HomeMy WebLinkAboutContract 33760 AMENDMENT NO. 1
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.* �
(M&C Not Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and APM and Associates,
Inc. , (Engineer) made and entered into City Secretary Contract No.
29092, (the Contract) which was authorized by the City Council by
M&C C-19273 on the 1st day of October 2002; and
WHEREAS, the Contract involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 2002, STM-A
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated May 22,
2006, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be performed
by Engineer total $23,000.00 (Water: $2,061.25; Sewer: $2,061.25;
Street maintenance: $1,622.50; Minor Drainage: $17,255.00) .
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $100,732.00.
07-14-06 PO4 : 15 IN r
t Vl"16 - CVP
Ills% 6 `-J21P?� ?k2'ff
R P
1
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
f i
EXECUTED on this the day of _ , 2006, in
Fort Worth, Tarrant County, Texas.
ATTEST:
NO M&C: WI-11TRRED
f)a L:k
Marty Hendrix
City Secretary
APPROVAL RECOMMENDED: APPROVED:
���1 A
A. Douglas Rademaker, P.E. Marc A. Ott
Director, Department of t"--Assistant City Manager
Engineering
APM AND ASSOCIATES, INC.
ENGINEER
By:
Name:Ronald L. O'Connell, P.E.
Vice President
101 S. Jennings Ave. , Suite 210
Fort Worth, TX 76104
APPROVED TO FORM AND LEGALITY:
Assista C Attorn
-2-
r,
APM & Associates, Inc. For Woirh
' Houston
Engineering . Planning . CM Services Austin
Mr. Rakesh Chaubey, P.E. May 22, 2006
Project Manager
Department of Engineering
City of Fort Worth
900 Monroe Street, 2°d Flr.
Fort Worth, TX 76102
RE: Water and Sanitary Sewer Replacement Contract 2002-STM-A
Water Project No. PW53-060530176420, Sewer Project No. PS58-070580175830
DOE Project No. 3701 Fee Proposal for Contract Amendment No. 1
Dear Mr. Chaubey:
AFJM &Associates, inc. is pleased to submi-I this fee proposal for Aiiid;tudiIla ii No. i to the contract fir the
above referenced project based on additional services requested during the design phase. The following is
a brief description and cost for the additional services provided on this project:
1. Drainage Design along Oakdale Drive $16,755.00
2. Paving Design along Proctor Street and Beckwood Drive $ 3,245.00
3. SWPPP 3,000.00
Total Contract Amendment No. 1 $23,000.00
For additional services provided pursuant to this Amendment No. 1, we request compensation in an
amount not to exceed Twenty-Three Thousand Dollars ($23,000.00). Such payment shall be made in
accordance with the payment terms specified in the Contract.
Summary of Contract Fee:
Original Contract Amount: $77,732.00
Amendment No. 1 (Not-to-Exceed): $23,000.00
Revised Contract Amount(Not-to-Exceed): $190,732.00
We hope tha u find this satisfactory for your processing.
Sin r
ona 0' nnell, P.E.
Vic resident
-JAI H61-1020
CITY W"CIENY
Headquarters:
100 North Central Expwy.,Suite 210 403 N.Sylvania Ave.,Suite 6 8700 Commerce Park Dr.,Suite 137 807 Brazos Street,Suite 803
Dallas,TX 75201 Fort North,TX 76111 Houston,TX 77036 Austin,TX 78701
(214)748-4888 Fax:(214)748-4991 (817)333-2466 Fax:(817)335-2467 (713)777-1597 Fax:(713)777-1919 (512)444-3535 Fax:(512)444-3536
City of Ft.Worth
Fee Proposal(Manhour Estimate)
for
Additional Drainage and Paving Design
Water and Sani.Swr. Replacement Contract 2002 STM-A
Project CADD
Task Principal Manager Design Engr. Tech Clerical Survey
Drainage Design 5 15 40 100 `141 45
Paving Design 1 4 15 20 6
SWPPP 1 3 19 10 10
Total Manhours 7 22 74 130 30 45
Billing Rate $150.00 $125.00 $75.00 $60.00 $45.00 $100.00
Total Cost $1,050.00 $2,750.00 $5,550.00 $7,800.00 $1,350.00 $4,500.00 $23,000.00
City of Ft.Worth
Fee Proposal Breakdown
for
Additional Drainage and Paving Design
Water and•Sani.Swr. Replacement Contract 2002 STM-A
Street
Maintenance Drainage I Water Sewer
Drainage Design $16,755.00
Paving Design $1,622.501 1 $811.261 $811.2
SWPPP 1 1 $500.001 $1,250.001 $1,250.00
Totals $1,622.501 $17,255.0012,061.25 2,061.2
Total $23,000.00