HomeMy WebLinkAboutContract 51563 Ry a iiia 515(o:3 a CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality ("CITY"), and Teal Engineering Services, Inc., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: 2018 Signal Bond Program, Year 1 —5th Street and University Drive Restriping. Article I Scope of Services The Scope of Services is set forth in Attachment A. Article II Compensation and Term of Agreement A. The ENGINEER's compensation shall be in the amount up to $23,324.00 as set forth in Attachment B. B. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein, whichever occurs first. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. City of Fort Worth,Texas — - Standard Agreement for Engineering Related Design Services ti�;� Revised Date:11.17.17 OFFICIAL 14ECyq RD Page 1 of 17 CITY SECRETARY FT. WORTH, TX (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing in the same or similar locality and under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 2 of 17 work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 3 of 17 indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on-site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on-site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 4 of 17 the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority Business and Small Business Enterprise (MBE)(SBE) Participation In accord with the City of Fort Worth Business Diversity goals (Chapter 20, Article X of the City's Code of Ordinances a/k/a Ordinance No. 20020-12- 2011, as amended), the City has goals for the participation of minority business enterprises and/or small business enterprises in City contracts. Engineer acknowledges the MBE and SBE goals established for this contract and its accepted written commitment to MBE and SBE participation. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 5of17 directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. i. The CITY shall be included as an additional insured with all rights of defense under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self- insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions or endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained within the policy, unless the CITY specifically approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b. Business Auto — the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 6 of 17 liability arising out of "any auto", including owned, hired, and non-owned autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no vehicles, coverage for hired or non-owned is acceptable. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation — ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary, commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. d. Professional Liability — ENGINEER shall maintain professional liability, a claims-made policy, with a minimum of $1,000,000.00 per claim and aggregate. The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be attached to this AGREEMENT prior to its execution. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, subject to any defense provided by the policy, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 7 of 17 c. Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to attach the required insurance documentation hereto shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A-V or greater, in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. g. Any deductible or self insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first-dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims-made basis, shall contain a retroactive date coincident with or prior to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims-made. k. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 8 of 17 final payments. I. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondeat superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 9 of 17 changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights- of-way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 10 of 17 an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims. by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary City of Fort Worth,Texas Standard Agreement for Engineering Reiated Design Services Revised Date:11.17.17 Page 11 of 17 of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY may secure Builders Risk/Installation insurance at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 12 of 17 Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER's performance of its obligations hereunder. D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 13 of 17 b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; C.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification In accordance with Texas Local Government Code Section 271.904, the ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 14 of 17 Texas. I. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. L. Prohibition On Contracts With Companies Boycotting Israel ENGINEER acknowledges that in accordance with Chapter 2270 of the City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 15 of 17 Texas Government Code, CITY is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the CITY that ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C -Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: BY: CITY OF FORT WORTH ENGINEER Teal Engineering rvices Inc. { r ` S an Alanis Assistant City Manager Gary 6 J st Vice President Date: kc �� Date: October 30, 2018 AP L RECOMMENDED: B . St ve Cooke City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services t�, qq Revised Date:11.17.17 0FFICiAL ROC C� i Page 16 of 17 S CITY 5ECRP`Ai'`� 4 FT WORTH., TES n Interim Director, Department of Transportation and Public Works Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting require ts. C t Hoover, P.E., MBA Senior Project Manager APPROVED TQ FORM AND LEGALITY By: ACzA Douglas W. Black Assistant City Attorney ATTEST: �. O��.., Form 1295 No. 4k k Ila L LIA- Gity Secret *' f f M&C Date: City of Fort Worth,Texas t� Standard Agreement for Engineering Related Design Services OFFICIAL. Revised Date:11.17.17 g� Page 17 of 17 CITY SECS, F,!' FT. WORTH, fi`` FORT WORTHm �r ATTACHMENT "A" Scope for Engineering Design Related Services for Intersection Improvements CPN 101723— 2018 Signal Bond Program, Year 1 — 5th Street and University Drive The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective of the 5th Street and University Drive Intersection Project is project is to improve safety at the intersection by signalizing the intersection and adding left turns lanes on University Drive. The project includes the development of Plans, Specifications and Estimate for roadway improvements at the intersection of 5th Street and University Drive in Fort Worth, Texas. The objectives of the project include the following: • Restripe University Drive between 7th Street and White Settlement Road to provide a center two-way left turn lane and two(2) thru lanes in each direction. WORK TO BE PERFORMED Task 1. Design Management Task . Seha+er sign DELETED Task 3. Preliminary Design (60%) Task 4. Final Design (90% and 100%) Task 5. Bid Phase SeFVOGes DELETED Task 6.GeRctFuetie,,T"ase SeWiees DELETED Task 7. ROW/Easement ewaees-DELETED Task 8. SuFvey and SubsuF aEe Utility-EngiReeringSe.dices DELETED Task 9. PeFmitting DELETED Task 10. Quality Control/Quality Assurance City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 1 of 23 FORT WORTHa TASK 1. DESIGN MANAGEMENT. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team: • Lead, manage and direct design team activities • Ensure Quality Control/Quality Assurance (QC/QA) is practiced in performance of the work. Refer to Task 10 for further details. • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting: • Attend a pre-design project kickoff/charter meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements • Attend up to one (1) field meeting with CITY representatives, including Traffic Management, prior to the 60% submittal. • Conduct and document biweekly project update meetings with CITY Project Manager • Conduct review meetings with the CITY at the end of each design phase • Conduct and document biweekly design team meetings • Conduct QC/QA reviews and document those activities. Refer to Task 10 for further details • Prepare invoices, in accordance with Attachment B to this Standard Agreement and submit monthly in the format requested by the CITY. • Prepare and submit monthly Project Status Reports in the format provided by the respective Transportation and Public Works Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement in compliance with the City's Specification 00 31 15 entitled Engineer Project Schedule. This PROJECT requires a Tier 3 schedule as defined in the City's Specification 00 31 15 entitled Engineer Project Schedule. • Prepare and submit a preliminary Project Risk Register, preliminary Stakeholder Register, and preliminary Project Communications Plan. CITY to modify and finalize. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design City of Fort Worth,Texas Page 2 of 23 Attachment A PMO Release Date:02.06.2015 Page 2 of 23 FORT WORTH • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub-consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • One (1) pre-design project kickoff/chartering meeting • One (1) field review meetings • Three (3) biweekly project update meetings during design phase • Two (2) plan review meetings • All submittals to the City will be Quality checked prior to submission. • Project design phase is anticipated to take two (2) months. • Two (2) monthly updates of Project Status Reports, MWBE forms, TPBE, Risk Register, and project schedule. DELIVERABLES A. Meeting summaries with action items B. QC/QA documentation C. Baseline design schedule D. Preliminary Project Risk Register, preliminary Stakeholder Register, and preliminary Project Communications Plan E. Monthly Schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly Project Status Reports G. Monthly TPBE spreadsheet updates H. Monthly Project Risk Register updates I. Plan Submittal Checklists (See Task 10) J. Monthly invoices K. Monthly M/WBE Report Form and Final Summary Payment Report Form City of Fort worth,Texas Page 3 of 23 Attachment A PMO Release Date:02.06.2015 Page 3 of 23 FORTWORTH, V� TASK 2. CSGHEMAT�DESIGN ALTERN I DELETED The SGhematiG Design AltelFRatives shall be submitted to CITY peF the appFeved RFoj Ce. tl Jrn lape at 55t1 Street. TheENGINEER rhamll in 2R+if"-develop, ihre)vg�h the StFe2t Data relleetmen In a.d.di+inn to data eh+ained from the CITU ENGINEER..sill r e rnh and make EiNGINEER w*ll also identify and seek to ebtain data fer existiRg GE)RditiE)R6 that may Dlaps anrd property 9WRership as available from the Tow 4ssesser's offing • Drel'minary n ver • Cnhematin plan sheets shE)WiRg evicting herlZental reardway alignments iotiRg Wrp Innes, rd anprepeserd lane &Rensiens and tape arrewls ASSUMPTIGNS • Tee(3) sets of 11" v 17" size will he rdeliPelF rd fOF the snhe atin design pFejeGt folder OR Buzzsaw-. appFeval by the GITV of the QGIRGepti gal Design Dankage A. Sehernatie Design Paekage City of Fort worth,Texas Page 4 of 23 Attachment A PMO Release Date:02.06.2015 Page 4 of 23 FORT WORTH TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. The Preliminary Design Drawings and Specifications shall include the following: • Preliminary cover and index of sheets including project limits, and area location map. aR d beginning and eR d dating limit of Texas. • Quantity Summary page and each design sheet shall include a quantity take off table. • General Notes TrafflG Signal Cv Sting Genrdl+lenc and Removals Sheet r Traffi�iig Rala, gout Truni'v-vi"gnal Eqd�pMeRtr Detail h@@tST/Irsheet perEOFFeF, 1 10' :Gale) Y Traffic Signal Summary (hams ❑aViRg Remeval Sheet Paving Layout Sheet "i n g Detail Sheets (I sheet peF GaFner,1" — 1-0'-&Gale) • Pavement Markings Removal Sheet • Pavement Markings Installation Sheet • Signing Removal Sheet • Signing Installation Sheet • Traffic Control Plan including all construction signage and pavement markings which will be in accordance with the latest edition of the Texas Manual on Uniform Traffic Control Devices. A PFE)je6t GeRtFel Sheet, shewiRg all GE)RtFE)l PeiRtS, used E)F set whole gathelFing data. Generally OR a ale of net less that. 1:400 The fellewing infermatien shall he &8" Iren Red); Y V and 7 Goerrdinatec ".dentifi d aF dinate system, rl ry , vvvn-rmcrcc�, iin-ni-iacnTrriea Gvvrcmuic�'Yvccnr,-crrnra� radius at the Southeast GGFReF of North Side DFive and NeFth Main Street). Updated daterd evicting anrd proposed typical cectien Sheets heFOZ aligRFneRt l?S�, F.T.' o I station and 1 titin ,data f all, rt"Gal �Tr�r tieie v=aavrraucm�r-arrvcrtTciur City of Fort Worth,Texas Page 5 of 23 Attachment A PMO Release Date:02.06.2015 Page 5 of 23 FORT WORTH prefile R-r=s, R.T�, R.I.'s, lew-pe;,;tS, and � son ; lengchf veTGal GIJFVer grades, K values, e,and veFtiGal GleaFanees wheFe Feq iiFed 41 Ne less than two bench maFks plaR/gFGfi4esheet. • BeaFings given en all p esed nen}erlipes OF baselines. • Sta}inn errua}inns rela}inn utilities to paving whep apprepria}o • erall es} en} layeut she }/ 1 �d gun-pti=vj cc�eaacn�cr�rrupv�ra�ccr�T • Intersection layout sheets including ROW lines, horizontal alignments, utilities, curbs, sidewalks, driveways, lane dimensions and arrows, and existing and proposed contours (0.25' intervals) • PFeliMiRaFy tra is-s+g+a!-and FeaddetaiFste;;nI pde GurhsuFhexpa„�,n je ;}s dF veways sidewalks and pavement rte}ails 0 Drellm ary sinpipa ave mep} marLinn illUminn}inn anrJ sinnnl lawn }s • Documentation of key design decisions. • Estimates of probable construction cost. 3.2. ee G }eGhnieal In„es}iaa}ieniPa„emeRt Design REMOVED FROM SCOPE OF SERVICES Gen}ras}er's use in de}nrmininn coil nnnditions fpr preparing bids and a Trennh Safety D • The ENGINEER shall pFepaFe a detailed geeteGhROE;al engineeFiRg Study pavement design OR onformanne with the Q4,of Garb IA/rbh Pavement Ilesiivn StandaFds nuaP, 2005. The study shall ORGlude FeeemMIBRdatiens FegaFd a ng Utility }ro ship Rd i.deRtify existing a Rdwater eleva}inn at eanh berinrl 3.3. Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.4. Publie Meeting—REMOVED FROM SCOPE OF SERVICES Af}or the preliminary plans have boon Feyiewed anal annrnvmd by the CITU the exhibits,ENGINEER shall pFepare pFajeet and attend eRe (1) publiG meet;Rg to help evplaip the prnpased prnien}}n residents The CITY shall select} a 61 di}able Iona}iop shall GGE)Fd.Rate with the CITY GIS staff te ideRtify afferted pFE)perty ewriers4esid— and develop a spreadsheet listing addFesses of those to invite to the publk; FneetiRg. 3.5. Utility Clearance City of Fort Worth,Texas Page 6 of 23 Attachment A PMO Release Date:02.06.2015 Page 6 of 23 FORT WORTH ir— ENGINEER will develop the design of CITY faGilitieS to aveid GF MiRiMize Go fliGt-S begin at the Preliminary Design phaco ' IR the Gase ef a publiG Utility GG1#IiGt, the ENGINEER will design QITY faGilitieS te ' Gensider petential fi,fi utilities in des ig ps IR the Gase of a pFivate Utility GenfiiGt, the ENGINEER will previde a PDF= set of plans with the Utility GE)RfliGts highlighted and a Utility (;941413ts Table Of thG68 GGRfliGtE; te be GE)E)FdinatffiE)R diFeGtly With the pFivate Utility PFOVideF if that PFGVideF Reeds tE) undertake design to adi,,st their utility's Innatien • The ENGINEER shall upload a DTIC file of the appreyed preliminary plan set to the from the CAD files ENGINEER shall visit the site dlJFiRg utility FelOGatiORS te veFify via aRy means eF fifi Rdi ASSUMPTIONS • Basemaps will be developed using aerial surveys provided by the City. • Three (3) sets of 1 Vx17" size plans will be delivered for the 60% design for review coordination. • (Ire (1) set of sneeifinatinn Will he delivered fer the 600% design • PDF and DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. • All submitted documents and checklists will be uploaded to the designated project folder in Buzzsaw • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. • One (1) Public Meeting is asci,med • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings and specifications including QC/QA documentation B. Utility QA—Aflirut PaGkage Q. TraffiG GE)URt Data D. G eeteshn,iral Report City of Fort Worth,Texas Page 7 of 23 Attachment A PMO Release Date:02.06.2015 Page 7 of 23 FORT WORTH, E. Estimates of probable construction cost G P blip 11 eetiRg eXhihitc City of Fort Worth,Texas Page 8 of 23 Attachment A PMO Release Date:02.06.2015 Page 8 of 23 FORT WORTH TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). • Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Final draft construction plans (90%) including specifications shall be submitted to CITY per the approved Project Schedule. • The ENGINEER will pFevide a PI)F= set Gf PlaRS With the Utility GeRfliGts highlighted and -a mien- • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Final Plans (100%)to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • A Quantity Summary page will be included in both the 90% and 100% design packages. Each design sheet of those package shall include a quantity take off table. • The ENGINEER shall submit a estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use standard CITY or TxDOT bid items, as applicable. ASSUMPTIONS • Three (3) sets of 11"x17" size drawings and one (1) set of specifications will be delivered for the 90% Design package. • A PDF and DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. • Ten (10) sets of 11"x17" size drawings and two (2) set of specifications will be delivered for the 100% Design package. • A PDF and DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. DELIVERABLES A. 90% construction plans and specifications including QC/QA documentation. B. Utility Conflict Coordination Package C. 100% construction plans and specifications including QC/QA documentation. D. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's or TxDOT's standard bid items and format, as applicable E. Original 11"x17" size cover mylar for the signatures of authorized CITY officials. City of Fort Worth,Texas Page 9 of 23 Attachment A PMO Release Date:02.06.2015 Page 9 of 23 FORT WORTH r TASKS. BID PHASE Cv `" €S. REMOVED FROM SCOPE OF SERVICES alteMative deliVeFy. ENGINEER will support the bid phase of the PFE)jeGt as fellews. 5.1. Bid SuppeFt lcness to potential bidders • (`nntraot dGGI invents shall he uploaded in a vl filo • I Ipit Prlae PFeposal rtnslimenty aro to he Created Utwli`inn (`CSV RiutnnlS n hi anrt and will be populated and GGRfigwFed se that all pages aFe Gemplete and the tr)tals from the inserter! I Init Drina Proposal rlooUment waFksheets • --Rlan Sets are to be uploaded e Bzzsaw iR two femqats, pdf i Rd AY4fes. The pd GAP- fA-F P--AGh plaR sheet, and will be RumbeFed and Rarned lilw to that of the plan set iRdev i�r! d2a T ENGINEER II Isar! all approved cr�e��.�t.�i�1-Fei --e��e{�vu-1--Fi�Et'tvTrti�1��h�,� -gyp.''n va ccrrr-cx�rovoc+ addenda onto Ru zzsayy and mail add8Rrta to all plan holdws • Attend the prehirt onnferense in suppon of the ( ITV Attend the hirl o e nn in suppart of the QT-Y. • Tabulate and Fevew all bods FeE;emved fE)F the G0R6tFHGtieR PF9jeGt, assist the CITY anrt the GCSA/ Data Spreadsheet n eaten t AtiliZino ! F=W Rirltnnls only are to he uploaded into the prniest's Rid Results folder OR Ruizzsaw. City of Fort Worth,Texas Page 10 of 23 Attachment A PMO Release Date:02.06.2015 Page 10 of 23 FORT WORTH_ ASSUMPTIONS • GGRStFlJGtieR dE)GLIMeRtS Will only be made available en Buzzsaw fer plan holdeirs anal/er given to plan ng r emc planheldws aprl/nr given 4e plan "eing r me • P[3� n/G aR d QWG files �., z �.cl 2�-t$- EFzzSavr DELIVERABLES �t. A�I—,-cvrlevciau P. Bid tabulatmOR6 E. QFVV Data Spreadsheet City of Fort Worth,Texas Page 11 of 23 Attachment A PMO Release Date:02.06.2015 Page 11 of 23 FORT WORTH u TASK 6. CONSTRUCTION PHASEMSERVIG REMOVED FOR SCOPE OF SERVICES CAIGONECP will suppe- F the senstn Gtign phase of the nrgient a follows • The ENGINEER droll prepare ane (1) task order nandeage fnr the `ITV's 1 Init Prise CAAUArlAF • The CAI('_INICCP shall attend the nrennnctnirtinn ngnforenro • After the PF8 GGRGtF61GtwA-.R GG-.Af(-QF(9AGe, the ENGINEER shall pFevide pFejert exhibits; r�'svaacv neFS. anrd rdistrihu he there to the rcrgiest team •T he ENGINEER will pFepnar�E)RstrU Gtinn Gemma iniaatinn Plan rdeta%4he • The F—=NG NICCD iA.4If meet with sgnnerneed nitrons as Reoder! by the sgntraster fell:general ngnfnrmanae .pith the design sgnsents anrd nonoral the rgntrant fnr agnstn istinn ngr is Sash r antee that the woFk severed by s��hmit-Fals in R--;Z;zsaui resgmmenrdatiens as to the ansentability of the werdr • The ENGICAICP will meet with the PrgieGt Delivery Team and Gentrastgr nn site to review any field nhanges •The Cn1(_InICCC? Will GOGFdinate with the TRW department as nenessani • The Cngineer will update aped submit menthly the Prnient State� Penert Di 4 QC ed Prei t Qsh I I�egFS�ef, �vc�'rra-r�vJesr-vvrre�cr',e- of final pUnGh lost. 6.2 Rer-,errd dlvra-Dram.fings shall nrenare reGOre�d rdrawings from infermatinn nreyirdeet by the TheENGINEER am. �shall n�i cperr�ccs-a-�v�n�.» cv--v7--mc CITY rdenintiRg aRY changes made to the CiRal DpaWings d ging nen tF 1ntign e As Built StAwey City of Fort worth,Texas Page 12 of 23 Attachment A PMO Release Date:02.06.2015 Page 12 of 23 r'oRT WOR`T'H_ 6 Red Line MaFkups from City Inspp-nter 6 A ppreved S bstitu hieps The ENGINEER shall FqE)dmfy the FiRal Drawings eIeGtFeRiE;aIly @Rd shall plaGe a Forrstr'zicviced. The stamp shall be Signor- onr- r-a+p-r- by the ENGINEER and ,hall he plan each plan eek T er+hefea,ro anr, Feyils+onG nn +hp-- 6hop-+ g-r Ret. Each sheet shall Glearly indiGate all GhaRges whiGh apply te that sheet by Gleudmng-an4 umberipg, e suitable a+hp-r sitahle meant prglrirlgrl by ether; and eprp-sp-nt the as ggnstrllnterd ngnrlitigns to depieted en these dFa��g&-. The ENGINEER shall submet a set ef sealed PmRal Dl:awiRgs, medified and stamped MAIC ferrr»4 The CNIGIAIRGR may keep np-pip-c of the infprma+inn pFeyided by the CITY fA-.r their files, but all eiriginal red lined drawings shall be returned te the CITY with the digital files Thelre shall be ene (1) DTIC file and ene (1) D VVF=file far the T-PVV plan Sp-+ anr- a separate DFapr- DWFfile er the VVateF p.Iane , e� ach PDF anrD1 /C file shall GA-.Pt-;4;P all assesaated sheete-ef the par+iGWIar plan set. SiREJ llaF ons anr, DWFfiles for each chert of a plan cot will net he ae•eepterl RTIC anr- DNA/C filp-c 1. TRW file name example- 1LW 1966_oFg47-.. f"when 11\A/_1966" is the assigRed file b btair'ed f the CITY, gna+�zhe fileisef��i„a; ,ne r�,T,ner� r 1 ,rem � n n pIp,aR set, "47" shall be the tetal�ll Rumbel:A-f sheefsgpthisfelt=- Example: 11 Water.ane- p- //Y_4CCC7 C pdf11 w " RCCC7" 11. •�pTG1�R11A cWcC file parr}�enam{�le-�c�wvTAl'��v:-pa�l—vrheFe >�wvr if 11 of an er ginal plan set "36shalA l be the tetal RumbeF ef sheetsOR this file. Example; x 12755_orgI8-. f Seth DTIC ane- MAIC files shall be upleaded to the prnip-n+'c RPGArr- Ilraulinn feldeFBuzzsain w. number/Q1 7\ 392 9426 File numbers will not be issued to a prpies+ Y RIe6s the apprepriate n eGt R embers and fund GGdeS have beep aSSOg Red anr- aFe in +hp- City of Fort Worth,Texas Page 13 of 23 Attachment A PMO Release Date:02.06.2015 Page 13 of 23 FORT WORTH GRe (1) DL ihlis Mee+inn i asci imerl Fight (9) site visits are assumed. Feur/A\ submittal reviews are assumed Six (6) DFI's are assumed Civ (6) Change Orders aro assumed, DELIVERABLES A. PubrreetiRg exhibits ,- Rp-vip-mi of Ghanne (lrrters ro-c��c.Tr-vrvrrcrrrgc-vrv�v F Review of shen dr $� F Final DUnsh I ist items City of Fort worth,Texas Page 14 of 23 Attachment A PMO Release Date:02.06.2015 Page 14 of 23 JVORT WORTH.. TASK 7. FLOW EASEMENT SERVICES. REMOVED FROM SCOPE OF SERVICES ENGINEER will suppeFt and perform aGtivities related to RQVV and land as GutliRed belew, pe E;GepaRg rdirestien aprl guirdanse from the ('ITV's RreleGt Manager, 7 1 Right_of_Way Research The ENGINEER shall deteFmille Fights of way, easemeRtS Reeds fGF GE)R6tF6lGt*GR e GR avamiablep and reG0MFReRdatiGRG Wall be made for appFeval by bt-t Y. 7 7 Right_ef WayiCasement Rreparatlen anrd Submittal • The ENGINEER shall prepare CIGGUrnents to be used to obtain Fight_of_way aped templates available nn the (`ITV's Ru zzsaw site 72 Temperoni Right of Cntn/ Dreparatien anrd S ibrpittal • PFOGF tG GenStFUGtk)R, the ENGINEER shall pFepare, mail and obtaiR TernperaFy Right the preiest anrd n asement is required to enter their prePeFty. • The ldesUrrmentatinn shall he previlderd in sonfermanee with the sheeLlists anrd templates available en the ('ITV's Ri zzsaw site ASSUMPTIONS • Few /A\ easements are assumed • Nip- Rev.; Right of way wall be required St—apt of the pFgjeGt-aR d available eA_gre�'nrvm�pp mpe4y117fAr{�atIAI�-FI.e. �r�—rrvrrr vv- eviAGUFesr. A. Cepit /A\ Casemept exhibits anrd meets nr) bounds p Vi decd OR GITV forms R One (1) TemperaFy Right of CntFy ender letters G. One (1)Temperary Right of Entry rd GUments City of Fort Worth,Texas Page 15 of 23 Attachment A PMO Release Date:02.06.2015 Page 15 of 23 FORT WORTH. TASK 8. SURVEY Akin SUBSURFACE RFACE i iTINTY ENGINEERING SERVICES. REMOVED FROM SCOPE OF SERVICES ENGINEER will provide supiey supper# as fellow DeSigR S61Pvcf grade lines �� • The mipinfnrma#inn to be provided OR the plans shall ipnl�irle the fellew;Rg: ^ pp .4. PrejeGt GORtr61 Sheet, shGWinn ALL I GeRtrnI Dnin#s used nr set whole. na#herinn data Geperally o a ala of pet loss than 1: a. IdeRtified (€x+stiRg. CITY MGRurneRt8901, PK Nail, 5/8" Iron RGd) b. X, Y andz ('nnrrtina#e�, R aR nnnr i r ed sus e+��a..,pd-a-a-re#erre� bearin�aase7 snerdipate nn CITY Datum nilly n y at' /� get the a-ef#h le the South a��rh �- eS6f�ptl� e6ur161� -� �r�-n�,�^veR�en^-n--vr-crre�,,rc Lipo of North Circe drive at the Fast oar! of a#the Se l#heast rnrper of Ne4h Side Drive anrt North Main Street). '�nrrt c GA alp-a l PvsTT.'s, P.I.'s, MaRheles, Valves, etG., OR ';;4rnp- rVe-e—rdinateate system, as the ('`nn#rel Nn less than ficin hnri-nntal hepsh marks per line OF Irma#inn Bearipns niyen nn all proposed nen#erlines or haselinns , C#a#inn epi atinns Cela#inn utilities to paving When appropriate e 8.2. a pYy n�Right fF=RtFy Tppa�ractffiGn anr•1 211hMWA4 • Prie.r tA- eRtering property, the ENGINEER shall prepaFe, Mail ;aAd ebtaiR TempeFaFy Right of Fp#pr from IaprinW pens • The Ansiimenta#inn shall he pFeyirler! in annfnrmapre vmfith the nhenkli # .;;Ad - templates available en the CITY' B zz aw site. vR-Z. S abvarfuve Utility ERgnineerirprrgn . Pr iirl rfa% Utility nnin�P (SUE) #e Quality Level /l r' R ani! /1 as Crays-vimr� �' '-'�\ ;r � � deserlbed bele�Th�Eshall be iNoth GWASGF 3A 02 City of Fort Worth,Texas Page 16 of 23 Attachment A PMO Release Date:02.06.2015 Page 16 of 23 FORT WORTH. Quality I evel m personal intewiews, visual inspeGtOGRS, ' te help ideRtify utility ewneFs that may have fa Gilities Within the nroien# limits er that .,•, i be affente.d by the nroie• QeIleGt appliGable FeGeFdE; (e.g., Utility eWReF base maps, n# u a6 built" eF FeG• • Develop SUE plan sheets anrd transfer infermatinn OR all involved utilities to depiGted *RdiGate: utility type arld ewnelrship; date Gf depiGtieR; qUality level(s); eRd �nonintc of�anY utility data_status�.g., aE;tive,abandoned, eut ersepv:se); Ii„e-size anrd GGnrditien• nUrnber of jointly buried Gables; and enGasemen# Quality Level G /inGL ides tad's as rdesnriberd for Qua I e�iel fl\ e that are surfane n i wtenanni� es of shsurfa Ge utili#ies LevelG taske- • The- supiey shall alse iRGIude (;R add4ien to subsyFfaGe utility featwes visible at the resolve GonfliG#inn infermntiOR the integration of Quality Level el D anrd Quality Level G information , GWRers eta.) as may hen Reed ed to f urtherreselye rlisGrenannies • PrA-;.9wd-e Quality Level G to identify eveFhead utilities OR the pFejeGt and PFAvide the overheard Utility infr,rma#inn en the SUE nlan sheets Level R /innlW-ides#nshs as rdesnriherd for Quaky Lev ('\ City of Fort Worth,Texas Page 17 of 23 Attachment A PMO Release Date:02.06.2015 Page 17 of 23 TORT WORTH ..`� subsurfaGe utilities within the pFejeGt limits, and!OF tO tFaGe a pal4iGular utw"ty line OF system. Of IiRes. • URIess E)theFwOE;e diFeGted, mark GeRtediRe Of SiRgle GGRduit lines, and Outside edges Of m ,Iti r•onr#,,i4 systems ann,,rtenanoes • Renommeni•I additional me ,res to reselve differences if they still evict evnlemtnry evcaya#inn er upgrade to Quality I evel A data. • As an alternative #n the nhvsinnl marking of lines, \/the ENGINEER may, with GIT 's •, Fvnese and Innate utilities at specific lacatlens • Provide utility size ani•! cnnfin„ration • PFeViap�ynrr thinknessan�Pe where annlinahle 0s Feasonan h�aGlG nimble fFem each test hole site ASSUMPTIONS • Up to Five 15\ Level el A test heles are inch,rter# • Level R SUE limits are as foliews• SUELevel R Seances far ayiirlth of onnrnvimately 'loaf+ inrl,isi ie of I Inl\/erGwtY DF , 5thStree RQVV, from VV 61h Street intersec#inn so,hh c,,rh rete,rn to annrnvimatehi 150 ft north of the north s ,rh ret,,rns of VV Wh StFeetAlse, theiih (`l;,;, es r;� aloo \//5th Street ROW, fF m� east of the enc# c,,rh re#Urns (same in#ersen#inn\ DELIVERABLES Texas. City of Fort Worth,Texas Page 18 of 23 Attachment A PMO Release Date:02.06.2015 Page 18 of 23 FORT WORTH, TASK9P€RMITfING. REMOVED FROM SCOPE OF SERVICES ENGINEER will pFevmde permittiRg suppert feF the CITY te ebtaiR ally and all agireements andle PeFmits n ally regi sired fnr a pralest of this size and Nino as foil )W6 p I Tows Department of Traps portation (TxDQT) Permit v. • Meet, negotiate and nnnrdina}e }o obtain approval of the agePny issi jinn the agreement and/or permits • ('ompleting all ferms(appllsatlons neoessary revised fnrmc for agenn, revieui Rerponding to anennv nommen+s and regi pests A�Ra+Ife ad Pe F m;r-NOT REQUIRED • Meet, nega}into and noordina}e to obtain appreval of the anenn . iss jinn the agreement and/or Permits Qi Ohm Otto ng revised forms fnr agenny ie��i Desponding }o anennv nommen}s and requests D 3 Texas Department of I in sing and Regi la+inn (TIDI LJ) v. e • Idep#if and a alyzethe FegaireMeRtS of the Texas Arnhi}eGWIFal C2arriers As+ n�i#hnrities having iYrisdintion to approve the design of the Droien# • FENGWNIFEER ms FespeRsible feF pFGVidiRg plaRS that -AFP- .01A GA—mplmaRGe with TEA R regi Bireme AS • Slubmi�R6tFUntinn dory imepts to the TIDLR • ( emple+ing all TDI=R ferms(appllaatlons nesessary • d#tCttt-t--the ianoe from the TDI [? • Request aP inspeo#inn from TDLR or a TDLR Zonally approved Registered nomple#ion Advise the ( ITV in writing of the results of the ins Pontoon • Respondipg to anennv oomments and regi pests • All hosts associated with TDLR plan reiie nd inspections are to he paid by the ENGINEER dU ging the GO Irse of the Preiec+ DT A Others As Needed (throated by the ENGINEER) City of Fort Worth,Texas Page 19 of 23 Attachment A PMO Release Date:02.06.2015 Page 19 of 23 FORT WORTH ASSUMPTIONS • Dermif pFepaFation will horvin a#eF approval of the DrolimiRaFy Design GGGtG,..^^^^++^^ . • QRe (1) meeting eaE;h is assumed with The Texas DepartmeRt of TFallSpeFtafieR and RAS eGiali t fAFfh«T-EnnT- and Tf1Dl n� S DELIVERABLES B Gepioc of AppFayed Dormifo City of Fort Worth,Texas Page 20 of 23 Attachment A PMO Release Date:02.06.2015 Page 20 of 23 FORT WORTH z TASK 10. QUALITY CONTROL/ QUALITY ASSURANCE ENGINEER to provide to the City a Quality Control/Quality Assurance Plan (QC/QA Plan) outlining the ENGINEER's method of ensuring the highest levels of design and accuracy are incorporated into the calculations, plans, specifications, and estimates. ENGINEER is responsible for and shall coordinate all subconsultant activity to include quality and consistency of plans. If, at any time, during the course of reviewing a submittal of any item it becomes apparent to the CITY that the submittal contains errors, omissions, and inconsistencies, the CITY may cease its review and return the submittal to the ENGINEER immediately for appropriate action. A submittal returned to the ENGINEER for this reason may be rejected by the CITY Project Manager. 10.1. QGiQAef SupveyalRd SUE Data presedures,field supveys, data, 'nrJarrd PF@prvvuvtc pri� deliyeFy to the CITU The GITT may of miovnrc anal SUE prevideFs le#eF that the SUE iRfermation provided hals lJRdeFgE)Re a Quality GORtFell Quality Assura RGe PFOGecc 10.2. QC/QA of Design Documentation • ENGINEER shall perform a QC/QA review of all documents being submitted for review at all stages of the design including the 60%, and 90% and Final Document design review submittals. QA should be performed by an individual within the firm who is not on the design team. • ENGINEER is to acknowledge that each item on the Detailed Checklist has been included by checking "done" on the checklist. If a particular checklist item is not applicable, this should be indicated by checking "N/A". If an entire checklist is not applicable, this should be indicated by checking every item on the list as "N/A" and still included with the submittal. The ENGINEER shall use the Detailed Checklist provided by CITY. • A Comment Resolution Log must be used to document conflicting comments between reviewers and to highlight comments made by the CITY that the ENGINEER is not incorporating into the design documents along with the associated explanation. The ENGINEER shall use the Comment Resolution Log provided by CITY. • The documentation of a QC/QA review includes (1) a copy of the color-coded, original marked-up document (or "checkprint") developed during the QA checking process and/or review forms which sequentially list documents and associated comments; and (2) a QC sign-off sheet with signatures of the personnel involved in City of Fort Worth,Texas Page 21 of 23 Attachment A PMO Release Date:02.06.2015 Page 21 of 23 FORT WORTH- the checking process. Mark-ups may also be documented using the Comment Resolution Log. • Evidence of the QC/QA review will be required to accompany all submittals. Documentation shall include, but is not limited to, the following items: - PDF of the completed Detailed Checklists - PDF of the QC/QA checkprint of the calculations, plans, specifications, and estimates demonstrating that a review has been undertaken; - PDF of previous review comments (if any) and the ENGINERR's responses to those comments in the Comment Resolution Log. • If any of the above information is missing, is incomplete or if any comments are not adequately addressed; the CITY may contact the ENGINEER and request the missing information. If the ENGINEER does not respond to the request within 24 hours, the CITY shall reject the submittal. No additional time will be granted for a returned submittal. • If the ENGINEER has not adequately addressed the comments, the submittal shall be rejected and returned to the ENGINEER immediately to address the issues. ASSUMPTIONS • All submittals to the City will be Quality checked prior to submission. • A PDF of the QC/QA documentation will be uploaded to the project folder in Buzzsaw. DELIVERABLES A. QC/QA documentation City of Fort Worth,Texas Page 22 of 23 Attachment A PMO Release Date:02.06.2015 Page 22 of 23 FORT WORTH. _� ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon — be sure to track changes. the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon — be sure to track changes. in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre-qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Construction management and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth,Texas Page 23 of 23 Attachment A PMO Release Date:02.06.2015 Page 23 of 23 ATTACHMENT B COMPENSATION Design Services for 2018 Signal Bond Program,Year 1 —51 Street and University Drive City Project No. 101723 Time and Materials with Rate Schedule Project I. Compensation A. The ENGINEER shall be compensated for personnel time, non-labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Category Rate for the ENGINEER's team member performing the work. Labor Category Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2018 Rate 2019 Rate $/hour ($/hour) Project Director $198.00 $204.00 Project Manager $175.00 $180.00 Senior Project Engineer $158.00 $162.00 Project Engineer $120.00 $130.00 CADD Technician $120.00 $130.00 ii. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non-labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 1 of 4 B-1 ATTACHMENT B COMPENSATION iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 2 of 4 B-2 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee % Amount Prime Consultant Teal Engineering Services, Project Management, Traffic $23,324.00 100.0% Inc. Signal Design Proposed MBE/SBE Sub-Consultants Non-MBE/SBE Consultants TOTAL $95,896.00 100% Project Number & Name Total Fee MBE/SBE Fee MBE/SBE CPN# 101723, 2018 Signal Bond $23,324.00 0.00 0.00% Program, Year 1 City MBE/SBE Goal = 25% Consultant Committed Goal = 0.00 % City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 3 of 4 B-3 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) City of Fort Worth,Texas Attachment B PMO Oficial Release Date:8.09.2012 Page 4 of 4 B-4