Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 1
Change Order No.: COAppr-01 Date Started: 2018-10-12
City Sec. No.: 49319 Date Due: 2018-10-27
Project Name: Northwest Community Park Phase II
CO2425 DOE Numbers:
Project Numbers:
Project installation of athletic ballfields at a community nark, to
Description: include 4 baseball fields, 2 T-Ball fields, liahtina,
irricration, a park drive, parking, and nature trail
Project/Contract
Comp`iancc
Manager: Aryan Lyness City Inspector: Adiida Cazoria
Contractor: Cole Construction, Inc.
COUNCIL ACTION (If Required):
M&C Log Name: N/A
M&C Number: N/A M&C Date: N/A
COST AND BAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
PARD $ 23,479.76 34014 - 0800450 - 5740010 - - CO2 104
Total Cost: 23,479.76 Total Requested Days: 104
Approval Status:
L
1 RELI 44ti i
CRET V
RTH,T
CFW Change Order Approval COAppr-U 1 Page 3 of 3
Approved: Yes
Comments:
User., Tadd Vinson
Date: 2018-10-15 4:26 PM
Approved: Yes
Comments:
User: Bryan Lyness
Date: 2018-10-16 5:56 PM
Approved: Yes
Comments:
User: Joe' McE'hany
Date: 2018 10 21 9:28 PM
Approved: Yes
Comments:
User: David Creek
Date: 2018 10 30 1:38 PM
Approved: Yes
Comments:
User: Richard Zava-a .�' ° 0E
Date: 2018-11-06 !1:40 PM tib
A7M,
s .M
Approved; Yes 0:
�s
Comments: y
UsF-r: Dour, B a;katy J. r, City Secretary
Cate- 20t8 11 08 9:07 PM .....;: .'
Atpproved: Yes
Comments:
User: Fernando Costa
Date: 2018 11 Og 9:25 PM
Action Required: Pease review, approve, and submit
OFFICIAL RECORD
CITY SECRETARY
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Nam of Empl yee/Signature
Title
C This form is N/A as No City Funds are associated with this Contract
L
Printed Name Signature
FORT NORTH, City of Fort Worth
*11� Change Order Request Breakdown
ProjectNamel Northwest Community Park-Phase II 1 City Sec# 49319
Client Project#(s)l CO2425
Contractor Cole Construction,INC PM Bryan Lyness,RLA Inspector Adilda Cazorla
Change Order Submittal# 0 Date 6I8/2018
Contract Time
Dept. PAR Totals CD
Original Contract Amount $3,556,883.93 $3,556,883.93 270
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $3,556,883,93 $3,556,883.93 270
Amount of Proposed Change Order $23,479.76 $23,479.76 104
Revised Contract Amount 3,580,363.69 $3,580,363.69 374
Original Funds Available for Change Orders $34,810.18 $34,810.18
Remaining Funds Available for this CO $34,810.18 $34,810.18
Additional Funding(if necessary) $0.00 $0.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.66%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,446,104.91
.USTTICATIOHTREASON$)r-oitCRM-G-E ORDER _—
ad4 tio9E to 1h2 projer.i were: concrete iq pa'king areas deemed necessary'or betlter access, concrete rail cs were adder rr
parking area for drainage control,the length of 2"water line was changed due to a change in meter location, the ballfreld fencing
layout was changed to better control access to the ballfields,topsoil was added to reach planned grade of the ballfields, pedestrian
paving was added to increase pedestrian access to and around ballfields,the original 6'nature trail was washed out and had to be
reinstalled,as a request from Athletics the infields on three fields were redesigned this required additional topsoil, irrigation, sod,
and labor,the TDLR review required that kickplates and gate latches be included on the dugout gates, during the project parking
lot poles were changed to meet completed standards(PARD standards for light poles were not completed at the time of bid),there
is addition for the installation of Forestry Grant trees and irrigation for them,a concrete low water crossing was installed along the
nature trail to avoid washout in the future, a diversion berm plus the seeding and irrigation of it was included to help prevent
drainage problems, coir logs where installed in a Swale near the nature trail to alleviate erosion,there is an addition for the
installation of an asphalt transition ramp at the park entry
deducted from the project were:the installation of a temporary ashpalt drive from the park entry to the concrete parking areas,the
installation of a barrier free ramp that was incorrectly added to the bid items,extra trench and saftey shoring was removed due to a
shorter length of need,fencing requirements were redesigned and required less 10'and 8'fencing heights on the ballfields,due to the
redesign of the baseball field infields less clay was needed,there was less topsoil needed on the softball field, PARD paid for water
required to irrigate this should have been paid for by the contractor
y
vz0 �4
CnyTYs C'q�p app
Rv
City of Fort Worth
Change Order Additions
Project Name I Northwest Community Park-Phase 11 City Sec;# 49319
Client Project# F C 22425
Contractorl Cole Construction,INC PM1 Inspector Adilda Cazorla
Change Order Submittal# 0 Date 6/8/2018
AODI I IONS
unit Unit os o a
U1-12 Installation of Reinforced Concrete Parking Areas,complete in place PAR 124.65000000 SY $48.00
U1-13 Installation of Reinforced Concrete Curbs at Parking Islands PAR 93.96500000 LF $8.00
U2-8 Install 2'Sch 40 PVC Water Pie PAR 203.00000000 LF $8.00
U3-3 Install 8'Fencing PAR 136.02000000 LF $48.00
1.13-4 Install 6'Fencing PAR 1.84000000 LF $42.00
113-12 Install Outfield Topsoil PAR 123.09000000 CY $32.60
U3-17 Install 8'Fencing PAR 136.02000000 LF $48.00
U3-18 Install 6'Fe cing PAR 1.84000000 LF $42.00
U3-26 Install Outfield Topsoil PAR 123.09000000 CY $32.60
1.13-39 Install Outfield Topsoil PAR 183.28000000 CY $32.60
A11-9 Install additional 5"pedestrian paving(UPO,QTBD) PAR 3,579.30000000 SF $5.70
Al-18 Install 6'wide Soft Surface Nature Trail PAR 2,272.00000000 SF $4.00
Al-21 Install Solid Sod in lieu of sprigs PAR 24,243.65000000 LS $0.30
Install additional irrigation(infields) PAR 1.00000000 LS $13,215.00
Additional Labor PAR 1.00000000 LS $4,405.00
Additional Topsoil PAR 97.25725000 CY $32.60
Install Kick Plates and Gate Latches on Dugout Gates PAR 1.00000000 LS $2,976.00
Additional Cost for Taller Light Poles ole and ier PAR 1.00000000 LS $7,490.00
Add for Installation of Trees and Tree Irrigation PAR 1.00000000 LS $12,900.00
Nature Trail Low Water Crossing(5'Concrete,6'Wide,90'Length)with Turne PAR 540.00000000 SF $8.60
Grading Cut&Fill for Diversion Berm&Swale includes seeding and irrigation) PAR 825.00000000 CY $18.00
COIR Logs staked out in swale PAR 44HOU000013 $5.150
Rem Temp Gravel&Install Asphalt 3"Thick 2'Wide X 75'Len th PAR ,=5
PAR $139,808.49
Sub otal AaamFn-s
Change Order Additions Page 2 44
FUKr Woxr„ City of Fort Worth
~''*"— Change Order Deletions
Project Name Northwest Community Park-Phase II City Sec# 49319
Client Project# CO2425
Cont-actorl Cole Construction,INC PMJ InsDectorF Adilda Cazoda
Change Order Submittal# CJ Date F 6/8/2018
UtLtl IUNS Qty
HEM DEP I
Unit Unit os o a
installation o emporary Asphalt Uriveway Approach(includes subTase an
Installation of Barrier Free Ramps per plans)complete in place
Trench a an onng
Install Fencing
Install ay Infield
Install ening
nsta ay n e
Install encing
nsta encing
Install ay Infield
Install Fencing PAR 36.UUUUUUUU
ns enang
ns ay n e
install Outfield opsoi
Amount r Water Bill
PAR 116,328.73
6ub I ofal DeLtions
Change Order Deletions Page 3 of 4
M/SBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
CFW Change Order Approval COAppr-01 Pagel of 3
Ro 'n
Assigned To: Due Date:
Assigned By: Due Time:
Links 1
forlworthoov/PAR/Miorated 02425- Northwest Community Park-Phase II/Contractor/Change OrdeWCO2425 -NWCP II
-Change Order Breakdown - 1 -final-09272018.xism
Attachments(0)
No Attachments have been added to this to►m_