Loading...
HomeMy WebLinkAboutContract 51573 FReceived Date: 11/26/2018 Received Time: 11:15 a.m. Developer and Project Information Cover Sheet: Developer Company Name: Forestar(USA)Real Estate Group Inc. Address, State,Zip Code: 14755 Preston Road, Suite 130,Dallas,TX,75254 Phone&Email: 972-341-2906,Tomburleson@forestargroup.com. Authorized Signatory,Title: Tom Burleson, Senior Vice President Project Name: Watersbend South Phase 4 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: South of High Summit Trail and Castorian Drive Plat Case Number: Plat Name: Mapsco: Council District: CFA Number: 2018-042 City Project Number: 101507 EFTWORTH, RECORD RETARY City of Fort Worth,Texas �( Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51573 WHEREAS, Forestar (USA) Real Estate Group Inc., ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Watersbend South Phase 4 ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer'sc_ontractor(s) City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 CITY SECRETARY Page 2 of 11 FTA NORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) X- Sewer(A-1) Z. Paving(B) M. Storm Drain(B-1) ®. Street Lights & Signs (C) Z.- E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2)years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers,agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and (2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Watersbend South Phase 4 CFA No.: 2018-042 City Project No.: 101 507 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 333,984.00 2.Sewer Construction $ 239,319.00 Water and Sewer Construction Total $ 573,303.00 B. TPW Construction 1.Street $ 747,062.75 2.Storm Drain $ 769,589.00 3.Street Lights Installed by Developer $ 87,518.13 4. Signals $ - TPW Construction Cost Total $ 1,604,169.88 Total Construction Cost(excluding the fees): $ 2,177,472.88 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 11,466.06 D. Water/Sewer Material Testing Fee(2%) $ 11,466.06 Sub-Total for Water Construction Fees $ 22,932.12 E. TPW Inspection Fee(4%) $ 60,666.07 F. TPW Material Testing(2%) $ 30,333.04 G. Street Light Inspsection Cost $ 3,500.73 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ 94,499.83 Total Construction Fees: $ 117,431.95 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 2,177 472.88 x Completion Agreement=100%/Holds Plat $ 2,177,472.88 Cash Escrow Water/Sanitary Sewer-125% $ 716,628.75 Cash Escrow Paving/Storm Drain=125% $ 2,005,212.35 Letter of Credit= 125%w/2yr expiration period $ 2,721,841.10 City of Fort Worth,Texas Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Forestar(USA)Real Estate Group Inc. Jesus J.Chapa(Nov 26,2018) Jesus J. Chapa Assistant City Managerh� TH. Burk-s: v Date: Nov 26,2018 Thomas H.Burleson(Nov 21,2018 Name: Tom Burleson Recommended by: Title: Senior Vice President K,1" Date: Nov 21,2018 Evelyn P be &(Nov 21,2018) Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form & Legality: administration of this contract, including ensuring all performance and reporting Richard A NcCraggen requirements. Richard A.McCracken(Nov 26,2018) Richard A. McCracken S5!2= Assistant 5!2 — Assistant City Attorney Jennifer Ezernack for(Nov 21,2018) - M&C No. /A Name: Janie Morales Date: Title: Development Manager Form 1295: N/A F T�o ATTEST: U Mary J. ayser(Nov 26,M18) •.�' Mary J.Kayser/Ronald Gonza , .. City Secretary/Assistant City Secretary OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX City of Fort Worth,Texas Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement Location Map Exhibit A:Water Improvements Exhibit A-1: Sewer Improvements Water and Sewer Cost Estimates I� Exhibit B: Paving Improvements Paving Cost Estimate `® Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate rgExhibit C: Street Lights and Signs Improvements 1®1 Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101507 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Watersbend South Phase 4 CFA Official Release Date:02.20.2017 Page 11 of 11 N �- -HICKS 0 } W E z �o a o SLi a D 0 P� �InIInII_I Q r. } CII tJ ILu�JI CV LD Q o B 7co N z 156 � o Y o PROD C T a � L OC TION NARMDN Q 9� W G� o U C4 I 9C I o ERT W❑RTH CITY LIMIT n SAGINAW CITY LIMIT I BAILEY - BLISWELL L ° 7 6NLEY- B➢SVELL N R—AR 1 CLOVER'Rf � �� a Houlsto�NREEN V f�� � o PPRK [,EvtP N L ^ FAI MEAD NORMAN S y w A4 MEA DV DA MEA➢D �. `l i C VICINITYMAP MTd L o CPNOOOOOO U' MAPSCO#19V U) WATERS EB END S®= N PHASE 4 0 i LOCATEDIN CY]rY OF FORT WORTH,TEDUS a) DEVELOPEQ2/ VaML PRPPARM BY: 0 3: LACKLAM H®LDEN( S GOODVENI 1 3045 LAC)aAND RD. MARSHALL FORT WORTH,TX.76116 CML ENGINEERS-PLANNERS-SURVEYORS PHONE:(817)502-2538 2406 Mustang Drive,OrapevYte,Teres 76051 Q Metro(617)326-4373 MARCH, 2®18 W WATE SB END SOUTH N W+E PHASE S WATER IE=FT"All SCALE: Il°1 =300' °l) GRAPHIC SCALE 1"=300 ' 0 N 0 0 300 rn Ln r- - lam �l l-- CO — N M I I 49 L G f m s « + + JO � �• �e o�atl er�tl r � u L ° ~ • • Il d r N 7 N 7 7 N QLL- 7 a • ! • . b U N ! I I a � ! . x • ° N N t ! n m e x e o ■IDItl emltl emtl tl N I � a M N tl ! O II tl M ! e e ! tl I N tl f e • tl al � ema b tl x f e R N N N e tl � N em• a tl N a t n m N � ■tOftl N n t m a 7 a n N O x z a pr / N N � m N L I + E L. f >0 N C Q v -- n v c a> U) a� LEGEND C -W PROPOSED WATER LINE PREPARED BY. W EXISTING WATER LINE GOODVa TN DEVELOPER/OWNER.- NOTE, 0 RAMI EAILL y ILACIIU.ANDHOLDINGS ALL WATER LINES SHOWN CML ENGINEERS-PLMNERS-SURVEYORS 3W LACKLAND RD. ARE 8' IN DIAMETER UNLESS 206 Mu+Anp DIM.Gmpr&i%Tames 71=1 FORT WORTH,M 76116 OTHERWISE NOTED LLJ Metro(817)SW4M PHONE:(617)502-2539 c�\ �� N ����ATVvA V V TERr\�\v IBE V 1L1i SOUTH w*E PHASE 4 s EVIER_91t SCALE: 1"" 0 3009 GD u<1lJlululllll L9 8 GRAPHIC SCALE I "=300 ' 0 N N 0 300 N Lo C — N + el + J+ + w J s Jo >0) ■ror+ n Ep > • rm a fm Y • • Y e e L I I n • e r r �- r r em •' Q LL Oft 41 U � I + + x w n a o I � n e ■ Y � a N x + x r + u L r r s e r •r � n a 40 \ e x a a L_ +O �5 x O \ $ s N x s e x N 11 ■ � \q � � \ w a e�r ■ b N « � \ ■ a e s x w N N JJ n a r+Or a rr a ■ \ x \ a a a Jr a J+ n L a N n ++ rml r Cn ram:is \ a m m aI am 1 emJt Y N I « I nY o I N TRALZ / cnC N a� LEGEND o PROPOSED SANITARY 3: S- SEWER LINE PRBPARM BY: EXISTING SANITARY (GOODYMI DEVE.OPER/OWNEEL SEWER LINE h A1�lEaAL1L Y �� NOTE : ff 0N1°'�'"� `" -P ""� RS D-SURVEYO3MLACKInNNo. ��� ALL PROPOSED SANITARY SEWER / 2405 MISW9 DrW T�78051ORT + (817) FHONE: 8111W. 2&'Q LINES SHOWN ARE 8 IN DIAMETER W PHONE:(81�502-2539 WATERS MEND SOUTH N PHASE 4 W*E S=Ts 8 FIT^131e SCALE: 1" v 300' 0 N ID CO O (D (D N O d �• • • w a • ■mc a glace rmc e e Q W a I " � ° er ° •o s s « I m O • a • • w v L • « La a + a • + w � a ^ ■ s r r O a +p O N r r I rmc a ami a ■mc a Lm e � a N •o •, ■ N a r O a Er) ■ L w ? a ■ r n LEGEND « ------ SIDEWALK BY HOMEBUILDER � r ■�e e � « rm a +• r r ae L n awe v ADA RAMPS PER THIS CONTRACT � n e ■ w \ rmc L ^ Y 7 °+ +• a a ac O " m U) ea a° PROPOSED 29' B—B ROADWAY •a `°Re w/ 50' R.O.W. 6' THICK REINFORCED cn Y a .m/ _ CONCRETE PAVEMENT m ee s O O °�: 01 °O a � PROPOSED 28' B—B ROADWAY w/ 60' R.O.W. 9' THICK REINFORCED CONCRETE PAVEMENT c N -- N 0 PROPOSED 37' B—B ROADWAY > AxMBY' 6/ THICK REINFORCED (GOODVaN8 DEVEL.OPERIOWNffiL CONCRETE PAVEMENT (D --MAUFLAIL III 0 CML ENGINEERS—PLANNERS--SURVEYORS IIr[9C119JL•L917JI1'HOLDINGS 3645 LACKLAND RD. zw°Mcawq orA(17)32D/s,Tmm 7eoef FORT WORTH,TX.78118 1Asho la1A SIDEWALK PER THIS CONTRACT W PHONE:(817)502-2538 N WATERSIBE S® W+E P1l 1LAA.]E 4 8 STORM DRAIN SCALE: 1" = 3009 IIr c HMIIT nB_1n Co GRAPHIC SCALE 1 "=300 ' 0 N rn 0 300 0 OD CO CV O d m 1 w a d ° do aaa• a • r e a � a - d �l N a a « a > e « a � � i rs • « a I • a 0 � • n r a a r « c r a • s I • a LL N U n a I I dr A r « I r y a r a r r « N O N ♦ a ~ r a • e u O m o N r -r- 0- 0 O « > r r n � tl v I w r -p « C a r r a N a e tl � s r • N fn \ a \\aoa e Lsr m m v mma / a V a m N A rm tl N is m O a a N L y a lea � n O C � N N � J N r i N O N C D / C N LEGEND 0 PROPOSED STORM DRAIN LINE PMARM BY: I DHVELOP1EMWNER: EXISTING STORM DRAIN LINE 0 M&UHAj g, 9 ILACKI-AND,HOLDINGS � PROPOSED STORM DRAIN INLET CML ENGINEERS—PLANNERS—SURVEYORS 3045 LACKLAND RD. / 2405 MUBWg DrM,Goprvtr,To 7005+ FORT WORTH,TX.78118 Mme— PROPOSED STORM DRAIN DROP INLET Ld MOO(817)32D4M PHONE:(817)502-2538 �TAPII4IERSIBIEND SO= N W*E Il I ASE 4 S STREET LIGHTS&STREET NAUM SIGNS E IT"C-g" SCALE: I" =300' CO GRAPHIC SCALE I "=300 0 N Lo 0 300 O O CO CO o - / x O t •l f r t t al o O �• a 0 rm e 01040 •° • • u a • N t u • ° u •Y r I r Cr' r m • N • • a N ` N • N • N ) M � A m ■ I I n o ■ v ^L A x N t N Y ) •P L_ •/ r N e e •I 7 N O N r N r N am a a n 3 A w I •o \ ■ r x � N r N N O ■ x r tl ■ ■ ar rn n ■ L ami •' I N r n x w � N ■ ■ n ■ r / .■me x w tl N ■mt Q1 x a A n \ ■mt r •/ x . M n N N m al L � m 7 m ao O N (n ■mc r H N N m C e: 27 to w N m of N ro i a / I f rn C O N Qto L PRBPARM BY: I GOODV NI DEVEI.OPEMOWNEL' LEGEND Qo O MARSHA][,j, Y LACK—WD HOLDINGS PROPOSED LIGHT POLE •$ CML ENGINEERS'PLANNEM—SURVEYM 3045LACKANDRD. - / a4W Mum"Drkm & a■ap,Tm 7M+ FORT WORTH,TX 76118 PROPOSED STREET SIGN 1 I J M°trO(B17)304M PHONE:(817)502-2539 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Watcobend Soud4 Phase 4,City Project 0101507 UNIT PRICE HID Project hem Inlbmell0n conatsar Construction S fart Description Spec' cation Unit Unit Price Bid Value Item Section No. Mearwc hwidir. Water Facilities 1 3311.0261 8'PVC Water Pipe 13311 10,33 LF 1112 4,964 $32.00 $150488.00 2 3312.3003 8'Gate Valvo&Valve Box J 33 12 20 EA 9 $1,260.00 $11.250.00 3 3312.0001 Std.Fre Hvdrant Assembly w/6'Gate Valve&Valve Box 331240 EA 6 $4.000.00 $24.000.00 4 3311.0001 Ductile Iron Water Fittings w/Res4aint 331111 TON 1.2 $4,000.00 $4,800.00 5 3305.0109 Trench Safe 330510 LF 4,984 $0.26 31,246.00 6 3312.2003 1"Domestic water services 331210 FA 138 3950.00 5129 200.00 7 3312.0117 Connect to Existin 8'W.L Stub-out 33 12 25 FA 4 S 1.000.00 54 000.00 Water Subtotal 1 ;333,984.00 Sanitarj Sewer Facilities 331 83331.4115 8'SDR-26 PVC Sewer Pipe 131 12 10,33.3331 LF 2,429 $38.00 $92,302.00 9 3331.4119 8"DIP Sewer Pipe 33 11 10,33 LF 22 $52.00 $1,144.00 1 1--.3331 10 3331.3101 SDR-26 4'Sewer Services 33 3150 FA 68 $650.00 $44 200.00 11 3331.3106 4"DIP Sewer Service 33 31 50 EA 9 $950.00 $8550.00 12 3339.1001 4'Std.Dia.Manhole 33 39910,33 EA 12 $3,400.00 $40,800.00 13 3339.1002 S Din.Drop Menholo 33 3901 33 EA 2 $5,400.00 $10,800.00 14 3339,1003 Extra Depth for 4'Dia.Manhole 33 39910,33 LF 58 $175.00 $10,150.00 15 0241.2201 Remove 4'Dia.Manhole 343910.33 EA 3920 1 $1,000.00 $1,000.00 18 3311.0242 8'PVC Sanitary Sower Pipe w/CSS Backfill 331110.33 1112 LF 100 $48.00 $4,800.00 17 13305.0109 Trench Safet 330510 LF 2.651dWU $2.561,00 18 3301,0002 Post-CCN Inspection _ _ 33 01 31 LF 2.651 $5.102.00 19 3339.0001 Epoxy Manhole Liner 33 39 60 FA 4 $820.00 20 9999.0001 Connect to Existing8'Sewer 000000 FA 3Si3.000.00 21 3301.0101 Vacuum Test Menhdes 33 01 30 EA 142.100.00 22 3305.0107 Manhole Ad'ustment.Misr 331514 FA 143,600,00 23 9999.0002 Remove 473 LF 8"Sewer&18-4"Sewer Services 00 00 00 LS 158,500.00Sanitary Sewer Subtotal 19.00 Stone Drain Facilities 24 3349.5001 10'Curb Iniet 1 334920 12 38.400.00 25 3349.5002 16'Curb Inlet 33 49 20 EA 4 --TT-26M18,800.00 26 9999.0003 3'x 3'Drop trial 999999 EA 3 4,000.00 $12,000,00 27 3341.0201 21'Class 01 R.C.P. 3341 10 LF 351 $50.00 $17,5W.00 28 3341,0205 24"Class III R.C.P. 34 41 10 68i _ $55.00 $37,455.00 29 3341.0208 27'Class 111 R.C.P. 3541 10 LF 106 $0.00 $6,360.00 30 3341.0302 30"Cless II!R.C.P. 38 41 10 LF 529 $70.00 $37.030.00 31 3341.0302 33'Class 111 R.C.P. 36 41 10 LF 311 $80.00 $24,880.00 32 3341.0402 42'Class Ill R.C.P. 384110 1 LF 1,348 $120.00 $161,760.00 33 3341.0402 48"Class Ill R.C.P. 384110 LF 1, 145. 90.00 34 3341.0502 54'Class III R.C.P. 39 41 10 LF 566 $180.00 $101,860.00 35 3349.4108 33"Class Ill R.C.P.Slo End Headwall 33 49 40 1 $4,000. $4,000.00 36 3349.411148'Class NI R.C.P.Slo End Headwall 35 49 40 EA 1 5 5.000.00 37 3349.4114 54'Class Ill R.C.P.Sloped End Headwall 36 49 40 A 2 .00 $12.000.00 38 3349.0002 4'x 4'Stone Junction Box 33 49 10 FA 3 S4.50MOO $13.500.00 39 3349.0002 5'x 5'Storm Junction Box 33 49 10 FA 7 ,500.00 $38.600.00 40 3349.0004 6'x 6'Storm Junction Box 34 49 10 FA 1 $6,rw.00 36,500.00 41 3305.0109 Trench Safer 3305 10 5,274 1.00 $6.274.00 42 3305.0112 Concrete Collar 330517 FA 4 ;500.00 $2,000.00 43 9999.0004 ArmorMax 00-0000 Sy 44 $00.00 33.960.00 44 OM.0005 Remove 12'Rock Rip-Rap Rip-Rap000000 BY 55 $20.00 51,100.00 45 9999.0006 Remove 24"Headwall 000000 EA 1 00 $500.00 46 99 07 Remove 30'Headwall 00 00 00 FA 1 750.00 $750.00 47 9999.0008 Remove 4T Headwall 00 00 00 1 1,000. $1,000.00 46 3135.0104 Gablon Ma6ress -7-13t, a 1 ;21,000.00 Storm Drain Subtotal $769,889.00 Water/Sanliary Sewer/Storm Drain Facilities Subtotal S1 342,892.00 CIITOP1eaT Meaia Wca*md 3"M PlwIA 7W8NaDCDN%TMX:ilea®PlnPeaAL4SVZ4MAWARMPROMM a"P.J PIDa612 tY,mWWArA2,1016 oo 414 BN noel SECTION 00 42 43 1.: &d Pmjr,-p PROPO C;1l FORM SYat.IsLcnd South,Pkuc 4,City Project nI0007 UNIT PRICE DID Project bem Infomliticn CUnL1_i"Qdutnl,,tiou. LBidliSt - - Spcciticalion Gnit of Did [ascription ( !Init Price Did Value Item __ SeetiooNo. M1lenSurc ,;uaN�� ____�._ Paving Facilities 49 13213.0101 6'Concrete Pavement i Residenfiall _ 1 32 13 13 SY 15,660 $34.00 _:539,240.00 50 3211.0501 6'Lime Treated Sub rade lResidentialt T 3211 29 SY 16,929 $2.75 $46554.75 51 3211.0400 H1STrafed Lime(if,30 lbsJS.Y. Residential+ 32 11 29 TON 253.9 $175.00 J $44.432.50 52 3213.0101 10'Concrete Pavement Arterial) 321313 SY 929 -350.0()l $46.450.00 53 3211.0501 8'Lime Treated Sub,rade QArterial)) ___ ___ __ _ i 32 11 29 f SY 1,016 _ _ $3.00 $3,048.00 54 3211.0400 H uated Limed,42lbsJS.Y.tArterial, 3211 29 TON m 21.3 $175.00 _ $3,727,50 55 3213.0506 P-1 Ramp 32 13 20 1 EA 11 51,200.00 $13.200.00 56 3213.0506 R-1 Ramp 321320 EA 13 $1,400.001 $18200.00 67 3213.0504 M•2 Ramo 321320 EA 3 _$1,400.00 _ $4.200.00 58 3213.0302 5'Concrete Sidewalk _ 32 13 20 LF 136 $15,00 $2,040.00 59 3213.0302 10'Concrete Sidewalk 32 13 20 LF 323 $30.00 $9.690.00 60 9999.0009 End of Road Barricade 000000 EA 4 $500.00 $2.000.00 61 9999.0010 Remove End of Road Barricade 00 00 00 EA 4 $200.00 $000.00 62 9999.0011 Concrete Header 00 00 00 LF 1.16 _ $30.00 $3,4110.00 83 9999.0012 St Si.n w/Sto Sian 00 00 00 EA g $750.00 $8,000.00 64 9999.0013 St Marker Slade 1 00 00 COEA 16 $4,000.00 Paving Subtotal 5747,062.75 Bid Summary Water/Sanitary Sewer/Storm Drain Facilities Subtotal $1.342,892.00 Pavia Facilities Subtotal $747.062,75 Total Bid $2,089,954.75 Parformance/Paywent and 2- .ar Maintenance Bonds $50,000.00 Grand Total $2,139.954.75 CrtYOFFORTAVAIN W-'.1,d Sonh Ph. M STAM)AAU CCHSTAU_M4 PID PAOPOSAI.I,k1'kll:l^=A AWAM))PH01WI) l iN PmiN ilGt161� fm Ani,ed AtN],7JIi PpJ?J7 etd i4.yw,l Proposal for Street Lights i lviijuctlT M, PROJECT Watersbend South Phase 4 BID DATE 08/17/18 3:OOPM (Friday) Independent Utility Construction, Inc. OWNER City of Fort Worth 5109 Sun Valley Drive, Fort Worth TX 76119 PROJECT# 101507 817-478-4444 / estimating@iuctx.com QUOTE DATE 08/21/18 CoFW Pre-Qualification Expires: 03/26/2019 EXPIRES 09/16/18 PP&M bonding included. Our work will take 30 calendar days. Unit Item BidList I Item Description IMMIM 0 1•MA I Unit Price I Ext. Price SL 63 3441.3201 LED Lighting Fixture(incl pole and concrete foundation) 211 EA 3,866.00T 81,186.00 SL 64 2605.3011 2" Conduit PVC SCH 40 (T) 437 LF 11.28 1 4,929.36 SL 65 3441.1408 No 6 Insulated Elec Condr 1 1,3111 LF 1 1.07 1 1,402.77 GRAND TOTAL: $87,518.13 This proposal is offered as a complete package and any deviations from the quantities listed could result in price adjustments and/or withdrawal of the entire proposal. Independent Utility Construction, Inc.reserves the right to withdraw this quotation at any time prior to the buyer's written acceptance. Excludes all bonding,testing,surveying,and staking unless otherwise noted. Retainage may not be withheld on projects less than$10,000.00.