HomeMy WebLinkAboutContract 51563 Ry
a iiia 515(o:3
a
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home-rule
municipality ("CITY"), and Teal Engineering Services, Inc., authorized to do business in
Texas, ("ENGINEER"), for a PROJECT generally described as: 2018 Signal Bond
Program, Year 1 —5th Street and University Drive Restriping.
Article I
Scope of Services
The Scope of Services is set forth in Attachment A.
Article II
Compensation and Term of Agreement
A. The ENGINEER's compensation shall be in the amount up to $23,324.00 as set
forth in Attachment B.
B. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement
shall be for a term beginning upon the effective date, as described below, and
shall continue until the expiration of the funds or completion of the subject
matter contemplated herein, whichever occurs first.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but
not limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
City of Fort Worth,Texas — -
Standard Agreement for Engineering Related Design Services ti�;�
Revised Date:11.17.17 OFFICIAL 14ECyq RD
Page 1 of 17
CITY SECRETARY
FT. WORTH, TX
(3) Upon completion of services enumerated in Article I, the final payment of
any balance will be due within 30 days of receipt of the final invoice.
(4) In the event of a disputed or contested billing, only that portion so contested
will be withheld from payment, and the undisputed portion will be paid. The
CITY will exercise reasonableness in contesting any bill or portion thereof.
No interest will accrue on any contested portion of the billing until mutually
resolved.
(5) If the CITY fails to make payment in full to ENGINEER for billings contested
in good faith within 60 days of the amount due, the ENGINEER may, after
giving 7 days' written notice to CITY, suspend services under this
AGREEMENT until paid in full. In the event of suspension of services, the
ENGINEER shall have no liability to CITY for delays or damages caused the
CITY because of such suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental
thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing in the same or similar locality and under the same or
similar circumstances and professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 2 of 17
work to be performed hereunder. The ENGINEER shall also advise
the CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that
could affect the total PROJECT cost and/or execution. These
conditions and cost/execution effects are not the responsibility of the
ENGINEER.
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the
ENGINEER or its personnel in any way responsible for those duties that
belong to the CITY and/or the CITY's construction contractors or other
entities, and do not relieve the construction contractors or any other entity of
their obligations, duties, and responsibilities, including, but not limited to, all
construction methods, means, techniques, sequences, and procedures
necessary for coordinating and completing all portions of the construction
work in accordance with the Contract Documents and any health or safety
precautions required by such construction work. The ENGINEER and its
personnel have no authority to exercise any control over any construction
contractor or other entity or their employees in connection with their work or
any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the
progress or quality of the completed work on the PROJECT or to determine,
in general, if the work on the PROJECT is being performed in a manner
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 3 of 17
indicating that the PROJECT, when completed, will be in accordance with
the Contract Documents, nor shall anything in the Contract Documents or
this AGREEMENT between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on-site inspections to
discover latent defects in the work or otherwise check the quality or quantity
of the work on the PROJECT. If the ENGINEER makes on-site
observation(s) of a deviation from the Contract Documents, the ENGINEER
shall inform the CITY.
(3) When professional certification of performance or characteristics of
materials, systems or equipment is reasonably required to perform the
services set forth in the Scope of Services, the ENGINEER shall be entitled
to rely upon such certification to establish materials, systems or equipment
and performance criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate
PROJECT cost or schedule. Therefore, the ENGINEER makes no
warranty that the CITY's actual PROJECT costs, financial aspects,
economic feasibility, or schedules will not vary from the ENGINEER's
opinions, analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling
and observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 4 of 17
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are not other
matters at issue between the CITY and the construction contractor that
affect the amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for
any errors or omissions in the information from others that is incorporated
into the record drawings.
I. Minority Business and Small Business Enterprise (MBE)(SBE)
Participation
In accord with the City of Fort Worth Business Diversity goals (Chapter 20,
Article X of the City's Code of Ordinances a/k/a Ordinance No. 20020-12-
2011, as amended), the City has goals for the participation of minority
business enterprises and/or small business enterprises in City contracts.
Engineer acknowledges the MBE and SBE goals established for this
contract and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may
result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers
and records of the ENGINEER involving transactions relating to this
contract. ENGINEER agrees that the CITY shall have access during normal
working hours to all necessary ENGINEER facilities and shall be provided
adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this section. The CITY shall give
ENGINEER reasonable advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the
CITY shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 5of17
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in
order to conduct audits in compliance with the provisions of this article
together with subsection (3) hereof. CITY shall give subconsultant
reasonable advance notice of intended audits.
(3) ENGINEER and subconsultant agree to photocopy such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for
the cost of copies at the rate published in the Texas Administrative Code in
effect as of the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain
commercial general liability (CGL) and, if necessary, commercial
umbrella insurance with a limit of not less than $1,000,000.00 per each
occurrence with a $2,000,000.00 aggregate. If such Commercial General
Liability insurance contains a general aggregate limit, it shall apply
separately to this PROJECT or location.
i. The CITY shall be included as an additional insured with all rights
of defense under the CGL, using ISO additional insured
endorsement or a substitute providing equivalent coverage, and
under the commercial umbrella, if any. This insurance shall apply
as primary insurance with respect to any other insurance or self-
insurance programs afforded to the CITY. The Commercial
General Liability insurance policy shall have no exclusions or
endorsements that would alter or nullify: premises/operations,
products/completed operations, contractual, personal injury, or
advertising injury, which are normally contained within the policy,
unless the CITY specifically approves such exclusions in writing.
ii. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto — the ENGINEER shall maintain business auto liability
and, if necessary, commercial umbrella liability insurance with a limit of
not less than $1,000,000 each accident. Such insurance shall cover
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 6 of 17
liability arising out of "any auto", including owned, hired, and non-owned
autos, when said vehicle is used in the course of the PROJECT. If the
engineer owns no vehicles, coverage for hired or non-owned is
acceptable.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation — ENGINEER shall maintain workers
compensation and employers liability insurance and, if necessary,
commercial umbrella liability insurance with a limit of not less than
$100,000.00 each accident for bodily injury by accident or $100,000.00
each employee for bodily injury by disease, with $500,000.00 policy limit.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability — ENGINEER shall maintain professional liability, a
claims-made policy, with a minimum of $1,000,000.00 per claim and
aggregate. The policy shall contain a retroactive date prior to the date of
the contract or the first date of services to be performed, whichever is
earlier. Coverage shall be maintained for a period of 5 years following the
completion of the contract. An annual certificate of insurance specifically
referencing this project shall be submitted to the CITY for each year
following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be attached to this AGREEMENT prior to its
execution.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, subject to any defense provided by the policy, as its
interests may appear. The term CITY shall include its employees,
officers, officials, agents, and volunteers as respects the contracted
services.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 7 of 17
c. Certificate(s) of insurance shall document that insurance coverage
specified in this agreement are provided under applicable policies
documented thereon.
d. Any failure on part of the CITY to attach the required insurance
documentation hereto shall not constitute a waiver of the insurance
requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium. Notice shall be sent
to the respective Department Director (by name), City of Fort Worth,
1000 Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A-V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of $25,000.00 that
would change or alter the requirements herein is subject to approval by
the CITY in writing, if coverage is not provided on a first-dollar basis. The
CITY, at it sole discretion, may consent to alternative coverage
maintained through insurance pools or risk retention groups. Dedicated
financial resources or letters of credit may also be acceptable to the
CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation
in favor of the CITY as respects the PROJECT.
i. The CITY shall be entitled, upon its request and without incurring
expense, to review the ENGINEER's insurance policies including
endorsements thereto and, at the CITY's discretion; the ENGINEER may
be required to provide proof of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a
claims-made basis, shall contain a retroactive date coincident with or
prior to the date of the contractual agreement. The certificate of
insurance shall state both the retroactive date and that the coverage is
claims-made.
k. Coverages, whether written on an occurrence or claims-made basis,
shall be maintained without interruption nor restrictive modification or
changes from date of commencement of the PROJECT until final
payment and termination of any coverage required to be maintained after
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 8 of 17
final payments.
I. The CITY shall not be responsible for the direct payment of any
insurance premiums required by this agreement.
m. Sub consultants and subcontractors to/of the ENGINEER shall be
required by the ENGINEER to maintain the same or reasonably
equivalent insurance coverage as required for the ENGINEER. When
sub consultants/subcontractors maintain insurance coverage,
ENGINEER shall provide CITY with documentation thereof on a
certificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent
consultant and not as a subcontractor, agent, or employee of the CITY.
The doctrine of respondeat superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure
in writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing
of any conflicts of interest that develop subsequent to the signing of this
contract and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with
published design criteria and/or current engineering practice standards
which the ENGINEER should have been aware of at the time this
Agreement was executed, the ENGINEER shall revise plans and
specifications, as required, at its own cost and expense. However, if design
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 9 of 17
changes are required due to the changes in the permitting authorities'
published design criteria and/or practice standards criteria which are
published after the date of this Agreement which the ENGINEER could not
have been reasonably aware of, the ENGINEER shall notify the CITY of
such changes and an adjustment in compensation will be made through an
amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of
the information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of
the CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses
required by local, state, or federal authorities; and land, easements, rights-
of-way, and access necessary for the ENGINEER's services or PROJECT
construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches,
drawings, specifications, proposals, and other documents; obtain advice of
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 10 of 17
an attorney, insurance counselor, accountant, auditor, bond and financial
advisors, and other consultants as the CITY deems appropriate; and render
in writing decisions required by the CITY in a timely manner in accordance
with the project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims. by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of
such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos
is a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and
provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third-Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering
services performed. Only the CITY will be the beneficiary
City of Fort Worth,Texas
Standard Agreement for Engineering Reiated Design Services
Revised Date:11.17.17
Page 11 of 17
of any undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third-party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity
or person regarding the PROJECT a provision that such entity or person
shall have no third-party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY may secure Builders Risk/Installation insurance at the
replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify that the Builders Risk/Installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 12 of 17
Article VI
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes, lockouts, accidents, or other events beyond
the control of the ENGINEER that prevent ENGINEER's performance of its
obligations hereunder.
D. Termination
(1) This AGREEMENT may be terminated
a.) by the City for its convenience upon 30 days' written notice to
ENGINEER.
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days' written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans,
specifications or other forms of ENGINEER'S work product;
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 13 of 17
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
C.) The time requirements for the ENGINEER'S personnel to document
the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all termination expenses. The
CITY'S approval will be obtained in writing prior to proceeding with
termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER
for the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors,
and ENGINEER's compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify or hold harmless the CITY against liability
for any damage committed by the ENGINEER or ENGINEER's agent,
consultant under contract, or another entity over which the ENGINEER
exercises control to the extent that the damage is caused by or
resulting from an act of negligence, intentional tort, intellectual
property infringement, or failure to pay a subcontractor or supplier.
CITY is entitled to recover its reasonable attorney's fees in proportion
to the ENGINEER's liability.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the
prior written consent of the other party.
H. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 14 of 17
Texas.
I. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any
reason to be invalid, illegal, or unenforceable in any respect, such invalidity,
illegality, or unenforceability will not affect any other provision, and this
AGREEMENT shall be construed as if such invalid, illegal, or unenforceable
provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F.,
VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause.
J. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in
any way affect this AGREEMENT and the work hereunder, and shall
observe and comply with all orders, laws ordinances and regulations which
may exist or may be enacted later by governing bodies having jurisdiction or
authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered. ENGINEER agrees to defend, indemnify and
hold harmless CITY and all of its officers, agents and employees from and
against all claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
K. Immigration Nationality Act
ENGINEER shall verify the identity and employment eligibility of its
employees who perform work under this Agreement, including completing
the Employment Eligibility Verification Form (1-9). Upon request by CITY,
ENGINEER shall provide CITY with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this
Agreement. ENGINEER shall adhere to all Federal and State laws as well
as establish appropriate procedures and controls so that no services will
be performed by any ENGINEER employee who is not legally eligible to
perform such services. ENGINEER SHALL INDEMNIFY CITY AND
HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR
LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER,
ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. CITY, upon written notice to ENGINEER, shall have the
right to immediately terminate this Agreement for violations of this
provision by ENGINEER.
L. Prohibition On Contracts With Companies Boycotting Israel
ENGINEER acknowledges that in accordance with Chapter 2270 of the
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
Revised Date:11.17.17
Page 15 of 17
Texas Government Code, CITY is prohibited from entering into a contract
with a company for goods or services unless the contract contains a
written verification from the company that it: (1) does not boycott Israel;
and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those
terms in Section 808.001 of the Texas Government Code. By signing
this contract, ENGINEER certifies that ENGINEER'S signature
provides written verification to the CITY that ENGINEER: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the
contract.
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This AGREEMENT may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
same instrument. The following attachments and schedules are hereby made a part of
this AGREEMENT:
Attachment A - Scope of Services
Attachment B - Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY: BY:
CITY OF FORT WORTH ENGINEER
Teal Engineering rvices Inc.
{ r
` S an Alanis
Assistant City Manager Gary 6 J st
Vice President
Date: kc ��
Date: October 30, 2018
AP L RECOMMENDED:
B .
St ve Cooke
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services t�, qq
Revised Date:11.17.17 0FFICiAL ROC C� i
Page 16 of 17 S
CITY 5ECRP`Ai'`�
4
FT WORTH., TES
n
Interim Director, Department of
Transportation and Public Works
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
require ts.
C t Hoover, P.E., MBA
Senior Project Manager
APPROVED TQ FORM AND LEGALITY
By: ACzA
Douglas W. Black
Assistant City Attorney
ATTEST: �. O��.., Form 1295 No. 4k
k
Ila
L LIA-
Gity Secret *' f
f M&C Date:
City of Fort Worth,Texas t�
Standard Agreement for Engineering Related Design Services OFFICIAL.
Revised Date:11.17.17 g�
Page 17 of 17
CITY
SECS, F,!'
FT. WORTH, fi``
FORT WORTHm
�r
ATTACHMENT "A"
Scope for Engineering Design Related Services for Intersection Improvements
CPN 101723— 2018 Signal Bond Program, Year 1 — 5th Street and University Drive
The scope set forth herein defines the work to be performed by the ENGINEER in completing
the project. Both the CITY and ENGINEER have attempted to clearly define the work to be
performed and address the needs of the Project.
OBJECTIVE
The objective of the 5th Street and University Drive Intersection Project is project is to improve
safety at the intersection by signalizing the intersection and adding left turns lanes on University
Drive.
The project includes the development of Plans, Specifications and Estimate for roadway
improvements at the intersection of 5th Street and University Drive in Fort Worth, Texas. The
objectives of the project include the following:
• Restripe University Drive between 7th Street and White Settlement Road to provide a
center two-way left turn lane and two(2) thru lanes in each direction.
WORK TO BE PERFORMED
Task 1. Design Management
Task . Seha+er sign DELETED
Task 3. Preliminary Design (60%)
Task 4. Final Design (90% and 100%)
Task 5. Bid Phase SeFVOGes DELETED
Task 6.GeRctFuetie,,T"ase SeWiees DELETED
Task 7. ROW/Easement ewaees-DELETED
Task 8. SuFvey and SubsuF aEe Utility-EngiReeringSe.dices DELETED
Task 9. PeFmitting DELETED
Task 10. Quality Control/Quality Assurance
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 1 of 23
FORT WORTHa
TASK 1. DESIGN MANAGEMENT.
ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of
ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate
effectively, coordinate internally and externally as needed, and proactively address issues with
the CITY's Project Manager and others as necessary to make progress on the work.
1.1. Managing the Team:
• Lead, manage and direct design team activities
• Ensure Quality Control/Quality Assurance (QC/QA) is practiced in performance of
the work. Refer to Task 10 for further details.
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting:
• Attend a pre-design project kickoff/charter meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
• Attend up to one (1) field meeting with CITY representatives, including Traffic
Management, prior to the 60% submittal.
• Conduct and document biweekly project update meetings with CITY Project Manager
• Conduct review meetings with the CITY at the end of each design phase
• Conduct and document biweekly design team meetings
• Conduct QC/QA reviews and document those activities. Refer to Task 10 for further
details
• Prepare invoices, in accordance with Attachment B to this Standard Agreement and
submit monthly in the format requested by the CITY.
• Prepare and submit monthly Project Status Reports in the format provided by the
respective Transportation and Public Works Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule
updates with a schedule narrative monthly, as required in Attachment D to this
Standard Agreement in compliance with the City's Specification 00 31 15 entitled
Engineer Project Schedule. This PROJECT requires a Tier 3 schedule as defined in
the City's Specification 00 31 15 entitled Engineer Project Schedule.
• Prepare and submit a preliminary Project Risk Register, preliminary Stakeholder
Register, and preliminary Project Communications Plan. CITY to modify and finalize.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form
at the end of the project
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
City of Fort Worth,Texas Page 2 of 23
Attachment A
PMO Release Date:02.06.2015
Page 2 of 23
FORT WORTH
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub-consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• One (1) pre-design project kickoff/chartering meeting
• One (1) field review meetings
• Three (3) biweekly project update meetings during design phase
• Two (2) plan review meetings
• All submittals to the City will be Quality checked prior to submission.
• Project design phase is anticipated to take two (2) months.
• Two (2) monthly updates of Project Status Reports, MWBE forms, TPBE, Risk
Register, and project schedule.
DELIVERABLES
A. Meeting summaries with action items
B. QC/QA documentation
C. Baseline design schedule
D. Preliminary Project Risk Register, preliminary Stakeholder Register, and preliminary
Project Communications Plan
E. Monthly Schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly Project Status Reports
G. Monthly TPBE spreadsheet updates
H. Monthly Project Risk Register updates
I. Plan Submittal Checklists (See Task 10)
J. Monthly invoices
K. Monthly M/WBE Report Form and Final Summary Payment Report Form
City of Fort worth,Texas Page 3 of 23
Attachment A
PMO Release Date:02.06.2015
Page 3 of 23
FORTWORTH,
V�
TASK 2. CSGHEMAT�DESIGN ALTERN I DELETED
The SGhematiG Design AltelFRatives shall be submitted to CITY peF the appFeved RFoj
Ce.
tl Jrn lape at 55t1 Street. TheENGINEER rhamll in 2R+if"-develop, ihre)vg�h the
StFe2t
Data relleetmen
In a.d.di+inn to data eh+ained from the CITU ENGINEER..sill r e rnh and make
EiNGINEER w*ll also identify and seek to ebtain data fer existiRg GE)RditiE)R6 that may
Dlaps anrd property 9WRership as available from the Tow 4ssesser's offing
• Drel'minary n ver
• Cnhematin plan sheets shE)WiRg evicting herlZental reardway alignments iotiRg
Wrp Innes, rd anprepeserd lane &Rensiens and tape arrewls
ASSUMPTIGNS
• Tee(3) sets of 11" v 17" size will he rdeliPelF rd fOF the snhe atin design
pFejeGt folder OR Buzzsaw-.
appFeval by the GITV of the QGIRGepti gal Design Dankage
A. Sehernatie Design Paekage
City of Fort worth,Texas Page 4 of 23
Attachment A
PMO Release Date:02.06.2015
Page 4 of 23
FORT WORTH
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. The Preliminary Design Drawings and Specifications shall include the following:
• Preliminary cover and index of sheets including project limits, and area location map.
aR d beginning and eR d dating limit
of Texas.
• Quantity Summary page and each design sheet shall include a quantity take off
table.
• General Notes
TrafflG Signal Cv Sting Genrdl+lenc and Removals Sheet
r Traffi�iig Rala, gout
Truni'v-vi"gnal Eqd�pMeRtr Detail h@@tST/Irsheet perEOFFeF, 1 10' :Gale)
Y Traffic Signal Summary (hams
❑aViRg Remeval Sheet
Paving Layout Sheet
"i n g Detail Sheets (I sheet peF GaFner,1" — 1-0'-&Gale)
• Pavement Markings Removal Sheet
• Pavement Markings Installation Sheet
• Signing Removal Sheet
• Signing Installation Sheet
• Traffic Control Plan including all construction signage and pavement markings which
will be in accordance with the latest edition of the Texas Manual on Uniform Traffic
Control Devices.
A PFE)je6t GeRtFel Sheet, shewiRg all GE)RtFE)l PeiRtS, used E)F set whole gathelFing data.
Generally OR a ale of net less that. 1:400 The fellewing infermatien shall he
&8" Iren Red); Y V and 7 Goerrdinatec ".dentifi d aF dinate system, rl
ry , vvvn-rmcrcc�, iin-ni-iacnTrriea Gvvrcmuic�'Yvccnr,-crrnra�
radius at the Southeast GGFReF of North Side DFive and NeFth Main Street).
Updated daterd evicting anrd proposed typical cectien Sheets
heFOZ aligRFneRt l?S�, F.T.' o I station and 1 titin ,data f all, rt"Gal
�Tr�r tieie v=aavrraucm�r-arrvcrtTciur
City of Fort Worth,Texas Page 5 of 23
Attachment A
PMO Release Date:02.06.2015
Page 5 of 23
FORT WORTH
prefile R-r=s, R.T�, R.I.'s, lew-pe;,;tS, and � son
; lengchf veTGal GIJFVer
grades, K values, e,and veFtiGal GleaFanees wheFe Feq iiFed
41 Ne less than two bench maFks plaR/gFGfi4esheet.
• BeaFings given en all p esed nen}erlipes OF baselines.
• Sta}inn errua}inns rela}inn utilities to paving whep apprepria}o
• erall es} en} layeut she }/ 1
�d gun-pti=vj cc�eaacn�cr�rrupv�ra�ccr�T
• Intersection layout sheets including ROW lines, horizontal alignments, utilities, curbs,
sidewalks, driveways, lane dimensions and arrows, and existing and proposed
contours (0.25' intervals)
• PFeliMiRaFy tra is-s+g+a!-and FeaddetaiFste;;nI pde GurhsuFhexpa„�,n je ;}s
dF veways sidewalks and pavement rte}ails
0 Drellm ary sinpipa ave mep} marLinn illUminn}inn anrJ sinnnl lawn }s
• Documentation of key design decisions.
• Estimates of probable construction cost.
3.2. ee
G }eGhnieal In„es}iaa}ieniPa„emeRt Design REMOVED FROM SCOPE OF SERVICES
Gen}ras}er's use in de}nrmininn coil nnnditions fpr preparing bids and a Trennh
Safety D
• The ENGINEER shall pFepaFe a detailed geeteGhROE;al engineeFiRg Study
pavement design OR onformanne with the Q4,of Garb IA/rbh Pavement Ilesiivn
StandaFds nuaP, 2005. The study shall ORGlude FeeemMIBRdatiens FegaFd a ng Utility
}ro ship Rd i.deRtify existing a Rdwater eleva}inn at eanh berinrl
3.3. Constructability Review
• Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule
and attend a project site visit with the CITY Project Manager and Construction
personnel to walk the project. The ENGINEER shall summarize the CITY's
comments from the field visit and submit this information to the CITY in writing.
3.4. Publie Meeting—REMOVED FROM SCOPE OF SERVICES
Af}or the preliminary plans have boon Feyiewed anal annrnvmd by the CITU the
exhibits,ENGINEER shall pFepare pFajeet
and attend eRe (1) publiG meet;Rg to help
evplaip the prnpased prnien}}n residents The CITY shall select} a 61 di}able Iona}iop
shall GGE)Fd.Rate with the CITY GIS staff te ideRtify afferted pFE)perty ewriers4esid—
and develop a spreadsheet listing addFesses of those to invite to the publk; FneetiRg.
3.5. Utility Clearance
City of Fort Worth,Texas Page 6 of 23
Attachment A
PMO Release Date:02.06.2015
Page 6 of 23
FORT WORTH
ir—
ENGINEER will develop the design of CITY faGilitieS to aveid GF MiRiMize Go fliGt-S
begin at the Preliminary Design phaco '
IR the Gase ef a publiG Utility GG1#IiGt, the ENGINEER will design QITY faGilitieS te
'
Gensider petential fi,fi utilities in des ig ps
IR the Gase of a pFivate Utility GenfiiGt, the ENGINEER will previde a PDF= set of plans
with the Utility GE)RfliGts highlighted and a Utility (;941413ts Table Of thG68 GGRfliGtE; te be
GE)E)FdinatffiE)R diFeGtly With the pFivate Utility PFOVideF if that PFGVideF Reeds tE)
undertake design to adi,,st their utility's Innatien
• The ENGINEER shall upload a DTIC file of the appreyed preliminary plan set to the
from the CAD files
ENGINEER shall visit the site dlJFiRg utility FelOGatiORS te veFify via aRy means eF
fifi Rdi
ASSUMPTIONS
• Basemaps will be developed using aerial surveys provided by the City.
• Three (3) sets of 1 Vx17" size plans will be delivered for the 60% design for review
coordination.
• (Ire (1) set of sneeifinatinn Will he delivered fer the 600% design
• PDF and DWF files created from design CAD drawings will be uploaded to the
designated project folder in Buzzsaw.
• All submitted documents and checklists will be uploaded to the designated project
folder in Buzzsaw
• The CITY's front end and technical specifications will be used. The ENGINEER shall
supplement the technical specifications if needed.
• One (1) Public Meeting is asci,med
• ENGINEER shall not proceed with Final Design activities without written approval by
the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications including QC/QA documentation
B. Utility QA—Aflirut PaGkage
Q. TraffiG GE)URt Data
D. G eeteshn,iral Report
City of Fort Worth,Texas Page 7 of 23
Attachment A
PMO Release Date:02.06.2015
Page 7 of 23
FORT WORTH,
E. Estimates of probable construction cost
G P blip 11 eetiRg eXhihitc
City of Fort Worth,Texas Page 8 of 23
Attachment A
PMO Release Date:02.06.2015
Page 8 of 23
FORT WORTH
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100
PERCENT).
• Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
• Final draft construction plans (90%) including specifications shall be submitted to CITY per
the approved Project Schedule.
• The ENGINEER will pFevide a PI)F= set Gf PlaRS With the Utility GeRfliGts highlighted and -a
mien-
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Final Plans (100%)to the CITY per the approved Project Schedule. Each plan sheet
shall be stamped, dated, and signed by the ENGINEER registered in State of Texas.
• A Quantity Summary page will be included in both the 90% and 100% design packages.
Each design sheet of those package shall include a quantity take off table.
• The ENGINEER shall submit a estimate of probable construction cost with both the 90%
and 100% design packages. This estimate shall use standard CITY or TxDOT bid items, as
applicable.
ASSUMPTIONS
• Three (3) sets of 11"x17" size drawings and one (1) set of specifications will be delivered for
the 90% Design package.
• A PDF and DWF file for the 90% Design will be created from design CAD drawings and will
be uploaded to the project folder in Buzzsaw.
• Ten (10) sets of 11"x17" size drawings and two (2) set of specifications will be delivered for
the 100% Design package.
• A PDF and DWF file for the 100% Design will be created from design CAD drawings and will
be uploaded to the project folder in Buzzsaw.
DELIVERABLES
A. 90% construction plans and specifications including QC/QA documentation.
B. Utility Conflict Coordination Package
C. 100% construction plans and specifications including QC/QA documentation.
D. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's or TxDOT's standard bid items and format, as applicable
E. Original 11"x17" size cover mylar for the signatures of authorized CITY officials.
City of Fort Worth,Texas Page 9 of 23
Attachment A
PMO Release Date:02.06.2015
Page 9 of 23
FORT WORTH r
TASKS. BID PHASE Cv `" €S. REMOVED FROM SCOPE OF SERVICES
alteMative deliVeFy. ENGINEER will support the bid phase of the PFE)jeGt as fellews.
5.1. Bid SuppeFt
lcness to potential bidders
• (`nntraot dGGI invents shall he uploaded in a vl filo
• I Ipit Prlae PFeposal rtnslimenty aro to he Created Utwli`inn (`CSV RiutnnlS n hi anrt
and will be populated and GGRfigwFed se that all pages aFe Gemplete and the
tr)tals from the inserter! I Init Drina Proposal rlooUment waFksheets
• --Rlan Sets are to be uploaded e Bzzsaw iR two femqats, pdf i Rd AY4fes. The pd
GAP- fA-F P--AGh plaR sheet, and will be RumbeFed and Rarned lilw to that
of the plan set iRdev
i�r! d2a T ENGINEER II Isar! all approved
cr�e��.�t.�i�1-Fei --e��e{�vu-1--Fi�Et'tvTrti�1��h�,� -gyp.''n va ccrrr-cx�rovoc+
addenda onto Ru zzsayy and mail add8Rrta to all plan holdws
• Attend the prehirt onnferense in suppon of the ( ITV
Attend the hirl o e nn in suppart of the QT-Y.
• Tabulate and Fevew all bods FeE;emved fE)F the G0R6tFHGtieR PF9jeGt, assist the CITY
anrt the GCSA/ Data Spreadsheet n eaten t AtiliZino ! F=W Rirltnnls only are to he
uploaded into the prniest's Rid Results folder OR Ruizzsaw.
City of Fort Worth,Texas Page 10 of 23
Attachment A
PMO Release Date:02.06.2015
Page 10 of 23
FORT WORTH_
ASSUMPTIONS
• GGRStFlJGtieR dE)GLIMeRtS Will only be made available en Buzzsaw fer plan holdeirs
anal/er given to plan ng r emc
planheldws aprl/nr given 4e plan "eing r me
• P[3� n/G aR d QWG files �., z
�.cl 2�-t$- EFzzSavr
DELIVERABLES
�t. A�I—,-cvrlevciau
P. Bid tabulatmOR6
E. QFVV Data Spreadsheet
City of Fort Worth,Texas Page 11 of 23
Attachment A
PMO Release Date:02.06.2015
Page 11 of 23
FORT WORTH u
TASK 6. CONSTRUCTION PHASEMSERVIG REMOVED FOR SCOPE OF SERVICES
CAIGONECP will suppe- F the senstn Gtign phase of the nrgient a follows
• The ENGINEER droll prepare ane (1) task order nandeage fnr the `ITV's 1 Init Prise
CAAUArlAF
• The CAI('_INICCP shall attend the nrennnctnirtinn ngnforenro
• After the PF8 GGRGtF61GtwA-.R GG-.Af(-QF(9AGe, the ENGINEER shall pFevide pFejert exhibits;
r�'svaacv neFS.
anrd rdistrihu he there to the rcrgiest team
•T he ENGINEER will pFepnar�E)RstrU Gtinn Gemma iniaatinn Plan rdeta%4he
• The F—=NG NICCD iA.4If meet with sgnnerneed nitrons as Reoder!
by the sgntraster fell:general ngnfnrmanae .pith the design sgnsents anrd nonoral
the rgntrant fnr agnstn istinn ngr is Sash r antee that the woFk severed by
s��hmit-Fals in R--;Z;zsaui
resgmmenrdatiens as to the ansentability of the werdr
• The ENGICAICP will meet with the PrgieGt Delivery Team and Gentrastgr nn site to
review any field nhanges
•The Cn1(_InICCC? Will GOGFdinate with the TRW department as nenessani
• The Cngineer will update aped submit menthly the Prnient State� Penert Di 4
QC ed Prei t Qsh I
I�egFS�ef, �vc�'rra-r�vJesr-vvrre�cr',e-
of final pUnGh lost.
6.2 Rer-,errd dlvra-Dram.fings
shall nrenare reGOre�d rdrawings from infermatinn nreyirdeet by the
TheENGINEER am. �shall n�i cperr�ccs-a-�v�n�.» cv--v7--mc
CITY rdenintiRg aRY changes made to the CiRal DpaWings d ging nen tF 1ntign
e As Built StAwey
City of Fort worth,Texas Page 12 of 23
Attachment A
PMO Release Date:02.06.2015
Page 12 of 23
r'oRT WOR`T'H_
6 Red Line MaFkups from City Inspp-nter
6 A ppreved S bstitu hieps
The ENGINEER shall FqE)dmfy the FiRal Drawings eIeGtFeRiE;aIly @Rd shall plaGe a
Forrstr'zicviced. The stamp shall be Signor- onr- r-a+p-r- by the ENGINEER and ,hall he
plan each plan eek T er+hefea,ro anr, Feyils+onG nn +hp-- 6hop-+ g-r Ret. Each
sheet shall Glearly indiGate all GhaRges whiGh apply te that sheet by Gleudmng-an4
umberipg, e suitable a+hp-r sitahle meant
prglrirlgrl by ether; and eprp-sp-nt the as ggnstrllnterd ngnrlitigns to
depieted en these dFa��g&-.
The ENGINEER shall submet a set ef sealed PmRal Dl:awiRgs, medified and stamped
MAIC ferrr»4 The CNIGIAIRGR may keep np-pip-c of the infprma+inn pFeyided by the
CITY fA-.r their files, but all eiriginal red lined drawings shall be returned te the CITY
with the digital files
Thelre shall be ene (1) DTIC file and ene (1) D VVF=file far the T-PVV plan Sp-+ anr- a
separate DFapr- DWFfile er the VVateF p.Iane , e� ach PDF anrD1 /C
file shall GA-.Pt-;4;P all assesaated sheete-ef the par+iGWIar plan set. SiREJ llaF ons anr,
DWFfiles for each chert of a plan cot will net he ae•eepterl RTIC anr- DNA/C filp-c
1. TRW file name example- 1LW 1966_oFg47-.. f"when 11\A/_1966" is the assigRed
file b btair'ed f the CITY, gna+�zhe fileisef��i„a;
,ne r�,T,ner� r 1 ,rem � n n
pIp,aR set, "47" shall be the tetal�ll Rumbel:A-f sheefsgpthisfelt=-
Example:
11 Water.ane- p- //Y_4CCC7 C pdf11 w " RCCC7"
11. •�pTG1�R11A cWcC file parr}�enam{�le-�c�wvTAl'��v:-pa�l—vrheFe >�wvr
if 11
of an er ginal plan set "36shalA l be the tetal RumbeF ef sheetsOR this file.
Example; x 12755_orgI8-. f
Seth DTIC ane- MAIC files shall be upleaded to the prnip-n+'c RPGArr- Ilraulinn feldeFBuzzsain
w.
number/Q1 7\ 392 9426 File numbers will not be issued to a prpies+ Y RIe6s the
apprepriate n eGt R embers and fund GGdeS have beep aSSOg Red anr- aFe in +hp-
City of Fort Worth,Texas Page 13 of 23
Attachment A
PMO Release Date:02.06.2015
Page 13 of 23
FORT WORTH
GRe (1) DL ihlis Mee+inn i asci imerl
Fight (9) site visits are assumed.
Feur/A\ submittal reviews are assumed
Six (6) DFI's are assumed
Civ (6) Change Orders aro assumed,
DELIVERABLES
A. PubrreetiRg exhibits
,- Rp-vip-mi of Ghanne (lrrters
ro-c��c.Tr-vrvrrcrrrgc-vrv�v
F Review of shen dr $�
F Final DUnsh I ist items
City of Fort worth,Texas Page 14 of 23
Attachment A
PMO Release Date:02.06.2015
Page 14 of 23
JVORT WORTH..
TASK 7. FLOW EASEMENT SERVICES. REMOVED FROM SCOPE OF SERVICES
ENGINEER will suppeFt and perform aGtivities related to RQVV and land as GutliRed belew, pe
E;GepaRg rdirestien aprl guirdanse from the ('ITV's RreleGt Manager,
7 1
Right_of_Way Research
The ENGINEER shall deteFmille Fights of way, easemeRtS Reeds fGF GE)R6tF6lGt*GR e
GR avamiablep and reG0MFReRdatiGRG Wall be made for appFeval by
bt-t Y.
7 7 Right_ef WayiCasement Rreparatlen anrd Submittal
• The ENGINEER shall prepare CIGGUrnents to be used to obtain Fight_of_way aped
templates available nn the (`ITV's Ru zzsaw site
72 Temperoni Right of Cntn/ Dreparatien anrd S ibrpittal
• PFOGF tG GenStFUGtk)R, the ENGINEER shall pFepare, mail and obtaiR TernperaFy Right
the preiest anrd n asement is required to enter their prePeFty.
• The ldesUrrmentatinn shall he previlderd in sonfermanee with the sheeLlists anrd
templates available en the ('ITV's Ri zzsaw site
ASSUMPTIONS
• Few /A\ easements are assumed
• Nip- Rev.; Right of way wall be required
St—apt of the pFgjeGt-aR d available eA_gre�'nrvm�pp mpe4y117fAr{�atIAI�-FI.e. �r�—rrvrrr vv-
eviAGUFesr.
A. Cepit /A\ Casemept exhibits anrd meets nr) bounds p Vi decd OR GITV forms
R One (1) TemperaFy Right of CntFy ender letters
G. One (1)Temperary Right of Entry rd GUments
City of Fort Worth,Texas Page 15 of 23
Attachment A
PMO Release Date:02.06.2015
Page 15 of 23
FORT WORTH.
TASK 8. SURVEY Akin SUBSURFACE RFACE i iTINTY ENGINEERING SERVICES. REMOVED
FROM SCOPE OF SERVICES
ENGINEER will provide supiey supper# as fellow
DeSigR S61Pvcf
grade lines
��
• The mipinfnrma#inn to be provided OR the plans shall ipnl�irle the
fellew;Rg: ^ pp
.4. PrejeGt GORtr61 Sheet, shGWinn ALL I GeRtrnI Dnin#s used nr set whole.
na#herinn data Geperally o a ala of pet loss than 1:
a. IdeRtified (€x+stiRg. CITY MGRurneRt8901, PK Nail, 5/8" Iron RGd)
b. X, Y andz ('nnrrtina#e�, R aR nnnr i r
ed sus e+��a..,pd-a-a-re#erre�
bearin�aase7 snerdipate nn CITY Datum nilly
n y at' /� get the a-ef#h le the South a��rh
�- eS6f�ptl� e6ur161� -� �r�-n�,�^veR�en^-n--vr-crre�,,rc
Lipo of North Circe drive at the Fast oar! of a#the Se l#heast rnrper of
Ne4h Side Drive anrt North Main Street).
'�nrrt c GA alp-a l PvsTT.'s, P.I.'s, MaRheles, Valves, etG., OR ';;4rnp-
rVe-e—rdinateate system, as the ('`nn#rel
Nn less than ficin hnri-nntal hepsh marks per line OF Irma#inn
Bearipns niyen nn all proposed nen#erlines or haselinns
,
C#a#inn epi atinns Cela#inn utilities to paving When appropriate
e
8.2. a pYy n�Right fF=RtFy Tppa�ractffiGn anr•1 211hMWA4
• Prie.r tA- eRtering property, the ENGINEER shall prepaFe, Mail ;aAd ebtaiR TempeFaFy
Right of Fp#pr from IaprinW pens
• The Ansiimenta#inn shall he pFeyirler! in annfnrmapre vmfith the nhenkli # .;;Ad
-
templates available en the CITY' B zz aw site.
vR-Z. S abvarfuve Utility ERgnineerirprrgn
.
Pr iirl rfa% Utility nnin�P (SUE) #e Quality Level /l r' R ani! /1 as
Crays-vimr� �' '-'�\ ;r � �
deserlbed bele�Th�Eshall be iNoth GWASGF 3A 02
City of Fort Worth,Texas Page 16 of 23
Attachment A
PMO Release Date:02.06.2015
Page 16 of 23
FORT WORTH.
Quality I evel m
personal intewiews, visual inspeGtOGRS, '
te help ideRtify utility ewneFs that may
have fa Gilities Within the nroien# limits er that .,•, i be affente.d by the nroie• QeIleGt appliGable FeGeFdE; (e.g., Utility eWReF base maps, n#
u
a6 built" eF FeG•
• Develop SUE plan sheets anrd transfer infermatinn OR all involved utilities to
depiGted
*RdiGate: utility type arld ewnelrship; date Gf depiGtieR; qUality level(s); eRd
�nonintc of�anY utility data_status�.g., aE;tive,abandoned, eut ersepv:se); Ii„e-size
anrd GGnrditien• nUrnber of jointly buried Gables; and enGasemen#
Quality Level G /inGL ides tad's as rdesnriberd for Qua I e�iel fl\
e
that are surfane n i wtenanni�
es of shsurfa Ge utili#ies
LevelG taske-
• The- supiey shall alse iRGIude (;R add4ien to subsyFfaGe utility featwes visible at the
resolve GonfliG#inn infermntiOR
the integration of Quality Level el D anrd Quality Level G information
,
GWRers eta.) as may hen Reed
ed to f urtherreselye rlisGrenannies
• PrA-;.9wd-e Quality Level G to identify eveFhead utilities OR the pFejeGt and PFAvide the
overheard Utility infr,rma#inn en the SUE nlan sheets
Level R /innlW-ides#nshs as rdesnriherd for Quaky Lev ('\
City of Fort Worth,Texas Page 17 of 23
Attachment A
PMO Release Date:02.06.2015
Page 17 of 23
TORT WORTH
..`�
subsurfaGe utilities within the pFejeGt limits, and!OF tO tFaGe a pal4iGular utw"ty line OF
system.
Of IiRes.
• URIess E)theFwOE;e diFeGted, mark GeRtediRe Of SiRgle GGRduit lines, and Outside edges
Of m ,Iti r•onr#,,i4 systems
ann,,rtenanoes
• Renommeni•I additional me ,res to reselve differences if they still evict
evnlemtnry evcaya#inn er upgrade to Quality I evel A data.
• As an alternative #n the nhvsinnl marking of lines, \/the ENGINEER may, with GIT 's
•, Fvnese and Innate utilities at specific lacatlens
• Provide utility size ani•! cnnfin„ration
• PFeViap�ynrr thinknessan�Pe where annlinahle
0s Feasonan h�aGlG nimble fFem each test hole site
ASSUMPTIONS
• Up to Five 15\ Level el A test heles are inch,rter#
• Level R SUE limits are as foliews•
SUELevel R Seances far ayiirlth of onnrnvimately 'loaf+ inrl,isi ie of I Inl\/erGwtY DF
,
5thStree RQVV, from VV 61h Street intersec#inn so,hh c,,rh rete,rn to annrnvimatehi
150 ft north of the north s ,rh ret,,rns of VV Wh StFeetAlse, theiih (`l;,;, es r;� aloo \//5th
Street ROW, fF m�
east of the enc# c,,rh re#Urns (same in#ersen#inn\
DELIVERABLES
Texas.
City of Fort Worth,Texas Page 18 of 23
Attachment A
PMO Release Date:02.06.2015
Page 18 of 23
FORT WORTH,
TASK9P€RMITfING. REMOVED FROM SCOPE OF SERVICES
ENGINEER will pFevmde permittiRg suppert feF the CITY te ebtaiR ally and all agireements andle
PeFmits n ally regi sired fnr a pralest of this size and Nino as foil )W6
p I Tows Department of Traps portation (TxDQT) Permit
v.
•
Meet, negotiate and nnnrdina}e }o obtain approval of the agePny issi jinn the
agreement and/or permits
• ('ompleting all ferms(appllsatlons neoessary
revised fnrmc for agenn, revieui
Rerponding to anennv nommen+s and regi pests
A�Ra+Ife ad Pe F m;r-NOT REQUIRED
• Meet, nega}into and noordina}e to obtain appreval of the anenn . iss jinn the
agreement and/or Permits
Qi Ohm Otto ng revised forms fnr agenny ie��i
Desponding }o anennv nommen}s and requests
D 3 Texas Department of I in sing and Regi la+inn (TIDI LJ)
v. e
• Idep#if and a alyzethe FegaireMeRtS of the Texas Arnhi}eGWIFal C2arriers As+
n�i#hnrities having iYrisdintion to approve the design of the Droien#
• FENGWNIFEER ms FespeRsible feF pFGVidiRg plaRS that -AFP- .01A GA—mplmaRGe with TEA R
regi Bireme AS
• Slubmi�R6tFUntinn dory imepts to the TIDLR
• ( emple+ing all TDI=R ferms(appllaatlons nesessary
• d#tCttt-t--the ianoe from the TDI [?
• Request aP inspeo#inn from TDLR or a TDLR Zonally approved Registered
nomple#ion Advise the ( ITV in writing of the results of the ins Pontoon
• Respondipg to anennv oomments and regi pests
• All hosts associated with TDLR plan reiie nd inspections are to he paid by the
ENGINEER dU ging the GO Irse of the Preiec+
DT A Others As Needed (throated by the ENGINEER)
City of Fort Worth,Texas Page 19 of 23
Attachment A
PMO Release Date:02.06.2015
Page 19 of 23
FORT WORTH
ASSUMPTIONS
• Dermif pFepaFation will horvin a#eF approval of the DrolimiRaFy Design
GGGtG,..^^^^++^^
.
• QRe (1) meeting eaE;h is assumed with The Texas DepartmeRt of TFallSpeFtafieR and
RAS eGiali t fAFfh«T-EnnT- and Tf1Dl n� S
DELIVERABLES
B Gepioc of AppFayed Dormifo
City of Fort Worth,Texas Page 20 of 23
Attachment A
PMO Release Date:02.06.2015
Page 20 of 23
FORT WORTH z
TASK 10. QUALITY CONTROL/ QUALITY ASSURANCE
ENGINEER to provide to the City a Quality Control/Quality Assurance Plan (QC/QA Plan)
outlining the ENGINEER's method of ensuring the highest levels of design and accuracy are
incorporated into the calculations, plans, specifications, and estimates.
ENGINEER is responsible for and shall coordinate all subconsultant activity to include quality
and consistency of plans.
If, at any time, during the course of reviewing a submittal of any item it becomes apparent to the
CITY that the submittal contains errors, omissions, and inconsistencies, the CITY may cease its
review and return the submittal to the ENGINEER immediately for appropriate action. A
submittal returned to the ENGINEER for this reason may be rejected by the CITY Project
Manager.
10.1. QGiQAef SupveyalRd SUE Data
presedures,field supveys, data, 'nrJarrd PF@prvvuvtc pri� deliyeFy to the CITU The GITT
may
of miovnrc anal SUE prevideFs
le#eF that the SUE iRfermation provided hals lJRdeFgE)Re a Quality GORtFell Quality
Assura RGe PFOGecc
10.2. QC/QA of Design Documentation
• ENGINEER shall perform a QC/QA review of all documents being submitted for
review at all stages of the design including the 60%, and 90% and Final Document
design review submittals. QA should be performed by an individual within the firm
who is not on the design team.
• ENGINEER is to acknowledge that each item on the Detailed Checklist has been
included by checking "done" on the checklist. If a particular checklist item is not
applicable, this should be indicated by checking "N/A". If an entire checklist is not
applicable, this should be indicated by checking every item on the list as "N/A" and
still included with the submittal. The ENGINEER shall use the Detailed Checklist
provided by CITY.
• A Comment Resolution Log must be used to document conflicting comments
between reviewers and to highlight comments made by the CITY that the
ENGINEER is not incorporating into the design documents along with the associated
explanation. The ENGINEER shall use the Comment Resolution Log provided by
CITY.
• The documentation of a QC/QA review includes (1) a copy of the color-coded,
original marked-up document (or "checkprint") developed during the QA checking
process and/or review forms which sequentially list documents and associated
comments; and (2) a QC sign-off sheet with signatures of the personnel involved in
City of Fort Worth,Texas Page 21 of 23
Attachment A
PMO Release Date:02.06.2015
Page 21 of 23
FORT WORTH-
the checking process. Mark-ups may also be documented using the Comment
Resolution Log.
• Evidence of the QC/QA review will be required to accompany all submittals.
Documentation shall include, but is not limited to, the following items:
- PDF of the completed Detailed Checklists
- PDF of the QC/QA checkprint of the calculations, plans, specifications, and
estimates demonstrating that a review has been undertaken;
- PDF of previous review comments (if any) and the ENGINERR's responses to
those comments in the Comment Resolution Log.
• If any of the above information is missing, is incomplete or if any comments are not
adequately addressed; the CITY may contact the ENGINEER and request the
missing information. If the ENGINEER does not respond to the request within 24
hours, the CITY shall reject the submittal. No additional time will be granted for a
returned submittal.
• If the ENGINEER has not adequately addressed the comments, the submittal shall
be rejected and returned to the ENGINEER immediately to address the issues.
ASSUMPTIONS
• All submittals to the City will be Quality checked prior to submission.
• A PDF of the QC/QA documentation will be uploaded to the project folder in
Buzzsaw.
DELIVERABLES
A. QC/QA documentation
City of Fort Worth,Texas Page 22 of 23
Attachment A
PMO Release Date:02.06.2015
Page 22 of 23
FORT WORTH.
_�
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and ENGINEER
agree that the following services are beyond the Scope of Services described in the tasks above.
However, ENGINEER can provide these services, if needed, upon — be sure to track changes.
the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon — be sure to track changes. in
writing by both parties before the services are performed. These additional services include the
following:
• Negotiation of easements or property acquisition.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre-qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services to support, prepare, document, bring, defend, or assist in litigation undertaken or
defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
City of Fort Worth,Texas Page 23 of 23
Attachment A
PMO Release Date:02.06.2015
Page 23 of 23
ATTACHMENT B
COMPENSATION
Design Services for
2018 Signal Bond Program,Year 1 —51 Street and University Drive
City Project No. 101723
Time and Materials with Rate Schedule Project
I. Compensation
A. The ENGINEER shall be compensated for personnel time, non-labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work.
Labor Category Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category 2018 Rate 2019 Rate
$/hour ($/hour)
Project Director $198.00 $204.00
Project Manager $175.00 $180.00
Senior Project Engineer $158.00 $162.00
Project Engineer $120.00 $130.00
CADD Technician $120.00 $130.00
ii. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non-labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 1 of 4
B-1
ATTACHMENT B
COMPENSATION
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 2 of 4
B-2
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee %
Amount
Prime Consultant
Teal Engineering Services, Project Management, Traffic $23,324.00 100.0%
Inc. Signal Design
Proposed MBE/SBE Sub-Consultants
Non-MBE/SBE Consultants
TOTAL $95,896.00 100%
Project Number & Name Total Fee MBE/SBE Fee MBE/SBE
CPN# 101723, 2018 Signal Bond $23,324.00 0.00 0.00%
Program, Year 1
City MBE/SBE Goal = 25% Consultant Committed Goal = 0.00 %
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 3 of 4
B-3
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
City of Fort Worth,Texas
Attachment B
PMO Oficial Release Date:8.09.2012
Page 4 of 4
B-4