Loading...
HomeMy WebLinkAboutContract 32634 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Enclave on GT, LP, hereinafter called "Developer", desires to make certain improvements to The Enclave on Golden Triangle an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section 11, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section 11, of the Policy. Enclave on Golden Triangle-Newer CFA 4°/d and Utilities 04 08 05 g F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged nggligenceof the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. Enclave on Golden Triangle-Newer CFA 41/2 and Utilities 04 08 05 L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C)Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. Il. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $101,294.60. Enclave on Golden Triangle-Newer CFA 4°/3 and Utilities 04 08 05 SUMMARY OF COST Enclave on Golden Triangle Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $29,587.50 29,587.50 2. Storm Drainage $54,590.00 54,590.00 3. Street Lights $13,750.00 13,750.00 4. Street Name Signs $0.00 $ B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 3,367.10 F3,367.10 TOTALS 101,294.60 $ - 101,294.60 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Paid $101,257.50 for future improvements for Golden Triangle Boulevard. 5. Paid $78,433.50 for future improvements for Park Vista Boulevard. Enclave on Golden Triangle-Newer CFA 4°/bland Utilities 04 08 05 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth,Texas this the ,j—'day of , 2005. Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. Dector ` ' o Fort Wo NO M&C REQUIRED r Marc Ott Assistant City Manager ATTEST: fN7\ A Marty Hendrix City Secretary Ap ov d asto o Assist Ci Attorney ATTEST: DEVELOPER: Enclave on GT, LP By: Enclave on GT GenPar 11, LP By: Enclave on GT GenPar, LLC By: /'A""` Corporate Secretary Richard E immons, President 0111 FF9C1w1. 2K05 CITY SNIV, EAPY Enclave on Golden Triangle-Newer CFA 40/5 and Utilities 04 08 05 FT. 1111615H, TEX. F%1y q A 4 N� ..Mi Y i_e PART—PROPOSAL: DEVELOPER AWARDED-CONTRACTS This proposal must not be removed from this boo*k of Contract Documents. TO: Enclave on GT,LJ1. PROPOSAL,FOR: PROJECT NAME TBEENCJA�7E ON GOLDEN TRIANGLE WATER PROJECT.NO. Pl-64-060164015411 SE7,JER-P-R—DJECTNO. P174-07174013406 )406 F=NO.. W1756 .X 17778 a includes the_fumisli4g iff all,.-materials,.except.materials specified to be hiffishe `bythe-'C_(_ �na qpMen or Y. appurtenances.and d' . mci ental work to provide a complete-and,serviceable project i THE INCL iVE 0N---G-OLDEN TFRVJDANGLE R=suant I -'.B �ffiorqiO-,fl :-."TN&fi66'to Md -1he mndersjped to ffie 'r� ­ id&4 hay. mg examined the ,Contract ocbmegts, Mc lud-in9 plans, spedbl contract'A cuments,� *: r . generalontract'D©e�nents and ons.--Or eater fn T.D.;. iitrn 16 Department 77 7 L 7-� A .w and�,P On ener "s tati MtraC --'ADC133nel, ica:tlou- s or�4 eq an d' " 11B T q)oi on ork 4ta g­�ffi 'f,ffw.work to -one,:and the 7.un erstan : el:ambun.. Dik M On s pT. jeq 's,hereby In M S, Wp. ent NO? Ni, 1; 1E 4 . I. . p'z I. 'essa �t6 1� 01 6fM d." th -cis on., o%tbiei D '=19 subject D rov- 1;e -U!-=10 ontract T 0 4 % ' 'b W. 6, Tt Mbi V M ."".1umts M 81 to an tan f :1. d' 'Pub I te q6 Bandand such other bonds,. 'a -:b abf.Documents-for' -a T- 'h!6 vn 161-and 166. an for G .- i t within lui�7.fiii stated-.a Is WOM fiaC Q pro o do work proposes J iZ B-1 Updated 0511612005 B9/14/2005 15: 45 8177351613 CONSTP.UCTION OFFICE PAGE 03 UNIT'I: PUBLIC PAVING MWROVEMENTS ITEM, APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTPI'Y BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place,the following items) (D-No.refers to related items in the Part D Special Conditions:) I. 524 SY 6-1nch 3,600 PSI Reinforced i q),yT%4_ r!-!l Vg'__ Dollars And r)v-5� Cents $ IL i$ _7 373 60 2. 562 SY 6-Inch Stabilized Subgrade T-IFIA Dollars And 00 Cents $ 10-PD $ ZO. -0 3. 8S Tons Rvdrated Lime (30 lbs/SYl ►vs -- 0 U C 14 UP D Ea-22 71mFL4Mollars And PC Cents $ I Z $ ( p 6 Z_ S O 4. 172 LF 7-inch Integral Curb C2 0a Dollars And 00 Cents 1 7 Z_ f20 5. 1 LS Sawcut&Remove Ex. Asphalt Pavement _ Two i N 0 v 5 A;-gP Dollars And UQ Cents $_Z 060.60 $ Zo O 0 0 6. 1 LS Traffic Control JPiFj-t-- }WPPP G—DDollars And r-)0 Cents $ DO-0o $ l SOO_ Cvo 7. 1 LS Test(Density& Compaction) F i vg- NuyyP_EDDollars And U 0 Cents 00 $ 0 00 TOTAL AMOUNT BID PUBLIC PAVING IMPROVEMENT B-2 Updated 05/162005 09/14/2005 15:45 8177351613 CONSTRUCTION OFFICE PAGE 05 I(we)acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation.of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No.2(Initials) Addendum No. 4 (Initials) Respectfully submitted, B G, � Ez-t— itle Address 4ZU0 - -1(���►J E2C W09:W, _ 74 C? Telephone: t7 7 3 S_^ 16 00 (Seal) Date: H-4 Updated 05/162 0J(� ��, �ni M^7 7 u✓ Q9/14/2005 15:45 8177351613 CONSTRUCTION OFFICE PAGE 04 PART B -PROPOSAL (Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at )east one set of the General Contract Documents and General Specifications for Water Department'l'rojects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shah be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storni Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within_„ _calendar days after issue of the work order,and to complete the contract within Zo working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A.or B below, as applicable:) ,_,A.The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A,copy of the statute is attached. Non resident bidders in the State of , our principal place of business,are not required to underbid resident bidders. S.The principal place of business of our company or our parent company or majority owner is in the State of Texas. B-3 Updated 0511! Coo 12 Cffi l`\ SEPrZ9-2005 08:00 FROM:LLANO UTILITY 9402708701 TO:817 306 1555 P.1 LLANO UTILITY SERVICES, INC. 4 3501 FM 2181 * Suite 245 * CORINTH, TX 76205 R (940)270-8700 ' Fax (940)270-8701 �e SALES AND PROPOSAL CONTRACT Client: INTIGRATED Page: 1 of 3 Project: ENCLAVE ON .GOLDEN TRIANGLE Date: 9/8/2005 FORT WORTH, TEXAS By: GCW Dale.: .-• :T: •Ctrl 'Uttt � L . PUBLIC STORM DRAIN :2X6 PRECAST:RCB 64 LF $ 220.00 $14,080.00 2°(2X4) PRECAST RCB 160 LF $ 140.00 $22,400.OD 21" RCP 98 LF $ 45.00 $4,410.00 ; .. 6:1 SET 2(2X4) 2 EA $ 2,200.00 $4,400.00 6:1 SET 2X6 2 EA $ 2,000.00 $4,000.00 STD-10' CURB INLET 1 EA $ 2,500.00 $2,500,00 4X4 JUNCTION BOX 1 EA $ 2,800.00 $2,800,00 SUB-TOTAL $54,590.00 PRIVATE STORM DRAIN 48" HDPE 118 LF $ 78.00 $9,204.00 42" HDPE 172 LF $ 68.00 $11,696.00 30" HDPE 160 LF $ 46.00 $7,360.00 21" HDPE 80D LF $ 32.00 $25,600.00 18" HDPE 182 LF $ 25.00 $4,550.00 12" PVC SDR-35 90 LF $ 20.00 $1,800.00 10' CURB INLET 5' WIDE 1 EA $ 3,300.00 $3,300.00 10'CURB INLET 4.5' WIDE 1 EA $ 3,200.00 $3,200,00 10' CURB INLET 3.5 WIDE 1 EA $ 3,100.00 $3,100.00 STD,10' CURB INLET 3 EA $ 2,500.00 $7,500.00 2X2 BEEHIVE INLET 1 EA $ 2,000.00 $2,000.00 TY.B 48" HEADWALL 1 EA $ 2,300.00 $2,300.00 STD 5' CURB INLET 3 EA $ 1,900.00 $5,700.00 FITTINGS AND BENDS 1 LS $ 4,300.00 $4,300.00 SUB-TOTAL $91,610.00 SANITARY 8" SDR-35 2360 LF $ 19.00 $44,840.00 8" SDR-26 W1 CTS EMBEDMENT 140 LF $ MOD $4,200.00 .4"..SDR-35 SEWER S•ERVCIE 1130 LF $ 16.00 $18,OBO.00 4'DIA:MANHOLE 11 EA $ 1,800.00 $19,600.00 DOUBLE CLEANOUT AT BUILDING 28 EA $ 250.00 $7,000,00 TRENCH SAFETY 3630 LF $ 0.50 $1,815.00 TESTING 3630 LF $ 1.40 $5,082.00 SUB-TOTAL $1,00,817.00 PUBLIC:SANITARY 4DIA MANHOLE 1 EA $ 1,800.00 $1;;E*Q,00 SEP''=89-2005 OB:00 FROM:LLANO UTILITY 94027OB701 TO:817 306 1555 P. LLANO UTILITYSERVICES , INC. \ 3501 FM 2181 * Suite 245 * CORINTH, TX 76205 (940)270-8700 * Fax (940)2708701 SALES AND PROPOSAL CONTRACT Client: INTIGRATED Page: 2 of 3 Project: ENCLAVE ON GOLDEN TRIANGLE Date: 9/8/2005 FORT WORTH, TEXAS By: GCW r I PUBLIC WATER 1.6" RCC:P WATER MAIN 2263 LF $ 52.00 $117,676.00 8" 0-900 DR 18 110 LF $ 20.50 $2,255.00 16" GATE VALVES 3 EA $ 6,000.00 $18,000.00 8" GATE VALVE 2 EA $ 900.00 $1,800.00 2'1X.16 TAPPING SLEEVE 1 EA $ 10,000.00 $10,000.00 16: FITTINGS 1 LS $ 4,300.00 $4,300.00 2" IRRIGATION SERVICE 2 EA $ 1 ,000.00 $2,000.00 6" METER ASSEMBLY AND VAULT 2 EA $ 11 ,500.00 $23,000.00 .REMOVE AND REPLACE HMAC PAVING 2D SY $ 85.00 $1,700.00 TRAFFIC CONTROL 1 LS $ 3,000.00 $3,000.00 BORE AND CASE 62 LF $ 220,00 $13,640.00 TESTING INCUDING POLLY PIG 2373 LF $ 1.35 $3,203.55 TRENCH SAF=ETY 2373 LF $ 1.25 $2,966.25 6=12 ROCK RIP-RAP 78 SY $ 55.00 $4,290,00 6" DETECTOR CHECK AND VAULT 2 EA $ 10,000.00 $20,000.00 SUB-TOTAL �E-830.SD PRIVATE WATER 8" C-900 DR-1:8 3140 LF $ 19.00 $59,660.0D 6'C-900 DR-1.8 2101 LF $ 18.00 $3,780.00 4" DR-18 485 LF $ 15.00 $7,275.00 1 1/2 POLLY 770 LF $ 10.00 $7,700.00 .......... .... ....... 8" GATE.VALVE 9 EA $ 925.00 $8,325,00 6" GATEVALVE 7 EA $ 750.00 $5,250.00 4" GATE VALVE 10 EA $ 575.00 $5,750.00 FIRE HYDRANT 7 EA $ 1,600.00 $11,200.00 LOWER WATER LINE AT STORM DRAIN 5 EA $ 1,500,00 $7,500.00 1 1/2" SERVICE CONNECTION 20 EA $ 700.00 $14,000.DD 3'' RISER IN BUILDING 10 EA $ 850.00 $8,500.00 FITTINGS 4 TN $ 3,000.00 $12,000.00 TRENCH SAFETY 4605 LF $ 0.35 $1,611.75 TESTING 4605 LF $ 0.75 $3,453.75 SUB-TOTAL $156,005.50 CITY BONDS AND CONTRACTS 1 LS $9,200.00 $9,200.00 SEP-09-2005 08:01 FP.OM:LLANO UTILITY 9402708701 TO:817 306 1555 P.3 i LLANO UTILITY SERVICES, INC. 3501 FM 2181 * Suite 245 ' CORINTH, TX 76205 (940)270-8700 * Fax (940)270-8701 SALES AND PROPOSAL CONTRACT C;Iie:nt: INTIGRATED Page: 3 of 3 `Projikt ENCLAVE ON GOLDEN TRIANGLE Date: 9/81200.5 FORT WORTH, TEXAS By: GCW R .T CSN TOTAL $641,853.30 NOTE: :BID TO PLANS DATED AUGUST 2005 -SEWER TO EXTEND TO 5' OF BUILDING, WATER TO EXTEND V ABOVE SLAB. PRICE DOES INCLUDE CONNECTION TO PLUMBERS SERVICES. .SOIL TESTING TO BE PAID BY OTHERS, 8TAKING AND-LAYOUT TO BE PAID BY OTHERS. NATIVE MATERIAL TO BE USED FOR 95% COMPACTION ON BACKFILL. METER FEES TO BE PAID BY OTHERS EXCESS SPOILS TO BE LEFT ON SITE. TREE HAUL DFF TO BE LEFT ON SITE. GRADE TO DRAIN BY OTHERS ALLOW 12 WEEKS FOR RCCP PIPE THANK YOU FOR THE OPPORTUNITY TO BID THIS PROJECT, PLEASE.CALL WITH ANY QUESTIONS. GARY C..WELLS 214.-280-9277 Email: gwells@llanoutility.com THE ENCLAVE ON GOLDEN TRIANGLE D.O.E. #5056 Border Street Assessment Calculations: Golden Triangle Boulevard —±430' of Frontage (1/2 of future 2-28' B/B divided roadway sections in a 120' ROW) September 19, 2005 Item No. Descri tion Qt /Unit Unit Price I Amount PAVING''- Golden Triangle"BOUIev'ard 1 Unclassified Street Excavation 960 CY 3.50 $ 3,360.00 2 7-Inch Reinforced Concrete Pavement 1,442 SY 25.00 $ 36,050.00 3 6-Inch Lime Stabilized Sub rade 1,546 SY 2.25 $ 3,478.50 4 Lime (27 lbs/SY) 21.0 Ton 105.00 $ 2,205.00 5 6-Inch Concrete Curb 810 ILF 1 2.00 $ 1,620.00 6 4-Foot Wide Sidewalk 362 LF 14.00 $ 5,068.00 7 Type I Sidewalk Ramp 4.0 EA 350.00 $ 1,400.00 TOTAL - PAVING. . . . . . . . . . . . . . . $ 53,181.50 Il. STORM DRAINAGE FACILITIES —Golden Trian9 le Boulevard , 8 48-Inch RCP 76 LF 110.00 $ 8,360.00 9 42-Inch RCP 219 LF 84.00 $ 18,396.00 10 36-Inch RCP 141 LF 64.00 $ 9,024.00 11 21-Inch RCP 21 EA 40.00 $ 840.00 12 10-Foot Recessed Inlet 2 JEA 1 2,200.00 $ 4,400.00 13 5'x 5' Storm Drain Manhole 2 JEA 1 3,300.00 $ 6,600.00 14 Trench Safety 456 LF 1 1.00 $ 456.00 TOTAL -STORM DRAINAGE FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 48,076.00 IH. STREETLIGHT FAC1LiT.I.ES""� Golden Triangle Bouievard . 15 IStreet Lights 21 EA 1 2,200.001 $ 4,400.00 TOTAL -STREET LIGHT FACILITIES . . . . . $ 4,400.00 . . . . . . . . . . . . . . . . . . . . . . . GRAND TOTAL (I. + II. + III.). . . . . . . . . . . . . . . . . . . . . $ 105,657.50 NOTE: UNIT PRICES SHOWN ABOVE ARE BASED ON UNIT PRICES PER CITY ORDINANCE NO. 14552 THE ENCLAVE ON GOLDEN TRIANGLE D.O.E.#5056 Border Street Assessment Calculations: Park Vista Blvd.- +584'of Frontage (1/2 of future 2-28'BB divided roadway sections in a 110'ROW) September 19,2005 Item No.1 Description Qty/Unit Unit Price Amount 1. PAVING ~ Park Vista Boulevard 1 Unclassified Street Excavation 1,200 CY 3.50 $ 4,200.00 2 74nch Reinforced Concrete Pavement 1,817 SY 25.00 $ 45,425.00 3 6-Inch Lime Stabilized Subgrade 1,882 SY 2.25 $ 4,234.50 4 Lime(27lbs/SY) 26.0 qLF 105.00 $ 2,730.00 5 7-Inch Concrete Curb 11168 2.00 $ 2,336.00 6 4-Foot Wide Sidewalk 584.0 14.00 $ 8,176.00 TOTAL -PAVING. . . . . . . . . . $ 67,101.50 II. STORM DRAINAGE FACILITIES - Park Vista Boulevard 7 48-Inch RCP 47 LF 110.00 $ 5,170.00 8 21-Inch RCP 15 LF 40.00 $ 600.00 9 10-Foot Recessed Inlet 1 EA 2,200.00 $ 2,200.00 10 5'x 5'Storm Drain Manhole 1.0 EA 3,300.00 $ 3,300.00 11 ITrench Safety 1 62 LF 1 1.00 $ 62.00 TOTAL -STORM DRAINAGE FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 $ 11,332.00 Ill. STREET LIGHT FACILITIES - Park Vista Boulevard 1 I Street Lights 3 EA 1 2,200.00 $ 6,600.00 TOTAL -STREET LIGHT FACILITIES . . . . . . . . . . $ 6,600.00 . . . . . . . . . . . . . . . . . . . . . GRAND TOTAL(I. + II. + III.). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 85,033.50 NOTE: UNIT PRICES SHOWN ABOVE ARE BASED ON UNIT PRICES PER CITY ORDINANCE NO. 14552 RECEIVED I . STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 0 EA $ 2, 000 $0, 000.00 MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000.00 MID-BLOCK ARTERIAL MEDIAN 5 EA $ 2, 500 $12, 500. 00 RELOCATE EXISTING LIGHT 0 EA $ 11500 $0, 000. 00 Subtotal $12,500.00 City' s Cost $00,000.00 Developer' s Subtotal $12,500.00 10% Contingency $1 ,250.00 Project Total $13,750.00 Adjacent Developer's Cost $00,000.00 Developer's Cost $13,750.00 2% Inspection Fee $00,000.00 CFA CODE #2005128 DEVELOPER'S COST: $13,750.00 ENCLAVE ON GOLDEN TRIANGLE October 11, 2005 Fort Worth, Texas October 11, 2005 PAGE I OF Exhibit Cl�%�6;!lS�L� '.� II. STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the city the amount shown below prior to the City starting its design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER' S COST: $13,750.00 ONCLAVE ON GOLDEN TRIANGLE October 11, 2005 FORT WORTH, TEXAS CFA CODE #2005128 Page II of Exhibit C III "STREETLIGHTS" MID- BLOCK MEDIAN GOLDEN TRAINGLE BLVD 5 ONCLAVE ON GOLDEN TRIANGLE Page III of Exhibit C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following zero (0) intersections at a cost to the Developer of $0.00: (No new intersections.) Enclave on Golden Triangle CFA code: 2005128 October 7, 2005 CS(IIII17 EI_1P11 _ --� P �-- U. I a = SCALE 1" = 2000' i Keller Hlckx -- Mgorr- r PROJECT LOCATION GOLDEN TRIANGLE BLVD {7 r THE ENCLAVE ON GOLDEN TRIANGLE LOCATION MAP �L, SCALE 1 200' r L3 I—A V Ll LEGEN PUBLIC 6- THICK, 3,6000 PSI CONCRETE W16- LIME STABILIZED SUBGRADE 7, (EMERCENCY A6HSS ONLY) PRIVATE 6- THICK, 3,6000 PSI Uftv to?V.of T PAtv Co W16" LIME STABILIZED SUBGR40E AWWOM ASWAT PAWMW EXHIBIT "B" PAVING FOR THE ENCLAVE ON GOLDEN TRIANGLE fN I i l µ SCALE 1' 200' - PRIVATE 48 TYPE'B' _ SLOPE i HOWL Q _ _rt _ f0'C.1. 5'C.f. � e PRIVATE- Z" J M� a�rT.BY f I U-s� �-L PRIVATE --a i I s�Nh><Ns,sD�r soDnirE�D r�rKK 10'C.I.- -q_ --L 21"ftCP PRIVATE PRAIA a 1,�;t,�;. � `-rA dilN -SII 1a'c.l. r �PRIYATE 21"RCP PRIVATE 4 y r DUG(DD2ttING LAM[ . 1 { PRIVATE 5,CI r J t-- J_E PRNATE 10'C.I. 18"RCP 21RCP PRIVATE PRIVATE -__l - PRIVATE_ LEGEN r I � > — PUBLIC STORM DRAIN I 3 PRIVATE STORM DRAIN "'ALN I 2'x2 BEEHIVE INLET PRIVATE RCP .i,. 10'Cl PRIVATE�. PRNATE 21'RCP 10'C.1. 4'x4'JUNCTION BOX- " � PRIVATE h 1'I"� GATED rEMERCENCY ACCESS 01JLYJ Yv'.ro'.� PU&JC •,1 s' PUBLIC `- ( — PUE LIC 21'RCP o PUIR.IC 21', 2'x6'R.C.B. �,"r, PUBLIC 2-2'x4'R.C.B. W/SLOPED HOWLS r w� GOLDEN TRIANGLE BLVD. fabPOW EXHIBIT B-1 STORM DRAIN FOR THE ENCLAVE ON GOLDEN TRIANGLE ti r 1 1L I� (I L n 4'�SID LALK MEDM AREA t I 1 (FUTURE) SCALE 1" = 200' If 0J � IL' I �, � 4'SIDEWALKp f Q (FUTURE) �b 1 I n wns 28 8-8 PAVEMENT a J� � 28'8-8 PAVEMENT (FUTURE) �1 THE ENCLAVE ON GOLDEN TRIANGLE I �_- 5 .-j u u U u u r j o o u I Hoavnn � f10 r� ROW PARK WSTA BEW. �r LEGEND 11rI `] I Ir 7" THICK, 3,6000 PSI CONCRETE �� C 41 ) W16" LIME STABILIZED SUBGR40E 4'SIDEWALK T SIDEWNJt z� GAFfD{EMERGIXCY ACCESS ONLY) RAMP SIDEwax RaMP FUTURE 7" THICK, 3,6000 PSI -- 28'8-8 PAVEMENT CONNCRETE CRETE W16- LIME STABILIZED 0 GOLDEN TRIANGLE7SIDE—WAK BLVD, EDIAN AREA UTURE) PAVEMEM 4 (FUW) (FURME) PAVING EXHIBIT For Golden Triangle Blvd. & Park Vista Blvd. THE ENCLAVE ON GOLDEN TRIANGLE 48"RCP FUTURE 48'RCP 5x5'STORM f11b9aV MH I -- EX. 48"TYPE'B' -SLOPED HDWL 21' T x_10•INLET FUTURE HOWL ' z PANAs 7TfliC1 FUTURE 21"RCP SCALE i" = 200' n rirT 1 r'RCP PRIME ---�Iro'ci.� FUTURE 10'INLET TT11 LT TTi � y PRNAiE� 1fC, rn Fun,c;,o x r_ _ N rpanncit- REMOVE EX 48"TYPE V, l �Yk L-�`------ --- 5x5'STORM T r � 1 DRAIN MH SLOPED HDWL oma"�"mss E 48"RCP FUTIf E 48"RCP EX(PRIVA (PRIVATE) - - - iii L r r IAT NATE- J i 21 RCP��� PANArE- J0, .`I JTT T IJ fT� u]i ,v'acP PRIVATE —�— "5.a. M1 ra•acP� ---- —— I llP"""TE C I LL I 1r/ pn u j( J D1 I 10' SCALE 1* 40' fNL£TJ V 1't Ii - P BEEIIAT IflIET l Ilhh 'E LEGEND ra•xP I EX. 4x4'STORM DRAIN MH EX. 10'INLET P o Aal. ., EX.21l*RTE CP EX. 21"RCP _ PROPOSED STORM DRAIN MATE 5x5'STORM D%N MH " 10'INLET r0 r10 I to,INLET EXISTING STORM DRAIN a CATO(EHOWCYAccess ONLY) ---- - - - -Tas"RCP �' 42"RCP FUTURE STORM DRAIN 21*RC RCPa 5x5'STORM 21"RCP GOLDEN TRIANGLE BLVD, - 10'x10'D.E. , —10x15'D.E. �,0�L—EX. 4"4' �i E'rJ-� 10'INLET I ti�I STORM DRAW MH to'INLET EX. ]0 INLET STORM DRAIN EXHIBIT �Pl -EX IRCP . 21"RCP I�or 3s"ecP 42' RCP Golden Triangle Blvd. & Park Vista Blvd. 2I"RCP ZW`SMRM DRAW MH 21"RCP 5x5' GRAIN MH THE ENCLAVE ON GOLDEN TRIANGLE SCALE r"= 40' SCALE 1"= 40'