Loading...
HomeMy WebLinkAboutContract 32477L] AMENDMENT NO. 2 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. 80M (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Carter & Burgess,Inc. (Engineer) made and entered into City Secretary Contract No. 30370, (the Contract) which was authorized by the City Council by M&C C-20200 on the loth day of August 2004 and subsequently revised by one amendment; and WHEREAS, the Contract involves engineering services for the following project: 36-inch Walnut Creek Sanitary Sewer Interceptor WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 291 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $19,320.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $135,829.00. n 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of CPAL'( 2005, in Fort Worth, Tarrant County, Texas. ATTEST: Marty HendriA3 City Secretary NO M&C REQUIRED APPROVAL RE=44ENDED : A. Douglas Rademaker, P.E. Director, Department of Engineering CARTER & BURGESS, INC. ENGINE �- e Name:Steve Veal, P.E., Vice President 777 Main Street Fort Worth, TX 76102-5304 APPROVED AS TO FORM AM LEGALITY: Assistant/,Oity Attorney WM OVE 7 Marc A. Ott Assistant City Manager Carter --Burgess September 29, 2005 Mr. Liam J. Conlon Project Manager Engineering Department City of Fort Worth 900 Monroe Street, Suite 201 Fort Worth, Texas 76102 Ref: Amendment No. 2 36-Inch Walnut Creek Sewer Interceptor Phase I Project No. PS 58-070580176330 D.O.E. No. 4440 Dear Liam: 777 Main Street Fort Worth, Texas 76102-5304 P.O. Box 901058 Fort Worth, Texas 76101-2058 Phone: 817.735.6000 Fax 1 : 817.735.6148 www.c-b.com The attached is a man-hour and cost breakdown for additional engineering services to: • Move the proposed 36-inch Walnut Creek Sanitary Sewer from the north side of Winscott Road to the south side. • Investigate re -aligning the proposed 36-inch Walnut Creek Sanitary Sewer around and east of Hwy. 377, investigate adding two siphon crossing on Walnut Creek and making a design recommendation. • Revising the plans around and east of Hwy. 377, revising the sewer depths to cross under Walnut Creek. • Prepare a storm water pollution prevention plan for the sewer main. This will amend the contract as following: • Original Contract = $111,509.00 • Amendment No. 1 = $5,000.00 • Amendment No. 2 = 19,320.00 • TOTAL CONTRACT FEE = $135,829. Please give me a call at 817-735-2889 if you need additional information and/or have any questions. Sincerely CARTER & BURGESS, INC. Terry L. Foyt, P.E. Senior Project Manager TLF/tf Attachments Carter & Burgess, Inc. Carter & Burgess Architects/Engineers, Inc. Carter & Burgess Consultants, Inc. C&B Architects/Engineers, Inc. C&B Architects/Engineers, P.C. C&B Nevada, Inc. WALNUT CREEK SEWER PHASE I AMENDMENT NO.2 September 29, 2005 Moving the Sewer to the Opposite Side of Winscott Road Design Survey 900 feet @ $4.00 per foot = $3,600 Project Engineer 6 hrs. @ $110.00 per hour = $660 Design Tech. 10 hrs. @ $95.00 per hour = $950 Subtotal $5,210 Investigate Revising the Alignment Around and East of Hwy. 377 Investigate Adding Two Siphons on Walnut Creek Recommending New Design Project Engineer 12 hrs. @ $110.00 per hour = $1,320 Design Tech. 0 hrs. @ $95.00 per hour = $0 Clerical 2 hrs. @ $45.00 per hour = $90 Subtotal $1,410 Revising the Alignment Around and East of Hwy. 377 Revising Design Depths by Crossing Under Walnut Creek Revising the Plans, Specifications and Estimate Project Engineer 24 hrs. @ $110.00 per hour = $2,640 Design Tech. 64 hrs. @ $95.00 per hour = $6,080 Clerical 4 hrs. @ $45.00 per hour = $180 Subtotal $8,900 Prepare a Storm Water Pollution Prevention Plan Lump Sum 1 ea. @ $3,800 per each = $3,800 GRAND TOTAL $19,320