,727.00; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Project Fund in the amount of$349,612.00 and the Sewer Capital Project Fund in the amount of $189,727.00, from available funds; and 3. Authorize the City Manager to execute a contract with Stabile & Winn, Inc. in the amount of$1,172,455.00 for Pavement Reconstruction and Water and Sanitary Sewer Replacement on NW 25th Street from Macie Avenue to Mccandless Street and NW 26th Street from Robinson Street to Titus Street. DISCUSSION: On September 7, 2004, (M&C C-20258) the City Council authorized the City Manger to execute an engineering agreement with Freese & Nichols, Inc., for the design of NW 26th Street from Robinson to Titus Street and NW 25th Street from Macie Street to McCandless Street (DOE 4567), which consists of pavement reconstruction and water and sanitary sewer main replacement. The 2004 Capital Improvement Program (CIP) includes funds for pavement reconstruction on NW 26th Street from Robinson Street to Titus Street and NW 25th street from Macie Street to McCandless Street. Street improvements include pavement reconstruction, construction of standard concrete curb and gutter, driveway approaches and sidewalks as indicated on the plans. The Water Department has determined that severely deteriorated water and sanitary sewer lines should be replaced prior to street reconstruction. The project was advertised on June 23, 2005 and June 30, 2005. On July 21, 2005, the following bids were received: Bidders Amount(Alt. "A") Amount _(Alt. "B") Asphalt Pavement Concrete Pavement Stabile &Winn, Inc. No Bid $1,172,455.00 McClendon Construction Co. Inc. No Bid $1,173,462.20 JLB Contracting, L.P. $1,233,019.37 $1.273,578.87 Jackson Construction, Ltd. $1,367,466.75 $1,391,309.75 Time of Completion: 210 Calendar Days Bids were received on two alternates: . Alternate "A" consists of a 6-inch hot mix asphalt concrete (HMAC) over 8-inch lime stabilized subgrade with 7-inch concrete curb and 18-inch gutter . Alternate "B" consists of a 6-inch concrete over 6-inch lime stabilized subgrade with 7-inch concrete curb After reviewing all bid proposals, staff recommends Alternate "B" (concrete) for construction since the use of concrete will result in less maintenance cost over the street's useful life. Funding in the amount of $47,098.00 is included for associated water and sewer construction survey, project management, pre-construction, material testing, inspection and project close out (water $30,320.00 and sewer $16,778.00). The contingency funds to cover change orders total $23,440.00 (water $15,204.00 and sewer $8,236.00). Funding in the amount of $90,293.00 is required for associated paving and drainage construction survey, project management, pre-construction, material testing, inspection and project close out. Contingency funds to cover change orders is $25,000.00. M/WBE - Stabile & Winn, Inc. is in compliance with the City's M/WBE Ordinance by committing to 6% M/WBE participation and documenting good faith effort. The City's goal on this project is 22%. This project is located in COUNCIL DISTRICT 2 Mapsco 47X,Y and 616,C. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation 1, and the adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Water Capital Project Fund, the Sewer Capital Project Fund and the Street Improvement Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1&2)P264 472045 602170001400 $349 612.00 1)PE45.538070 0609020 $349,612.00 1&2�1?274 472045 702170001400 $189_727.00 1)PE45 538070 0709020 $189,727.00 2P264 531350 602170001452 $6,386.00 3)P264 541200 602170001483 $304,088.00 2)P264 531350 602170001460 $233.00 3)P274 541200 602170001483 $164,713.00 X264 531350 602170001480 $479.00 3)C200 541200 202400001483 $703_654.00 21P264 533010 602170001481 $233.00 2L264 531350 602170001482 $319.00 2)P264 541200 602170001483 $319-292.00 2)P264 531350 602170001484 $3-193.00 2JP264 531350 602170001485 $19,158_00 2LP 64 531350 702170001491 $319.00 2)P274 531350 702170001452 3 A59.00 2)P274 531350 702170001460 $304.00 2)P274 531350 702170001480 259.00 T 2)P274 533010 702170001481 $304.00 2)P274 531350 702170001482 $173.00 2)P274 541200 702170001483 $172,949.00 2)P274 531350 702170001484 $1,729.00 2)P274 531350 702170001485 $10,377.00 2)P274 531350 702170001491 $173.00 Submitted for City Manager's Office by: Marc Ott (6122) Originating Department Head: A. Douglas Rademaker(6157) Additional Information Contact: A. Douglas Rademaker(6157) ATTACHMENTS 30NW25 00014.pdf CITY OF FORT WORTH DEPARTMENT OF ENGINEERING ADDENDUM NO. 1 To the Plans, Specifications & General Contract Documents E OF T 2004 CAPITAL IMPROVEMENTS PROGRAM ,. NW 25th Street (Macie Ave. to McCandless St.) ��.................r NW 26th Street (Robinson St. to Titus St.) CHRIS B. BOSCO' r PAVING, DRAINAGE,WATER ,ot 93679 1 c AND SANITARY SEWER IMPROVEMENTS z ... B :E N SAO 0\•?�i^ ✓ Bid Date: July 21st', 2005; 2:00 PM 8l6� L ti Addendum No. 1: Issued July 14th, 2005 ,, ID'S This Addendum, forms part of the Plans, Contract Documents & Specifications for the above referenced Project and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this addendum in.the space provided below, in the proposal (page 27) and acknowledge receipt on the outer envelope of your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The plans and specification documents for NW 25th Street from Macie Avenue to McCandless Street and NW 26th Street from Robinson Street to Titus Street are hereby revised by Addendum No.1 as follows: SPECIFICATIONS & CONTRACT DOCUMENTS: 1- CONTRACT DOCUMENTS&TECHNICAL SPECIFICATIONS • The table of contents shall be deleted in there entirety and replaced with the enclosed revised table of contents. 2- MINORITY AND WOMEN BUSINESS ENTERPRISE SPECIFICATIONS • The City's M/WBE goal on this project is 22% for Alternate "A" and 24% for Alternate "B". Replace the entire section with the attached M/W BE forms for both Alternates "A"and "B". .. 3- BID PROPOSAL • The Bid Proposal shall be deleted in there entirety and replaced with the enclosed revised •— Bid Proposal. 1. The following items in the bid proposal have been revised or deleted from the previous bid proposal. UNIT I:WATER IMPROVEMENTS: -- • Unit I Water Improvements Item No. 4, Page 2, 6-Inch Gate Valve w/Cast Iron Box & Lid, the quantity has been revised to 8 EA. • Unit I Water Improvements Item No. 5, Page 2, Unit has been revised to EA. • Unit I Water Improvements Item No. 13, Page 3, Standard Fire Hydrant (3'-6" Depth), the quantity has been revised to 8 EA. Addendum No. 1, Page 1 ... Unit I Water Improvements Item No. 22, Page 5,Temporary Asphalt Pavement Repair (6" Flex Base& 2"HMAC), Unit has been revised to LF. • Unit I Water Improvements Item No. 23, Page 5, Seeding, Delete this item from the Bid Proposal. Seed will be subsidiary to the contract per Item D-45. • Unit I Water Improvements Item No. 28, Page 6, St. Augustine Block Sodding, Delete - this item from the Bid Proposal. Sodding will be subsidiary to the contract per Item D-45. • Unit I Water Improvements Item No. 30, Page 6, 1-Inch Air Release Valve, the quantity has been revised to 1 EA. UNIT I: SANITARY SEWER IMPROVEMENTS: • Unit I Sanitary Sewer Improvements Item No. 19, Page 10, Broadcast Seeding, Delete this item from the Bid Proposal. Sodding will be subsidiary to the contract per Item D-45. UNIT 11: PAVING & DRAINAGE IMPROVEMENTS: • Unit II Paving & Drainage Improvements Item 9, Page 3 & 9, Remove Trees 6" and Larger, Delete this item from the Bid Proposal. Tree Removal to be done by others. • Unit 11 Paving & Drainage Improvements Item 34, Page 7 & 13, Hydromulch Seeding, Delete this item from the Bid Proposal. Seeding to be done by others. • Unit It Paving & Drainage Improvements: SP (Special Provisions for Street and Storm Drain Improvements) was added to spec item column. e 4- SPECIAL PROVISIONS • Item No. 25 Working Days on Page SP-11 shall be revised to read "Calendar Days: The contractor agrees to complete the Contract within the allotted number of calendar day." 5- CONTRACTS • Item No. 4, Page 2 of the Transportation and Public Works Contract shall be revised to read calendar days. 6- GENERAL NOTES: • Any reference to Working days shall be replaced with Calendar days. 7- CLARIFICATIONS: 1. Please note it is not mandatory to bid both Alternate 'A' HMAC Pavement and Alternate 'B' Concrete Pavement. 2. Note on Plan Sheet TY-1 Section 1 shall be revised to read 7"Curb and Gutter(Typ.) 3. Both Transportation and Public Works and Water Department Project designation signs will be required for this project, as defined in the Special Conditions and Special Provisions. 4. The minimum driveway width of ten (10) feet is measured at the face of curb, which is equivalent to an eleven (11) foot minimum driveway measured from edge of pavement as shown in the City of Fort Worth Standard Driveway Approach Detail. Addendum No. 1, Page 2 A signed copy of this Addendum should be included in the sealed bid envelope at the time of bid .,. submittal. Failure to acknowledge the receipt of this Addendum could cause the subject bidder to be considered"NONRESPONSIVE,"resulting in disqualification. RECIEPT ACKNOWLEDGEMENT: ISSUED BY: A. Dougl Rademaker, P.E., Director en hnso ilana r DOE Engineering Services 9 Company: SQTAwLr- 4-W,a J Address:2-0. Sox -+R38p City: SACMv-AA`d State:. Addendum No. 1, Page 3 TUL.-20-2005 00:40 FREESE and N i C iOLS 1 NC 817 735 7491 CITY OF FORT WORTH DEPARTMENT OF ENGINEERING ADDENDUM NO.2 �t F To the Plans, Specifications &General Contract Documents 2004 CAPITAL IMPROVEMENTS PROGRAM f NW 25`"Street(Macie Ave.to McCandless St.) CHRIS B.BOSCO NW 28u'Street(R�binson St. to Titus St.) ,d . 93679 4 PAVING, DRAINAGE,WATER 9p� !� �O , AND SANITARY SEINER IMPROVEMENTS �F� E EM��i► . Bid Date: July 21tn,2005; 2:00 PM Addendum No.2: Issued July 14", 2005 I This Addendum, forms part of the Plans, Contract Documents & Specifications for the above referenced Project and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this addendum in the space provided below, in the proposal (page 27 of Addendum No. 1) and acknowledge receipt on the outer envelope of your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The plans and specification documents for NW 25"' Street from Macie Avenue to McCandless Street and NW 260 Street from Robinson Street to Titus Street are hereby revised by Addendum No.2 as follows: SPECIFICATIONS &CONTRACT DOCUMENTS: 1- BID PROPOSAL 1. The following items in the bid proposal have been revised from the previous bid proposal included in (Addendum No. 1). UNIT I:WATERLINE IMPROVEMENTS: • Unit I Waterline Improvements (Addendum No. 1 Proposal) Pages 7 & 8, "List of Ductile Iron Fittings for waterline", Delete pages 7& 8 from the Addendum No. 1 bid proposal and replace with the List of Ductile Iron Fittings for Waterlines included in this Addendum No. 2. UNIT II: PAVING & DRAINAGE IMPROVEMENTS: • Unit II Paving & Drainage Improvements (Addendum No_ 1 Proposal) Item 27 (Alternate "A") "Adjust Existing Water Valve Boxes to Grade", Page 18, the quantity has been revised to 20 EA at a unit price of $200.00 for a bid amount of $4,000.00 • Unit If Paving & Drainage Improvements (Addendum No. 1 Proposal) Item 29 r (Alternate "A") Construct Concrete Collar for Waterline Valves", Page 18, Delete this item from the Hid Proposal, the construction of the concrete collar will be subsidiary to the adjust existing water valve box bid item. • Unit II Paving & Drainage Improvements (Addendum No. 1 Proposal) Item 28 (Alternate "B") "Adjust Existing Water Valve Boxes to Grade", Page 24, the quantity has been revised to 20 EA at a unit price of $200.00 for a bid amount of $4,000.00 Addendum No.2, Page 1 ,,Iry oxo� �� CC G , 4 00 FREEE*E and N I CHQLS INC 817 735 7491 F.021103 o , 2- SPECIAL PROVISIONS: 1. Item No. 71 Pre-bid Item—Adjust Water Valve Box, page SP-27, add the following, "The contractor will be responsible for constructing the concrete collars around the water valves, including all materials, labor;equipment and incidentals necessary to complete the work." 3- CLARIFICATIONS: 2. Remove the following note from Plan Sheet PV-9: "Remove 10 LF of Exist. Ret. Wall tie new wall into exist. Wall" 3. The proposed concrete block retaining wall shown on sheet PV-6 shall be Pavestone or approved equal and shall meet the wall manufactures construction specifications. A signed copy of this AddendUrl should be included in the sealed bid envelope at the time of bid w submittal. Failure to acknowledge the receipt of this Addendum could cause the subject bidder to be considered"NONRESPONSIVE," resulting in disqualification_ RECIEPT ACKNOWLEDGEMENT, ISSUED BY: A. Douglas Rademaker, P.E., Director By. By:e�7 Faz Gopal Sahu, P.E., DOE Project Manager Engineering Services Company:51C ff Address: P.O. U X1380 City: S A i,w-� Stater�1.1'�q 9. Addendum No.2, Page 2 2004 CAPITAL IMPROVEMENTS PROGRAM NW 25TH STREET (MACIE AVE. TO MCCANDLESS ST.) — NW 26TH STREET (ROBINSON ST. TO TITUS ST.) PROJECT NO. 00014 SEWER PROJECT NUMBER: P274-541200-070217-0001480 WATER PROJECT NUMBER: P264-541200-060217-0001480 T/PW PROJECT NUMBER: C200-541200-020240-0001480 DOE NUMBER 4567 FILE NO. K-1880 &X-16487 CONTRACT DOCUMENTS & TECHNICAL SPECIFICATIONS TABLE OF CONTENTS UNIT I —WATER DEPARTMENT UNIT II —TRANSPORTATION & PUBLIC WORKS DEPARTMENT SECTION A UNITS I & II: WATER DEPARTMENT & TRANSPORTATION/ PUBLIC WORKS Notice to Bidders Comprehensive Notice to Bidders Fort Worth M/WBE Policy .. Bid Proposal Vendors Compliance to State Law SECTION B UNITS I: WATER DEPARTMENT Special Instructions to Bidders (WTR) Part C - General Conditions Part C-1 - Supplemental Conditions to Part C General Conditions Part D—Special Conditions Part DA—Additional Special Conditions Part E - Material Specification SECTION C UNIT II: TRANSPORTATION/ PUBLIC WORKS Special Instructions to Bidders (T/PW) Special Provisions for Street and Storm Drain General Construction Notes SECTION D UNITS I & II: WATER DEPARTMENT &TRANSPORTATION/ PUBLIC WORKS Certificate of Insurance Performance Bond .. Payment Bond Maintenance Bond 1 Contract Contractor's Compliance with Worker's Compensation Law APPENDICES UNITS I & II: WATER DEPARTMENT & TRANSPORTATION/PUBLIC WORKS Appendix A— Standard Figures and Details Appendix B—Geotechnical Report Appendix C— Permanent Easements and Temporary Right of Entry Agreements i a 2 FORTWORTH "'I'll SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 2004 CAPITAL IMPROVEMENTS PROGRAM PAVING, DRAINAGE, WATER, AND SANITARY SEWER IMPROVEMENTS FOR NW 25TH STREET (MACIE AVE. TO MCCANDLESS ST.) NW 26TH STREET (ROBINSON ST. TO TITUS ST.) T/PW No. C200-541200-020240-0001480 Water No. P264-541200-060217-0001480 Sewer No. P274-541200-070217-0001480 D.O.E. No. 4567 File No. K-1880 & X-16487 IN THE CITY OF FORT WORTH, TEXAS JUNE 2005 CHARLES R. BOSWELL MIKE MONCRIEF CITY MANAGER MAYOR ROBERT D. GOODE, P.E. S. FRANK CRUMB, P.E. - DIRECTOR ACTING DIRECTOR TRANSPORTATION AND WATER DEPARTMENT PUBLIC WORKS MARC OTT A. DOUGLAS RADEMAKER, P.E. ASST. CITY MANAGER DIRECTOR DEPARTMENT OF ENGINEERING rm Freese and Nichols r 4055 INTERNATIONAL PLAZA, SUITE 200 FORT WORTH, TEXAS 76109-4895 (817) 735-7300, F&N No. FTW04284 CONTRACT DOCUMENTS for 2004 CAPITAL IMPROVEMENTS PROGRAM NW 25TH STREET (MACIE AVE. TO MCCANDLESS ST.) NW 26TH STREET (ROBINSON ST. TO TITUS ST.) T/PW No. C200-541200-020240-0001480 Water No. P264-541200-060217-0001480 Sewer No. P274-541200-070217-0001480 D.O.E. No. 4567 File No. K-1880 & X-16487 CITY OF FORT WORTH TARRANT COUNTY, TEXAS JUNE 2005 I hereby state that these Contract Documents were prepared under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Texas. OFAM •TF�000 *° °*'®® -' �*�weeeeeessessoseeeee�� ® CHRIS B. BOSCO ®esseeeeseeeeeeeeeeeseeetee 93679 ;���!'�„rT B oa.•°Ci 0 0000.•••�Oe:k, 10 9� �e. CENS a p� No o * G`= I!' Christopher B. Bosco, P.E. Date: June 21, 2005_ Registration No. 93679 2004 CAPITAL IMPROVEMENTS PROGRAM NW 25TH STREET (MACIE AVE. TO MCCANDLESS ST.) NW 26TH STREET (ROBINSON ST. TO TITUS ST.) PROJECT NO. 00014 SEWER PROJECT NUMBER: P274-541200-070217-0001480 WATER PROJECT NUMBER: P264-541200-060217-0001480 T/PW PROJECT NUMBER: C200-541200-020240-0001480 DOE NUMBER 4567 FILE NO. K-1880 &X-16487 CONTRACT DOCUMENTS & TECHNICAL SPECIFICATIONS TABLE OF CONTENTS UNIT I —WATER DEPARTMENT UNIT II —TRANSPORTATION & PUBLIC WORKS DEPARTMENT SECTION A UNITS I & II: WATER DEPARTMENT & TRANSPORTATION/ PUBLIC WORKS Notice to Bidders Comprehensive Notice to Bidders Fort Worth M/WBE Policy Bid Proposal Vendors Compliance to State Law SECTION B UNITS I & II: WATER DEPARTMENT Special Instructions to Bidders (WTR) Part C -General Conditions Part C-1 - Supplemental Conditions to Part C Genreal Conditions Part D— Special Conditions Part DA—Additional Special Conditions Part E - Material Specification SECTION C UNIT III: TRANSPORTATION/ PUBLIC WORKS r Special Instructions to Bidders (T/PW) Special Provisions for Street and Storm Drain General Construction Notes SECTION D UNITS I & II: WATER DEPARTMENT &TRANSPORTATION/ PUBLIC WORKS Certificate of Insurance Performance Bond Payment Bond Maintenance Bond Contract Contractor's Compliance with Worker's Compensation Law APPENDICES UNITS 1 & II: WATER DEPARTMENT & TRANSPORTATION / PUBLIC WORKS Appendix A—Standard Figures and Details Appendix B— Railroad Consent Letter Appendix C— Permenant Easements and Temporary Right of Entry Agreements SECTION A UNITS I & II: WATER DEPARTMENT &TRANSPORTATION / PUBLIC WORKS NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS FORT WORTH M/WBE POLICE BID PROPOSAL VENDORS COMPLIANCE TO STATE LAW NOTICE TO BIDDERS Sealed proposals for the following: 2004 CAPITAL IMPROVEMENT PROGRAM PAVING, DRAINAGE &WATER IMPROVEMENTS FOR NW 25TH STREET & NW 26TH STREET FOR: UNIT I: WATER &SANITARY SEWER IMPROVEMENTS NW 25TH STREET (MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(TITUS ST.TO ROBINSON ST.) D.O.E. NO. 4567 WATER PROJECT NO. P264-541200-060217-0001480 SEWER PROJECT NO. P274-541200-070217-0001480 UNIT II: PAVING &STORM DRAIN IMPROVEMENTS NW 25TH STREET (MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET (TITUS ST.TO ROBINSON ST.) D.O.E. NO. 4567 T/PW : C200-541200-020240-0001480 Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 p.m., July, 21 2005 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Contract Documents, including Plans and Specifications, may be obtained at the office of the Transportation and Public Works Department of the City of Fort Worth, 1000 Throckmorton Street, Fort Worth, Texas 76102. A set of plans and documents will be provided for a non- refundable fee of sixty dollars ($60.00)each. A majority of the work on the referenced project consists of the following: UNIT 1—WATER IMPROVEMENTS 3,455 LF 8-Inch (AWWA C 900)Water Pipe UNIT I—SANITARY SEWER IMPROVEMENTS 900 LF 4-Inch Sanitary Sewer Pipe 2,100 LF 8-Inch Sanitary Sewer Pipe UNIT II—ALTERNATE"C Asphalt Paving 14,490 SY 8" Lime Stabilized Sub-grade 10,100 SY 6" HMAC Pavement t, 305 TNS Lime for Sub grade.(45#/SY) 7,900 LF 7" Reinforced Concrete Curb and 18"Gutter UNIT II—ALTERNATE"D" Concrete Paving 14,490 SY 6" Lime Stabilized Sub-grade 13,610 SY 6" Reinforced Concrete Pavement 232 TNS Lime for Sub grade(32#/SY) 6,590 LF 7" Reinforced Concrete Curb Included in the above will be all other items of construction as outlined in the Plans and Specifications. Bidders shall not separate, detach, or remove any portion, segment or sheets from the contract documents at any time. Bidders must complete the proposal sections and submit the complete specificaitons book or face rejection of bid as non-responsive. For additional information concerning this project, please contact Mr. Gopal Sahu, P.E., Project Manager, City of Fort Worth (817)392-7949 or Chris Bosco, P.E., Freese and Nichols, Inc. at(817)735-7359. A pre-bid meeting will be held on July 12. 2005 at 11:30 am in the Transportation and Public Works Conference Room No. 270, 2nd Floor, City Municipal Building, 1000 Throckmorton Street, Fort Worth, Texas 76102. r Advertising Dates: June 23, 2005 June 30, 2005 FTW 04284 1 1 � � s COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: 2004 CAPITAL IMPROVEMENT PROGRAM PAVING, DRAINAGE &WATER IMPROVEMENTS FOR NW 25TH STREET & NW 26T"STREET FOR: UNIT I: WATER &SANITARY SEWER IMPROVEMENTS NW 25TH STREET (MACIE AVE.TO MCCANDLESS ST.) NW 26T" STREET (TITUS ST.TO ROBINSON ST.) D.O.E. NO. 4567 WATER PROJECT NO. P264-541200-060217-0001480 SEWER PROJECT NO. P274-541200-070217-0001480 UNIT II: PAVING & STORM DRAIN IMPROVEMENTS NW 25TH STREET (MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET (TITUS ST.TO ROBINSON ST.) D.O.E. NO. 4567 ` T/PW : C200-541200-020240-0001480 Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort.Worth, Texas will be received at the Purchasing Office until 1:30 p.m., July. 21 2005 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Contract Documents, including Plans and Specifications, may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas 76102. A set of plans and documents will be provided for a non-refundable fee of sixty dollars ($60.00)each. These documents contain additional information for prospective bidders. All bidders will be required to comply with Provision 5159a of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. Bid security is required in accordance with Paragraph 2 of the Special Instructions to Bidders. A majority of the work on the referenced project consists of the following: UNIT I —WATER IMPROVEMENTS 3,455 LF 8-Inch (AWWA C 900)Water Pipe UNIT I —SANITARY SEWER IMPROVEMENTS 900 LF 4-Inch Sanitary Sewer Pipe 2,100 LF 8-Inch Sanitary Sewer Pipe UNIT II—ALTERNATE"C". Asphalt Paving 14,490 SY 8" Lime Stablilized Sub-grade 10,100 SY 6" HMAC Pavement 305 TNS Lime for Subgrade (45#/SY) 7,900 LF 7" Reinforced Concrete Curb and 18"Gutter UNIT II—ALTERNATE"D" _ Concrete Paving 14,490 SY 6" Lime Stablilized Sub-grade 13,610 SY 6" Reinforced Concrete Pavement 232 TNS Lime for Subgrade (32#/SY) 6,590 LF 7" Reinforced Concrete Curb Included in the above will be all other items of construction as outlined in the Plans and Specifications. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of ninety (90) days form the date bids are opened. The award of contract, if made, will be within ninety (90)days after the opening of bids, but in no case will be award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. FTA 04284 2 = Bidders are responsible for obtaining all addenda to the contract documents prior to the bid receipt time and acknowledge them at the time of bid receipt. Information regarding the status of addenda may be L obtained by contacting the Department of Engineering at (817) 392-7910. Bids that do not acknowledge all applicable addenda may be rejected as non-responsive. In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM SUBCONTRACTOR/SUPPLIER UTILIZATION FORM , PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the - appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- responsive. Bidders are advised that the City of Fort Worth has not acquired all necessary easements and temporary right of entry agreements for the construction of the project as shown in the Plans Bidders are hereby notified that the City anticipates obtaining the necessary temporary right of entry agreements and easements by the start of construction. In the event the necessary easements and temporary right of entry agreements are not obtained, the City reserves the right to cancel the award of the contract at any time before the Contractor begins any construction work on the project(s). In addition Bidders shall hold their unit prices until the City has completed the acquisition of all the easements and temporary right of entry agreements. The contractor shall be prepared to commence construction without all executed easements and _. temporary right of entry agreements and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require easements and/or temporary right of entry agreements. The Managing Department for this project is the Department of Engineering. For additional information concerning this project, please contact Mr. Gopal Sahu, P.E., Project Manager, City of Fort Worth (817)392-7949 or Chris Bosco, P.E., Freese and Nichols, Inc. at(817)735-7359. CHARLES R. BOSW ELL CITY MANAGER MARTY HENDRIX CITY SECRETARY Department of Engineering A. DougJas Rademaker, P.E. - Direct B • a John P: . ` Manager, E Engineering Services Advertising Dates: June 23, 2005 June 30, 2005 FTW04284 3 „.. . .+ .�`Xn k w ' � Vis F Mri' Y�+lt'r{� .�.,. { ✓ .§ , , i� t.:.�.. n"M �.: �,• 'f ,� :� �+, (/, , ,.r 3^4�7i-. �'� '� ��,rt ,.'+--� rtww 47, I tl€nal��f fF[�an l omen. B�s�nes� En#erp�rs��-Sped��catca���. � ar,4k, �.:'� �`�: r -+i;'.:rr, s3`�'•� :..,,. .- j ., r ',.” f _ , L..�:��S.rS':. 7 a, ., :• [ :. 5. SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY 17-27-05A10 49 RCdu If the total dollar value of the contract is$25,000 or more,the M/WBE gocl is applicable. If the total dollar value of the contract is less than$25,000,the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MBE/W BE goal on this project is 24%of the Bid Alternate"B"value of the contract. I — COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal,or 2. Good Faith Effort documentation,or; 3. Waiver documentation,or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. Subcontractor Utilization Form,if goal is i received by 5:00 p.m., five (5) City business days after the bid met or exceeded: I opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor ( received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than I opening date, exclusive of the bid opening date. statedgoal: _ 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontractin supplier work: openingdate, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the MIWBE Office at(817)392-6104. Rev.5/30103 age Cil cj3 hip . r CityFtv . ; 'Subcontra%torigen[€zao �Q ,s AP .r k.,'�, t.; s - J v.'-�::; ...r^-� �W: �: "',Vii..- y«, ,.P*t, akE;fq ,� r• T�'i. + 4 ��jj, n PRIME COMPANY NAME: Check applicable block to describe prime I MNV/DBENON4A/w/DBE PROJECT NAME: I F__F;; 2004 Capital Improvements Program—Paving,Drainage,Water and Sanitary Sewer BID DATE Improvements for NW 2e Street(Macie Ave.to McCandless St.)and NW 26"'Street(Robinson St.to Titus St.)T/PW No.C200-541200-020240-0001480 Water No.P264-641200-060217-0001480 T�`�/ ��I ZOO Sewer No.P274-541200-070217-0001480 ��JJ l DOE No.4567 City's M/WBE Project Goal: I Prime's M/WBE Project Utilization: PROJECT NUMBER T/PW No.C200-541200-020240-0001480 24%(Alt. "B") / '2C % Water No.P264-541200-060217-0001480 1p 7 J Sewer No.P274-541200-070217-0001480 ( DOE No.4567 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing s, Department on or before 5:00,p.m. five (5) City busines's days after bid opening, exclusive of bid opening dater will result in the bid being considered non-responsive to bid:specifications.. The undersigned Offeror agrees_-to enter into a formai agreement with the M/WBE firm(s), listed in this utilization schedule, conditioned upon.execution of a contract.with the City of.,Fort Worth-, The ,intentional alid/br knowing.misrepresentation of facts is grounds for,,consideration of disqualification and will result in the bidberng considered non-responsive to bid specifications M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid_ Marketplace is the geographic area of Tarrant, Parker,Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier.is the level of subcontracting- below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1 n tier,.a payment.by a subcontractor to its supplier is considered 2"d tier = ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise(DBE) is synonymous with Minority/Women Business Enterprise(M/WBE).' If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract- The M/WBE may lease �•. trucks from another M/WBE firm, including M/WBE owneroperators,, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement- , . � 2y -�u ;� ,µ sL-v ; ay,�a' • ',s w a �,y 4TH '+ t "Rev 5/30/03 ,^�' ms`s .•'u. 33 -s.1y t ^n , ,�$�"S�'t ,;.. ., .:T:,; � x __".'`` ::` ad.*,' xtun��,•�"�, t 'u�;K^�S :.r'en 't-r ';,�t:"3� "` Ci.«:.�t �w '+..' •.' _ _� . - Primes are requiredto identrfy ALL subcontractors/suppoers;regardless of status,i.e.,Minorit}r,Women and non-MNVBEs. Please list MNVBE firms first,use additional sheets if necessary. Certification N R C V D (check one) ° )' -`L -0 D A 1 0 '9 SUBCONTRACTOR/SUPPLIER T Company Name i N T Detail Detail Address e M W C X M Subcontracting Work Supplies Purchased Dollar Amount r hone/Fax Tele T D W P R O B E E C T E w, A µs'C� Tw►,►c���6►� f SOI DEw!t41R 1��4uu►�Cr FvaT �ori:�la,TX. �lo►�1 ZO TS,x- GuT' Z3,14-5 f6ki In-via of-T)e. -+So%o 1 I SEA �. $ 305 9}L- 445-$z90 i �}�FZ- 445-39oZ, N i4YpEn1 GAP t�R L �►11JE'�'S, 6i.Qtat- IRO. (box 83b`1 ao V,%.:T \Jo.x"—rx. -1�.1z4 b w Z3'z.$P 31-�- 56% - 1-31+5 AW_X_ H4TiAAvS I ~' �t3oho P.O. Bow I�-� Twneat.�a q � z lux � x SAI*i►f> { Q), V00� "Im- P.O. Box %16Z3Z;r 1000 � K x 918- 3�Sg ROD t��r r .»,..p t�..,y,...:. .. �: •��; Page 3.or 4,-;.�• � F, o, In f BES a: M`(Check one) D ' SUBCONTRACTOWSUPPLIER T N T Detail Detail Company Name i Address e M W T p C X M Subcontracting Work Supplies Purchased Dollar Amount VyI Telephone/Fax r B B p O B E + E C T E 37-2't-05/ 10 :49 RCVD A TIm-TSxAA 1133 E, boor' 9,= ro. UTt,t Tt E5 F WqtX-j%rTV. 1}6%AZ 1s x 45$,�� ( &I- 491.- SVP I 51,:�- 44(a-3,044 � d s1 ��t-ao�S 305 E, 1 00 I l�ar �„1�;Tom. �t.ti 1 f 91 Z�Oo 91-+-53S- I&A-69 is x ATAX Gonnese wt- Fe.1C1: P.O. etc ln,155 A"%PLa v-1, .-N. IVAZ 1S (9I %1--V-zks- 491 X 51q. SU.1 - T�.�cw5� �r�►L��a�wo�t 134Z3- C-tawwa[ XwaMa4- �.trte qo el�-430-f.3 bit I X 8�1�--►+3o-ezz3 Lo�t.A�u/SHt�sa�y 711oo AVE, mp STd-, 12�p.,rgfL. Foex \,.19wn►,T)e. -410111 i - Sof- IIS Gcnat,�ta-rt-. 551 a- Dl�,,•;ivr! )a l 4N�'� � a, 9AUTOr CvvY Tk. I145 205 3ZZ 31-4- 455- 435' ' 1 h Rev.V30/03 }f Page .+ � St'm�''!'a � �,�xr{�w� i�a;.`h. "�2�2�'�,"�.'3��',SP��Y '�t?e '"a •,'. �=a�.` DohartnuntrNfi(WH 6cnhttactocs/ p le S I 4� Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ Sort_W . —05,,'1 V 4 , The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of ChangelAddition. Any unjustified change or deletion shall be a material breach of contract.and may result in debarment in accord with the procedures outlined in the ordinance. The contractor ,,shall:submit a detailed_explanation of how the requested:change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted-, it will affect-the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. A orized Signature Printed Signature - Q�s�a�-�-�T S�o�a.�c aoE��o,.1, Es�,c-►�o,e,._ Title Contact NamelTitle(if different) ST;kw .E dAIJfuJ 31'A-M-4- Zoa<o 31'4- &4_4_Z"b Company Name Telephone and/or Fax d. �o�o �l3Q�c'7. Jet�r�{ .1r,er,dssson a Stab�le�.nn. �� Address Email Address S c,�a►�a�, X , t� -9 �u�Y vo _ ZOOS city/Stateop Date Rev 5/30103 �c�; CHM � u ,, � CxIKtya Fort(North i r �; Good Faith Effort Form PRIME COMPANY NAME: Check applicable block to describe rime _r-27- .r PROJECT NAME: KW/DBE NON-M/WlDBE 2004 Capital Improvements Program—Paving,Drainage,Water and Sanitary Sewer BID DATE Improvements for NW 25"'Street(Macie Ave.to McCandless St.)and NW 26'"Street OC Robinson St.to Titus St, ��t••�( Z-� City's M/WBE Project Goal: PROJECT NUMBER TlPW No.C200-541200-020240-0001480 Water No.P264-541200-060217-0001480 249/6(Alt"B") Sewer No.P274-541200-070217-0001480 DOE No.4567 If you have failed to secure M/WBE participationand you have.subcontracting and/or supplier opportunities or if:your DBE participation is less than the City's project goal,you must complete this form. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure-.to complete this form, in its entirety- with.supporting documentation, kand received by the -Managing Department:on or before 5:00 p.m::five(5)City business days'after bid opening,exclusive of bid opening date;will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunitv2 for the completion of this project, regardless of whether it is to be provided by a M/WBE or non-M/WBE. (DO NOT LIST NAMES OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the edtier. (Use additional sheets, if necessary) A AtTGACEIIGIEI34' . ,� ja, v k-'��\ 'i. ✓• ryrt r :: } ¢ PPS .t?age:`2o1F3=r' Lis 69Subc06nttacting OQportuaities Fist ofSupplierl, Poo alis :r.buF=�+PFYM`�:ts'.'E4Eell -:;k3:FM.+.F,.„+.s f..,, -)•„�i,,.MYd1e'.ridax•.,r..a'tllrta' "tt'3 k'al1;Y: { S.rt.,, 4- A •e7•Y i ;xr t, t -> n�x :.,-'y .` -� �i�r•Lzq'it,ti. tr- S- Xt+' e STO►Z- -PM1wI ` �Nt��TS RE-�7{-}2► w C Y V t_ 'fs__ra­t_ So S p7-27- 2.) Obtain a current(not more than three(3) months old from the bid open date) list of M/WBE subcontractors and/or suppliers from the City's M/WBE Office. 3 Yes Date of Listing to / 7-0 / Zoo Sr No 3.) Did you solicit bids from M/WBE firms,within the subcontracting and/or supplier areas previously listed,at least ten calendar days prior to bid opening by mail,exclusive of the day-the bids are opened? tyw++.6.0 '�- \- Z-0057 . Yes (If yes,attach M/WBE mail listing to include name of firm and address ant,a dated copy of letter mailed.) No 4.) Did you solicit bids from M/WBE firms,within the-subcontracting and/or supplier areas previously listed,at least ten calendar days prior to bid opening by telephone,exclusive of the day the bids are opened? C_^"Crz1 -4- 1-7.005 T • Yes (If yes,attach list to include name of M/WBE firm,person contacted,phone number and date and time of contact.) No NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide M/WBE name, date,.time, fax number and documentation faxed. NOTE: If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (10) or less, the bidder must contact the entire list to be in compliance with questions 3 and 4. If the list of M1WBEs for a particular subcontracting/supplier opportunity is ten (10) or more, the bidder mustcontact.at least two- (2/3) of the list within such area of opportunity,.but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of glens and specifications in order to assist the M/W BEs? •/ Yes - : r No 3� - `,,.- .,yt • : . ; 'SP ^'F.y.,loss,: 1 's... ,y,`' .:.r 7td-r .e` RAV 0$/30/03. r ,:A K4 '�M '�'}py r-,. h s''" - __�`�t fQ.wi+n ti��,.. ?..r'" �.z. .r s+`•=,g � �� '"` ;a-�,`'�"'sd'N`'++"'o''il'"t !, ``^i- •,��vG -..�1.�� ��'.1y ���Y 6'#v 4t, k � ;, q e E t'_ �i 9'^ •C; ! t Y 5u6m documentattorr fi MMB quot the forms ofan'afftdavtt, tncfude�.a detat7ec rexpl nat[o o ;wh�fE�e�IK1t1 6E' rel arr a x supporting documentation the bidderwishes to be considered bythe City'In the eventof'a bona fide " dispute concerning quotes,.the bidder will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel Please use additional sheets,if necessary,and attach.) Company Name Telephone Contact Person Scope of Work Reason for Rejection sly M.S. .OZ9Z �N�tttt �+Mr1 Tt�T law ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain M/WBB participation on this project. Ac crcasa- M 1\,A ser, Q%Awms. oa_ Q-=V-crV> The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith "= It is understood ,that any M/WBE(s) _listed _in ,, _.,_ ._ 'Attachment 1C will be contacted and;:the reasons for not using them-wil4be verified by the City's M/WBE Office t _ k A*'i� +��"C"� .'ex+k**`w�•�.�M; Yh y 4`��1 rt '._ � i 4 w,6 �S"'E��^"i'i'li_Fb 'a�` n.rt+ +:c y H•»� 'yz �r r.k �- _ '� qra Q, � +✓,� tr ae a x x,# f.a, yJ ' ""4 *� iy,c` T'S '8� p ���j�/� -:*.,"i _" ", _.".� �", J.,axe i`':.,•. �,'. :� .." _ '�,, _ _ ' d �' •�, rF' v 'I'FACHMENT1Ct , page 4 of a mak_ rued Signature Panted Sigriafure 4sata oe_c o P . Es-n rg wroe— Title Contact Name and Title(if different) Company Name Phone Number Fax Number Q.O. bor -JA-6$0 ,�errt,he letwor+L+ S�Rbi.lewe.nn.c�M Address Email Address stowt44%0.40 46 City/State/Zip to Y 07-27-05A10 :50 UNITS I & II - PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: Mr. Charles R. Boswell City Manager City of Fort Worth, Texas FOR: 2004 CAPITAL IMPROVEMENT PROGRAM NW 25' STREET (MACIE AVE. TO MCCANDLESS ST.) NW 26' STREET (ROBINSON ST. TO TITUS ST.) UNIT I: WATER AND SANITARY SEWER IMPROVEMENTS WATER PROJECT NO. P264-541200-090217-0001480 SEWER PROJECT NO. P274-541200-070217-0001480 UNIT II: PAVING AND DRAINAGE RECONSTRUCTION T t PW NO. C200-541200-020240-0001480 D.O.E. NO. 4567 Includes the furnishing of all materials (except as specified to be furnished by the City), equipment and labor for the installation of all improvements and appurtenant work shown in the plans and specification, all necessary appurtenances and incidental work to provide a complete and serviceable project. Pursuant to the foregoing "Notice to Bidders", the undersigned bidder, having thoroughly examined the contract documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects,the site of the project and understanding the amount of work to be done, and the prevailing conditions,hereby proposes to do all the work, furnish all labor,equipment and material except as specified to be furnished by the City, which is necessary to fully complete the inspection and approval of the Director of the Engineering Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, and Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Total quantities given in the bid proposal may not reflect actual quantities, but represent the best accuracy based on a reasonable effort of investigation; however, they are given for the purpose of bidding on and awarding the contract. Contractor proposes to do the work within the time stated and for the following sums: (Furnish and install, including all appurtenant work, complete in place, the following items): .. Proposal Section FTW04284 1 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT I-WATER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 1. 62 LF 6-Inch(AWWA C 900)(All Depths) Twc,jftY Ti4"e Dollars and $ ¢o $ oro Cents per LF 7-,6— 1142-6 - 2. 142-62. 3,455 LF 8-Inch(AWWA C 900)(All Depths) TUjrr,h'_ F,..E Dollars and $ $ Do A10_ Cents per LF Z>r- Sb,3�5 3. 80 LF 10-Inch(AWWA C 900) (All Depths) Dollars and $ a,, $ 00 �]o Cents per LF 3 p Z 4 O'D 4. 8 EA 6-Inch Gate Valve w/Cast Iron Box &Lid Per Figure 3 Rvs, g.,t►oa.cp fig`( Dollars and $ ao $ o� ^bo Cents per EArJ Jr� LL-oo 5. 8 EA 8-Inch Gate Valve w/Cast Iron Box &Lid Per Figure 3 SeVE �tiI 4gAo+ f1frY Dollars and $ ao $ 0_0iAo Cents per EA b�000 r 6. 1 EA 10-Inch Gate Valve w/Cast Iron Box&Lid Per Figure 3 .. YwP L_v 1E1��..�Q�Ems_Dollars and $ 22 $ gas Cents per EA if ZOD 112-00 - Proposal 1ZOOProposal Section FTW04284 2 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET (ROBINSON ST.TO TITUS ST.) UNIT I-WATER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID Class "A"Plastic Meter Box (Single Head 7. 92 EA Service) RF-V'( RvE Dollars and $ sa, $ wlyz Cents per EA S' 8. 112 EA 1-Inch Single Head Service Tap to Main Per Item D-52.7 00 St x 11.w,Aoazo Tw oo Y Dollars and rlo Cents per EA 561D 9. 1,918 LF 1-Inch Copper Service Line from Main to — Meter,Including Setting Meter Box (Class"A") Per Item D-52.7 $ 5O $ ao F-I V a Dollars and to, 5m pw y�t-Y Cents per LF 10. 12 EA I-Inch Bullhead Service Tap to Main -� Per Item D-52.7 ��{{ $ coo $ o0 sEYE1-) I Age-W T dollars and -+3c)— Mo Cents per EA 11. 120 LF 1-Inch Dual-head Copper Service Line from Main to Meter,Including Setting Meter Box (Class"C") Per Item D-52.7 $ Z5 $ E 1 to E Dollars and 5 6 Y) T-%-e- Cents per LF 12. 10 EA Relocate Existing Meter Box Per Item D-52.7 00 S%�Y Dollars and $ "' $ ONe F1+�,ror�.p -- �� boo Cents per EA 13. 8 EA Standard Fire Hydrant(T-6"Depth) Per Figure 5 $ oo $ %00 tLM%M%.*j A+wgo ep Dollars and ` 900 �C'�ZDp an Cents per EA ... Proposal Section FTW04284 3 F , Q 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET (MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT I—WATER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 14. 4 EA Remove &Salvage Existing Fire Hydrant Per Item D-29 ONE immomo Si yrs/ Dollars and $ $ CFO ..�o LWCents per EA lb0^ (O 15. 3 EA 151/2"x 171/2"Class"C"Plastic Meter Box (Bullhead Service) ONf- 14mmoewF tvr- Dollars and $ co $ hlgg Cents per EA. �05� 31 S 16. 3 EA 2-Inch Service Tap to Main Per item D-52.7 �•y $ $ ,1 coo El4�T 4%%,46"A>1 W�Dollars and 8a 2-0 z`t'61) .� Cents per EA 17. 25 LF 3/4-Inch Copper Service Line on Private Property by a Licensed Plumber $ o0 TE $b) Dollars and 10 coo� Z p - 00 Cents per LF 18. 2 EA 1 1/2"Single Head Service Tap to Main Per Item D-52.7 $ 90 $ 00 SwaJ !1~u.+O"p firrYDollars and h10 Cents per EA 19. 80 LF 1 1/2"Copper Service Line from Main to Meter,Including Setting Meter Box Per Item D-52.7 $ coo $ oho 5 t u Dollars and 6 4' v Cents per LF 20. 50 LF Concrete Easement for Water Line Per Item D-52.7 vv $ TW4wr'( Foua..- Dollars and 3y, $ t 1►0 Cents per LF .� Proposal Section FTW04284 4 _ 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT I-WATER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 21. 165 LF Permanent Asphalt Pavement Repair Per Figure 4 s $ $ Twe-,%" Sw_v41 e. Dollars and 7_71 7 4S5 tJ►o Cents per LF 22. 4,775 LF Temporary Asphalt Pavement Repair 6"Flex Base &2"HMAC $ $ So EtC-,t+T Dollars and g� F� Cents per LF 23. 100 LF Trench Safety for Excavations>5' Depth Per Item D-55 $ $ 00 ome Dollars and A o Cents per LF ` O D 24. 2.0 TN Cast Iron/Ductile Iron Fittings Per Item DA-52.14 fiya.'rY Two 0AA%k*a to Dollars and $4,2,0D_ $ ?1,10Cents per Toni 25. 1 EA Provide 2"Temporary Water Service(Entire Project) Per Item D-52.8 $ ao $ 00 Twemyy D4E- T*wusg a9Dollars and 2-1 om 7,1 000 SIM Cents per 26. 1 EA Pre-Construction Exploratory Excavation(D- Hole) Per Item D-51 $ 00 $ elo Tycx ee 44Arlo&A o Dollars and 300 30fl ,.i. Cents per EA .. 27. ILS SWPPP Implementation and Maintenance Per Item D-68 oA 4uao a e� Dollars and $ 14 OD $ Loo0,0 Cents per Lump Sum Proposal Section FTW04284 5 ,P 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) .. UNIT I-WATER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 28. 1 EA 1-Inch Air Release Valve Per Figure 15 Tw%asY sw. 4,16 tDDollars and $ �_ $ %D r► * Cents per EA 1600 Zb00 29. 20 CY Class`B"Concrete for Miscellaneous Placement Per Item D-21 $ $ 0t4F_ Dollars and ZD V110 Cents per Cubic Yard 1 30. 20 CY Class"E"Concrete for Miscellaneous Placement Per Item D-21 $ $ 00 O n4 f- Dollars and t r Zp tao Cents per Cubic Yard 1 31. 20 CY Crushed Limestone for Miscellaneous Placement Per Item D-22 $ $ o0 010 r Dollars and II Bio Cents per Cubic Yard l z� 32. 50 LF Concrete Curb &gutter Removal and Replacement Per Item DA-24 $ oo $ pO SUjtt;r,( Dollars and 000 .. ►A* Cents per LF SUBTOTAL FOR UNIT I-WATER IMPROVEMENTS $ .. Proposal Section FTW04284 6 --- r7,CCJt ana NILHULS INC: sil, Vj P.03/03 ]PROPOSAL LIST OF DUCTILE IRON FITTINGS FOR WATER LINE : No.of Size of Fitting Type of Fitting Weight Per Total Weight Fittings Fitting(lbs.) (lbs.) 1 10-inch x 8-inch Cross 310 310 2 10-inch Sleeve 100 200 8 8-inch x 6-inch Tee 175 1400 2 8-inch x 6-inch Reducer 95 190 1 8-inch x 8-inch Cross 235 235 4 8-inch 45° Bend 110 440 3 8-inch Sleeve 85 255 2 6-inch Sleeve 65 130 Total weight- 3,160 lbs.(1.58'Ions) E� Proposal Section FTW04284 7 TOTAL P.0-7 � r PROPOSAL LIST OF DUCTILE IRON FITTINGS FOR WATER LINE (Fort Worth) No.of Size of Fitting Type of Fitting Weight Per Total Weight Fittings Fitting(lbs.) (lbs.) 3 16-inch x 6-inch Tee 540 1620 2 16-inch 90° Bend 430 860 1 16-inch Plug 155 155 5 12-inch x 8-inch Tee 340 1,700 5 12-inch x 6-inch Tee 325 1,625 1 12-inch x 8-inch Reducer 165 165 5 12-inch 90°Bend 255 1,275 2 12-inch 45°Bend 215 430 2 12-inch 22.50° Bend 220 440 6 1.2-inch 11.25° Bend 220 1,320 1 12-inch Plug 80 80 3 12-inch Sleeve 115 345 11 8-inch x 8-inch Tee 185 2,035 17 8-inch x 6-inch Tee 175 2,975 14 8-inch x 6-inch Reducer 95 1,330 2 8-inch x 4-inch Reducer 80 160 1 8-inch x 8-inch Cross 235 235 6 8-inch 90° Bend 125 750 4 8-inch 45° Bend 110 440 Proposal Section FTW04284 7 A 2 8-inch 22.50° Bend 110 220 6 8-inch 11.25° Bend 110 660 4 8-inch Plug 45 180 11 8-inch Sleeve 85 930 14 6-inch Sleeve 65 910 1 4-inch x 3-inch Reducer 40 40 1 4-inch Sleeve 45 45 1 3-inch Sleeve 30 30 Total weight= 20,955 lbs. (10.48 Tons) OW .. Proposal Section FTW04284 8 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT I—SANITARY SEWER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 1. 900 LF 4-Inch Sanitary Sewer Pipe for Service Lines (All Depths) $ oo $ oA Sr,vS1A Dollars and tAo Cents per LF 2. 10 LF 6-Inch Sanitary Sewer Pipe for Service Line (SDR 35) (All Depths) $ $ � OA Dollars and e) 8� ,J1 o Cents per LF 3. 2,100 LF 8-Inch Sanitary Sewer Pipe(SDR 35) (All Depths) T*-Aw-'r Y Two Dollars and _moo Cents per LF 3Z b-k 1ZJD0 4. 66 EA 4-Inch Sanitary Sewer Servie Connection Per Item D-28 Ti+oe� lWoo w o F%RrY Dollars and $ $ W►a Cents per EA 3s °O o0 � 5. 66 EA Two-way Sanitary Sewer Service Cleanout at Property Line Per Item D-61 $ $ 40 0= Dmv- 4uv+ors �,t16sWYDollarsand \qo \2�St}O TJkQ Cents per EA 6. 7 EA Standard 4' Diameter Sanitary Sewer Manhole(0-6") Per Figure 104 �r16 4uylo"013ollars and $ $ \ 00 wLa Cents per EA .. Proposal Section FTW04284 9 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE. TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT I-SANITARY SEWER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID Standard 4' Diameter(Drop)Sanitary Sewr 7. 1 EA Manhole(0-6") (Hydraulic Slide)Per Figure 107 Twa,.�r`( Fovea-6-omp Dollars and ° W°—` 04!4 Cents per EA Z,4,00— Z�� 8. 12 VF Added Depth for Standard 4' Diameter Sanitary Sewer Manhole>6' 0N6 11maoecz F%r-rY Dollars and ISO wt-n Cents per VF 9. 1 EA Abandon Existing Sanitary Sewer Manhole oa � Foya. 4 ►aowii� t'�p+"(Dollars and $ I f r`T�pm" $ w1No Cents per EA "- 10. 5 EA Remove Existing Sanitary Sewer Manhole Per Item D-29 $ coo $ +opo Two J vwoLrip fife-1 Dollars and 2-5(7 �I Z-50 A® Cents per EA 11. 2 EA 6-Inch Sanitary Sewer Service Connection Per Item D-29 $ oo $ o0 Foy a-A%A* ra FiF-rY Dollars and �,��` C\ *42 Cents per EA 12. 60 LF Reconnection of 4"Sanitary Sewer Service Line on Private Property `By a Licensed Plumber" $ oo $ o0 7W*%VVI TW o Dollars and 32. I lgZk) o Cents per LF 13. 5 LF Reconnection of 6" Sanitary Sewer Service Line on Private Property`By a Licensed Plumber" $ ov $ 00 TiiAg-r"Y TW%X--E Dollars and 33- Cents per LF .. Proposal Section FT W04284 10 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT I-SANITARY SEWER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT r ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 14. 8 EA Watertight Insert for Sanitary Sewer Manhole (Polyethylene)Per Item D-27 Dollars and 4S� 3Loo� bLT Cents per EA 15. 211 LF Permanent Asphlat Pavement Repair Per Figure 4 $ $ Tt+te'tY EtG%4-r Dollars and Cents per EA. 16. 416 LF Temporary Asphalt Pavement Repair-6" Flex Base with 2"HMAC V-1 I t4sl Dollars and $ 1 c� $ 3-444 w Cents per&A 4F 17. 6 EA Concrete Collar for Sanitary Sewer Manhole Per Figure 121 �. $ oo $ oc Fouts 16400r., fir-TY Dollars and Cents per LF 18. 4,240 SF Gravel Alley Replacement $ $ 00 BCW C� Dollars and o Cents per SF .., 19. 390 LF Pre-construction Cleaning &TV Inspection of Existing Sanitary Sewer"To Be Abandoned" $ $ Per Item D-35 00 Mt4L� Dollars and � Aq Cents per LF 20. 2,105 LF Post-construction TV Inspection of New Sanitary Sewer to Per Item D-38 $ $ 00 Q me- Dollars and Z I ID tn10 Cents per LF .. Proposal Section FTW04284 11 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET (ROBINSON ST.TO TITUS ST.) UNIT I-SANITARY SEWER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 21. 2,105 LF Trench Safety System for Excavations>5' Depth Per Item D-55 $ o� $ aio o tJE. Dollars and Z,105 PAA Cents per LF 22. 10 EA Vacuum Test New Sanitary Sewer Manhole Per Item D-36 $ oo $ ONE 4uaMS> Dollars and �D tA0 Cents per EA 10� `i coo 23. 18 LF Pressure Class 150 DI or PVC ,. $ � $ o� Fop rY Two Dollars and ..10 Cents per LF 24. 1 EA Pre-Construction Exploratory Excavation (D-Hole) Per Item D-51 $ $ Dollars and 3c� -3()o — 1•�® Cents per EA 25. 5 CY Pressure Grouting of Existing SS "To be Abandoned" Per Item D-20 $ $ 010 00 Too 9mA2mz TrMfT1 Dollars and Z 3D b Ao Cents per CY 26. 10 CY Class`B"Concrete for Miscellaneous Placement Per Item D-21 $ 00 $ oQ �T-A t Dollars and ' O TAo Cents per CY �• Proposal Section FTW04284 12 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET (ROBINSON ST.TO TITUS ST.) UNIT I—SANITARY SEWER IMPROVEMENTS: PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 27. 10 Cy Class"E"Concrete for Miscellaneous Placement Per Item D-21 $ DA $ ©N r- Dollars and fro Cents per CY SUBTOTAL FOR UNIT I—SANITARY SEWER IMPROVMENTS $ °= rr Proposal Section FTW04284 13 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26T11 STREET(ROBINSON ST. TO TITUS ST.) UNIT II—PAVING AND DRAINAGE RECONSTRUCTION ALTERNATE`B": 6"REINFORCED CONCRETE PAVEMENT SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID SP 1. 1 LS Utility Adjustments Five Thousand Dollars and $5,000.00 $5,000.00 No Cents per LS SP 2 2 EA Project Designation Sign Two Hundred Dollars and $200.00 $400.00 No Cents per EA 104,SP 3. 1,128 LF Remove Existing Concrete Curb and Gutter D sf= Dollars and $ $ t►10 Cents per LF 104,SP 4. 12,020 SF Remove Existing Concrete Driveways OWT6Dollars and $ $ Nc Cents per SF Iz%OZD 104,SP 5. 125 LF Remove Existing Concrete Cinderblock Retaining Wall $ °A $ ao Dollars and 7- Cents Cents per LF Proposal Section FTW04284 20 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT Il—PAVING AND DRAINAGE RECONSTRUCTION ALTERNATE"B": 6"REINFORCED CONCRETE PAVEMENT SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID Remove Existing 15" Storm Drain Pipe 100 6. 125 LF _ 9"At Dollars and $ 9 $ Bio Cents per LF 100 7. 1 EA Remove Existing Storm Drain Manhole 'Fo.Aa- Am%tywx4�,, T%rrY Dollars and $ $ d' Ao T Cents per EA �Slc � 104,SP 8. 3 EA Remove Existing 10' Inlet Fo.,�ri 1�u.�►Ce. Dollars and $ °0 $ °_ wl� Cents per EA `E 1r�0 100,SP 9. 145 LF Remove Existing Chain Link Fence �o%Af. Dollars and $ 50 $ So Cents per LF 65Zr 106,SP 10. 7,495 CY Unclassified Street Excavation TwF=ly a Dollars and $ $ °= Alb Cents per CY « 9q 1 8410 �t 210 11. 14,695 SY 6"Lime Stabilized Subgrade yr-14L Dollars and $ g0 $ 510 Y-N EY`f Cents per SY ZZ OwL 212 12. 235 TON Lime for Subgrade(32#/SY) "&nnf Dollars and $ °= $ L w10 Cents per W l 7-1115p00_ Toy) i .. Proposal Section FTW04284 21 15 74 o.. 'GI now y�r, yy 2 S i.+.4 F- ♦ .i^ {F F: 't '1 i"'�1f G � y BIl��# `.�-. .���itr�igff't a F i^y,%%k�',�'t+4^ ^'C�t�{Ti' .S 1•, -.t.: �,tY UNIT IF=PAVING!AND DRAINAGE RECONSTRUCTION ALTERNATE`B": 6"REINFORCED CONCRETE PAVEMENT SPEC PAY APPROXEVIATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 502,SP 13. 80 LF 7"Reinforced Concrete Curb and 18"Gutter f1 tr-Ta .�•1 Dollars and $ 90 $ aQ �10 Cents per LF 5" )ti ZOp 314,SP 14. 13,580 SY Construct 6"Reinforced Concrete Pavement TWErn'Y *'tw.a Dollars and $ °y $ 'C Fou► . Cents per SY z'3 3l2`�33� 502,SP 15. 7,865 LF Construct 7"Reinforced Attached Concrete Curb TL.!'O Dollars and *J►o Cents per LF i SP 16. 16,950 LF Silicone Joint Sealant cMr= Dollars and °Q rlc Cents per LF Ib1gS>7 504, 17. 23,630 SF Construct 6" Reinforced Concrete Driveways SP $ to $ �ouaL Dollars and )� �Ob�335 t=NP�`f Cents per SF 312,SP 18. 185 TON 6"HMAC Transition S w 6.x" Vivts. Dollars and 00 O bxft Cents per TON 00 _ 504,SP 19. 3,260 SF 6" Reinforced Concrete for Driveway Transition ` Fog a- Dollars and $ Srp $ a= Cents per SF 14, Proposal Section r•r FTW04284 2Z 3- 3 - '�_-t:^rar �ra '4 '`* x .���,r -� 'Stt'} t �W 4 x� i- _ _ ..:x �,,�t'&°✓r- r�.7 2004 CAPITAL IMPROVEMENT PROGRAM .. NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT II-PAVING AND DRAINAGE RECONSTRUCTION ALTERNATE`B": 6"REINFORCED CONCRETE PAVEMENT SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 312,SP 20. 25 TON 6"HMAC for Driveway Transition SEyEr�1�Y Fwr- Dollars and $ oo $ 00 tAo Cents per TON 4a �j� 11Qu4 208 21. 2,660 SY Flex Base for Driveway Transition 'Tw d Dollars and $ om $ 010 Cents per SY Z 513D 444 22. 1 EA Construct Standard 20' Curb Inlet Fo=1 Two mgyajppDollars and $ 0;3 $ 00 .. ba Cents per EA q z' l}ZDO .. 444 23. 3 EA Construct Standard 10' Curb Inlet Twgwt''Y lW FH ttutWollars and $ ao $ &io Cents per EA ZI zm 61 bo0 440 24. 152 LF 21"Class III RCP,Complete in Place F-4G1al" Dollars and $ 1 `� �b`'� Cents per LF 402 25. 140 CY Unclassified Trench Excavation and Backfill E.1 C-4}1-"� Dollars and $ $ e= 5 8 1 � Cents per�' 12-ID �� t 525 26. 152 LF Trench Safety Stystem for Strom Drain Pipe Over 5' Deep tA o Dollars and 15" l =to Cents per LF Proposal Section FTW04284 23 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT II—PAVING AND DRAINAGE RECONSTRUCTION ALTERNATE`B": 6"REINFORCED CONCRETE PAVEMENT SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID SP 27. 1 EA Adjust Existing W� - Manholes to Grade Dollars and $350.00 $ 350.00 Cents per EA SP 28. Zo 5<EA Adjust Existing Water Valve Boxes to Grade 7-00,00 4.000.,0-0 PF-9- 400"*%tri _ Dollars and $3*.:40 $ 4&7-- Cents per EA SP 29. 20 EA Adjust Existing Water Meters to Grade Dollars and $35.00 $700.00 Cents per EA 510 30. 145 LF Construct New Chain Link Fence including Relocation of Existing Gates or Installation of New Gates Complete. $ yo $ o 13� s .. Tt-E1tZTt,�w� Dollars and � n 5�� tlr= `( Cents per LF r 116,SP 31. 890 CY Top Soil as Directed by Engineer Dollars and $ 10.00 $8,900.00 Cents per CY .. SP 32. 520 SF Construct Concrete Block Retaining Wall in Place(Exposed Surface SF) TwEtg!! F%"a- Dollars and tAo Cents per SF $ 71+ $ 00 Proposal Section FTW04284 24 yVMC111A IL NK0;k,p, 2004 CAPITAL IMPROVEMENT PROGRAM NW 25TH STREET(MACIE AVE.TO MCCANDLESS ST.) NW 26TH STREET(ROBINSON ST.TO TITUS ST.) UNIT II—PAVING AND DRAINAGE RECONSTRUCTION ALTERNATE`B": 6"REINFORCED CONCRETE PAVEMENT SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID SP 33. 1,820 SF 4"Reinforced Concrete Sidewalk Fou e_ Dollars and $ =0 $ aO �10 Cents per SF �a� SUBTOTAL FOR UNIT II (ALTERNATE `B') $ 3 bS 5o .. Proposal Section FTW04284 25 4 d' BID SUMMARY PROJECT SUB-TOTALS: UNIT I:WATER REPLACEMENT(Page-6) $ C IA UNIT 1:SEWER REPLACEMENT(Page- 13) $ k6LA ` o0 UNIT 11:PAVING/DRAINAGE ASPHALT PAVING(Alt"A")(Page 19) $ I110 I 1 UNIT II:PAVING/DRAINAGE CONCRETE PAVING(Alt`B")(Page 25) $ 9� PROJECT BID TOTAL 1: UNIT I WATER,UNIT 1 SEWER&UNIT II PAVING/DRAINAGE(ALT"A") $ PROJECT BID TOTAL 2: UNIT I WATER,UNIT 1 SEWER&UNIT II PAVING/DRAINAGE(ALT`B") The City reserves the right to award the contract to the responsive low bidder of the Project Bid Total 1 or 2 .4. .. Proposal Section FTW04284 26 Y R Within ten(10)days after acceptance of this Proposal,the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of five(5%) percent is to become the property of the City of Fort Worth,Texas, in the event the contract or bonds are not executed and delivered within the time above set forth, as liquidated damages for delay and additional work caused thereby. .. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization,subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. -• The Bidder agrees to begin construction within 10 calendar days after issue of the work order,and to complete the contract within 210 calendar days after beginning construction as set forth in the written order to be furnished by the Owner. Liquidated damages shall be assessed as indicated in section 7-7.10. (Complete A or B below,as applicable:) [ ] A. The principal place of business of our company is in the State of [ ] Nonresident bidders in the State of ,our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. [ ] Nonresident bidders in the State of ,our principal place of business, are not required to underbid resident bidders. [ B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Receipt is acknowledge of e following addenda: Addendum No. 1 _ Addendum No. 2 Addendum No. 3 Respectfully submitted, (SEAL)By: u If Bidder is Corporation Title: Pa.Eb%MAX: Address: P.O. %c,?o —*,39O p, v .. Proposal Section FTW04284 27 VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to non-resident bidders. This law provides that, in order to be awarded a contract as low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of business are outside of the state of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable contract in the state in which the non-resident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or non-resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the blank in Section B. y A. Non-resident vendors in (give state), our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident vendors in (give state), our principal place of business, are not required to underbid resident bidders. Our principal place of business or corporate offices are in the State of Texas: BIDDER: By:So�4t•1 Company (pleas int Q.q. Brox3$O Signature: v 1.ZA0 '•• w.) iN 46 t Title: QR�s�o ►.�� City State Zip (please print) THIS FORM MUST BE RETURNED WITH YOUR BID ®. am , Y 4 f � am SECTION B i UNIT I: WATER DEPARTMENT SPECIAL INSTRUCTIONS TO BIDDERS (WATER DEPARTMENT) PART C-GENERAL CONDITIONSdft t PART CA -SUPPLEMENTRY CONDITIONS TO PART C GENERAL I! I CONDITIONS 41 Ion PART D-SPECIAL CONDITIONS u PART DA-ADDITIONAL SPECIAL CONDITIONS PART E - MATERIAL SPECIFICATIONS ti i i SPECIAL INSTRUCTIONS TO BIDDERS (WATER DEPARTMENT) I) PREQUALWICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation:a current financial statement,an acceptable experience record,an acceptable equipment schedule and any other documents the Department may deem necessary,to the Director of the Water Department at least seven(7) j I calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one(1)year old. In the case that a bidding date falls within the time a new statement is being prepared,the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project,it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit-shall be considered non-responsive and will be rejected as such. e) The City,in its sole discretion,may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened,and if inadvertently opened,shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications(financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to +. be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check,or an acceptable bidder's bond,payable to the City of Fort Worth,in an amount of not less than five(5%)percent of the largest possible total of the bid submitted must accompany the bid,and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten(10)days after the contract has been awarded To be an acceptable surety on the bid bond,the surety must be authorized to do business in the state of Texas. In addition, the surety must(1)hold a certificate of authority from the Untied States secretary of the treasury to aw qualify as a surety on obligations permitted or required under federal law,or(2)have obtained J reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a j reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City,in its sole discretion,will determine the adequacy of the proof required herein. 3. BONDS: A performance bond,a payment bond,and a maintenance bond each for one hundred (100%)percent of the contract price will be required,Reference C 3-3.7. 4. WAGE RATES: } Section C3-3.13 of the General Conditions is deleted and replaced with the following: 06/04/03 i 'f (a) The contractor shall comply with all requirements of Chapter 2258,Texas Government Code, i including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the.prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. i � 1 •• (b) The contractor shall,for a period of three(3)years following the date of acceptance of the work, maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract;and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of D-3 Right to Audit pertain to this inspection. 1 (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs(a)and(b)above. i (d) With each partial payment estimate or payroll period,whichever is less;an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all k times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g,Texas Revised Civil Statutes,the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder"means a bidder whose principal place of business is not in this state,but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. i This provision does not apply if this contract involves federal fiends. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is$25,000.00 or less,the contract amount shall be paid within forty- five(45)calendar days after completion and acceptance by the City. 4 1 9. AGE: In accordance with the policy("Policy")of the Executive Branch of the Federal Government, .., Contractor covenants that neither it nor any of its officers,members,agents employees,program participants or subcontractors,while engaged in performing this contract,shall,in connection with the employment,advancement or discharge of employees or in connection with the terms,conditions or privileges of their employment,discriminate against persons because of their age except on the bases of a bona fide occupational qualification,retirement plan or statutory requirement. F Contractor further covenants that neither it nor its officers,members,agents,employees, subcontractors,program participants,or persons acting on their behalf,shall specify,in solicitations or advertisements for employees to work on this contract,a maximum age limit for such employment 06/04/03 unless the specified maximum age limit is based upon a bona fide occupational qualification,retirement plan or statutory requirements. ` Contractor warrants it will fully comply with the policy and will defend,indemnify and hold City F harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 a ("ADA"),Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public,nor in the availability,terms and/or conditions of employment for applicants for employment with,or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal,state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. _ 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth 4 " Ordinance No. 15530,the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary.The bidder shall submit the MBE/WBE UTILIZATION FORM, ? . SUBCONTRACTOR/SUPPLIER UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM { and/or the GOOD FAITH EFFORT FORM("with Documentation")and/or the JOINT VENTURE ; FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m.,five(5)City business days after the bid.opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall ` be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. R t. Upon request,Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE)and/or women business enterprise (WBE)on the contract and payment thereof- Contractor further agrees to permit any audit and/or examination of any books,records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts(other than a negligent misrepresentation)and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal,State or local laws or ordinances relating to -false statements. Further,any such misrepresentation of facts(other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and w barred from participating in City work for a period of time of not less than three(3)years. 12. FINAL PAYMENT,ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment(less retainage)from the city for each pay period- b. eriodb. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. �l C. The project shall be deemed complete and accepted by the City as of the date the final punch list 5 has been completed,as evidenced by a written statement signed by the contractor and the City. d. .The warranty period shall begin as of the date that the final punch list has been completed. r. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. I 06104/03 I" lI I f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding(i)final quantities,or(ii)liquidated damages,city shall make a progress payment in the amount that city deems due and payable. l g. In the event of a dispute regarding either final quantities or liquidated damages,the parties shall r attempt to resolve the differences within 30 calendar days. I. i. I, i If k � i I : 4 I, i i% it P I � 11 n II II ;I 6I j 06/04/03 f PART C - GENERAL CONDITIONS TABLE OF' CONTENTS NOVEMBER, 1, 1987 TABLE .OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms Cl-1 (1) C1-1.2 Contract Documents Cl-1 (1) C1-1.3 Notice to Bidders C1-1 (2) C1-1.4 Proposal C1-1 (2 ) C1-1.5 Bidder Cl-1 (2) C1-1.6 General Conditions Cl-1 (2) C1-1.7 Special Conditions C1-1 (2) C1-.1.8 Specifications Cl-1 (2) E= C1-1.9 Bond C1-1 (2) C.1-1.10 Contract Cl-1 (3) C1-1.11 Plans Cl-1 (3) C1-1.12 City C1-1 (3 ) C1-1.13 City Council C1-1 (3 ) C1-1.14 Mayor C1-1 (3) CL-1.15 City Manager C1-1 (3) C1-1.16 City Attorney Cl-1 (3) C1-1.17 Director of Public Works Cl-1 (4) C1-1.18 Director, City Water Department Cl-1 (4) C1-1.19 Engineer C1-1 (4) C1-1.20 Contractor C1-1 (4 ) C1-1.2L Sureties C1-1 (4) C1-1.22. The Work or Project C1-1 {4) C1=1.23 Working Dap Cl-1 (4) C.1-1..24 Calendar Day Cl-1 (4) C1-1.25 Legal Holiday C1-1 (4) CI-1.26 Abbreviations C1-1 (5) C1-1.27 Change Order Cl-1 (6) C1-1.28 Paved Streets and Alleys.. Cl-1 (6 ) C1-1.29 Unpaved Streets and Alleys Cl-1 .(6.) C1-1.30 City Streets C1-1 (6) C1-1.31 Roadway C1-1 (6) C1-1.32 Gravel Street Cl-1 (6 ) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C.2-2.1 Proposal. Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 "Examination of Contract Documents and. Site C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3 ) so C2-2.5 Rejection of Proposals C2-2 (3) C2-2.6 Bid Security C2-2 (3) (I) C2-2.7 Delivery of Proposal C2-2 (4) C2-2. 8 Withdrawing Proposals C2-2 (4 ) C2-2. 9 Telegraphic Modification of Proposals C2-2 (4) C2-2.10 Public Opening of Proposal C2-2 (4) C2-2.11 Irregular Proposals C2--2 (4) C2-2.12 Disqualification of Bidders C2-2 (5) C3-3 AWARD AND EXECUTION OF DOCUMENTS - C3-3. 1 Consideration of Proposals C3-3 .(1) C3-3 .2 Minority Business Enterpise I Women-Owned Business Enterpr.iz.e coznplrian.ce C3-=3 (1} C3-3.3 " Equal Employment. Provisions C3-3 (1) C3-3 . 4 Withdrawal of Proposals C3-3 (2) C3=3. 5 Award of Contract C3-3 (2) C3-3 ..6 Return of Proposal Securities C3-3 (2) C3-3 .7 Bonds C3-3 (2) C3"3.8 Execution of Contract C3-3 (4) C3-3.9 Failure to Execute Contract C3-3 (4) C3-3.10 Beginning Work C3-3 (4) C3-3 .11 Insurance C3-3 (4). C3-3.12 Contractor's Obligations C3-3 (7) C3-3.13 Weekly Payroll C3'-3 (7) C3-=3 .14 Contractor's Contract Administration C3-3 (7) C3-3.15 Venue C3-3 (8) C4- 4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4'-4 (1) C4-4.2 Special Provisions C4=4 (1) C4-4.3 Increased or Decreased QuAntities C4-4 U) C4-4.4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4.6 Schedule of Operations C4-4 (3) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5.3 Coordination of Contract Documents C5-5 (2) C5-5.4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3) C5-5_6 Field Office C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) C5-5.8 Authority and Duties of Inspectors C5-5 (4) C5-5.9 Inspection C5-5 (5) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment C5--5 (5) - 05-5.12 Samples and Tests of Materials C5-5 (6) C5-5.13 Storage of Materials C5-5 (6) C5--5.14 Existing Structures .and Utilities C5--5 (7) C5-5.15 Interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8) C5-5.17 Cleanup CS-5 (8) C5-5.18 Final Inspection CS-5 (9) - I (2) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed , C6-6 (l) ._ C6-6.2 Permits and Licenses C6-6 (1) C6-6.3 Patented Devices, Materials and Processes C6-6 (1) C6-6.4 Sanitary Provisions C6-6 (2}- C6-6.5 Public Safety and Convenience. C6-6 , (21 C6-6.6 Privileges of Contractor in Streets,.. _ . , '. Alleys, and Right-of-Way c6-6 ' (3.),_ C6=6.7 Railway Crossings C66 (4l C6=6.8 Barricades, Warnings and Watchmen C6-6 (4} C6-�6.9 Use of Explosives, Drop Weight, etc. C6-6 (5) C.6-6:1.0 Work Within Easements C6-6 (6) C6-6.11 Independent Contractor C6-6 (8) C6-6.12 Contractor's Responsibility for Damage Claims C6-6 (8) C6-6.13 Contractor's Claim for- Damages C6-6 (10) - C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10 ) C6-6.15 Temporary Sewer Drain Connections C6--6 (10) C6-6.16 Arrangement and Charges of Water Furnished by City C6-6 ('11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11) C6-6.18 Contractor' s Responsibility for Work C6-6 (11) = C6-6.19 No Waiver of Legal Rights C6-6 (12) C6-6.20 Personal Liability of Public Officials C6-6 (12) C6-6.21 State Sales Tak C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7.3 Prosecution of the Work C7-7 (1) C7-7.4 Limitations of Operations C7-7 (2) C7-7.5 Character of Workman and Equipment C7-7 (2) C7-7.6 Work Schedule C7-7 (3) C7-7.7 Time of Commencement and Completion C7-7 (4) C7-7. 8 Extension of time of Completion C7-7 (4) C7-7. 9 Delays C7-7 (4) C7-7. 10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6) C7-7.12 Temporary Suspension C7-7 (6) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the - Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9) C7-7.16 Termination for Convenience of the Onwer C7-7 (10) C7-7.17 Safety Methods and Practices C7-7 (13) C8-8 MEASUREMENT AND PAYMENT C8-8.1 Measurement of Quantities C8-8 (1) C8-8. 2 Unit Prices C8-8 (1) (4( a1 k C8-8.3 Lump Sum C8-8 (1) C8-8. 4 Scop: of Payment . C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2) C8-8.6 Withholding Payment C8-8 (3 ) C8-8.7 Frial 'Acceptance C8-.8 (3 )' C8-8.8 Final Payment C8-8 (3 ) C8 -8.9. Adquacy o€ Deign C8-8 (4) C8-8.10 General Guaranty C8-8 (4.) .- C8.-8.11 Subsidiary Work C8-8 (5) C.8-8 .12 Miscellaneous Placement of Material C8-8 '(5) C8-8.13: Record Dodumen.t C8-8 (5). t 1 (4) i • PART C - GENERAL CONDITIONS +� CI-1 DEFINITIONS MR SECTION C1-1 DEFINITIONS C1-L-..I ._DEF;IN.ITI,ONS .OF. -TE-RMS: Whenever in these Contract DocumE%ts;-the following terms -or pronouns in place o:f them are used.,• the. intent and meaning s.hal.l be understood and i.nterpre-ted as follows.- C1-1.2 ollows:C1-1.2 CONTRACT• DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds .; a4denda , plans, etc . , which govern the terms and perfiirmance of the contract . These are. contained in the General Contract Documents and the Special Contract Documents. a: GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern .all Water Department Projects and include the following items.: PART A = NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) !White PART C - GENERAL CONDITIONS (CLTY.) Canary Yellow (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS E1-White E2-Golden. Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS. (.Sample) White = ,. PART G - CONTRACT (Sample) White b. SPECIAL, CONTRACT DOCUMENTS: The Special Contract " Documents, are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid.). PART C -. GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1 (1) i C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications .� either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1. 4 PROPOSAL: The completed Vritten and signed tender of...a bidder to perform :the wank 'which the O' Whbr' 'a'e"s Tes to- security; 'con s-titut4g.' tire Proposal , which becomes binding upon the BIdder `is officially received by the Owner, has been publicly opened and read and not. rejected by the Owner. E:1-1 . 5 BIDDER: Any person , persons , firm, partnership , V. company,;, association; corporation, acting directly or through a ..duly authorized represent.at:ive, submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1 . 6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes , and requirements of the City of Fort Worth' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the . latter shall take precedence and shall govern, i C1-1 . 7 SPECIAL CONDITIONS : Special. conditions are the specific requirements . which are necessary for the particular project covered by the Contract Documents and not specifically covered in the .General Conditions . When considered with the 'General Condi.tiansand other elements of the Contract Documents they provide the information which. the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1=1.8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, :construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specifications, regulations, requirements , statutes , etc. , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. CI-1 . 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and Cl-1 (2) faithful performance of the contract and include the ` following: a. Performance Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3 .7 ) . e. Maintenance Bond :(see paragraph C3.-1...7} d. proposal or 'Bid "Security (see Special Instructions to Bidders; Part A and C2-2.6), C1-1 .10 CONTRACT: The Contract is the formal signed agreement between the Owner and .the Contractor covering the mutual .M understanding of the two contracting parties about the project to be completed under• the Contract Documents.- C1-1.11 ocuments:C1-1..11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail the location, dimension and position of. the various elements of the p.ro3ect , including such profiles , typical crass=sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarity other drawings - or for the purpose of showing changes in the work hereinafter authorized` by' the Owner. The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract ••l Documents just as though- they were bound' therein. C1,-1 . 12 CITY: The City of 'Fort Worth, Texas , a municipal corporatioh, authorized and chartered under the Texas State • Statutes, acting by and through its governing body or its City Manger, each of which is required by charter to perform specific duties . Responsibility for final enforcement of Contracts involving the City of Bort Worth is. by Charter vested in the City Manager. The terms City and Owner are synonymous. r C1-1 . 13 CITY COUNCTL: The duly elected and qualified governing body of the City of Fort Worth, Texas. • C1-1 . 14 MAYOR: The officially elected Mayor, or in his absence, the Mayor' Piro tem of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort worth, Texas, or his duly authorized representative. C1-1 .16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas , or his duly authorized representative. Cl-1 (3) I J C1-1. 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official J of the City .of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1 . 18 DIRECTORS CITY WATER DEPARTMENT: The duly appointed Dire:ctox .o•f the City. Water Department of the City of , Fort Worth , Texas , or his duly authorized representative , assistant, or agents. C.1-1.1g .-ENGINEER: The. Director ..of Public Works, the Di-rector of the Fort Worth City Water .Department , or their duly authorized assistants , agents , engineers , ,inspectors , or superintendents, acting within the scope of the particular duties. entrusted to them. T C.1-1 :_ 20 CONTRACTOR: The person , persons , partnership , company, firm; association, or corporation , entering into a contract with .the Owner for the execution of the work, . acting directly or through a duly authorized ,r.6presentative .. .. A sub=contractor is a person, firm, corporation, or others under Jcontract with the principal contractor , supplying -labor and materials or only labor, for work at the site of the project.. C1-1. 21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged. are toa be fully responsible for the entire and satisfactory fulfillment of the Contract and for' any ,and all requirements as set forth in the Contract Documents and approved changestherein. C1--1 . 22 THE WORK . OR PROJECT: The completed work contemplated in and covered by. th-e Contract Documents, including but not limited to the furnishing of all labor, materials , to.olsy equipment, and incidentals necessary to produce a completed and serviceable project. C1-1. 23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays , and legal - holidays, i.n which the weather or other conditions not under the control .of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7: 00 a.m. and 6 : 00 p.m. , with exceptions as permitted in paragraph C7'-7.6. C1-1. 24 CALENDAR DAYS : A calendar day is any day of the week or month, no days being excepted. C1-1. 25 LEGAL HOLIDAYS: Legal holidays shall be observed as �! prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: Cl-1 (4)