Loading...
HomeMy WebLinkAboutContract 32455ITY SECRETARY�/ eON TRACT NO. a2 AMENDMENT No. 1 THE STATE OF TEXAS §CITY SECRETARY CONTRACT NO.30444 (No M&C Needed) COUNTY OF TARRANT WHEREAS, the City of Fort Worth (City) and Kimley-Horn and Associates, Inc., (Engineer) made and entered into City Secretary Contract No. 30444, (the Contract) which was authorized by the City Council by M&C 20237 on the 24th day of August, 2004; and WHEREAS, the Contract involves engineering services for the following project: Eagle Mountain Raw Water Transmission Pipeline WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an amended scope of work, with no change to the maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to delete certain items of work and to add those additional engineering services specified in the proposal letter dated August 29, 2005, a copy of which is attached hereto and incorporated herein. There is no net charge to the contract amount associated with this change in the scope of work. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this 2005, in Fort Worth, Tarrant County, Texas. ATTEST: Mar'y Hendrix, City Secretary NO M&C REQUIRED APPROVAL RECOMMENDED: IY ��►� S. Frank Crumb, P.E. Director , Water Department Kimlev-Horn and Associates, Inc. ENGINEER Name: Glenn A. Garv, P.E., Vice President APPROVED AS TO FORM AND LEGALITY: Assistan City )t nei day of -C t1662,1�1— Assistant �ity Manager Kimley-Horn and Associates, Inc. August 29, 2005 0 Suite 1025 801 Cherry Street, Unit 11 Fort Worth, Texas Mr. Chris Harder, P.E. 76102 Engineer City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: City of Fort Worth -Eagle Mountain Raw Water Transmission Pipeline Project No. P164-060164052005/City Secretary Contract #30444 Amendment #1-Additional Services - Survey and Easement Acquisition KHA No. 061018027 Dear Chris: As we have discussed with you, as part of this project, there have been a few requests for Kimley-Horn to provide services for items that were not specifically part of the original scope of services for this contract. Most of the requests have been related to easement acquisition along the pipeline alignment, all of which have involved two of Kimley-Horn's subconsultants: James Daniels & Associates, Inc. and SAM, Inc. The following is a summary of the additional services performed and the amount requested: Additional Survey and Survey Coordination The original scope of services called for locating trees twelve -inch diameter and larger within the limits of the survey. Per the City's request, the revised topographic survey included locating trees 4-inch diameter and larger. In addition, additional meetings were requested by the City to meet with the property owner for coordination of right -of -entry, boundary, and topographical survey. The additional amount requested for these services is $5,500.00. Revised Appraisals As part of negotiations with property owners, the City requested that the appraisals for Parcels 1, 2, 3, 4A, and 4B (Rosen and Geren parcels) be revised to include any possible damages to the remainder tracts. The additional amount requested for these services is $5,000.00. ■ TEL 817 335 6511 FAX 817 335 5070 CM Kimley-Horn M„ and Associates, Inc. Mr. Chris Harder, August 29, 2002, Page 2 Proposed Centerline Staking As a result of conversations between you and Mr. Harry Brants regarding easement acquisition, it is our understanding that Mr. Brants requested that the centerline location of the proposed 72-inch pipeline be staked on his property. After meeting with Mr. Brants, the City requested that the pipeline centerline be staked along its proposed alignment at 200 foot intervals and at all points of intersection. The additional amount requested for these services is $3,927.00. Subsurface Utilitv Engineering (SUE) Due to the number of points of intersection along the existing 54-inch raw water pipeline on the Brants property, Kimley-Horn has been unable to determine the exact location of the line with traditional survey methods. The location of approximately 3,100 LF of 54-inch line is unconfirmed due to the lack of above ground appurtenances between these points. On the north end of the Brants property the line is also outside of its easement. Additionally, there is a significant portion of the 54-inch line along Robertson Road that is located outside of its easement. Due to the varying location of the existing 54-inch water line in other areas that do not appear to be consistent with the record drawings, Kimley-Horn would recommend that the City consider utilizing SUE services to assist in locating this line. These services consist of providing Quality Level B designating services through the use of geophysical prospecting techniques. The additional amount requested for these services is $6,588.00. Based upon our original contract with the City, it appears that there will be approximately $40,000 of unused fee that was originally allocated for our tunneling subconsultant, Dr. G. Sauer Corporation. If the City concurs with our requested additional services, we recommend that a portion of this unused fee be reallocated to increase the original budgets for surveying and easement acquisition services. This will result in no increase to our total contract amount of $799,855. A fee summary of the services explained above is shown on the following table. Also included is a 10% markup for the additional subconsultant services performed by SAM, Inc. The additional subconsultant services performed by James Daniels & Associates, Inc. will not be marked up per the original contract language. The fee table shows a total reallocation request of $22,720. -Horn Kimley and Associates, Inc. Additional Services Additional Survey and Survey Coordination Revised Appraisals Proposed Centerline Staking Subsurface Utility Engineering 10 % Markup on SAM, Inc. Total Requested Mr. Chris Harder, August 29, 2002, Page 3 Additional Fee $ 5,550 $ 5,000 $ 3,972 $ 6,588 $ 1,610 $22,720 All of these services will be performed by M/WBE subconsultants. This will revise our total contract M/WBE participation percentage to be 24.7 % . Our M/WBE goal for this project is 22.0%. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Glenn A. Gary, P.E. Vice President GAG/JRT:jrt P:\061018.027\ppp\AddSveRequestl.doc