HomeMy WebLinkAboutContract 33626 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.&1� n/
WHEREAS, One SR L.P., a Texas Limited Partnership by Centamtar Terrace,
L.C.C., it's General Partner, hereinafter called "Developer", desires to make certain
improvements to Sendera Ranch, Phase I, Section 3B, an addition to the City of Fort
Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Wise, and Denton Counties, Texas, hereinafter called "City", to
do certain work in connection with said improvements.
NOW, THEREFORE,KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Mehrdad Moayedi, its duly
authorized manager, and the City, acting herein by and through Marc Ott, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section 11, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section I1, of the Polic -.
�?,
Sendera Ranch,Phase 1,Section 3B 1��'�5C/t� k9
;Revlseid E? #P pfr"41�rVe I�2004 U�� V C U L 'r'�u�U
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof.
Sendera Ranch,Phase 1,Section 3B ov ii
Revised Form per Legal December 2004 8�t� ?E11 GPI",
VIA
Water (A)attached, Sewer (A-1)attached; Paving (B) Storm Drain (B-
1)_; Street Lights and Signs (C).
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
II. Water and Sewer Facilities
A. Developer shall install the proposed water line(s), fire line(s) and/or
meters as shown on Exhibit A, the estimated cost of which is $499,788.
The City agrees to record the location of each said service line in respect
to the corner of the lot served, and to retain said records in its possession.
The Developer and the City shall share in the cost of the water
improvements as follows:
WATER FACILTIES:
Estimated Estimated City Estimated Total
Developer Cost Cost Cost
Mains within Development $ 408,244 $ 29,231 $ 437,475
Approach $ -0- $ 62,313 $ 62,313
Easements* $ -0- $ -0- $ -0-
Services $ -0- $ -0- $ -0-
Engineering $ -0- $ -0- $ -0-
Sub-Total Water $ 408,244 $ 91,544 $ 499,788
* To be dedicated by the developer
The costs stated herein may be based upon construction estimates rather
than actual cost. The final cost to Developer and City shall be based upon:
1. Unit prices contained in City of Fort Worth Ordinance No. 14552;
WATER COST SHARE (From Station 0+00.00 to 24+08.89, the developer pays
for 8" water pipe, gate valves, and fittings. The City pays for 12"/8" water
pipe, gate valves, fittings, and 1" air release valve. From Station 24+08.89
to 44+57.64, the City pays for 12" water pipe, gate valves, fittings, and 4"
blowoff valve with 4' sump MH.)
Sendera Ranch,Phase 1,Section 3B jy
Revised Form per Legal December 2004 JJ�I JSLTc� i Pu`�1
�(7 �ftJf�}iCi IL �7
Onsite Water Distribution System
12"/8" water pipe ($26-$17)
2,409 L.F. x $9 = $ 21,681
1278" gate valve ($1,223-$676)
3 EA x $547 = $ 1,641
Cast Iron Fittings ($2,969/ton)
0.80 Ton x $2,969 = $ 2,375
1" air & vacuum release valve ($3,534)
1 EA x $3,534 = $ 3,534
$ 29,231
Offsite Water Distribution System
12" water pipe ($26)
2,409 L.F. x $26 = $ 53,274
12" gate valve ($1,223)
2 EA x $1,223 = $ 2,446
Cast Iron Fittings ($2,969/ton)
1 Ton x $2,969 = $ 2,969
4" blow off valve with 4' sump MH ($3,624)
1 EA x $3,624 = $ 3,624
$ 62,313
WATER
Unit Price from
Pay Item Unit Description Developer's
Projects
1 LF 6"Water Pie $ 15.00
2 LF 8"Water Pie $ 17.00
3 LF 10"Water Pie $ 24.00
4 LF 12"Water Pie $ 26.00
5 LF 16"Water Pie $ 40.00
6 EA 8"Gate Valve w/Cast Iron box& Lid $ 676.00
7 EA 10" Gate Valve w/Cast Iron box& Lid $ 1,182.00
8 EA 12" Gate Valve w/Cast Iron box& Lid $ 1,223.00
9 EA 16" Gate Valve w/Cast Iron box& Lid $ 6,587.00
10 TN Cast Iron/Ductile Iron Fittings $ 2,969.00
11 EA Install 1"Air&Vacuum Release Valve $ 3,534.00
w/Vault
12 EA Install 4"blow-Off w/4"Gate Valve & $ 3,624.00
Sump Manhole
Sendera Ranch,Phase 1,Section 3B
Revised Form per Legal December 2004
B. Developer shall install sanitary mains as shown on Exhibit A-1, the
estimated cost of which is $239,338. The City agrees to record the
location of each said service line in respect to the corner of the lot served,
and to retain said records in its possession. The Developer shall bear the
cost of the sewer improvements as follows:
SANITARY SEWER FACILITIES:
Estimated Estimated City Estimated Total
Developer Cost Cost Cost
Mains within Development $ 239,338 $ -0- $ 239,338
Approach $ -0- $ -0- $ -0-
Easements* $ -0- $ -0- $ -0-
Services $ -0- $ -0- $ -0-
Engineering $ -0- $ -0- $ -0-
Sub-Total Sewer $ 239,338 $ -0- $ 239,338
*To be dedicated by the developer.
The costs stated herein may be based upon construction estimates rather
than actual cost.
TOTAL WATER AND SANITARY SEWER FACILITIES:
Estimated Estimated City Estimated Total
Developer Cost Cost Cost
Sub-Total Water $ 408,244 $ 91,544 $ 499,788
Sub-Total Sewer $ 239,338 $ -0- $ 239,338
Total Water and Sewer $ 647,582 $ 91,544 $ 739,126
Construction
Construction Inspection $ 12,952 $ 1,831 $ 14,783
Grand Total $ 660,5341 $ 93,3751 $ 753,909
Sendera Ranch,Phase 1,Section 3B �gS,l 1
Revised Form per Legal December 2004
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, andSid Developer
ha executed this instrument in quadruplicate, at Fort Worth,Texas this the Ln— ay of
2006.
Approval Recommended:
Water Department
r l
S. Frank Crumb
Director C-Ontract Authorization
—LI
Late
ATTEST:
City Of Fort Worth
f�L 4A—t�— 7 — A:5,6el—
City Secretary Assistant City Manager
Marty Hendrix Marc A. Ott
Approved as Form:
Assistant Ci At mey
DEVELOPER
One SR L.P., a Texas
ATTEST: Limited Partnership by
Centamtar Terrace, L.C.C.,
it's General Partner
UA A
Corporate Secretary By:
Sign, print name and ti le
n ren
Sendera Ranch,Phase 1,Section 3B
Revised Form per Legal December 2004 CITY
FT.
p
SH ll4
FM 156
ti JO 8
ROJ ECT
o SITE
Z l INTERloo
AL PI
a
h ¢
P,q
m
Wlllov sow
ea courm MY. �
x x
1111411
o
x
BLUE MOUND E
Af lS. COUNTRY 7
PEDEN RD.
n=
mG i`
N
Fu um DoweWpmot y
Bonds Rucl 3
J
Z
N
NOT TO SCALE
GL .?�i
LEY
LOCATION MAP
SENDERA RANCH
PHASE I - SECTION 3B
Carter vrlgess
CARTER & BURGESS,INC:
777 MAIN STREET
FORT WORTH,V 76102
1917)735-6000
PROJECT NO. 014054.010.001.0E
20. 20'
N fk�sr
\ao•
SCALER 1" = 300' 27 13 14
16
:.
g
_` iR is t1 �+"a•ai'
m / / t1 is 12
24 / Is 17 13
a� to 14
a
s 1s 1e
n
7 >ti 10
Ro
s
17
to
+ e
Z2
u `
n
4 23
/tl 3
' 16
s
1s
n �' 3
36 t P
r43 ! t4 ` P_e�,yl1
ss 31 a 6 is
39 44 7 t 1 r'" •a
3.
® 33 40 o 6 11
a s 1s
x
n
n a I
a 3t 1-ASCII "
OIs
,pyo
° 17 30 0 ! 33
14 " T 1
0 is as 6 17 +s `3
3'�{ �
Q I
10 LEGEND
87 is +s Ito
s /s Rrr ` ® tt 6 14 21 " PROP. WATER LINE
17 ri ° '= 13 a PROP. GATE VALVE ♦�
s s g DAZE
4 11 !° 3 DRIVE PROP. FIRE HYDRANT
C 3 1f 24 : of ISTINO PROP. TEE
N0. 18 I PROP. BLOWOFF VALVE—I—
t" » _ _ PROP. AIR RELEASE VALVE
I_
EXIST. WATER LINE `—
�� EXIST. GATE VALVE
-� EXIST. FIRE HYDRANT —
I -
LIMITS OF PROJECT
PROPOSED WATER
LINES ARE B" UNLESS
A00'� OTHERWISE INDICATED
'00o•E'
�¢ -- p`- _ WATER
EXHIBIT 'A'
71—
61ATCHL I NE SEE SH SENDERA RANCH
PHASE I - SECTION 3B
"IT %15-1-ffl 'Ol�� Carter..Burgess
S7 o�qq CARTER & BURGESS,INC.
7n MAM mM7
a 1 •:: \:4 FM WORM,IX 76102
(917173&-6000
PROJECT NO. 014054.010.001.63C
N
SCALE1 1" = 300'
MATCHLINE SEE SHEET 2
---------------
I ----•-----
I-------------
----------- I
NI ' 13
p1�E��•
------------ I 5 iq�3 -- ---- --- -- --- ---- ---
-------------
I--------------
.��7ERNA'DRI='E -
I I �
I � •
_
mssr HOUND DRJAVE
LEGEND WATER
EXHIBIT 'A'
PROP. WATER LINE �� N
'2, � SENDERA RANCH
PROP. GATE VALVE �--►�� �� �L°���1 a•``_
PHASE I - SECTION 31
PROP. FIRE HYDRANT
EXIST. WATER LINE ---- ��
EXIST. GATE VALVECartev Burgess
EX I ST. FIRE HYDRANT — PROPOSED WATER CARTER & BURGESS,INC.
LINES RE 8" 02
LIMITS OF PROJECT ———— OTHERWISE IINDI,CATED "5-NLESS FORT 0 IX 761
PROJECT NO. 014054.010.001.6:
N ,�
p ao a, 72 a ar s a
a a �
SCALE• 1" = 300' 40
y tR 17 14
a +•
is 11
a / /
it is 12
2• /
f{ 'T u
' A
{ 1• 1•
22
• 1{
is
21
T
a !0 1f
° 21
19 17
Is
2
a 0.OA
A 17'{ /
7 7
u /
2
•T C? t0
36 1
7f N ° 14
a 36 45 { 17
2
70 N 7 12 ,
N
54 ® a {{ 43 • 11
a� 32 as
,: r 41 42 9 Is Lns 76
34
° 17 a• 2 17 IN{ a
° ,4
u It
a T �• a 72
{ 11
31
n a
• to a DAZE
R DRIVE
' u a
1■ 24
7 2 I NG
FOVO DRRIILLTSITE
2 a a N0. 1 e
1
LEGEND SANITARY SEWER
1 EXHIBIT 'A-1'
T PROP. SANITARY SEWER
SENDERA RANCH
PROP. MANHOLE 0 PHASE I - SECTION 3E
EXIST. SANITARY SEWER
EXIST. MANHOLE 0
g �a
LIMITS OF PROJECT — DEEDJAL i1Eco �o Carter°Burgess
PROPOSED SEWER LINES ARE PV CARTER & BURGESS,INC.
v
8" UNLESS OTHERWISE FM o'er 6102
INDICATED '' ,1;�i�fU ( mn»0M
' v� n� "�0 PROJECT NO. 014054.010.001.06
Page 1 of 2
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 6/13/2006
DATE: Tuesday, June 13, 2006
LOG NAME: 60SENDERA RANCH REFERENCE NO.: C-21509
SUBJECT:
Approval of Community Facilities Agreement with One SR L.P., a Texas Limited Partnership by
Centamtar Terrace, L.C.C., its General Partner, for Construction of Water and Sewer Services to
Serve Sendera Ranch, Phase 1, Section 313, a Development of Single-Family Homes in the Far
Northwest Part of the City of Fort Worth, Texas
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a Community Facilities
Agreement with One SR L.P., a Texas Limited Partnership by Centamtar Terrace, L.C.C., its General
Partner, for the installation of water and sewer services to serve Sendera Ranch, Phase 1, Section 3B, a
future single-family home development, located in far northwest Fort Worth.
DISCUSSION:
One SR L.P., a Texas Limited Partnership by Centamtar Terrace, L.C.C., its General Partner, the
developer of Sendera Ranch, Phase 1, Section 3B, has executed a proposed contract for community
facilities to serve a single-family development located in the far northwest part of Fort Worth, south of
Sendera Ranch Boulevard and east of Willow Springs Road (see attached map).
Total Cost for water and sewer improvements for this development is $752,909. There will be City
participation in water pipe oversizing (12"/8") to increase pipe capacity in the development area. The
Developer and City estimated costs for water and sewer improvements are subject to construction
inspection fees.
ESTIMATED COST:
PROJECT COST DEVELOPER CITY TOTAL
WATER $408,244.00 $91,544.00 $499,788.00
SEWER $238,338.00 $0.00 $238,338.00
INSPECTION $12,952.00 $1,831.00 $14,783.00
TOTAL $659,534.00 $93,375.00 $752,909.00
This development is zoned A-5 and located in COUNCIL DISTRICT 2.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the
Water Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
http://www.cfwnet.org/council_packet/Reports/mc_print.asp 9/11/2006
Page 2 of 2
P264 539140 602140039283 $91,544.00
Submitted for City Manager's Office by: Marc Ott (6122)
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: S. Frank Crumb (8207)
http://www.cfwnet.org/council_packet/Reports/mc_print.asp 9/11/2006