HomeMy WebLinkAboutContract 51035-CO1 CFW Change Order Approval COAppr-01 Page 2 of 3 CITY SECRETARY Cit of Fort Worth coNTRACTNo. ChangeOrder FORT WORTH. y Ch Orde r Req es u t A pp royal (Change Order Breakdown Available in Links) For Change Order Submittal No.: COSub01 Change Order No.: COAppr-01 Date Started: 2018-11-13 City Sec. No.: 51035 Date Due: 2019-01-02 Project Name: HMAC 2018-5 Street Rehab Project Numbers: 101386 DOE Numbers: Project Street rehabilitation by the Pulverize and Overlay for various Description: street segments. Replacing curb & driveway sections,pulverizing the existing road material, stabilizing and re-compacting the material, and installing a new 2" asphalt surface course. Project/Contract Compliance Maged Zaki City Inspector: Jesse Guptin Manager: Contractor: Advanced Paving COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 14 710.33 30100-0200431-5740010-101386-0 20 TPW $ 14,000.00 130100-0200431-5330201-101234-0 5 6 7 ,6,9 Q Total Cost: $ 28,710.33 Total Requested Days: 20 4� A�oVal us: `e � °ys��Q `4' OFFICIAL RECORD CITY SECRETARY L 9 -- FT. WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?Siteld=51500&Proces... 11/26/2018 CFW Change Order Approval COAppr-01 Page 3 of 3 Approved: Yes Comments: User: Becky Garrett Date: 2018-11-14 12:44 PM Approved: Yes Comments: User: Maged Zaki Date: 2018-11-14 5:07 PM Approved: Yes Comments: User: Lane Zarate Date: 2018-11-15 7:08 PM Approved: Yes Comments: User: Ricardo Matute Date: 2018-11-16 3:00 PM Approved: Yes Comments: User: Signing for TPW Director Role Approvals Date: 2018-11-16 3:38 PM Attestby: — • ;� Approved: Yes 0: Comments: User: Doug BlackA/j J, j{ s City SeCI'et$Ty 'k Date: 2018-11-16 11:03 PM �XAS Approved: Yes Comments: User: Susan Alanis Date: 2018-11-19 8:17 AM Action Required: Please review and approve 035 Io cC',t: OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 11/26/2018 FORT WORTH. City of Fort Worth Change Order Request Breakdown Project Namel HMAC 2018-5 Street Rehabilitation City Sec# 1 51035 Client Project#(s)l CPN#101386 Contractor Advance Paving PM Maged Zaki I Inspectorl Jesse Guptin Change Order Submittal# 0 Date 11/9/2018 Contract Time Dept. TIPW Totals CD Original Contract Amount $945,691.15 $945,691.15 180 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders(in M&C Process) Contract Cost to Date $945,691.15 $945,691.15 180 Amount of Proposed Change Order $28,710.33 $28,710.33 20 Revised Contract Amount $974,401.48 $974,401.48 200 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $28,710,33 $28,710.33 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.04% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,182,113.94 CHANGE ORDER This change is requested to add extra bid items for lowering the street light wiring on BERKELEY PL to prevent damage during street reclamation.These wires were found on depth 4"from the street surface. FOR_ rWORTH City of Fort worth Change Order Additions Project Name I HMAC 2018-5 Street Rehabilitation City Sec# 51035 Client Project# I CPN#101386 Contractor Advance Paving PM Maged Zaki I Inspector JesseGuptin Change Order Submittal# 0 Date F 11/9/2018 ADDITIONS ITEM UE6CRIPTION DEPT City Unit Unit Cost I ota 7SCH 80 PVC Trench 40 2"S H 80 PVC Bore T/PW 350. 0 0 000 LF 2. # XHHW PW ,622.0 000 LF 1.9 42 Type B Ground Box(@ Oncor Pole) T/PW 3. 00000 EA 77M 43 Reconnect Conductor T/PW 12.00000000 EA 137.50 T/PW $28,710.33 Sub Total Additions Change Order Additions Page 2 of 4 FORT WORTH City of Fort Worth —1"T'-- Change Order Deletions Project Name HMAC 2018-5 Street Rehabilitation CitySec# 51035 Client Project# CPN#101386 Contractor Advance Paving PM Maged Zaki inspector' Jesse Guptin Change Order Submittal# 0 Date 11/9/2018 DELETIONS ITEM DESCRIPTION UEPT Qty Unit Unit Cost Total T/PW $0.00 Sub Total Deletions Change Order Deletions Page 3 of 4 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Maged Zaki Project Manager OFFICIAL RECORD CITY SECRETARY FT WORTH,TX CFW Change Order Approval COAppr-01 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/101386 - HMAC 2018-5 Street Rehab/Contractor/Change Orders/Change Order Breakdown #1 Revl- 2018-5.xls Attachments 101 No Attachments have been added to this form. IECEIVED 2019 o►NorFogrw Cr1'SE'Ch4Y https://projectpoint.buzzsaw.com/ bz web/Forms/ForniPrint.aspx?SiteId=51500&Proces... 11/26/2018