AMENDMENT NO. 1
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. �1
COUNTY OF TARRANT $
WHEREAS, the City of Fort Worth (CITY) and MAXIMUS, Inc. ,
(CONSULTANT) made and entered into City Secretary Contract No.
32246, (the AGREEMENT) ; and
WHEREAS, the Agreement involves professional services for the
following project :
Cost analysis of infrastructure related plan review,
inspection and CFA activities
WHEREAS, it has become necessary to execute Amendment No. 1
to said Agreement to include an increased scope of work and
revised maximum fee;
NOW THEREFORE, City and Consultant, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the Agreement:
1.
Section 1 of the Agreement is amended to include the
additional consulting services specified in a proposal letter
dated December 16, 2005, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services
to be performed by Consultant total $3, 260 . 00 .
2 .
Section 2 of the Agreement is amended to provide for an
increase in the maximum fee to be paid to the Consultant for all
work and services performed under the Agreement, as amended, so
that the total fee paid by the City for all work and services
shall not exceed the sum of $19, 930 . 00 .
c T.0
�JRIGINAL
3 .
All other provisions of the Agreement, which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the day of _ 4
2006, in Fort Worth, Tarrant County, Texas.
ATTEST:
FV\
1liO M&C; REQUIRED
Marty Hendri City Secre ary
APPROVAL RECOMMENDED: APPROVED:
AA
Robert Goode, P.E. Marc Ot
Director, Transportation/ Assistant City Manager
Public Works Department
MAXIMUS, Inc.
CONSULT
By:
APPROVED TO FORM AND LEGALITY:
Amy Ram
Assistant ity Attorney
Page 2 or 2
3 :e
December 16, 2005
Christa Sharpe
Assistant Director
Transportation and Public Works
City of Fort Worth, Texas
1000 Throckmorton
Fort Worth, Texas 76102
Dear Ms. Sharpe:
As discussed in the joint departmental meeting on October 14, 2005, the City asked
MAXIMUS to perform several additional tasks related to the Civil Plan Review User Fee
Study. These tasks were not included in my proposal letter dated July 7, 2005. In
response to my request for additional compensation, you asked me to submit a request for
a change order. Since that meeting, both City staff and MAXIMUS consultants have
spent considerable time adjusting expenditure information, time estimates, and reviewing
options and discussing fee structure alternatives. Since we are now close to completing
all the tasks, I prepared a single change order request that will cover all tasks to be
completed by December 31, 2005.
Detailed below are those additional tasks MAXIMUS completed after presentation of the
DRAFT Civil Plan Review User Fee Study on October 14, 2005. Some of these tasks are
included in the original scope of services and will be billed under the original contract
scope as Task 7 (Presentation of Results to City Officials/Developers/Other
Interested Parties). The City has already paid MAXIMUS for Tasks 1 through 6 as
defined in my original proposal letter.
Tasks included in original scope of services (will be billed as Task
Revise Water Department data to include additional time for various staff members on
fee related activities defined in the draft report and incorporate new salary data for
affected positions. (2 hours)
Prepare PowerPoint and make presentation of results to City officials (department heads)
— (8 hours)
Revise TPW models to include new position added after completion of draft report. (0.25
hour)
Revise PowerPoint presentation (FINAL REPORT) to include adjustments requested by
the department heads in the meeting on December 9, 2005 (estimated 6 hours).
Christa Sharpe
December 16, 2005 Page 2
Additional Charges (requested as a change order to the original contract)
Revise Costing Data in DOE, TPW, Water, and Sewer to include separate fee
calculations for four categories of inspection charges: Water, Sewer, Streets, Storm
Drains. (4 hours)
Review and analyze new databases (2 databases provided) for DOE charges related to
plan reviews, inspections, and materials testing; prepare summary analysis (graphs) for .
further discussion of plan review fee structure development. (8 hours)
Develop additional cost models for Civil Plan Review to include "Processing Fees" for
TPW, DOE, Water, and Sewer. (4 hours)
Update salary information and DOE multiplier based on projected 2005-06 salary and
benefit levels for all cost models (20 separate cost models). (4 hours).
Additional hours: 20
Hourly rate: $163.00
TOTAL REQUSTED CHANGE ORDER: $3,260
Thank you for your consideration of this request.
Very truly yours,
MAXIMUS, Inc.
J. Mark Carpenter
State Manager
Cost Services Division