Loading...
HomeMy WebLinkAboutContract 49776-AR1 .'CFW Construction Allowance Request Approval CAAppr-02 Page 2 of 3 CITY SECRETARY 4I'-�1��_ _ A, FORT WORTH. City of Fort Worth CONTRACTNO. Construction Allowance Request Approval (Construction Allowance Breakdown Available in Links) For Construction Allowance Submittal No.: 1 Construction Allowance Request Approval No.: CAAppr-02 Date Started: 2018-11-13 Date Due: 2019-01-02 City Sec. No.: 49776 Project Name: HMAC 2017-13 HIR Street Rehab Project Numbers: 100994 DOE Numbers: Project Removal and replacement of non-functional curb and gutter, Description: driveways and sidewalks, followed by an HIR overlay of 1" virgin MAC. Project/Contract Compliance Kristian Sugrim City Inspector: Jarad Sounders Manager: Contractor: Cutler Repaving, Inc. COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 20,679.70 30100-0200431-5740010-100994 20 Total Cost: $ 20,679.70 Total Requested Days: 20 Approval Status: OFFICIAL RECORD CITY SECRETARY FT WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&Proces... 11/19/2018 CFW Construction Allowance Request Approval CAAppr-02 Page 3 of 3 Approved: Yes Comments: User: Lane Zarate Date: 2018-11-13 8:25 PM Approved: Yes Comments: User: Ricardo Matute Date: 2018-11-16 3:00 PM Approved: Yes Comments: User: Signing for TPW Director Role Approvals Date: 2018-11-16 3:36 PM y .��o�r Approved: Yes AftSted Comments: User: Doug Black Date: 2018-11-16 11:01 PM N[ J.10sAr, CIty Secretary *"'• Approved: Yes TE)( Comments: User: Susan Alanis Date: 2018-11-19 8:18 AM Action Required: 1295: �� OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX https:Hprojectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&Proces... 11/19/2018 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ua"O' 0 2- Name of Employee - �'� A Q--A VKO,'!� Title OFFICIAL.RECORD CITY SECRETARY FT. WORT,TX FORT WORTH® City of Fort Worth `"'r� Construction Allowance Request Breakdown Construction CA# 0 Date 1 11/3/2018 City Sec# J 100994 Client Project#(s) FAC#(s) Project Name 2017-13 HIR Street Rehabilitation Description Contractorl Cutler Repaving, Inc. City Inspector Jarad Souders Funding TPW Select Day Type Allocation Account Totals Original Contract Amount $1,735,745.70 $1,735,745.70 Extras to Date Credits to Date Current Contract Amount $1,735,745.70 $1,735,745.70 Amount of Proposed Allocation $20,679.70 $20,679.70 Original Allowance Available for Allocation $94,546.00 $94,546.00 Allowance Funds Previously Allocated Remaining Funds Available for this Allocation $94,546.00 $94,546.00 .ILISTIFICA710N SUMMARY The City has requested a raised crosswalk and additional striping be installed on Evans Avenue resulting in an increase of twenty Contract days. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. cl"� 0�0 F FORT WORTH® City of Fort Worth .�' .� Construction Allowance Request Breakdown Construction FOA# 1 Date 11/3/2018 Client Project#(s) FAC#(s) Project Name 2017-13 HIR Street Rehabilitation Description Contractorl Cutler Repaving, Inc. City Inspector C ADDITIONS ITEM UESCRIPTION ep yUnit' Raised Crosswalk Crosswalk Striping TPW 1.00 L Re ective Pavemnt Markings TPW 210 EA 87Y I Solid W 90 MIL Pament Marking TPW 1,000.00 LF Change Order Additions Page 1 of 4 Sub Change Order Additions Page 2 of 4 City Sec# 100994 Jarad Souders Unit os o a 3,162.50 $3,1627 5.60 $11,200.77 1.5 Change Order Additions Page 3 of 4 TPW $20,679.70 Total Additions20,679.70 Change Order Additions Page 4 of 4 O rn rn 0 0 o � xt � U U) D C CO T (U U C O O 0 LU C L) T O U 0 'a LU c N Y 4- d m i ML ` W o0 D (3) C� LL bA }� d M c : d L M W 0 C O CT t: o m LU o 0 Q L LL C o m o o � o � o a V Q z _ � v O }, U V D i C N O N = CO Z O m D U r � U � C _O 01 (n C = O- O u Cl) � w C14 U O m in w e o E o *k k .q L) Fu k O QZ U C E.y Q u- a) ua LL- U o 0 M�f 6 U 0 0 0 0 0 0 IIH cn c CD 0 H 0 E-- co co N w- O N aj t10 (0 a C: 0 aj aj 0 aj a O aj ti4 C: co L U M1WBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA N/A Total $0.00 Previous Construction Allowance Requests CO# DATE AMOUNT N/A Total $0.00 CFW Construction Allowance Request Approval CAAppr-02 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Projects/100994 - HMAC 2017-13 HIR Street Rehab/Contractor/Change Orders/Constr Allow Request Breakdown #1R 2017-13.xlsm Attachments(0) No Attachments have been added to this form, https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&Proces... 11/19/2018