HomeMy WebLinkAboutContract 33614 AMENDMENT NO. 1
STATE OF TEXAS S CITY SECRETARY CONTRACT NO. hl
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Kimley-Horn,
Associates (Engineer) made and entered into City Secretary
Contract No. 32839, (the Contract) which was authorized by the
City Council by M&C **C-21167 on the 29th day of November 2005;
and;
WHEREAS, the Contract involves engineering services for the
following project:
2004 CIP INTERSECTION IMPROVEMENTS CONTRACT II, PN 00200
and;
WHEREAS, it has become necessary to execute Amendment No. 1
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1 .
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated May 31, 2006, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $8000.
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and service: „
exceed the sum of $61,500 . "�) I' �' ;;
� n
J Uo .•i;'v�Ju�� Gj o
06-12-06 A09 :33 IN RIGINAL
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the _ day of ;Jt_!.� t o 200$, in Fort Worth,
Tarrant County, Texas.
ATTEST:
Marty Hendrix
City Secretary -~ry--�
NO M&C� ';4TIQU a!IEI)=
APPROVAL RECOMMENDED: OVED:
I n�-
V'( (rj,(7t7
—
A. Douglas Rademaker, P.E. Marc A. Ott
Director, Department of Assistant City Manager
Engineering
ENGINEE
By:
Name:
Se-^l-'r Vi« P(PS44:i
APPROVED AS TO FORM AND LEGALITY:
Assistan Ci y Attorney
-2- F iulfkI :EC0�.a
Cf1 �EU�� l�2y
05/31/2006 09:25 FAX 8173355070 KINL.EY-HORN 10002
❑�❑ Kimley-Nom
amd Associates,Inc.
May 31,2006 ■
Suite 1025
'Via Mal!and Facsimile#(817)392-2373 FCA WoM,T'au rutUnit 11
76102
Mr,Ben Baca,P.E.
Department of Engineering
City of Fort Worth
027 Taylor Street
Fort Worth,TX 76102
Xte: 2004 Intersection Improvements Contract B-Traffic Signal Designs
Contract Amendment
KRA No.061018037/City Secretary No.32839
Dear Mr.Baca:
The original scope of services for the traffic signal design portion of this project
identified one full signal design and four minor signal modifications. After our
preliminary site visits with Department of Engiveeaing and Traffic Services staff,,it was
tieteriinined that the four intersections idemifiied as rydnor modifications should be full
signal designs. KHA requests a supplemental agreement for$8,000 to cover the
additional effort required to completely redesign these four intersections. Below is a
breakdown of the additional contract time and fee per intersection.
Intersection Additional Additional Fee
Contract Time (Lump Sum)
+McCart&Sycamore School 5 days 52,000
Altamesa&Crowley 5 days $2,000
Golden Triangle&Alta Vista 5 days $2,000
Hulen&Overton Ridge 5 days $2,000
'total 20 days 581000
'Thank you for the opporumity to be of service to the City of Fort Worth.Should you have
any questions,please do not hesitate to call.
Very hely Y-ns,
k MLEY-HORN AND ASSOCIATES,INC.
Cott R.Arnold,P.E.
Project Engineer
SRA
T#* 87 335 50 CITY
F#* 817 335 5070
�� "w