Loading...
HomeMy WebLinkAboutContract 46311-FP1 FORT NORTH® C �� - p COONTRACNTRAC T N0. TRANSPORTATION AND PUBLIC WORKS ✓ q(oo-7— NOTICE OF PROJECT COMPLETION G S 2f(03 j) City Project Ns: 02047 Regarding contract 46311 for SEWER MAIN REPLACEMENT CONTRACT 2013B as required by the WATER DEPARTMENT as approved by City Council on 12/09/2014 through M&C C-27122 the director of the WATER DEPARTMENT upon the reco�endatiora,q the Assistant Director of the Transportation&Public Works Department has accepted the projec[a&f�m�letE, Original Contract Prices: l �{ $1,000,000.00 NOV 14 lois ,_ Amount of Approved Change Orde;s: Ns 1 Revised Contract Amount: "' $1,000,000.00 Total Cost Work Completed: $897,788.75 Less Deductions: Liquidated Damages: Days aQ$210.00/Day Pavement Deficiencies: Total Deduction Amount: $0.00 Total Cost Work Completed: $897,788.75 Less Previous Payments: $897,788.75 Final Pay nt Due $0.00 1;7 (a Recommcceptance Date Asst. Dire r, W - Infrastructure Design and Construction Accepted Date Asst. Director, WATER DEPARTMENT Asst—CV"nager, Date 914 4 Ss Department o TP &W Const.Services rmmJents: CPN# Date Project Manager C7 Risk Management Canaay -5121< j� D.O.E. Brotherton c 0 2 ::" CFA Morales/Scanned Pl�l4 LOFFICIALRECOR '� GutzlerlScanned hcrtflZlf��� aThe Proceeding people have beenC�o+ntacted concerning the request for final payment& have ETA59 �� released this project for such payment. TH ✓ C_Ino�onrn f`nnrir4nri R�• /dLb�w��ia_`''7fin�e�.�ia l�•y'� NOV 14 2018 ' �5 (4o�- Cb l 7 cs 44U311 City Project Numbers 02047 _ DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding Project Manager LopezA City Secretary Contract Number 46311 Inspectors DICKINSON / WATSON Contract Date 12/9/2014 Contractor CIRCLE C CONSTRUCTION COMPANY Contract Time 365 CD PO BOX 40328 Days Charged to Date 447 CD FORT WORTH, TX 76140 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $897,788.75 Less %Retained $0.00 . Net Earned $897,788.75 Earned This Period $0.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $897,788.75 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $0.00 Friday,October 19,2018 Page 12 of 12 FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Contract Limits Project Type SEWER City Project Numbers 02047 DOE Number 7271 Estimate Number 9 Payment Number 9 For Period Ending 10/22/2018 CD City Secretary Contract Number 46311 Contract Time 366D Contract Date 12/9/2014 Days Charged to Date 447 Project Manager LopezA Contract is 33.000 Complete Contractor CIRCLE C CONSTRUCTION COMPANY PO BOX 40328 FORT WORTH, TX 76140 Inspectors DICKINSON / WATSON Friday,October 19,2018 Pa.-e 1 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding SEWER MAIN REPLACEMENT CONTRACT 2013B Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 Work Order Mobilization 50 Ea $1,200.00 $60,000.00 36 $43,200.00 2 Work Order Emergency Mobilization 25 Ea $2,000.00 $50,000.00 4 $8,000.00 3 6"PVC Sewer Pipe,0'to 6' 75 Lf $33.00 $2,475.00 4 6"PVC Sewer Pipe,6'to 8' 75 Lf $35.00 $2,625.00 26 $910.00 5 6"PVC Sewer Pipe,8'to 10' 75 Lf $38.00 $2,850.00 10 $380.00 6 6"PVC Sewer Pipe,101 to 12' 50 Lf $42.00 $2,100.00 7 8"PVC Sewer Pipe,0'to 6' 750 Lf $42.00 $31,500.00 13 $546.00 8 8"PVC Sewer Pipe,6'to 8' 800 Lf $45.00 $36,000.00 195 $8,775.00 9 8"PVC Sewer Pipe,8'to 10' 800 Lf $48.00 $38,400.00 545 $26,160.00 10 8"PVC Sewer Pipe, 10'to 12' 400 Lf $52.00 $20,800.00 500 $26,000.00 11 8"PVC Sewer Pipe,12'to 14' 100 Lf $60.00 $6,000.00 293 $17,580.00 12 8"PVC Sewer Pipe, 14'to 16' 100 Lf $70.00 $7,000.00 13 8"PVC Sewer Pipe,16'to 18' 100 Lf $72.00 $7,200.00 14 10"PVC Sewer Pipe,0'to 6' 100 Lf $45.00 $4,500.00 15 10"PVC Sewer Pipe,6'to 8' 100 Lf $48.00 $4,800.00 16 10"PVC Sewer Pipe,8'to 10' 100 Lf $50.00 $5,000.00 17 10"PVC Sewer Pipe,10'to 12' 50 Lf $54.00 $2,700.00 18 10"PVC Sewer Pipe,12'to 14' 50 Lf $62.00 $3,100.00 19 10"PVC Sewer Pipe, 14'to 16' 50 Lf $70.00 $3,500.00 20 10"PVC Sewer Pipe,16'to 18' 50 Lf $82.00 $4,100.00 21 12"PVC Sewer Pipe,0'to 6' 50 Lf $51.00 $2,550.00 22 12"PVC Sewer Pipe,6'to 8' 50 Lf $53.00 $2,650.00 23 12"PVC Sewer Pipe,T to 10' 50 Lf $56.00 $2,800.00 62 $3,472.00 24 12"PVC Sewer Pipe,10'to 12' 50 Lf $62.00 $3,100.00 193 $11,966.00 25 12"PVC Sewer Pipe, 12'to 14' 50 Lf $68.00 $3,400.00 43 $2,924.00 26 12"PVC Sewer Pipe, 14'to 16' 50 Lf $78.00 $3,900.00 62 $4,836.00 27 12"PVC Sewer Pipe, 16'to 18' 50 Lf $88.00 $4,400.00 40 $3,520.00 28 15"PVC Sewer Pipe,0'to 6' 50 Lf $55.00 $2,750.00 29 15"PVC Sewer Pipe,6'to 8' 50 Lf $57.00 $2,850.00 30 15"PVC Sewer Pipe,T to 10' 50 Lf $62.00 $3,100.00 31 15"PVC Sewer Pipe,10'to 12' 50 Lf $68.00 $3,400.00 Friday,October 19,2018 Page 2 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding 32 15"PVC Sewer Pipe, 12'to 14' 50 Lf $73.00 $3,650.00 33 15"PVC Sewer Pipe,14'to 16' 50 Lf $83.00 $4,150.00 34 15"PVC Sewer Pipe,16'to 18' 50 Lf $93.00 $4,650.00 35 6"DIP Sewer Pipe,0'to 6' 50 Lf $60.00 $3,000.00 36 6"DIP Sewer Pipe,6'to 8' 50 Lf $70.00 $3,500.00 37 6"DIP Sewer Pipe,8'to 10' 50 Lf $83.00 $4,150.00 38 6"DIP Sewer Pipe,10'to 12' 50 Lf $85.00 $4,250.00 39 6"DIP Sewer Pipe, 12'to 14' 50 Lf $90.00 $4,500.00 40 6"DIP Sewer Pipe, 14'to 16' 50 Lf $95.00 $4,750.00 41 6"DIP Sewer Pipe, 16'to 18' 50 Lf $105.00 $5,250.00 42 8"DIP Sewer Pipe,0'to 6' 50 Lf $80.00 $4,000.00 73 $5,840.00 43 8"DIP Sewer Pipe,6'to 8' 50 Lf $83.00 $4,150.00 44 8"DIP Sewer Pipe,T to 10' 50 Lf $88.00 $4,400.00 45 8"DIP Sewer Pipe,10'to 12' 50 Lf $91.00 $4,550.00 46 8"DIP Sewer Pipe,12'to 14' 50 Lf $95.00 $4,750.00 47 8"DIP Sewer Pipe,14'to 16' 50 Lf $100.00 $5,000.00 48 8"DIP Sewer Pipe,16'to 18' 50 Lf $110.00 $5,500.00 49 10"DIP Sewer,0'to 6' 50 Lf $90.00 $4,500.00 50 10"DIP Sewer,6'to 8' 50 Lf $93.00 $4,650.00 51 10"DIP Sewer,8'to 10' 50 Lf $96.00 $4,800.00 52 10"DIP Sewer,10'to 12' 50 Lf $98.00 $4,900.00 53 10"DIP Sewer,12'to 14' 50 Lf $104.00 $5,200.00 54 10"DIP Sewer,14'to 16' 50 Lf $114.00 $5,700.00 55 10"DIP Sewer, 16'to 18' 50 Lf $124.00 $6,200.00 56 12"DIP Sewer,0'to 6' 50 Lf $100.00 $5,000.00 57 12"DIP Sewer,6'to 8' 50 Lf $102.00 $5,100.00 55 $5,610.00 58 12"DIP Sewer,8'to 10' 50 Lf $105.00 $5,250.00 59 12"DIP Sewer, 10'to 12' 50 Lf $110.00 $5,500.00 18 $1,980.00 60 12"DIP Sewer,12'to 14' 50 Lf $115.00 $5,750.00 11 $1,265.00 61 12"DIP Sewer,14'to 16' 50 Lf $120.00 $6,000.00 62 12"DIP Sewer,16'to 18' 50 Lf $125.00 $6,250.00 63 16"DIP Sewer,0'to 6' 50 Lf $110.00 $5,500.00 64 16"DIP Sewer,6'to 8' 50 Lf $113.00 $5,650.00 65 16"DIP Sewer,8'to 10' 50 Lf $116.00 $5,800.00 Friday,October 19,2018 Page 3 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding 66 16"DIP Sewer, 10'to 12' 50 Lf $118.00 $5,900.00 67 16"DIP Sewer,12'to 14' 50 Lf $125.00 $6,250.00 68 16"DIP Sewer, 14'to 16' 50 Lf $135.00 $6,750.00 69 16"DIP Sewer, 16'to 18' 50 Lf $145.00 $7,250.00 70 6"PVC Sewer Pipe,0'to 6',CLSM B 50 Lf $65.00 $3,250.00 71 6"PVC Sewer Pipe,6'to 8',CLSM B 50 Lf $65.00 $3,250.00 72 6"PVC Sewer Pipe,8'to 10',CLSM 50 Lf $68.00 $3,400.00 73 6"PVC Sewer Pipe, 10'to 12',CLSM 50 Lf $72.00 $3,600.00 74 6"PVC Sewer Pipe,12'to 14',CLSM 50 Lf $76.00 $3,800.00 75 6"PVC Sewer Pipe, 14'to 16',CLSM 50 Lf $84.00 $4,200.00 76 6"PVC Sewer Pipe,16'to 18',CLSM 50 Lf $110.00 $5,500.00 77 8"PVC Sewer Pipe,0'to 6',CLSM B 50 Lf $75.00 $3,750.00 78 8"PVC Sewer Pipe,6'to 8',CLSM B 50 Lf $78.00 $3,900.00 79 8"PVC Sewer Pipe,8'to 10',CLSM 50 Lf $82.00 $4,100.00 80 8"PVC Sewer Pipe, 10'to 12',CLSM 50 Lf $90.00 $4,500.00 81 8"PVC Sewer Pipe,12'to 14',CLSM 50 Lf $94.00 $4,700.00 82 8"PVC Sewer Pipe, 14'to 16',CLSM 50 Lf $112.00 $5,600.00 83 8"PVC Sewer Pipe, 16'to 18',CLSM 50 Lf $118.00 $5,900.00 84 10"PVC Sewer Pipe,0'to 6',CLSM 50 Lf $78.00 $3,900.00 85 10"PVC Sewer Pipe,6'to 8',CLSM 50 Lf $80.00 $4,000.00 86 10"PVC Sewer Pipe,8'to 10',CLSM 50 Lf $84.00 $4,200.00 87 10"PVC Sewer Pipe, 10'to 12',CLS 50 Lf $92.00 $4,600.00 88 10"PVC Sewer Pipe,12'to 14',CLS 50 Lf $100.00 $5,000.00 89 10"PVC Sewer Pipe, 14'to 16',CLS 50 Lf $110.00 $5,500.00 90 10"PVC Sewer Pipe,16'to 18',CLS 50 Lf $125.00 $6,250.00 91 12"PVC Sewer Pipe,0'to 6',CLSM 50 Lf $83.00 $4,150.00 92 12"PVC Sewer Pipe,6'to 8',CLSM 50 Lf $86.00 $4,300.00 93 12"PVC Sewer Pipe,8'to 10',CLSM 50 Lf $96.00 $4,800.00 94 12"PVC Sewer Pipe, 10'to 12',CLS 50 Lf $100.00 $5,000.00 95 12"PVC Sewer Pipe,12'to 14',CLS 50 Lf $105.00 $5,250.00 96 12"PVC Sewer Pipe,14'to 16',CLS 50 Lf $115.00 $5,750.00 97 12"PVC Sewer Pipe, 16'to 18',CLS 50 Lf $125.00 $6,250.00 98 15"PVC Sewer Pipe,0'to 6',CLSM 50 Lf $85.00 $4,250.00 99 15"PVC Sewer Pipe,6'to 8',CLSM 50 Lf $87.00 $4,350.00 Friday,October 19,2018 Page 4 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding 100 15"PVC Sewer Pipe,8'to 10',CLSM 50 Lf $92.00 $4,600.00 101 15"PVC Sewer Pipe,10'to 12',CLS 50 Lf $98.00 $4,900.00 102 15"PVC Sewer Pipe, 12'to 14',CLS 50 Lf $103.00 $5,150.00 103 15"PVC Sewer Pipe,14'to 16',CLS 50 Lf $113.00 $5,650.00 104 15"PVC Sewer Pipe, 16'to IT,CLS 50 Lf $123.00 $6,150.00 105 6"DIP Sewer Pipe,0'to 6',CLSM B 50 Lf $90.00 $4,500.00 106 6"DIP Sewer Pipe,6'to 8',CLSM B 50 Lf $100.00 $5,000.00 107 6"DIP Sewer Pipe,8'to 10',CLSM 50 Lf $108.00 $5,400.00 108 6"DIP Sewer Pipe,10'to 12',CLSM 50 Lf $112.00 $5,600.00 109 6"DIP Sewer Pipe, 12'to 14',CLSM 50 Lf $120.00 $6,000.00 110 6"DIP Sewer Pipe,14'to 16',CLSM 50 Lf $125.00 $6,250.00 111 6"DIP Sewer Pipe,16'to I T,CLSM 50 Lf $135.00 $6,750.00 112 8"DIP Sewer Pipe,0'to 6',CLSM B 50 Lf $110.00 $5,500.00 113 8"DIP Sewer Pipe,6'to 8',CLSM B 50 Lf $113.00 $5,650.00 114 8"DIP Sewer Pipe,8'to 10',CLSM 50 Lf $118.00 $5,900.00 115 8"DIP Sewer Pipe,10'to 12',CLSM 50 Lf $123.00 $6,150.00 116 8"DIP Sewer Pipe, 12'to 14',CLSM 50 Lf $131.00 $6,550.00 117 8"DIP Sewer Pipe,14'to 16',CLSM 50 Lf $140.00 $7,000.00 118 8"DIP Sewer Pipe,16'to IT,CLSM 50 Lf $150.00 $7,500.00 119 10"DIP Sewer,0'to 6',CLSM Backf 50 Lf $123.00 $6,150.00 120 10"DIP Sewer,6'to 8',CLSM Backf 50 Lf $126.00 $6,300.00 121 10"DIP Sewer,8'to 10',CLSM Back 50 Lf $128.00 $6,400.00 122 10"DIP Sewer, 10'to IT,CLSM Bac 50 Lf $134.00 $6,700.00 123 10"DIP Sewer,12'to 14',CLSM Bac 50 Lf $144.00 $7,200.00 124 10"DIP Sewer,14'to 16',CLSM Bac 50 Lf $154.00 $7,700.00 125 10"DIP Sewer, 16'to 18',CLSM Bac 50 Lf $164.00 $8,200.00 126 12"DIP Sewer,0'to 6',CLSM Backf 50 Lf $130.00 $6,500.00 127 12"DIP Sewer,6'to 8',CLSM Backf 50 Lf $132.00 $6,600.00 128 12"DIP Sewer,8'to 10',CLSM Back 50 Lf $135.00 $6,750.00 129 12"DIP Sewer, 10'to IT,CLSM Bac 50 Lf $140.00 $7,000.00 130 12"DIP Sewer,12'to 14',CLSM Bac 50 Lf $145.00 $7,250.00 131 12"DIP Sewer,14'to 16',CLSM Bac 50 Lf $150.00 $7,500.00 132 12"DIP Sewer,16'to 18',CLSM Bac 50 Lf $155.00 $7,750.00 133 16"DIP Sewer,0'to 6',CLSM Backf 50 Lf $140.00 $7,000.00 Friday,October 19,2018 Page 5 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding 134 16"DIP Sewer,6'to 8',CLSM Backf 50 Lf $140.00 $7,000.00 135 16"DIP Sewer,8'to 10',CLSM Back 50 Lf $143.00 $7,150.00 136 16"DIP Sewer,10'to IT,CLSM Bac 50 Lf $146.00 $7,300.00 137 16"DIP Sewer, 12'to 14',CLSM Bac 50 Lf $148.00 $7,400.00 138 16"DIP Sewer,14'to 16',CLSM Bac 50 Lf $158.00 $7,900.00 139 16"DIP Sewer, 16'to 18',CLSM Bac 50 Lf $170.00 $8,500.00 140 6"D.I.Sewer Carrier Pipe 50 Lf $65.00 $3,250.00 141 8" D.I.Sewer Carrier Pipe 50 Lf $75.00 $3,750.00 142 10"D.I.Sewer Carrier Pipe 50 Lf $85.00 $4,250.00 143 12"D.I.Sewer Carrier Pipe 50 Lf $100.00 $5,000.00 52 $5,200.00 144 16"D.I.Sewer Carrier Pipe 50 Lf $125.00 $6,250.00 145 12"Casing By Open Cut 50 Lf $75.00 $3,750.00 146 16"Casing By Open Cut 50 Lf $95.00 $4,750.00 147 20"Casing By Open Cut 50 Lf $120.00 $6,000.00 148 24"Casing By Open Cut 50 Lf $145.00 $7,250.00 149 30"Casing By Open Cut 50 Lf $185.00 $9,250.00 150 12"Casing By Other Than Open Cut 50 Lf $500.00 $25,000.00 151 16"Casing By Other Than Open Cut 50 Lf $600.00 $30,000.00 152 20"Casing By Other Than Open Cut 50 Lf $600.00 $30,000.00 153 24"Casing By Other Than Open Cut 50 Lf $700.00 $35,000.00 154 30"Casing By Other Than Open Cut 50 Lf $700.00 $35,000.00 155 Concrete Encase Sewer Pipe 50 Lf $75.00 $3,750.00 156 Pre-CCTV Inspection 1000 Lf $5.00 $5,000.00 1194 $5,970.00 157 Post-CCTV Inspection 1000 Lf $3.00 $3,000.00 2133 $6,399.00 158 Trench Safety 1000 Lf $2.00 $2,000.00 2372 $4,744.00 159 Exploratory Excavation of Existing U 5 Ea $1,500.00 $7,500.00 15 $22,500.00 160 4'Dia.Manhole(0'-6'Depth) 40 Ea $3,200.00 $128,000.00 20 $64,000.00 161 4'Dia.Manhole Extra Depth 10 Vf $150.00 $1,500.00 52.6 $7,890.00 162 4'Dia.Drop Manhole(0'-6'Depth) 20 Ea $4,000.00 $80,000.00 2 $8,000.00 163 4'Dia.Drop Manhole Extra Depth 10 Vf $200.00 $2,000.00 20.5 $4,100.00 164 4'Dia.Shallow Cone Section Manhole 20 Ea $3,000.00 $60,000.00 165 4'Dia.Type A Manhole(0'-6'Depth) 5 Ea $5,000.00 $25,000.00 166 4'Dia.Type A Manhole Extra Depth 10 Vf $250.00 $2,500.00 167 4'Dia.Fiberglass Manhole(0'-6'De 5 Ea $3,200.00 $16,000.00 Friday,October 19,2018 Page 6 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding 168 4'Dia.Fiberglass Manhole Extra Dep 10 Vf $150.00 $1,500.00 169 4'Dia.Fiberglass Drop Manhole(0'- 5 Ea $4,000.00 $20,000.00 170 4'Dia.Fiberglass Drop Manhole Extr 10 Vf $200.00 $2,000.00 171 4'Dia.Fiberglass Shallow Manhole 5 Ea $3,000.00 $15,000.00 172 4'Dia.Fiberglass Type A Manhole(0 5 Ea $5,000.00 $25,000.00 173 4'Dia.Fiberglass Type A Manhole Ex 10 Vf $150.00 $1,500.00 174 External Drop Into Existing Manhole 20 Ea $2,500.00 $50,000.00 1 $2,500.00 175 External Drop Extra Depth(Over 6'o 20 Vf $250.00 $5,000.00 176 5'Dia.Manhole(0'-6'Depth) 5 Ea $4,000.00 $20,000.00 177 5'Dia.Manhole Extra Depth 10 Vf $200.00 $2,000.00 178 5'Dia.Drop Manhole(0'-6'Depth) 5 Ea $5,000.00 $25,000.00 1 $5,000.00 179 5'Dia.Drop Manhole Extra Depth 10 Vf $250.00 $2,500.00 24 $6,000.00 180 5'Dia.Shallow Manhole 10 Ea $4,000.00 $40,000.00 181 5'Dia.Type A Manhole(0'-6'Depth) 5 Ea $6,000.00 $30,000.00 182 5'Dia.Type A Manhole Extra Depth 10 Vf $250.00 $2,500.00 183 5'Dia.Fiberglass Manhole(0'-6'De 10 Ea $4,000.00 $40,000.00 184 5'Dia.Fiberglass Manhole Extra Dep 10 Vf $250.00 $2,500.00 185 5'Dia.Fiberglass Drop Manhole(0'- 5 Ea $5,000.00 $25,000.00 186 5'Dia.Fiberglass Drop Manhole Extr 10 Vf $250.00 $2,500.00 187 5'Dia.Fiberglass Shallow Manhole 5 Ea $4,000.00 $20,000.00 188 5'Dia.Fiberglass Type A Manhole(0 5 Ea $6,000.00 $30,000.00 189 5'Dia.Fiberglass Type A Manhole Ex 10 Vf $250.00 $2,500.00 190 Wastewater Access Chamber(Any Depth 5 Ea $400.00 $2,000.00 191 Concrete Collar 40 Ea $350.00 $14,000.00 31 $10,850.00 192 Manhole Vacuum Testing 50 Ea $100.00 $5,000.00 18 $1,800.00 193 Manhole Adjustment,Major(Structura 10 Ea $3,500.00 $35,000.00 1 $3,500.00 194 Manhole Adjustment,Minor(Grade Rin 10 Ea $2,000.00 $20,000.00 6 $12,000.00 195 Manhole Adjustment,Major w/Cover 10 Ea $3,000.00 $30,000.00 196 Abandon Manhole 10 Ea $800.00 $8,000.00 197 Remove 4'Sewer Manhole 10 Ea $800.00 $8,000.00 10 $8,000.00 198 Remove 5'Sewer Manhole 10 Ea $1,000.00 $10,000.00 199 Sanitary Line Grouting 20 Cy $150.00 $3,000.00 44.5 $6,675.00 200 4"Sewer Abandonment Plug 5 Ea $800.00 $4,000.00 6 $4,800.00 201 6"Sewer Abandonment Plug 5 Ea $1,000.00 $5,000.00 2 $2,000.00 Friday,October 19,2018 Page 7 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding 202 8"Sewer Abandonment Plug 5 Ea $1,500.00 $7,500.00 1 $1,500.00 203 10"Sewer Abandonment Plug 5 Ea $2,000.00 $10,000.00 204 12"Sewer Abandonment Plug 5 Ea $2,500.00 $12,500.00 205 15"Sewer Abandonment Plug 5 Ea $3,000.00 $15,000.00 206 16"Sewer Abandonment Plug 5 Ea $4,000.00 $20,000.00 207 4"Sewer Service Tap 20 Ea $450.00 $9,000.00 39 $17,550.00 208 4"PVC Sewer Service Line 50 Lf $30.00 $1,500.00 920.8 $27,624.00 209 4"Bored Sewer Service Line 50 Lf $35.00 $1,750.00 210 4"DIP Sewer Service Line 50 Lf $35.00 $1,750.00 211 4"DIP Bored Sewer Service Line 50 Lf $45.00 $2,250.00 212 4"Private Sewer Service Line 50 Lf $55.00 $2,750.00 1918 $105,490.00 213 4"DIP Private Sewer Service ine 50 Lf $60.00 $3,000.00 214 4"2-Way PVC Cleanout 20 Ea $150.00 $3,000.00 69 $10,350.00 215 4"2-Way Cast Iron Cleanout 10 Ea $200.00 $2,000.00 13 $2,600.00 216 6"Sewer Service Tap 50 Ea $500.00 $25,000.00 6 $3,000.00 217 6"PVC Sewer Service Line 100 Lf $30.00 $3,000.00 38.75 $1,162.50 218 6"Bored Sewer Service Line 50 Lf $40.00 $2,000.00 219 6"DIP Sewer Service Line 100 Lf $40.00 $4,000.00 220 6"DIP Bored Sewer Service Line 50 Lf $45.00 $2,250.00 221 6"Private Sewer Service Line 100 Lf $60.00 $6,000.00 90 $5,400.00 222 6"DIP Private Sewer Service Line 100 Lf $65.00 $6,500.00 223 6"2-way PVC Cleanout 50 Ea $175.00 $8,750.00 3 $525.00 224 6"2-way Cast Iron Cleanout 10 Ea $200.00 $2,000.00 4 $800.00 225 8"Sewer Service Tap 20 Ea $550.00 $11,000.00 1 $550.00 226 8"PVC Sewer Service Line 100 Lf $35.00 $3,500.00 39 $1,365.00 227 8"Bored Sewer Service Line 50 Lf $45.00 $2,250.00 228 8"DIP Sewer Service Line 100 Lf $50.00 $5,000.00 229 8"DIP Bored Sewer Service Line 50 Lf $55.00 $2,750.00 230 8"Private Sewer Service Line 100 Lf $65.00 $6,500.00 231 8"DIP Private Sewer Service Line 100 Lf $70.00 $7,000.00 232 8"2-way PVC Cleanout 20 Ea $200.00 $4,000.00 1 $200.00 233 8"2-way Cast Iron Cleanout 20 Ea $225.00 $4,500.00 234 Concrete Riprap 20 Cy $150.00 $3,000.00 20 $3,000.00 235 Large Stone Riprap,dry 20 Cy $125.00 $2,500.00 Friday,October 19,2018 Page 8 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding 236 Large Stone Riprap,grouted 20 Cy $175.00 $3,500.00 237 Imported Embedment/Backfill,CLSM 100 Cy $150.00 $15,000.00 238 Imported EmbedmentBackfill,Crushed 50 Cy $25.00 $1,250.00 239 Type B Concrete(42500) 50 Cy $150.00 $7,500.00 240 Type E Concrete(#1500) 50 Cy $150.00 $7,500.00 241 Block Sod Placement 20 Sy $10.00 $200.00 997 $9,970.00 242 Seeding,Broadcast 20 Sy $5.00 $100.00 243 Seeding,Hydromulch 20 Sy $8.00 $160.00 1193 $9,544.00 244 Seeding,Soil Retention Blanket 20 Sy $15.00 $300.00 245 4"Cone Sidewalk 40 Sy $75.00 $3,000.00 72.2 $5,415.00 246 4"Cone Sidewalk,Exposed Aggregate 20 Sy $85.00 $1,700.00 247 6"Concrete Driveway 50 Sy $85.00 $4,250.00 453.5 $38,547.50 248 6"Concrete Driveway,Exposed Aggreg 20 Sy $90.00 $1,800.00 249 6"Cone Curb and Gutter 100 Lf $30.00 $3,000.00 523 $15,690.00 250 6"Cone Curb&Gutter Attached to Cc 100 Lf $30.00 $3,000.00 74.5 $2,235.00 251 9"Cone Valley Gutter,Residential 20 Sy $75.00 $1,500.00 252 11"Cone Valley Gutter,Arterial/Ind 20 Sy $85.00 $1,700.00 253 Asphalt Pvmt Repair,Sewer Service 100 Lf $40.00 $4,000.00 254 4'Wide Asphalt Pvmt Repair,Residen 100 Lf $45.00 $4,500.00 15 $675.00 255 5'Wide Asphalt Pvmt Repair,Residen 300 Lf $50.00 $15,000.00 1130.5 $56,525.00 256 6'Wide Asphalt Pvmt Repair,Residen 300 Lf $55.00 $16,500.00 257 4'Wide Asphalt Pvmt Repair,Arteria 300 Lf $55.00 $16,500.00 403 $22,165.00 258 5'Wide Asphalt Pvmt Repair,Arteria 300 Lf $65.00 $19,500.00 556 $36,140.00 259 6'Wide Asphalt Pvmt Repair,Arteria 300 Lf $75.00 $22,500.00 260 4'Wide Asphalt Pvmt Repair,Industr 300 Lf $55.00 $16,500.00 261 5'Wide Asphalt Pvmt Repair,Industr 300 Lf $65.00 $19,500.00 262 6'Wide Asphalt Pvmt Repair,Industr 300 Lf $75.00 $22,500.00 263 Asphalt Pvmt Repair Beyond Defined W 300 Sy $20.00 $6,000.00 105 $2,100.00 264 Asphalt Pvmt Repair Beyond Defined W 300 Sy $25.00 $7,500.00 265 Asphalt Pvmt Repair Beyond Defined W 300 Sy $30.00 $9,000.00 266 2"Thick Extra Width Asphalt Pavment 100 Sy $20.00 $2,000.00 267 3"Thick Extra Width Asphalt Pavment 100 Sy $22.00 $2,200.00 268 4"Thick Extra Width Asphalt Pavment 100 Sy $25.00 $2,500.00 269 Temporary Asphalt Paving Repair 75 Lf $15.00 $1,125.00 Friday,October 19,2018 Page 9 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 2013B Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding 270 6"Flexible Base,Type B,GR-1 40 Sy $25.00 $1,000.00 271 6"Flexible Base,Type B,GR-2 40 Sy $15.00 $600.00 272 Conc Pvmt Repair,Residential 300 Sy $65.00 $19,500.00 273 Cone Pvmt Repair,Arterial/Industria 300 Sy $75.00 $22,500.00 5 $375.00 274 Cone.Pvmt.Repair Beyond Defined Wi 300 Sy $85.00 $25,500.00 275 Cone.Pvmt.Repair Beyond Defined Wi 300 Sy $75.00 $22,500.00 5 $375.00 276 Brick Pvmt Repair 100 Sy $70.00 $7,000.00 277 Brick Pvmt Repair(City Supplied) 100 Sy $50.00 $5,000.00 278 4"Waterline Lowering 1 Ea $2,500.00 $2,500.00 279 6"Waterline Lowering 1 Ea $3,500.00 $3,500.00 280 8"Waterline Lowering 1 Ea $4,500.00 $4,500.00 281 10"Waterline Lowering 1 Ea $5,500.00 $5,500.00 282 12"Waterline Lowering 1 Ea $6,500.00 $6,500.00 283 Traffic Control 50 Ea $750.00 $37,500.00 14 $10,500.00 284 Street Use Permit 50 Ea $75.00 $3,750.00 14 $1,050.00 285 REPAIR 36"SEWER LINE 1 LF $702.00 $702.00 17 $11,934.00 286 BYPASS PUMPING 1 LS $18,500.00 $18,500.00 1 $18,500.00 287 DIA SHAFT 30 VF $750.00 $22,500.00 30 $22,500.00 288 VALVE BOX ADJUSTMENT 5 EA $500.00 $2,500.00 5 $2,500.00 289 36"CASING BTOC 52 LF $750.00 $39,000.00 56 $42,000.00 290 4"DIRECTIONAL BORE 108 LF $125.00 $13,500.00 204 $25,500.00 291 MH 4'DIA PROTECTIVE COATING 4.35 VF $235.00 $1,022.25 4.35 $1,022.25 293 HAND DIGGING OF SEWER LINE 5 LF $450.00 $2,250.00 5 $2,250.00 294 1.25'SERVICE CONNECT ASSEMBLE 1 EA $800.00 $800.00 1 $800.00 295 1.25"SERVICE LINE INCL ROCK 1 EA $500.00 $500.00 1 $500.00 296 INSTALL SIMPLEX GRINDER PUMP 1 EA $5,250.00 $5,250.00 1 $5,250.00 297 CONTROL PANEL 1 EA $1,500.00 $1,500.00 1 $1,500.00 298 HAND DIGGING OF SEWER 1 LS $4,980.00 $4,980.00 1 $4,980.00 299 SEWER SERVICE CONNECTION 2 EA $450.00 $900.00 2 $900.00 300 CHANNEL REPLACEMENT 4.5 SF $75.00 $337.50 4.5 $337.50 Sub-Total of Previous Unit $2,700,226.75 $897,788.75 Friday,October 19,2018 Page 10 of 12 City Project Numbers 02047 DOE Number 7271 Contract Name SEWER MAIN REPLACEMENT CONTRACT 20135 Estimate Number 9 Contract Limits Payment Number 9 Project Type SEWER For Period Ending 10/22/2018 Project Funding Contract Information Summary Original Contract Amount $1,000,000.00 Chante Orders Total Contract Price $2,700,226.75 a f` Date/O-ZL-//69 Total Cost of Work Completed $897,788.75 Contractor ` Less %Retained $0.00 Date//",k � Net Earned $897,788.75 Inspection upery sor - Earned This Period $0.00 �( Retainage This Period $0.00 Date u Less Liquidated Damages Proj Manager Days @ /Day $0.00 Date LessPavement Deficiency $0.00 Asst. ecto TPW Less Penalty $0.00 Date �j Less Previous Payment $897,788.75 Director/Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $0.00 Friday,October 19,2018 Pale 11 of 12 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:9 NAME OF PROJECT: Sewer Main Replacement Contract 2013-B PROJECT NO.: 2047 CONTRACTOR: Ciecle C DOE NO.: NA PERIOD FROM.01/01/15 TO: 02/28/17 FINAL INSPECTION DATE: 22-Oct WORK ORDER EFFECTIVE:1/1/2015 CONTRACT TIME: 365 Q WE CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS THIS 0 0 0 22 0 22 PERIOD PREVIOUS 0 0 0 579 789 1,368 PERIOD TOTALS 0 0 0 601 789 1,390 TO DATE "REMARKS: Z CONTRACTOR d DATE fNSP CTOR DATE ENGINEERING DEPARTMENT (D The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,Thi 76012-6311 (817) 392-7941 •Fax: (817) 392-7845 CONSENT OF SURETY OWNER TO FINAL PAYMENT ARCHITECT ❑ AIA Document G707 CONTRACTOR ❑ SURETY ❑ OTHER ❑ Bond No.TXC605717 TO OWNER: ARCHITECT'S PROJECT NO.: City Project No.2047,TPW/DOE#7271 City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76111 CONTRACT FOR: Utility Improvements CONTRACT DATED: PROJECT: (name, address) Sewer Main Replacements Contract 2013B in the City of Fort Worth,TX In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (Insert name and address of Surety) Merchants Bonding Company(Mutual) 2100 Fleur Drive Des Moines,IA 50321-1158 SURETY on bond of (Insert name and address of Contractor) William J.Schultz,Inc.dba Circle C Construction Company P.O.Box 40328 Fort Worth,TX 76140 CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of Owner) City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76111 OWNER, as set forth in the said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand this date: October 20,2016 (Insert in writing the month followed by the numeric date and year.) Merchants Bo a Company(Mutual) (Surety) (Signature of authorized r resentative) Atest: Witness as to Surety: Sheryl A.HIutts,Attorney-in-Fact (Seal): (Printed name and title) John A.Miller,Witness Note: This form is to be used as a companion document to AIA DOCUMENT G706,CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition AIA DOCUMENT G707•CONSENT OF SURETY COMPANY TO FINAL PAYMENT•April 1970 Edition•AIA® One Page ©1970•THE AMERICAN INSTITUTE OF ARCHITECTS,1735 New York Ave.,NW,Washington,D.C.20006 MERCHANTSS� BONDING COMPANY. POWER OF ATTORNEY Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING, INC.,both being corporations of the State of Iowa(herein collectively called the"Companies")do hereby make,constitute and appoint, individually, John A Miller; John R Stockton; Sheryl A Klutts their true and lawful Attorney(s)-in-Fact,to make,execute,seal and deliver on behalf of the Companies,as Surety,bonds,undertakings and other written obligations in the nature thereof,subject to the limitation that any such instrument shall not exceed the amount of: TWENTY-FIVE MILLION($25,000,000.00)DOLLARS This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the Board of Directors of Merchants Bonding Company(Mutual)on April 23,2011 and adopted by the Board of Directors of Merchants National Bonding,Inc.,on October 24,2011. "The President,Secretary,Treasurer,or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys-in-Fact,and to authorize them to execute on behalf of the Company,and attach the seal of the Company thereto,bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof." - "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond,undertaking,recognizance,or other suretyship obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given to the Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation.It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee,shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner- Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation. In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 11th day of October 2016 lf! 41,,,'CtC)tf, "!•,�, •••ANG ��••• MERCHANTS BONDING COMPANY(MUTUAL) *� aT;,,• •-••.t t1�••.••••.�,o•• MERCHANTS NATIONAL BONDING,INC. :dc.• 1933 c.C: 2 �3 •y.• STATE OF IOWA � lrnHgHlN�`'�` ••'••.•••••• COUNTY OF Dallas ss. President On this 11th day of October 2016 ,before me appeared Larry Taylor,to me personally known,who being by me sworn did say that he is President of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING, INC.;and that the seals affixed to the foregoing instrument are the Corporate seals of the Companies;and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. aPR�<s WENDY WOODY v Commission Number 784654 My Commission Expires • �owP June 20 2017 Notary Publr , County,Iowa (Expiration of notary's commission does not invalidate this instrument) I,William Warner,Jr.,Secretary of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof,I have hereunto set my hand and affixed the seal of the Companies on this 20th day of October,2016 `tet' _ •►y:2 to; • •2: �:g. Secretary 1933 :c: La �`� .vd�• l�c�. 'f f�flrlrll WHtlll�lt'`` ••••.. POA 0014 (6/15) AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Teresa Skelly, Vice President Of Circle C Construction, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Sewer Main Replacements Contract 2013B DOE 7271 BY �Teresa Subscribed and sworn before me on this date 21 of March, 2017. °a''P 4,MICHELE S.LANKFORD Notary Public STATE OF TEXAS Notary ID#117594" Notary Public o.'+'` WIy Ci... .E*:00&.7,'1019 Tarrant, Texas FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Sewer Main Replacements Contract 2013B PROJECT NUMBER: 2047 DOE NUMBER: 7271 WATER PIPE LAID SIZE TYPE OF PIPE LF FIRE HYDRANTS: VALVES(16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: SEWER PIPE LAID SIZE TYPE OF PIPE LF 12" PVC Sewer Pipe 8"to 10" 62.00 12" P VC Sewer Pipe 10'to 12' 193 12" PVC Sewer Pipe 12 to 14' 43 12" PVC Sewer Pipe 14'to 16' 62 12" PVC Sewer Pipe 16 to 18' 40 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Sewer Main Replacements Contract 2013B PROJECT NUMBER: 2047 DOE NUMBER: 7271 WATER PIPE LAID SIZE TYPE OF PIPE LF FIRE HYDRANTS: VALVES(16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: SEWER PIPE LAID SIZE TYPE OF PIPE LF 6" PVC Sewer Pipe 6'to 10' 26.00 6" P VC Sewer Pipe 8'to 10' 10 8" PVC Sewer Pipe 0 to 6' 13 8" PVC Sewer Pipe 6 to 8' 195 8" PVC Sewer Pipe 8'to 6' 545 8" PVC Sewer Pipe 10'to 12' 500 8" PVC Sewer Pipe 12'to 14' 293 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS s The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845