HomeMy WebLinkAboutContract 33802 Cil Y SUCrjE-rARY
CITY OF BORT WORTH, TEXAS CONTRACT NO.
STANDARD AGREEMENT FOR ENGINEERING SERVICES
This AGREEMENT is between the City of Fort Worth (the "CITY"), and A.N.A.
Consultant, L.L.C., Inc., (the "ENGINEER"), for a PROJECT generally described as: Water
and Sanitary Sewer Replacement Contract 2005, WSM-D,
Article I
Scope of Services
A. The Scope of Services is set forth in Attachment A.
Article 11
Compensation
A. The ENGINEER's compensation is set forth in Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation to reasonably
substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of any
balance,,wil I be due Mthin 30 days of receipt of the final invoice—
(4) In the event of a disputed or contested billing, only that portion so contested will
be withheld from payment, and the undisputed portion will be paid. The CITY
will exercise reasonableness in contesting any bill or portion thereof. No
interest will accrue on any contested portion of the billing until mutually
resolved._
(5) If the CITY fails to make payment in full to ENGINEER for billings contested in
good faith within 60 days of the amount due, the ENGINEER may, after giving 7
days' written notice to CITY, suspend services under this AGREEMENT until
paid in full, including interest. In the event of suspension of services, the
ENGINEER shall have no liability to CITY for delays or damages caused the
CIN because of such suspension of services.
STANDARD ENGINEERING AGREEMENT REV 10106!
Page 7 of 14
ORIGINAL
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The standard of care applicable to the ENGINEER's services will be the degree
of skill and diligence normally employed in the State of Texas by professional
engineers or consultants performing the same or similar services at the time
such services are performed.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering work
to be performed hereunder. The ENGINEER shall also advise the CITY
concerning the results of same. Such surveys, tests, and investigations
shall be furnished by the CITY, unless otherwise specified in
Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations, the
actual characteristics may vary significantly between successive test
points and sample intervals and at locations other than where
observations, exploration, and investigations have been made. Because
of the inherent uncertainties in subsurface evaluations, changed or
unanticipated underground conditions may occur that could affect the total
PROJECT cost and/or execution. These conditions and costtexecution
effects are not the responsibility of the ENGINEER.
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in ink
on reproducible plastic film sheets, or as otherwise approved by CITY, which
shall become the property of the CITY. CITY may use such drawings in any
manner it desires; provided, however, that the ENGINEER shall not be liable for
the use of such drawings for any project other than the PROJECT described
herein.
STANDARD ENGINEERING AGREEMENT(REV 10106105)
11
MR
Page 2 of 14
E. Engineers Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the ENGINEER or
its personnel in any way responsible for those duties that belong to the CITY
and/or the CITY's construction contractors or other entities, and do not relieve
the construction contractors or any other entity of their obligations, duties, and
responsibilities, including, but not limited to, all construction methods, means,
techniques, sequences, and procedures necessary for coordinating and
completing all portions of the construction work in accordance with the Contract
Documents and any health or safety precautions required by such construction
work. The ENGINEER and its personnel have no authority to exercise any
control over any construction contractor or other entity or their employees in
connection with their work or any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress or
quality of the completed work on the PROJECT or to determine, in general, if
the work on the PROJECT is being performed in a manner indicating that the
PROJECT, when completed, will be in accordance with the Contract
Documents, nor shall anything in the Contract Documents or the agreement
between CITY and ENGINEER be construed as requiring ENGINEER to make
exhaustive or continuous on-site inspections to discover latent defects in the
work or otherwise check the quality or quantity of the work on the PROJECT. If,
for any reason, the ENGINEER should make an on-site observation(s), on the
basis of such on-site observations, if any, the ENGINEER shall endeavor to
keep the CITY informed of any deviation from the Contract Documents coming
to the actual notice of ENGINEER regarding the PROJECT.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth in
the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance with
Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation or
maintenance costs; competitive bidding procedures and market conditions;
time or quality of performance by third parties; quality, type management,
STANDARD ENGINEERING AGREEMENT(REV 10/46105) offiCI i
Page 3 of 14 OfUU A,py
or direction of operating personnel; and other economic and operational
factors that may materially affect the ultimate PROJECT cost or schedule.
Therefore, the ENGINEER makes no warranty that the CI-FY's actual
PROJECT costs, financial aspects, economic feasibility, or schedules will
not vary from the ENGINEER's opinions, analyses, projections, or
estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction contractor
has completed the work in exact accordance with the Contract Documents; that
the final work will be acceptable in all respects; that the ENGINEER has made
an examination to ascertain how or for what purpose the construction contractor
has used the moneys paid; that title to any of the work, materials, or equipment
has passed to the CITY free and clear of liens, claims, security interests, or
encumbrances; or that there are not other matters at issue between the CITY
and the construction contractor that affect the amount that should be paid.
H. Record drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent the
exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
I. Minority and Woman Business Enterprise(Ili AAfBE) Participation
In accord with City of Fort Worth Ordinance No. 15530, the City has goals for
the participation of minority business enterprises and woman business
enterprises in City contracts. Engineer acknowledges the IVIIWBE goal
established for this contract and its commitment to meet that goal. Any
misrepresentation of facts (other than a negligent misrepresentation) and/or the
commission of fraud by the Engineer may result in the termination of this
agreement and debarment from participating in City contracts for a period of
time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of three (3) years
after final payment under this contract, have access to and the right to examine
and photocopy any directly pertinent books, documents, papers and records of
STANDARD ENGINEERING AGREEMENT(REI!10106/05) �m, ]�I I �1���n�
Page 4 of 14 7 j 'f tVjl
the ENGINEER involving transactions relating to this contract. ENGINEER
agrees that the CITY shall have access during normal working hours to all
necessary ENGINEER facilities and shall be provided adequate and appropriate
work space in order to conduct audits in compliance with the provisions of this
section. The CITY shall give ENGINEER reasonable advance notice of
intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of three (3) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such subconsultant,
involving transactions to the subcontract, and further, that the CITY shall have
access during nominal working hours to all subconsultant facilities, and shall be
provided adequate and appropriate work space, in order to conduct audits in
compliance with the provisions of this article together with subsection (3)hereof.
CITY shall give subcon-sultant reasonable advance notice of intended audits.
(3) ENGINEER and subconsultant agree to photocopy such documents as may be
requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost
of copies at the rate published in the Texas Administrative Code in effect as of
the time copying is performed.
K ENGINEEITs Insurance
(1) Insurance coverage and limits:
ENGINEER shall provide to the City certificate(s) of insurance documenting
policies of the following coverage at minimum limits that are to be in effect prior
to commencement of work on the PROJECT:
Commercial General Liability
$1,000,000 each occurrence
$2,000,000 aggregate
Automobile Liability
$1,000,000 each accident on a combined single limit
or
$250,000 Property Damage
$500,000 Bodily Injury per person per occurrence
A commercial business policy shall provide coverage on "Any Auto", defined
as autos owned, hired and non-owned when said vehicle is used in the
course of the PROJECT.
STANDARD ENGINEERING AGREEMENT(REV 10106105) On
Page 5of14 U1 J+'� h�l `vvhJ
Workers Compensation
Coverage A: Statutory limits
Coverage B: Employer's Liability
$100,000 each accident
$500,000 disease-policy limit
$100,000 disease-each employee
Professional Liability
$1,000,000 each claim
$2,000,000 aggregate
Professional liability shall be written on a claims-made basis and shall
contain a retroactive date prior to the date of the contract or the first date of
services to be performed, whichever is earlier. Coverage shall be maintained
for a period of 5 years following the completion of the contract. An annual
certificate of insurance specifically referencing this project shall be submitted
to the City for each year following completion of the contract.
(2) Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be delivered to the CITY prior to ENGINEER
proceeding with the PROJECT.
(a) Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. The term CITY shall include its
employees, officers, officials, agents, and volunteers as respects the
contracted services.
(b) Certificate(s) of insurance shall document that insurance coverage specified
in this agreement are provided under applicable policies documented
thereon.
(c) Any failure on part of the CITY to request required insurance documentation
shall not constitute a waiver of the insurance requirements.
(d) A minimum of forty-five (45) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium_ Such terms shall be
endorsed onto ENGINEER's insurance policies. Notice shall be sent to the
respective Department Director (by name), City of Fort Worth, 1000
Throckmorton, Fort Worth, Texas 76102.
(e) Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A_ VII in the current A.M. Best Key
Rating Guide or have reasonably equivalent financial strength and
solvency to the satisfaction of Risk Management.
STANDARD ENGINEERING AGREEMENT(REV 10106165)
Page 6of14
(f) Deductible limits, or self insured retentions, affecting insurance required
herein shall be acceptable to the CITY in its sole discretion; and, in lieu
of traditional insurance, any alternative coverage maintained through
insurance pools or risk retention groups must be also approved.
Dedicated financial resources or letters of credit may also be acceptable
to the City.
(g)Applicable policies shall each be endorsed with a waiver of subrogation E
in favor of the CITY as respects the PROJECT_
(h) The City shall be entitled, upon its request and without incurring
expense, to review the ENGINEER's insurance policies including
endorsements thereto and, at the CITY's discretion, the ENGINEER may
be required to provide proof of insurance premium payments.
(i) The Commercial General Liability insurance policy shall have no
exclusions by endorsements unless the CITY approves such exclusions
in writing.
(j) For all lines of coverage underwritten on a claims-made basis, other than
Professional Liability, the retroactive date shall be coincident with or prior
to the date of the contractual agreement. The certificate of insurance
shall state both the retroactive date and that the coverage is claims-
made.
(k) The CITY shall not be responsible for the direct payment of any
insurance premiums required by this agreement and all insurance
required in this section, with the exception of Professional Liability, shall
be written on an occurrence basis.
(I) Sub consultants and subcontractors to/of the ENGINEER shall be
required by the ENGINEER to maintain the same or reasonably
equivalent insurance coverage-as required for the ENGINEER. When
sub consultants/subcontractors maintain insurance coverage,
ENGINEER shall provide CITY with documentation thereof on a
certificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
STANDARD ENGINEERING AGREEMENT(REV 10/061055)
Page 7 of 14
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions of
the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the ENGINEER
will, if requested, assist the CITY in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required, at
its own cost and expense. However, if design changes are required due to the
changes in the pem�itting authorities published design criteria and/or practice
standards criteria which are published after the date of this Agreement which
the ENGINEER could not have been reasonably aware of, the ENGINEER shall
notify the CITY of such changes and an adjustment in compensation will be
made through an amendment to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for the
ENGINEEKs performance of its services and will provide labor and safety
equipment as required by the ENGINEER for such access. The CITY will
perform, at no cost to the ENGINEER, such tests of equipment, machinery,
pipelines, and other components of the CITY's facilities as may be required in
connection with the ENGINEER's services. The CITY will be responsible for all
acts of the CITY's personnel.
STANDARD ENGINEERING AGREEMENT(REV 10!06105) n ,
Page 8 of 14 lV V �:� J�, l.},r„1
'd T,
�1� �' CC712
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights-of-way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEEKs studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule in Attachment A.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or timing
of the ENGINEER's services or of any defect in the work of the ENGINEER or
construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior role
in the generation, treatment, storage, or disposition of such materials. In
consideration of the associated risks that may give rise to claims by third
parties or employees of City, City hereby releases ENGINEER from any
damage or liability related to the presence of such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is a
result of ENGINEER's negligence or if ENGINEER brings such hazardous
substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of Article
IV.E. regarding the ENGINEER's Personnel at Construction Site, and provisions
providing contractor indemnification of the CITY and the ENGINEER for
contractor's negligence.
STANDARD ENGINEERING AGREEMENT(REV 10/06/05)
Page 9 of 14
K Contractor Claims and Third-Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers.-
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain no
direct action against the ENGINEER, its officers, employees,
and subcontractors, for any claim arising out of, in connection
with, or resulting from the engineering services performed.
Only the CITY will be the beneficiary of any undertaking by the
ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third-party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third-party beneficiary rights under this Agreement.
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
1. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risklinstallation insurance is maintained at
the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify that the Builders Risk/installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required or
requested assistance to support, prepare, document, bring, defend, or assist in
litigation undertaken or defended by the CITY. In the event CITY requests such
services of the ENGINEER, this AGREEMENT shall be amended or a separate
agreement will be negotiated between the parties_
K. Changes
The CITY may make or approve changes within the general Scope of Services
in this AGREEMENT. If such changes affect the ENGINEER's cost of or time
STANDARD ENGINEERING AGREEMENT(REV 10/06105)
Pago 10 of 14
required for performance of the services, an equitable adjustment will be made
through an amendment to this AGREEMENT with appropriate CITY approval.
Article 111
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt
of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of the
ENGINEER, whether in hard copy or in electronic form, are instruments of
service for this PROJECT, whether the PROJECT is completed or not. Reuse,
change, or alteration by the CITY or by others acting through or on behalf of the
CITY of any such instruments of service without the written permission of the
ENGINEER will be at the CITY's sole risk. The CITY shall own the final
designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance caused
by acts of God, strikes, lockouts, accidents, or other events beyond the control
of the ENGINEER.
D. Tennination
(1) This AGREEMENT may be terminated only by the City for convenience on
30 days' written notice. This AGREEMENT may be terminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows--
a.)
ollows_a.) Cost of reproduction of partial or complete studies, plans, specifications
or other forms of ENGINEER'S work product;
b.) Out-of-pocket expenses for purchasing storage containers, microfilm,
electronic data files, and other data storage supplies or services;
C.) The time requirements for the ENGINEER'S personnel to document the
STANDARD ENGINEERING AGREEMENT(REV 10106105)
Page 11 of 14
work underway at the time the CITY'S termination for convenience so
that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will submit to the
CITY an itemized statement of all termination expenses. The CITY'S approval
will be obtained in writing prior to proceeding with termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule, commitment
and cost of the ENGINEER`s personnel and subcontractors, and ENGINEER's
compensation will be made.
E. Indemnification
(1) The ENGINEER agrees to indemnify and defend the CITY from any loss,
cost, or expense claimed by third parties for property damage and bodily
injury, including death, caused solely by the negligence or willful
misconduct of the ENGINEER, its employees, officers, and subcontractors
in connection with the PROJECT.
(2) If the negligence or willful misconduct of both the ENGINEER and the
CITY (or a person identified above for whom each is liable) is a cause of
such damage or injury, the loss, cost, or expense shall be shared between
the ENGINEER and the CITY in proportion to their relative degrees of
negligence or willful misconduct as determined pursuant to T.C.P. & R.
Code,_section 33.011A4EVemon Supplement 1996).
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the prior
written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are- business
understandings between the parties and shall apply to all the different theories
of recovery, including breach of contract or warranty, tort including negligence,
strict or statutory liability, or any other cause of action, except for willful
misconduct or gross negligence for limitations of liability and sole negligence for
indemnification. Parties mean the CITY and the ENGINEER, and their officers,
employees, agents, and subcontractors.
L Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT, its
STANDARD ENGINEERING AGREEMENT(REV 10106/05)
Page 12 of 14
interpretation and performance, and any other claims related to it. The venue
for any litigation related to this AGREEMENT shall be Tarrant County, Texas.
J. Alternate Dispute Resolution
(1) All claims, disputes, and other matters in question between the CITY and
ENGINEER arising out of, or in connection with this Agreement or the
PROJECT, or any breach of any obligation or duty of CITY or ENGINEER
hereunder, will be submitted to mediation. If mediation is unsuccessful, the
claim, dispute or other matter in question shall be submitted to arbitration if both
parties acting reasonably agree that the amount of the dispute is likely to be less
than $50,000, exclusive of attorney's fees, costs and expenses. Arbitration shall
be in accordance with the Construction Industry Arbitration Rules of the
American Arbitration Association or other applicable rules of the Association
then in effect. Any award rendered by the arbitrators less than $50,000,
exclusive of attorney's fees, costs and expenses, will be final, judgment may be
entered thereon in any court having jurisdiction, and will not be subject to appeal
or modification except to the extent permitted by Sections 10 and 11 of the
Federal Arbitration Act(g U.S.C. Sections 10 and 11).
(2) Any award greater than $50,000, exclusive of attorney's fees, costs and
expenses, may be litigated by either party on a de novo basis. The award shall
become final ninety (90) days from the date same is issued. if litigation is filed
by either party within said ninety (90) day period, the award shall become null
and void and shall not be used by either party for any purpose in the litigation.
K. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or
unenforceability will not affect any other provision, and this AGREEMENT shall
be construed as if such invalid, illegal, or unenforceable provision had never
been contained herein. Articles V.F., VI.B., VI.D., VI.H., VI.I., and VI.J. shall
survive termination of this AGREEMENT for any cause.
L. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State laws
and regulations and with all City ordinances and regulations which in any way
affect this AGREEMENT and the work hereunder, and shall observe and comply
with all orders, laws ordinances and regulations which may exist or may be
enacted later by governing bodies having jurisdiction or authority for such
enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless CITY
and all of its officers, agents and employees from and against all claims or
liability arising out of the violation of any such order, law, ordinance, or
regulation, whether it be by itself or its employees.
STANDARD ENGINEERING AGREEMENT(REIT 10106/0'5) l ��i� C�)i�)J
Page 13 of 14 a
VV
CITY
� ';
Article VII
Attachments, Schedules, and Signatures
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be changed
by a written amendment executed by both parties. The following attachments and schedules
are hereby made a part of this AGREEMENT:
Attachment A- Scope of Services
Attachment B—Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E -Location Map
Executed this the,____day of _ Y.' .0_ . , 2005.
ATTEST: CITY OF FORT WORTH
By. V ie��'�'►E
Marty HendrixMarc A. Ott
City S retary Assistant City Manager
_ APPROVAL RECOMMENDED
Contract Authori.zatio'n
-.--1-1' W C
Y A. Douglas Rademaker, P.E.
Director, Engmeerft Department
APPRAS TO RM D LEGALITY
Assistan y torney
A.N.A. CONSULTANT L.L.C.
ATTEST: ENGINEER
By:
M qA�ssaad, .
Vice-Presiden
61 H1 CIri 'K'S C '
STANDARD ENGINEERING AGREEMENT(REV 10106/05)
Page 14 of 14 �iCIII �� � 211
r. nn
I
ATTACHMENT "yy"
General Scope of Services
"Scope of Services set forth herein can only be modified by additions, clarifications, and/or
deletions set forth in the supplemental Scope of Services. In cases of conflict between the
Supplemental Scope of Services and the General Scope of Services, the Supplemental Scope
of Services shall have precedence over the General Scope of Services."
GENERAL
1) Preliminary Conference with City
The Engineer shall attend preliminary conferences with authorized representatives of
the City regarding the scope of project so that the plans and specifications which are to
be developed hereunder by the Engineer will result in providing facilities which are
economical in design and conform to the City's requirements and budgetary
constraints.
2) Coordination with Outside Agencies/Public Entities
The Engineer shall coordinate with officials of other outside agencies as may be
necessary for the design of the proposed street, and storm drain and/or water and
wastewater facilities/improvements. It shall be the Engineer's duty hereunder to secure
necessary information from such outside agencies, to meet their requirements.
3) Geotechnical Investigations
The Engineer shall advise the City of test borings, and other subsurface investigations
that may be needed. In the event it is determined necessary to make borings or
excavate test holes or pits, the Engineer shall in coordination with the City and the
City's geotechnical engineering consultant, draw up specifications for such testing
program_ The cost of the borings or excavations shall be paid for by the City.
4) Agreements and Permits
The Engineer shall complete all forms/applications to allow the City of Fort Worth to
obtain any and all agreements and/or permits normally required for a project of this size
and type. The Engineer will be responsible for negotiating and coordinating to obtain
approval of the agency issuing the agreement and/or permits and will make any
revisions necessary to bring the plans into compliance with the requirements of said
agency, including but not limited to highways, railroads, water authorities, Corps of
Engineers and other utilities.
5) Design Changes Relating to Permitting Authorities
If permitting authorities require design changes, the Engineer shall revise the plans and
specifications as required at the Engineers own cost and expense, unless such
changes are required due to changes in the design of the facilities made by the
-1-
permitting authority. If such changes are required, the Engineer shall notify the City and
an amendment to the contract shall be made if the Engineer incurs additional cost. If
there are unavoidable delays, a mutually agreeable and reasonable time extension
shall be negotiated.
6) Plan Submittal
Copies of the original plans shall be provided on reproducible mylar or approved plastic
film sheets, or as otherwise approved by the Department of Engineering and shall
become the property of the City. City may use such drawings in any manner it desires;
provided, however that the Engineer shall not be liable for the use of such drawings for
any project other than the project described herein; and further provided, that the
Engineer shall not be liable for the consequences of any changes that are made to the
drawings or changes that are made in the implementation of the drawings without the
written approval of the Engineer.
PHASE 1
7) Right-of-Way, Easement and Land Acquisition Needs
The Engineer shall determine the rights-of-way, easement needs for the construction of
the project. Engineer shall determine ownership of such land and furnish the City with
the necessary right-of-way sketches, prepare necessary easement descriptions for
acquiring the rights-of-way and/or easements for the construction of this project.
Sketches and easement descriptions are to be presented in form suitable for direct use
by the Department of Engineering in obtaining rights-of-way, easements, permits and
licensing agreements. All materials shall be furnished on the appropriate City forms in a
minimum of four(4) copies each.
6) Design Survey
The Engineer shall provide necessary field survey for use in the preparation of Plans
and Specifications. The Engineer shall furnish the City certified copies of the field data.
9) Utility Coordination
The Engineer shall coordinate with all utilities, including utilities owned by the City, as to
any proposed utility liens or adjustment to existing utility lines within the project limits.
The information obtained shall be shown on the conceptual plans. The Engineer shall
show on the preliminary and final plans the location of the proposed utility lines,
existing utility lines, based on the information provided by the utility, and any
adjustments and/or relocation of the existing lines within the project limits. The
Engineer shall also evaluate the phasing of the water, wastewater, street and drainage
work, and shall submit such evaluation in writing to the City as part of this phase of the
project.
-2-
10) Conceptual Plans
The Engineer shall furnish four (4) copies of the Phase 1 concept engineering plans
which include layouts, preliminary right-of-way needs and preliminary estimates of
probable construction costs for the EngineerAs recommended plan. For all submittals,
the Engineer shall submit plans and documents for street/storm drain and
_ water/wastewater facilities. The Engineer shall receive written approval of the Phase 1
Plans from the City's project manager before proceeding with Phase 2.
PHASE 2
11) Design Data
The Engineer shall provide design data, reports, cross-sections, profiles, drainage
calculations, and preliminary estimates of probable construction cost.
12) Preliminary Construction Plains and Technical Specifications
The Engineer shall submit twenty (20) copies of Phase 2 preliminary construction plans
and five (5) copies of the preliminary technical specifications for review by the City and
for submission to utility companies and other agencies for the purposes of coordinating
work with existing and proposed utilities. The preliminary construction plans shall
indicate location of existing/proposed utilities and storm drain lines. The Engineer shall
receive written approval of the Phase 2 plans from the City's project manager before
proceeding with Phase 3.
PHASE 3
13) Final Construction Plans
The Engineer shall furnish five (5) copies of the final construction plans and contract
specifications for review by the City.
14) Detailed Cost Estimate
The Engineer shall furnish four(4) copies of detailed estimates of probable construction
costs for the authorized construction project, which shall include summaries of bid items
and quantities.
15) Plans and Specification Approval
The Engineer shall furnish an original cover mylar for the signatures of authorized City
officials. The Contract Documents shall comply with applicable local, state and federal
laws and with applicable rules and regulations promulgated by local, state and national
boards, bureaus and agencies. The Engineer shall receive written approval of the
Phase 3 plans from the City's project manager before proceeding with Phase 4.
1L�G��'I �rA'k0 1 D
PHASE 4
16) Final Approved Construction Plans
The Engineer shall furnish 45 bound copies of Phase 4 final approved construction
plans and contract specifications. The approved plans and contract specifications shall
_ be used as authorized by the City for use in obtaining bids, awarding contracts, and
constructing the project.
17) Bidding Assistance
The Engineer shall issue addenda as appropriate to interpret, clarify, or expand the
bidding documents, and assist the owner in determining the qualifications and
acceptability of prospective constructors, subcontractors, and suppliers. When substitu-
tion prior to the award of contracts is allowed by the bidding documents, the Engineer
will advise the owner as to the acceptability of alternate materials and equipment
proposed by the prospective constructors.
18) Recommendation of Award
The Engineer shall assist in the tabulation and review of all bids received for the
construction of the project and shall make a recommendation of award to the City.
19) Pr-ebid Conference
The Engineer shall attend the prebid conference and the bid opening, prepare bid
tabulation sheets and provide assistance to the owner in evaluating bids or proposals
and in assembling and awarding contracts for construction, materials, equipment, and
services.
PHASE 5
20) Preconstruction Conference
The Engineer shall attend the preconstruction conference.
21) Construction Survey
The Engineer shall be available to the City on matters concerning the layout of the
project during its construction and will set control points in the field to allow City survey
crews to stake the project. The setting of line and grade stakes and route inspection of
construction will be performed by the City.
22) Site Visits
The Engineer shall visit the project site at appropriate intervals as construction
proceeds to observe and report on the progress and the quality of the executed work.
-4-
23) Shop Drawing Review
The Engineer shall review shop and erection drawings submitted by the contractor for
compliance with design concepts. The Engineer shall review laboratory, shop, and mill
test reports on materials and equipment.
24) instructions to Contractor
The Engineer shall provide necessary interpretations and clarifications of contract
documents, review change orders and make recommendations as to the acceptability
of the work, at the request of the City.
25) Differing Site Conditions
The Engineer shall prepare sketches required to resolve problems due to actual field
conditions encountered.
26) Record Drawings
The Engineer shall prepare record drawings from information submitted by the
contractor.
-5-
ENKI IIBIT "FA-11,
SLtPPLE Ti ENTAL SCOPE OF SERVICES
(SUPPLEMENT TO AT T ACE-nvi=_K T "A")
I ESIGt SEp,IfICES: WATER AIIDIOR SANITARY SEWER IIIriPROVE MEINI i S
The following is a clarification of the tasks that the ENGINEER will perform under ATTACHMENT
"A', Work under this attachment includes engineering services for water and/or sanitary sewer
improvements for the following:
Water and Sanitary Sewer peplacernent Contract 200571+�lSI&D
D.O.E. No.: 5296
City Project No.: 00386
Water Sewer
Council =ReplaGBMent
Proposed Length
Street Districts Water ExistingLength Sewer Existing Replacement g
Map No. Size(in.) (tt.) Map No. Size(in.) size(in.)
Collett Little
Road. 2072-364 12 12 3300 - - -
(US 287 to Loop No.5 2078-364
820 service
Road
No.5 2066-376 6&8 8 9500 2066-376 6&8 8 1517
Baylor Street
(Wichita St.to
Vaughn Blvd.)
No.8 2866-376 6&8 8 1950 2066-376 6&808 8 422
Baylor Street
(950-E.of 450 2072-376 8 VC 8 664
No.5 2072-376 8 PVC 8
Freddie St.to
Miller Ave.
Hampshire Blvd. 2066-388 6,8& 8 1900 2072-388 6 8 359
(Haynes Ave.to No.8 2072-388 20 20 1900
Oakland Blvd.
San Rose Or. g 1350 2072-376 6&8 B 863
(Reed St.to No.5 2072-376 6
Ba for st.
TOTAL '12,350 TOTA 3,825
Upon receipt of notice to proceed, the ENGINEER will perform the following tasks:
EA1-1
Rev 11/02/05
rPtf--.F,T A r c��-Et.IGIN�E IIr4G
1. Initiai Data Collection
a. Pre-Design Coordination Meetings
ENGINEER will attend and document meetings, as required, to discuss and
coordinate various aspects of the project and to ensure that the project stays on
schedule. For purposes of establishing a level of comfort, two (2) meetings are
anticipated.These include the following:
One (1) pre-design kick-off meeting, (including the CITY's Department of
Engineering and other departments that are impacted by the project).
One (1) review meeting at completion of the City's review of the conceptual
engineering plans.
b. Data Collection
In addition to data obtained from the City, ENGINEER will research and
make efforts to obtain pertinent information to aid in coordination of the
proposed improvements with any planned future improvements that may
influence the project. ENGINEER will also identify and seek to obtain data
for existing conditions that may impact the project including; utilities, City
Master plans, property ownership as available from the Tax Assessor's
office.
The data collection efforts will also include conducting special coordination
meetings with affected property owners and businesses as necessary to
develop sewer re-routing plans.
The following shall be applicable at all locations where it is necessary to
relocate or reroute the existing private sanitary sewer service line due to
the abandonment or realignment of the existing public sanitary sewer
lateral or main:
The CITY shall furnish the Engineer with a sample format of how the sewer
service line reroute/relocation should be designed and submitted for
construction. During design survey, if a rod can be inserted through the
EA1-2
Rev 11/02/05
cleanout to the bottom of the service line, the Engineer will obtain the flow
line elevation and design the service line prior to advertising the project for
bid. If the service flow line information cannot be obtained during design
survey, the Engineer shall delay the design of the sewer service line until
atter the start of construction. The CITY will then direct the Contractor to
de-hole the service line at the clean-out location of all buildings or
structures so that the Engineer's surveyor can determine the flow line of the
sewer service line. The Engineer shall use this information to provide the
design for the sanitary sewer service line to be rerouted or relocated.
c. Coordination with Other/agencies
During the concept phase the ENGINEER shall coordinate with ail utilities,
including utilities owned by the City, TxDOT and railroads. These entities
shall also be contacted if applicable, to determine plans for any proposed
facilities or adjustment to existing facilities within the project limits. The
information obtained shall be shown on the concept plans. The ENGINEER
shall show the location of the proposed utility lines, existing utility lines and
any adjustments andlor relocation of the existing lines within the project
limits. ENGINEER shall complete all forms necessary for City to obtain
permit letters from TxDOT and railroads and submit such forms to the City.
City shall be responsible for forwarding the forms to the affected agencies
for execution.
2. Schedule Submittal and Monthly Progress Report
The ENGIENER shall submit a progress schedule after the design contract is fully
executed. The schedule shall be updated and submitted to the CITY along with monthly
progress reports as required under Attachment B of the contract.
PART B - CONSTRUCTION PLANS AND SPECIFICATIONS
9. Conceptual Engineering
i. Surveys for Design
a. ENGINEER will perform field surveys to collect horizontal and
vertical elevations and other information which will be needed for use
by the ENGINEER in design and preparation of plans for the project.
Information gathered during the survey shall include topographic
EA1-3
Rev 11/02/05
data, elevations of all sanitary and adjacent storm sev�iers, rim/invert
elevations, location and buried utilities, structures, and other features
relevant to the final plan sheets. For sever lines located in allays or
backyards, ENGINEER will obtain the following:
Obtain permission for surveying through private property.
Locate horizontal and vertical alignment of utility lines. Tie
improvements, trees, fences, walls, etc., horizontally along rear lines
in an approximately 50' wide strip. In addition, locate all rear house
corners and building corners in backyards.
Profile existing water and/or sewer line centerline.
Compile base plan from field survey data at 1"-20' scale.
Obtain permission for surveying through private property. Locate
horizontal and vertical alignment of utility lines, existing utilities, trees,
fences, walls, etc., horizontally along rear lot lines in an
approximately 20'wide strip. In addition, locate all rear house corners
and building corners in backyards. Compile base plan from field
survey data at 1" =20' horizontal and 1" = 4' vertical scale.
When conducting design survey at any location on the project, the
consultant or its sub-consultant shall carry readily visible information
identifying the name of the company and the company
representative. All company vehicles shall also be readily identified.
b. Engineer will provide the following information:
All plans, field notes, plats, maps, legal descriptions, or other
specified documents prepared in conjunction with the requested
services shall be provided in a digital format compatible with the
electronic data collection and computer aided design and drafting
software currently in use by the CITY Department of Engineering.
All text data such as plan and profile, legal descriptions, coordinate
files, cut sheets, etc., shall be provided in the American Standard
Code for Information Interchange (ASCII) format, all drawing files
shall be provided in MicroStation (DGN) or Autocad (DWG or DXF)
format(currently Release 2002), or as otherwise approved in writing
EP-1-4
Rev 11/02/05
by the CITY, and all data colleted generated during the course of
the project shall be:oma the property of the CITY.
The minimum information to be provided in the plans shall include
the following:
1 A Project Control Sheet, showing ALL Control Points, used
or set while gathering data. Generally on a scale of not less
than 1:400:
2. The following information-about each Control Point;
a. Identified (Existing City Monument #8901, PK Nail,
518" Iron Rod)
b. X,.Y and Z Coordinates, in an identified coordinate
system, and a referred bearing base. Z coordinate
on City Datum only.
c_ Descriptive Location (Ex. Set in the centerline of the
inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North
Side Drive and North Main Street).
3, Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves,
etc., in the same coordinate system, as the Control Points.
4 No less than two bench marks plan/profile sheet.
5. Bearings given on all proposed centerlines, or baselines.
5. Station equations relating utilities to paving, when
appropriate.
7. Obtain the "foot print" of all properties where the sanitary
sewer service line is to be relocated or rerouted.
ii. Public Notification and PersonnelNehicle Identification
a. Prior to conducting design survey, ENGINEER will notify
EAS.-5
Rev 11/02/05
-affected residents of the projeot in writing. The notification letter
shall be on company Jetterl-oad and shall in-lude the f0ll0vvring:
project name, limits, JOE project no., Consultant's project
manager and phone no., scope of sulvey work and design
survey schedule. The letter will be reviewed and approved by
the City prior to distribution.
b. When conducting site visits to the project location, the
ENGINEER or any of its sub-consultants shall carry readily
visible information identifying the name of the company and the
company representative. All company vehicles shall also be
readily identifiable.
iii. Conceptual Engineering Plan Submittal
a 'Conceptual plans shall be submitted to City 45 days after
Notice to Proceed Letter is issued.
b. The ENGINEER shall perform conceptual design of the
proposed improvements and furnish four (4) copies of the
concept engineering plans which includes layouts,
preliminary right-of-way needs and cost estimates for the
ENGINEER's recommended plan. ENGINEER shall perform
remaining field surveys required for final design of selected
route(s). The ENGINEER shall also evaluate the phasing of
the water, sanitary sewer, street and drainage work, and
shall submit such evaluation in writing to the City as a part
of the concept phase of the project. All design shall be in
conformance with Fort Worth Water Department policy and
procedure for processing water and sewer design.
ENGINEER shall review the City's water and sewer master
plan, other pertinent design information and provide a
summary of findings pertaining to the proposed project.
2, Preliminary Engineering
Upon approval of Part 8, Paragraph iii (b), ENGINEER will prepare
preliminary construction plans as follows:
a. Overall water and/or sanitary sewer layout sheets and an
EAl-5
Rev 11/02/05 n T •]]?' f r ��
n
overall easement layout sheet(s).
b, Preliminary project plans and profile sheets on 22" r. 34,:
sheets which show the following: Proposed water andlor
sanitary sewer pian/profile and recommended pipe size, fire
hydrants, water service lines and meter boxes, gate valves,
isolation valves, manholes etc., related appurtenances and
all pertinent information needed to construct the project.
Legal description (Lot Nos., Block Nos., and Addition
Names) along with property ownership shall be provided on
the plan view.
C. For sewer lines, pipelines schedule for point repairs,
rehabilitation and replacement will be located on the base
sheets prepared from survey information gathered under
Part B, Paragraph b. Conflicts shall be resolved where
pipelines are to be rehabilitated on the same line segment.
Base sheets shall reference affected or adjacent streets.
Where open-cut and trenchless technology construction is
anticipated, below and above ground utilities will be located
and shown on the base sheets.
d. Existing utilities and utility easements will be shown on the
plan and profile sheets. ENGINEER will coordinate with
utility companies and the City of Fort Worth to determine if
any future improvements are planned that may impact the
project.
e. The design for sewer service line reroutelrelocation will be
provided if the flow line elevation of the sewer service can
be determined from the cleanout location_ If this elevation
cannot be determined during design survey, the design
shall be provided after award of the construction contract
as specified in Part A, Paragraph 1 b.
f. The ENGINEER shall make provisions for reconnecting all
identifiable water andlor wastewater service lines which
connect directly to any main being replaced, including
replacement of existing service lines within City right-of-
way or utility easement. When the existing alignment of a
EAI-7
Rev 1I/02/QS
water and sanitary sealer main or late;al is changed,
provisions will be made in the final plans and/or
specifications by the ENGINEEF to relocate all service
lines which are connected to the existing main and
connect said service lines to the reiocated main.
g, The ENGINEER will prepare standard and special detail
_ sheets for water line installation and sewer rehabilitation or
replacement that are not already included in the D-Section
of the City's specifications. These may include connection
details between various parts of the project, tunneling
details, boring and jacking details, waterline relocations,
details unique to the construction of the project, trenchless
details, and special service lateral reconnections.
h. Right-of-Way Research
The ENGINEER will conduct preliminary research for
availability of existing easements where open-cut
construction or relocation of existing alignments is probable.
Temporary and permanent easements will— a�propriate�
based on available information and recommendations will
be made for approval by the City.
i, Right-of-waylEasement Preparation and Submittal
Preparation and submittal of right-of-way, easements and
rights-of-entry will be in conformance with "Submittal of
Information to Real Property for Acquisition of Property".
j, Utility Clearance Phase
The ENGINEER will consult with the City's Water
Department, Department of Engineering, and other CITY
departments, public utilities, private utilities and government
agencies to determine the approximate location of above
and underground utilities, and other facilities that have an
impact or influence on the project.
ENGINEER will design City facilities to avoid or minimize
EA1-8
Rev Il/02/05
conflicts with existing utilities.
The shall deliver a minimurn of 13 sets of
approved preliminary construction plans to the City's Utility
Coordinator for forwarding to all utility companies, which
have facilities within the limits of the project.
k. Preliminary construction plan submittal
i Preliminary plans and specifications shall be
submitted to City 90 after approval of Part
B, Paragraph iii (b).
ii. The ENGINEER shall deliver two (2) sets of
preliminary construction plans and two (2) sets of
specifications and contract documents to CITY for
review. Generally, plan sheets shall be organized as
follows:
Cover Sheet
General NoteslLegand
Easement layout(if applicable)
Abandonment
Plan & Profile Sheets
Standard Construction Details
Special Details (if applicable)
iii, The ENGINEER shall submit a preliminary estimate
of probable construction cost with the preliminary
plans submitted. ENGINEER shall assist City in
selecting the feasible and/or economical solutions to
be pursued.
I. Review Meetings with City
The ENGINEER shall meet with CITY to discuss review
comments for preliminary submittal. The CITY shall direct the
ENGINEER in writing to proceed with Final Design for Final
Review.
�A1-9
Rev 11/02/05 5l�'T� 7 i�` ✓ °
M. P ubtic lIrieet;ing
mer the preliminary pians have been reviewed and approved
by the City, the LNGINEER shall prepare project exhibits,
provide the CITY with the database listing the names and
addresses of all residents and business to be affected by the
proposed project, and attend public meeting to help explain the
proposed project to residents. The CITY shall select a suitable
location and mail the invitation letters to the affected customers.
3. Final Construction Plan Submittal
a. Final Construction Documents shall be submitted to CITY 60 days after
approval of Part B, Paragraph 2 k.
Following CITY approval of the recommended improvements, the
ENGINEER shall prepare final plans and specifications and contract
documents to CITY (each plan sheet shall be stamped, dated, and signed
by the ENGINEER registered in State of Texas) and submit two (2) sets of
plans and construction contract documents within 15 days of CITY's final
approval. Plan sets shall be used for Part C activities.
b. ENGINEEWs Estimate of Probable Construction Cost
The ENGINEER shall submit a final estimate of probable construction cost
with the final plans submitted.
C. Mylar Submittals
The ENGINEER shall submit a final set of mylar drawings for record
storage as follows:
1. Water and sanitary sewer plans shall be submitted as one
set of plans. Water and sanitary sewer plans shall be
separate from paving and drainage plans. All sheets shall
be standard size (22" x 34') with all project numbers
(Water/Sanitary Sewer and TPW) prominently displayed.
2. For projects where paving/grating/drainage improvements
occur on a Water Department funded project with no T&PW
EAI-10
Rev 11/02/05
funding involved, a separate set of mylars with cover sheet
shall be submitted for TPW.
3. Signed plans sets shall also be submitted as an Adobe
Acrolaat PDF format (version 6.0 or higher) file. Thera
shall be one (1) PDF file for the Water plan set and a
separate PDF file for the TPW plan set. Each PDF file shall
_ contain all associated sheets of the particular plan set.
Singafar PDF files for each sheet of a plan set will not
be accepted PDF files shall conform to naming
conventions as follows:
1. Water and Sewer file name example — "X-
35667—org36.pdf" where "X-35667" is the
assigned file number obtained from the City of Fort
Worth, ,_org" designating the file is of an original
plan set, "36" shall be the total number of sheets in
this file.
Example: X-12755 orgl8.pdf
ll. TPW file name example — "W-1956_org47.pdf"
where "W-1956" is the assigned file number
obtained from the City of Fort Worth, "_org"
designating the file is of an original plan set, "47"
shall be the total number of sheets in this file.
Example: W-0053—org3.pdf and K-0320 org5.pdf
Both PDF files shall be submitted on one (1) Compact Disk, which will
become properly of and remain with the City of Fort Worth. Floppy disks,
zip disks e-mail flash media will not be accepted,
4. For information on the proper manner to submit PDF files
and to obtain a file number for the project, contact the
Department of Engineering Vault at telephone number(817)
392-8426. File numbers will not be issued to a project
unless the DOE number and proper fund codes have been
assigned and are in the Department of Engineering
database.
EA1-11
Rev 11/02/05
PAP,7 C - RR E-1, �Tr.JCTAI
Admini:strati3n
a. Deliv,-_r Bid Documents
The ENGINEER will make available for bidding, upon request by the CITY, up to
fifty (50) sets of the final approved and dated pians and specifications and contract
documents for the projects to the CITY for distribution to potential bidders.
Proposal will be delivered in electronic format.
b. Bidding Assistance
The ENGINEER shall assist the CITY during this phase including preparation and
s as
delivery of any additional addenda prior b d opening
pb ddersb Engineeplan r shall attend the
er and r pond
to questions submitted to DOE by prospective
scheduled pre-bid conference.
The ENGINEER shall assist in reviewing the bids for completeness and accuracy.
The ENGINEER shall attend the project bid opening, develop bid tabulations in
hard copy and electronic format and return four (4) copies of the bid tabulation,
along with the contract documents to the City within three (3) working days after
bid openings.
C. Assistance During Construction
he
The ENGINEER shalt attend the pre-construction
advisee theerence CiTYfor on design and and/or
ENGINEER shall also consult with
construction changes, if necessary.
F,AJ--12
Rev ailoa/os
v' r v1A lI C0 EMD,
�u ff 3-�I2kMal`'�V
FT, .i511 , TU.
Water& SS-AttachB_B-1_5-2_06-0050Attachment B 5/11/2006
ATTACHMENT "B"
COMPENSATION AND SCHEDULE
Water and Sanitary Sewer Replacement Contract'.2005 WSM-D
D.O.E. No.: 5296
City Project No.: 00386
I. Compensation
A. The Engineer shall be compensated a total lump sum fee of$ 199,016.00
as summarized in Exhibit "B-3A". Payment of the total sump sum fee shall
be considered full compensation for the services described in Attachment"A"
and Exhibit"A-1"for all labor materials, supplies and equipment necessary to
complete the project.
B. The ENGINEER shall be paid in monthly partial payments as described in
EXHIBIT"B-1" upon receipt of invoices submitted by the ENGINEER, based
on an estimate of the percentage of completion of the project, not to exceed
the milestone limits-described in EXHIBIT 'S-1".
!l. Schedule
Final Construction Plans and Contract Documents for bid advertisement shall be
submitted within 230 calendar days after the "Notice to Proceed" letter is issued.
A. Conceptual Engineering Plans - 45 Calendar Days
B. Preliminary Engineering Plans and Contract Documents - 90 Calendar Days
C. Final Engineering Plans and Contract Documents - 60 Caiendar Days
D. Final Engineering Plans and Contract Documents for Bid Advertisement- 35
Calendar Days
B- 1
Water& SS-Attach B—B-1_B-2_06-0050Exhibit B-1 5/1112066
EXHIBIT Bal
(BAFFLEMENT TO ATTACHMENT B)
METHOD OF PAYMENT
Water and Sanitary Sewer Replacement Contract 2005 WSM-D
D.O.E. No. : 5296
City Project No.: 00386
I. Method of Payment
The ENGINEER shall be paid monthly upon receipt of an invoice on the bases of statements
prepared from the books and records of account of the ENGINEER, based on the ENGINEER'S
estimate of the percentage of completion of the project, such statement to be verified as to accuracy
and compliance with the terms of this contract by an officer of ENGINEER. Payment according to
statements will be subject to certification by the Director of Department of Engineering or his
authorized representative that such work has been performed.
The aggregate of such monthly partial payments shall not exceed the following:
Until satisfactory completion of EXHIBIT"A-1", Conceptual Engineering Plan submittal and
approval by the City, a sum not to exceed 30 percent of the lump sum.
Until satisfactory completion of EXHIBIT"A-1", Preliminary Construction Plan and contract
documents submittal and approval by the City,a sum not to exceed 60 percent of the lump
sum.
Until satisfactory completion of EXHIBIT "A-1", Final Construction Plan and contract
documents submittal and approval by the City, a sum not to exceed 90 percent of the lump
sum.
Balance of earnings to be due and payable upon delivery to the CITY of plans and bid documents
for advertising as described in EXHIBIT"A-1".
Il. Progress Reports
A_ The Engineer shall submit to the designated representative of the Director of the
Department of Engineering monthly progress reports covering all phases of design
by the 15"of every month in the format required by the City.
B. If the ENGINEER determines in the course of making design drawings and
specifications that the engineer's opinion of probable construction cost estimate of
$2,324,227.95 _(as estimated in Exhibit"134"for Water and Sanitary Sewer will
be exceeded, whether by change in the scope of the project, increased costs or
other conditions, the ENGINEER shall immediately report such fact to the CITY's
Director of the Department of Engineering and, if so instructed by the Director of
Engineering shall suspend all work hereunder.
B1 - I
Water& SS-Attach3—B-1_R-2_06-0050Attachment B-2 5111/2006
EXHIBIT B-2
(SUPPLEMENT TO ATTACHMENT B)
2006 HOURLY RATE SCHEDULE
Water and Sanitary Sewer Replacement Contract 2005 WSM-D
D.O.E. No.: 5296
City Project No.: 00386
Employee Classification Rate/Hour(Range)
Principal $185
$125 -165
Project Mana er 1 Planner
$115 - 145
RPLS
$ 95125
Design Engineer
-Designer 1 CAD O erator $ 75 - 95
75 - 95
-SurveyTechnician $
Draftsman $ 50 -75 500 -75
$ 40 - 55
Clerical
SurveyCrew $100 - 150
Cost+ 10%
Reimbursable
ile
Mileage $ 0.32 Per M
Reproduction work will be at current commercial rates. Subcontractors will be paid for at actual
invoice cost plus ten percent (I01).
132- 1 ?! / r
Exhibit B-3A
5/11/2006
EXHIBIT B-3A
(SUPPLEMENT TO AT I ACHIVIEtvIT S)
SUMMARY OF TOTAL PROJECT FEES
Water and Sanitary Sewer Replacement Contract 2005 WSM-D
Q.Q.E. No.: 5296
City Project No.: 00386
Consulting Firm cope o � ervacess e mount ercentage
prime Consultant
Engineering and Project $151,252.0p 7S°10
A.N.A. Consultants, L.L.C. Management
M—WB,E Consultants
Lopez Garcia Group Engineering $42,964.00 21.59%
Trevino Engineering Support Services Reproduction $4,800.00 2.41%
Non DQE Consultant
Not Applicable
Totall $199,016.00 100%
SUMMARY OF M[WBE FEE
MIWBE
Professional T
Services Scope of Services Total Fee MNVBE Fee Percentage
Engineering Water, Sewer $999,016.00 $47,764.00 24.0%
Services
The MIWBE goal has been met.
KPS
W-SS-Exhibit B-3-Design Fee Calculations B3A-1
Exhibit B-3B
5/1112005
EXHIBIT B-3B
(SUPPLEIVIEKIT TO ATTACHMENT S)
PROFESSIONAL SER\nCFS FEE SLil11'IIUARY
!!!rater and Sanitary Sewer Replacement Contract 2005 WSM-D
_ D.O.E. No.: 5296
City Project No.: 00386
Basic Services:
Part A—Conceptual Design and fart B—Plans and Specifications
Water Department
Fee Percentage Based Basic Service Basic Service
on Construction Cost Percentage for (Preliminary and
Estimated per TSPEICEC Curve Preliminary and Design Phase)
Improvements Construction Cost `A' Design Phase Compensation
ater $ 1,708,928.10 6.85°/fl 85% $99,502.00
rSewer 615,299.85 6.85% 1 8511/6 $35,826.00
Basic Services l=ee Total $135,328.00
Survey Services Fee Total $40,979.00 (See Exhibit B-3C)
Additional Services Fee Total $22,709.00 (See Exhibit B-3D)
Total Contract Fee $199,016.00
W-SS-Exhibit B-3-Design Fee Calculations B3B-1
Exhibit S-313
5/11/2006
EXHIBIT B-3B
(SUPPLEMENT TO ATTACHMENT S)
PROFESSIONAL SERVICES FEE SUMMARY
Water and Sanitary Sewer Replacement Contract 2005!NSM-D
D.O.E. No.: 5296
City Project No.: 00386
SUMMARY OF TOTAL FEE
Service Description _ afar ewer ota
Engineering services and Additional Services $108,349.00 $49,687.00_ $155,036.00
Survey Services $33,117.00 $7,862.00 $40,979.00
Total $141,466.00 $57,149AD $199,0'15.00 -
BREAKDOWN OF DESIGN FEE (LESS SURVEY FEE)
Water Design Fee
Design Phase Sub
Design Phase Water Engineering Services Fee Percent of Design Total
$108,349.00 30% $32,505.00
Concept 60% $65,009.00
Preliminary $108,349.00
$108,349.00 10% $10,835.00
Final
Water Design Fee Less Survey Fe $105,349.00
Sewer Design Fee
Design Phase Sub
Design Phase Sewer Engineering Services Fee Percent of Design Total
$49,687.00 30% $14,906.00
Concept 60% $29,812.00
ry
Prelimina $49,687.00
$49,687.00 1U% $4,969.00
Final Sewer Design Fee less Survey Fe $49,687.00
W-SS-Exhibit B-3-Design Fee Calculations 1338-2
Exhibit B-3C
5/11/2006
EXHIB[T B-3C
(SUPK�E ENT 'TO ATT,CK[AEKT B)
FEES FOR SURVEYING SERVICES
Water and Sanitary Sewer Replacement Contract 2005 WSi+ -D
D.O.E. No.: 5296
City Project No.., 00386
Linear Foot of Cost per Cost per
Improvement Type of Survey Survey (L.F.) L.F. Improvement
Water Topographic 10,349 $3.20 $33,116.80
Sewer Topographic 2,347 $3.35 $7,862.45
Total for Surveying Services 12,696 $3.23 $40,979.30
W-SS-Exhibit B-3-Design Fee Calculations B3C-1
Exhibit B-3D
5/11/2006
EXHIBIT B-3D
(SUPPLEMENT TO ATTACHMENT B)
FEES FOR ADDITIONAL SERVICES
Water and Sanitary Sewer Replacement Contract 2005 WSM-D
D.Q.E. No.: 5296
City Project No.: 00386
Water Department
Erosion Control Plan and SW3P $5,000.00
Right of Entry (8) $400_00
Highway Permit $1,500.00
Monthly Progress Report(MWBIE Reports) & e-mail minutes of all meetings $1,900.00
Public Meeting (2) $1,200.00
Assistance with Advertisement of Project $550.00
Pre-Construction Meeting $550.00
Reproductions Sub-Total (See Exhibit"B-3E") $8,358.00
Administration of Sub-consultant Services (10%) $3,250.51
Water dub Total $22,709.00
Additional Services Fee Total $22,709.00
W-SS-Exhibit B-3-Design Fee Calculations 83D-1
Exhibit S-3E
5/11/2006
EXHIBIT B-3E
(SUPPLEMENT TO ATTACHMEhIrT )
FEES FOP REPRODUCTION SERVICES
Water and Sanitary Sewer Replacement Contract 2005 WSM-D
D.Q.E. No.: 5296
City Project No.: 00386
Estimated
Cost per Number of Number of
Type of Document Page Pages Copies Total Cost
Conceptual Design Phase
Concept Plan 1 $0.50 52 4 $104.00
Existing Cit As-Built Plans (City Vault) :L $0.55 L 75 1 `I $41.25
Preliminary Design and Utility Clearance Phase
Construction Plans $1.35 40 16 $864.00
Specifications $0.18 360 2 $129.60
Gas & Electric Utility Maps $25.00 4 1 $900.00
Final Design Phase
Highway Permit $0.80 5 6 $24.00
Construction Plans $1.35 40 2 $108.00
$0.25 360 2 $180.00
Specifications
Bid Document Phase
Construction Plans $1.25 43 57 $3,063.75
Specifications $0.15 360 50 $2,700.04
SW3P $0.16 110 8 $140.80
Public Meeting,Phase
Mounted Drawing(s) $37.50 1 2 $75.00
Final
Construction Plan Mylar(s) $4.75 43 1 $204.25
Half Size Plans $0.45 43 10 $193.50
Plans in PDF Format $10.00 43 1 $430.00
Reproduction Sub-Total ,
CITE/ �MCIPMIWY
W-SS-Exhibit B-3-Design Fee Calculations 133E-1
5111/2006 Exhibit B-4
EXHIBIT B-4 Summary
(SUPPLEMENT TO ATTACHMENT B)
WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2005 WSM-D
CITY PROJECT NO.: 00386 D.O.E. NO.: 5296
OPINION OF PROBABLE CONSTRUCTION COST
Water Main Sewer Main Total
Location Construction Construction Construction
Q Collett Little Road (U.S. 287 to Loop 820 Ser. Rd.) $ 382,329.75 $ - $ 382,329.75
Baylor Street(Wichita to Vaughn) $ 437,114.15 $ 351,462.65 $ 788,576.80
I- Baylor Street (150' E of Freddie to Miller) $ 45,766.50 $ 80,798.30 $ 126,564.90
Hampshire Blvd. (Haynes to Oakland) $ 678,075.75 $ 33,574.75 $ 711,650.50
W San Rose Dr. (Reed to Baylor) $ 165,641,85 $ 149,464.15 $ 315,106.00
n
O
tY
a' PROJECT TOTALSI $ 1,708,928.10 $ 615,299,85 $ 2,324,227.95
Percent Costl 73.53% 26.47% 100.00%
Water Main Sewer Main Total
us
Location Construction Construction Construction
Collett Little Road (U.S. 287 to Loop 820 Ser. Rd.) $ 382,329.75 $ - $ 382,329.75
'c Baylor Street(Wichita to Vaughn) $ 211,050,40 $ 271,269.35 $ 482,319.75
Baylor Street(150' E of Freddie to Miller) $ 45,766.60 $ 80,798.30 $ 126,564.90
San Rose Dr. (Reed to Baylor) $ 165,641.85 $ 149,464.15 $ 315,106.00
O DISTRICT 5 TOTALS $ 804,788.60 $ 501,531.80 $ 1,306,320.40
Percent District's Cost 61.61% 38.39% 100.00%
Percent Overall Project Cost 34.63% 21.58% 56.20%
Water Main Sewer Mains Total
Location Construction Construction Construction
Baylor Street(Wichita to Vaughn) $ 226,063.75 $ 80,193.30 $ 306,257.05
Hampshire Blvd. (Haynes to Oaldand) $ 678,075.75 $ 33,574.75 $ 711,650.50
o DISTRICT 8 TOTALS $ 904,139.50 $ 113,768.05 $ 1,017,907.55
O Percent District 8 Cost 88.82% 11.18% 100.00%
Percent Overall Project Cost 38.90% 4.89% 43.80%
`8ince ENGINEER has no control over the cost of iabor, materials, equipment ur services furnished by others, or over the
Contraotor(s) rnethuds of determining prieesr or aver competitive bidding or market conditions,ENGTNIEI;R's opinions of probabie
Total project Costa and Construction Cost provided for herein are made on tho basis; of ENGINEER's experience and quaiificatlons
and represent E°NGINFER's best judgment as an experienced and qualified professional engineer:,familiar with the construction
Industry; bul ENGINEER cannot find does not guarantee that-proposais, gids or actual Total project or Construction Costs will not
vary From opinions of probable Bost prepared by ENGINEER. If prior to the Sidding or Negotiating Phase OWNER wishes greater
assurance to the Construction Cost he shall employ an independent cost estimator,
Exhibit-13-4
134-1 Summary
Exhlbit B-4
51t1120D6 `
EXHIBIT B4 Unit I Water
(SUPPLEMENT TO ATTACHMENT B)
WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2005 WSM-D
CITY PROJECT NO.:00386 D.O.E.NO.:5296
OPINION OF PROBABLE CONSTRUCTION COST
WATER REPLACEMENT
IUNIT I-WATER LIFE IMPROVEMENTS
TOTAL
WATER
_ PROJECT
PAY ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE SUB-TOTAL
1 6"PVC DR-14 WATER LINE INCL.REM.EXIST, 101 LF $34.00 $3,434.00
2 8"PVC DR-14 WATER LINE INCL.REM.EXIST. 7381 LF $2B.00 $2D6.668.00
3 12"WATER LINE INCL.REM.EXIST. 3390 LF $45.00 $752,550.00
4 16"DIP WATER MAIN 50 LF $80.00 $4,000.00
5 20"GL.51 DUCTILE IRON WATER PIPE 1900 LF $11D.00 $209,000.00
6 8"DIP WATER MAIN INCL,REM.EXIST, 288 LF $65.00 $18,720.00
7 6"GATE VALVE&BOX 14 EA $650.00 $9,100.DD
B B"GATE VALVE&BOX 34 EA $350.00 $32.300.01)
9 12"GATE VALVE&Gt VALVE BOX&LID B EA $1,600.00 $12,800.00
10 20"RESILIENT SEATED VALVE wICONC VAULT 2 EA $15,000,00 $30,000.00
11 16"BUTTERFLY VALVE AND CONC,VAULT 1 EA $10,01)0.01) $10,000,00
12 CAST IRON FITTINGS 12"AND SMALLER 8.75 TN $3,000.00 $26,250.00
13 CAST IRON FITTINGS 16"AND LARGER 1.5 TN $5,000.00 $7,500.00
14 FIRE HYDRANT ASSWMBLY STD.3'6"BURY 14 EA $2,000.00 $28,000.00
15 FIRE HYDRANT 13APRELL EXTENSION 18 LF $20.00 $360.00
16 1"WATER SERVICE TAP TO MAIN 187 EA $250.00 $46,750.00
17 2"WATER SERVICE TAP TO MAIN 1 EA $500.00 $500.00
18 1"COPPER WATER SERVIGE FROM MAIN TO METER 3671 LF $13.50 $49,558.50
19 2"COPPER WATER SERVICE FROM MAIN TO METER 35 LF $36.00 $1,260.00
20 WATER METER BOX CL.A 187 EA $100.00 $18,700.00
21 WATER METER BOX CL.C 1 EA $150.00 $750.00
22 6"TURBO METER W!4"BYPASS IN CONG VAULT 11 EA $9,50D.00 $9,500.06
23 TRENCH SAFETY SYSTEM 1090 LF $2.00 $2,1B0.00
24 CONCRETE ENCASEMENT 7 CY $30.00 $210.00
23 PERMANENT ASPH.PAVEMENT REPAIR PER 2000-1A 15450 LF $40.00 $618,000.00
26 PERMANENT CONC.PAVEMENT REPAIR PER 2000-2 340 LF $55.00 $18,70D.00
27 REMOVE&SALVAGE EXIST.FIRE HYDRANT 10 EA $350.00 $3,500.00
28 REMOVE&SALVAGE 20"GATE VALVE 2 EA $3,000.00 $6,00D.00
29 REPLACE CONC.CURB&GUTTER 174 LF $32.00 $5,SSB.OD
30 FURNISH AND LAY 2"TEMP.WATER SERVICE LINE 8074 LF $1.25 $1$240.50
240 i F $1.00 $2,00.00
31 EXTRA DEPTH FOR WATER MAIN
32 1"AIR RELEASE VALVE&VAULT 2 EA $2,500.00 $5,00D.00
33 6"BLOW OFF 2 EA $3,500.00 $7,000.00
Water Sub-Total $1,553,591.00
Contengencie510°A $155,359.90
Water Project Total $1,708,950.10
glil°e ENCrINR15R-has no Comnot a°ar the Cost of labor,thKOnm'r„oqt iproen,n"€nrvivm&furnlshod ttY oth°m,al Dvim DIC Gnnlrmctnr�sr-methods
aF douralining Pievmsi ai oyer cnmpetlflve Dldoing or market C4niiitlanC,ENGEfLP t;R'F uPiedgite a!pr,ababl¢7btei nrajecl Goss,nd
C4nsitruvifo4 Gobi Drpvs-"d Ior jkwsin pea rnM$e on tie°hasis ur FOGINEER'h LWp6Fio>M.p'and 4Uailticott011fi 4Ln4 MpreSOM E=NGINEER'S#•Bs±
J1 djjpWnL mel7 2K"rWnC*d dh'J 4UHlifrBd'Qm%ssIon111 on9lnmo,IamillprwitEF tha rJ0lL4trw0u 1 Indusim ho!ENGINEM rrannoi Aekf does 1101
gLkmnren that pfapbsah,hldsccbCival 7ntmI Prnjeci.01.C(p7 SeutauTh CoL;tr,will riot%,mytroril 4plrllans of orulmbly carr prmpamd by
ENGINEER H Priv-;u[lie WorlIng w Nepuflailnn PI}�!o OWNP.R-wlslm Umi ter Fsmut2ncd M the RiMrfirnrrtio'!Cast E'e 541111 amjtlmy an
iitdcpendenl cost n0matar.
Fchibit B-4 84-1 Sum W&SS
5/111206 Exhibit 13-4
EXHIBIT B-4 Unit II Sanitary Sewer
(SUPPLEMENT TO ATTACHMENT B)
WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2005 WSM-D
CITY PROJECT NO.:00366 D.O.E.NO.:5296
OPINION OF PROBABLE CONSTRUCTION COST
SANITARY SEINER REPLACEMENT
UNIT It-SANITARY SEWER REPLACEMENT
TOTAL
SEWER
PROJECT
PAY STEM7 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE SUB-TOTAL
1 8"PVC SS OPEN CUT ALL DEPTHS INC.REMOVAL OF EXISTIN 2912 LF $45.00 $131,040,00
2 8"SDR-26 SEWER PIPE ALL DEPTHS 340 LF S48.00 $16,320.00
3 8"DIP SS INCLUDES REMOVAL OF EXISTING 314 LF $60.00 $18,840.00
4 8"HDPE BY OTHER THAN OPEN CUT 279 LF S75.00 $20,925.00
5 4"SS SERVICFTAP 59 EA $275.00 $16,225.00
6 4"PVC SEWER SERVICF 561 LF $26.DO $14,586.00
7 4"SDR-26 PVC SEWER SERVICE 1398 LF $30.00 $41,990.00
8 4"CHIMNEYSERVICE 16 EA $30D.00 $4,80D.00
9 4"TWO-WAY SS CLEANOUT 75 EA $275.00 $20,625.00
10 4'DIAMETER SAN.SEWER MANHOLE 15 EA $2,100.00 $31,5DO.00
11 EXTRA DEPTH FOR 4'DIAMETER SS MH 8 VF $150.00 $1,200.00
12 CONCRETE COLLAR FOR SS MH 17 EA $275.00 $4,675.00
13 WATER TIGHT SAN.SEWER MANHOLE INSERT 15 EA $75.00 $1,125.00
14 VACUUM TEST SS MANHOLE 17 EA $200.00 $3,400.00
15 POST CONSTRUCTION TV INSPECTION 3885 LF $2.50 $9,712.50
16 PERMANENT ASPH.PAVEMENT REPAIR PER 2000-1A 4624 LF $40.00 $184,960.00
17 PERMANENT CONC.PAVEMENT REPAIR PER 2000-2 150 LF $55.00 $8,250.00
18 REPLACE CONC.CURB&GUTTER 235 LF $32.00 $7,520.00
19 REPLACE CONC.WALK&DRIVE 880 SF $12.00 $10,560.00
20 TRENCH SAFETY SYSTEM 5505 LF $2.00 $11,010.00
21 CONCRETE ENCASEMENT 5 CY $30.00 5150.00
Sewer Sub Total $559,363.50
Contengencies 10% $55,936.35
Sanitary Sewer Project Total $515,299.85
Since;ENGINEER'hos:na:cohtrokaverthe.eost-aftabot,mater[a[fi-tqulpme&or services tarnished.ujrothers,oraverthe;Contractor(s}
methods,oEdetermining.priceb,or over i;DmpPtrfiva bidding or n'arKe' .nnc1;t[onjsL,-NGINEER'sopininns afprobabla Tntal!projectCosts anu
Constmution Gma'Provided"far h,ehk ons rnerde nn tiha has41 of ENGINECR's aperlerigu Rail quaiificatioin and_rt:presenl eNGINEER:s,be5t
judgmanr as et,axpe-teeiced a'rd rlrrilkfipd profassinria,enI;lnecr,Samimrwith Iha comoructlari industry;lrLfENGINEERxannot end-doesmol
guarantee tha[proposals,bids or ammai ip[a1 Prol4el or Construction inc-its will nnt vary tronvalitinlvns f5f probahlo cos,pfgoared by
ENGINEER. It prioria thv Skddlay ar Napatiatrng phax DWNER wishxs greaaPrassviance m ttr CansSruczlan Cwt hR shw11 yn proy sal
independeni Rus;Fstimaror.
f
I
h
4
i
Exhibfl_B-4 B4-2 Sum W&SS
J O O O O O O O O O O O O O O O O O N O O O O O O O O O O O O O O O N N r
Q O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 r o 0 0 0 0 0 0 0 0 0 o to 0 0 0 N C] If
F 4'100690 O m N NE40000 0(°N FArfPrO 69 fAO M O(AN O N r D(flO M.�} r
(°f FT c
d -O -�� d'm V.-O OOair(O a r 4l O
7 IL Ill E9 6?N 64 6s to fs3 63 Ui r� 69 N 64 H3 S 69 r
N fA f0
wm N OaJ(A «.S.S
OC^
N T
E MZNO OONMr Nr M4iMMr O r OrO MNOOO CC_:i�;
N r N O)r N M N M N O m r PtS� P
LlCp lta�'recti
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G O O N N
Mn J O O O O O O O O O O O O O O O O O N.0 0 0 0 0 0 0 0 0 0 0 O O N N h
Q ¢ d' 0 0 0 0 0 0 0 0 �..............
0 0 0 �!J O
O Ol(H EA fAr O 64 EAO U3 d' f9(°640(A 640 M OfAO69M Efl E4 N O
O
N p m 9 R
P CYO n
T 2 O c}
a N m O N N V V0 V N N N 7 O�
r r
Q
0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 O O O O O O O O O O O O O O O O O O O rn N
J O O O O O O O O O
¢ (O(O o 0 0 0 0 00 0 6,o 0 0 0 0 0 0 0 0 0 0 0 666-66 N 6 0 0 {i W -
F r 690 0 64Nf900 d'000 N NO NdiI O fA�(° v3 Ft3 y�
O�M� rr 6N9 q�s9� �0-j 169 Mv� N^1n1 N
0 VI I:i IR
Nil= E4 _ bi (P - -
J N
K
mS M}
c c'F
N NN ON(n O NN�rMNr ON�'
aN NNS
= r r
O 0 O 0.... O O O O ......0 0 0 0 O 0 0 0 O
J 0 0 0 0 0 0 O O O O O O O O O O O O O O O O o o 0 0 0 0 0 0 0 0 (O
¢ 0 0 0 0 0 0 0 0 O O O O o 0 0 0 O O O (p p w
V m�6964�N O FR fA 640690 N X6464 R9 V3 tfl�W M OfAN�69 ER ER ffl 0 O O
F M r M(D N O FPr 69 EA(° M W r
N O EA N ��Ol
in
Na N
m °QJ
`m
W
N Z
N
N l] C1
F F L
QUa tP O N o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o v v (oP ton o -
K U Q<r00000000000o o o o ori o o o 0000000N(ci000 a m o c
m .. Z 0 n tO0 0 tfJi„, OM M N H3 fA 0V3O�069�63�fR H30 M O(00 �V
O d- rr M V V r (A
F•O O o
Z U Z F- ` > ro
W U ~ N m LL 7
Z W w !n O
10=
' USO N w m3 ter:} 'c=dr
C F a W V13
Orr
o �Nd'N I I N N(O l°Jn OroNr O O N-ni µ
7 Q
Q J M U J Nam N V
v0o-o w y � m 'aE ti $,N
0000000000000000000.00 o Oo 0000000000 o N N ~ °i” N �"
0000000000000000�n0000o000000000o N�N n FFP� q P d
M W W Z - a o 00000000000 00000roo 00000 00004i000 ,y m s:t v E
S�2�F• O W a o �Q-'(»�oe>(n(»(oo(0o-(oo s9....0(°oo......0 `ni-v`ni en iamu]oo uFirM >> E 'ai cQ-
X W W U d ~ ° �v �I609 1: cO»�� sM9 �� � is »-6M41-�V"N N N (moi `w'ot -i
W dy w Q
iL 00 0 ti N P mm
o a o �r U'4"'• G
QV O U J ZQ O9 -1-
(O N cO I-1-1-1
roa W rNrM�r uo'J Nr ='C'q o'G
1 Il N N O q U
Z N O WJ' rJ C
w O 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C O 0 0 0 0 0 0 0 0 0 N 0 0 0 jp c N P N�•�U
M O o O 61 O O O ON lore O M O O I I O M fA 64 O O P O ti N P a Vi.C,
F636964 E9r69 o M O OOOOeAN 64 EF,r r in 69 fPr
fR Efl FA r�4J O M�47 N 64 U3 fPr 64 m EPr M� N M .p� 'L a W O
63 EA U C 4 a V w
H ? F at
=LL LL LL LL J J LLJJ Q �'a9-'2
ZJ LLLLaaZzWJWWJ ¢ JUJWJa W
P
U
OOO W d'd'NN�-NN Y W rr Nrrr Or OOON V d'ONN � � 0.(0.p
F j ttZ11 7�N.�• N
C3
a of v o
Q C Y r
ei❑w��
KCK ¢N d.E.z Pry
W wd-a
W W F 000 z_ .` a
N
�� r oo a SwF kuim:m
z--X aF K FF > W W Z 7 0'.z.0`c m
�WW ❑��wrrm as z Qr w
ww LL� �p>J(W.�bz 2�
N U 2'd'F aX UUa�M_ �� Z W W 2J N L« t:-
F' N N x W X-§Z�a wzzz00 LL'fr w¢�W VI[:R O"--
JJ_ ?� (/J��Z__xw (n F-c- W-FZF l°1 fi N C!
W D L)C)W Fw-� m W 0OO N F<<LLLL U Z W LLFf-�a� n'p C.tl1[f1
^2 Z Z a W W> Z Z"X W W ¢ W ¢J 2 a .S] C °
rr Joa¢}WOODU d :OF > a ti,vt
W w w w >i �¢Z- J } F w U(7 0 a K v
FF--¢U w �w ni u
] Fzz� z ¢>¢�rcm�aa» mWz>>XomwFm sd� mP.
0 -JJ OzXx>ow=r�w¢¢ww 0 Ud'(-LU aW NM~¢>
err z�- w>(nu]�KFFw. LU
d wLi JZm0UFJOU' (n LL'w W XX'}w JN QP
I-.Fza oa¢ (na KKp p�lny 2 U o U' U}CLQ
¢¢-�-¢asm U') .0 Za m UUWWmm2 ¢aza¢ ¢¢o>
W F i< W N F »F F W F U.0»U J LL -
332j ww J }FKFF>>-¢ - JJ W u
w V V-W JCL» Fli L1 LLZz W W W W W LL W¢U¢a202U1LL
Z rrJF W JJQZ aQ ���.-,F FFrnNOZFaLL C C'cl•rLl 0."
J CCK K Q O F¢¢>W w Z z K N N tY W W N F W W°�°b U¢w 0
❑❑W Na»W JFI--OOIJ�KK W w�`�0 W ZZ W W W SD W
UUQa�3fW-IW-Q W-KfY==�F iWUu) �o
dd�0 U0(¢'J aU' C7 LL'm(Fi1(Fig KK KOU OV¢¢mo w z wK..d K�Qm .1�cru]
¢¢___ - } CLO W W W W W J - _ -
O (O W rrNN<O GJr Nr UULLLLriv�-N>�ioFUaa K x QLL W
LL7
N ( W vi p Ll
(LLi
Z �, NNNNNNNNNNMMMM G�(��N Ei
r z
i 9 -� Q o 0 oui000 1-w 0000
7 c Q 41
uNi o vni
� E
aa m M H nFw rvnn
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 D
11 J O O O O O O O O O O 0 O 0 O O O O O O O O p M M 6 l
¢ d0000m00000000irioov o<oa m o m .n.✓
I- meD ea e>In ae»Ino sr W o4�mo�IO V M
G
= E9 -6° �4 69 64 E9 FA W N
�O �� 9
LO r f N
lll M F-
2i n a
J �
a
O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O N N
J 0 0 0
Q 4i 0 013 0 0 0
mN 0000 '00000 4ioroo m 1 v
OCr"J O�m��Mfl O�EA �N 7
p
m>. � ll1 H «3 sy ss V M N T m
LL
y �+ J M W.
vma m}
�Mm �
a
C3-15
0 0 0 0 0 0 0 0 80 0 0 0 0 0 0 0 0 0 O M M
N�4"
N 9dp N
Oc;'�m
FR 64 N Z9
R
b a0
y ' + m t'-
V! VJ
O O
a c LL u)
y m J
U7 m W lJ F
H
�-
4� In Q M N (p(O (D
N U �
0 0 0 0 0 0 0 0 p0 0 0 0 0 O O O 0 0 0 0 0 O N N O 10 4]
d (j 00000000 p00004�00000o in w m w o ro,
m .o �c.M1 o N . co cD ro o of of ai
oE9o4)N�M M
F- M M N m 4'l OO'iNOM ME9
Y Q O W ,L+ O -d' Ne-O> (V Off'.-�e-M IOD QO N 4m"� O D
z FR 69ffl CO Efl(fl 69 69 (O V�
n r m o .-N
1-LL1 V W rn> � JO u3� � r»ei ev �nin D o
Sao
'- � `owe o.
J o O M o'o
N E 3 y c
W o r ? C7 a m e m
7 m
�� C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o w= gi n
J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
�j Z 0] W -- ¢ 00000000a00000000000
N �N ~O es ss ss ss ss�v3 e3 ss ss es ca ss e3 Ia ss e»c»ea se Inss w eos � �s E E
IL r
W d [� rL o`m y W ` `
W Q m o 3 E x Va c m
y'O O N
CL d' 2 -�rNm J �� m °9 m of
1a. wm o a o} --na o ccin
EL o
t] = U U s c o °
a
z
o
K o 0 0 a o 0 o p o o p o 0 0 0 0 o q q A u U
Ze°rs�s0s � smssssN-��irsNsern�cQsass"sm»c9�sms A 0 0
d pI N O A m U D
z LL LL LLLL¢LLLL¢¢¢LL¢¢¢LLLLLLw LLLL>- V7 " +O+ d o O O A
J J J J W J J W W W>W W W J J J J f n J U
O G O U o N
o
N V 07.- p�N N rNrYJ d'O� N� N C N Nd ILp
Io y
e E o m
o m °1 3
a `o
z
N—
W PC� ✓�
w ¢ N O W a A
O N vC Z O d
Q o0 m o(9 am
> N N D Z p C
w W D
O � N� b
Z W z W w W E W c O o
O� F z o.D- `oz -
2 a U N w Z K z m U' a Z
W K?o Lu �U7 p 0°"w 16 Lu
� o o
W wxa0o w zKSz Www in cmp
U ❑�-w Z U Ztug¢ ai-Z�>
¢ W O�OO H ND:'JZ OO 9 om
W ~ (W/] Ow¢1zl>-j>Nf W W Z U Uat.
¢W wx¢ U� z3 O Zz¢¢o�Y I-w >+.=c O
H w W Q W��'w¢ D- Jt/]w D m.J
K �aUIli > UwcO 2� w¢>w
W UtYOw¢w w>UZ OJ¢U Un.Z ¢ t vcc
li Z W jx F-<n tnKM¢LLJMM mo ODU�U
W W>j F-W CL Uw Otnx O�Ho!¢UZZ W z u 8� O
} 0wz OUw ay LD'WzzzOU¢w o � o
a N W W N N Z W O W 1-,2 O z z zwwU U x W N'a0 m Z W
Q U� aNUIY�Og �nU¢¢ U� t;p Z
W >Oaom>ox�¢�Uw� ��ggzU d�-
Z acnoxcnau�Ut-p X 0¢¢Owwwww0 w '- vwz v
Q rororo�"v"v"v"v wU�>aaaxrrr-U zw ,n�W, m
W W °z m E w
ca v
z d N d W G 6 N
412112006 Attachment C
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGRE ENT AND
ATTACHMENT A
Water and Sanitary Sewer Replacement Contract 2005 WSM-D
DA.E, No.: 5296
City Project No.; 00386
1. None
JA06005Mcontract\Wator&SeweAConcrete-AttachC.doc
C- 1
City Project No. 00386
Water and Sanitary Sewer Replacement 2005 WSiVi-D
_ Attachment D-1
Project Schedule
ID Task Name Duration Start Finish
1 Notice to Proceed 0 days 6/29/2006 612912DD6
2 Pre-Engineering 30 days 6/30/2006 713012DD6
3 Data Collection 10 days 6/30/2006 7/10/2006
4 Design Phase 24 days 6130120D6 7/24/2006
5 Conceptual Engineering 45 days 6/30/2006 8//412006
6 Survey 21 days 6/30/2006 7/21/2006
7 Conceptual Engineering Plans 45 days 6/30/2006 8/14/2006
-8 Conceptual-Plan-Submittal 0-days 811412006811_412006
9 City Review 10 days 8/15/2006 8/28/2006
10 Project Review Meeting 1 days 1 812912DD6 8/29/2006
11 Preliminary Engineering 90 days 8130/2006 11/28/2006
12 Preliminary Plans and Contract Documents 90 days 8/30/2006 11/28/2006
13 Preliminary Plan Submittal 0 days 11/28/2006 11/28/2006
14 City Review 10 days 11/29/2005 12/13/2006
15 Project Review Meeting 0 days 12/14/2006 12/14/2006
16 Public Meeting 1 days 12/14/2006 12/14/2006
17 Final Engineering 60 days 12/15/2006 2/1312007
18 Utility Clearance 180 days 1211510D6 6113/2007
18 Prepare Final Plans and Contract Documents 35 days 2/13/2067 3/2012007
19 Submit Final Plans and Contract Documents 0 days 3/20/2007 3/20/2007
20 City Review 10 days 3/21/2007 4/3/2007
21 Project Review Meeting 0 days 4/4/2007 4/4/2007
22 Address Final Review Comments 35 days 4/4/2007 519/2007
23 Circulate Plans for Signature 5 days 5/9/2007 5/16/2007
24 Construction Phase 180 days 8/21/2007 2/18/2008
25 Pre-construction Assistance 60 days 5/24/2007 7/23/2007
26 Advertise Project 30 days 5/24/2007 6/28/2007
27 Open Bids 0 days 6/28/2007 6/28/2007
28 Project Award 45 days 6/28/2007 8/14/2007
29 Construction 180 days 8/21/2007 2/18/2008
30 Water&Sewer Construction 180 days 8/21/2007 2/18/2008
JG
0p
Q o r LSC.
woo
oza doa 7
ink
0
CC
"
~ h
K
U
� 3
" N
a
®e
LSY3 - UOOMW6
Sjo s iu
Si p N U1 - 11��11 � j�✓?
p p W CE
ON
�FAJI
¢ 4 0o p J 1,hr O
V Y n
153M 000MU 8 Sr �J ►N� L U
Cd
1-4DOOM aja 'alU 3lAdW ,a� ^ fi
X33& tea.
O J 'act/
w „
� •ao
w
NNd A
1nrR M tllllJ7h -
c��/��t1���Q
v
�Q ars
4 ~
^ 4
O .n
•a IO..W la..ol f � LL9 N
"a0 N3383 HB]H
J��, - ST.H - 4 y c
�O 1Z` -^ _ {a] nom•,I/F�1p�� vYU9 �m o
O-. k, o
H
I � N I A I I e�I�'i nn; �I N I I �I'"I� / r—�-•P' I--I �
Qy
OR m
S-
13 NOO r^.�
., vl k
NH f A
d
-
� n Y
C
� O
no N n
.ost a n m .5 L n
H I88 s u ^
„zs��. 'AS 6 112f7Dj31H HS
m �
Q ti s
-
9~ 00
E�
m ^ 'm5 = ^ H 0VH3 [V
e�
WW
�W ® W
c N 9L10il910• /y rYl L!
^ NVION '35 � a NVIpN
L n n m = If 7 41 ��q
1p
Rm - DO _ ip n52,
N o
„y [GL
IL
aWO� 'i5 a Otro'0.3
s's ^ ^
z ¢ N w
.01
.00 wo a o m
r
S w VLN
m
3
Q
Ali= a
d ��°
..B - . „x� YLlWV10• 1 F- O
VIIFI 1p. 15 V11H�IM gm
cK a
U(> m o
.. S
¢'m E
o
m
� o
20" m
fi" 30 A 4 28 223 6- 13 1 2 2f1n 12"
50' M
7~ 29 27 2 27 1 24 6 n O 14 2 1A GR X D 7
2B C, ]k 3 F
3 26 3 25 Z 4 25 7 15 3 4
9 27 < 25 4 25 H 5 24 BAR m 6R 54 A TR ll
1P — 12 l6 19' t 5 5
AR E B 9
26 5 2n 5 24 7 6 23 9H 9A 17 17 5
U 25 6 23 6 23 7 22 1DB IDA 10 1B 6 6 19 s E N VIRG NI
12 24 7 22 7 22 s 21 11B 11A U 7 - 7 C
21 > 9 19 - 7 B s
13 23 8 21 9 2D 12B t2A a C)0 26 B D I 0 1
la 22 B 20 9 20 SD F, 13 9 9 50' ER 3 4 A B C
19 0 7 27 9 Q 10 ID C - J 2
15 21 ID 19 10 19 if 10 in 6 22 10 1 11 IS
18' 2011 D' 16 $2 17 IS B 1 K TR 6
5 23 li 12 12
TR
4 19 12 17 12 17 13 1s 13 21 q 24 12 13B t3A 73 n 0 1 2 SA 25 B
3 18 13 16 13 44 Z2 � R
2 17 ''14$ 15 74 5 X15 A 23 y '025 i'ANOLA 74 14 m A m 97'
�'• 206' 4" I 57 2 1
26 t 26 1 28 27
26 1 2 1 M521L 25 27 2 21 47' 142 25 2 25 324 26 3 208 2 26
3 24 3 24 4 423 - 25 4 2DA 3 25 4 23 4 23 5 5 24 50' 522 5 22 21 7.5' 6 23 w6 k9/ 4 24
V 50' 6 21 O 7 4 -155 23 _ 3
7 22 7 s 2s
x0 it 7 2D w tO 6 to j m 6 22 4
19 e 21 s 4 7 24 7 21
H 19 9 5
9 2D
16 9 10 Q 9 18 5' f0 1P 26 B 23 B 2D 50' 6
10 2
17 50' 10 - 25 22
17 � 10 -17 11 �. 1s 11 9 49 7
16 11 15 7.5' 13 19 24 10 2l 10 1s 9
15 i2 15 1p 14 $5 16 12 _ 14 15 16 17F 29 12 13 14 "15 16 17 22 23 i1 12 13 14 15 16 17 18 19 20 1R ll 15 16 17 9
14 13 14 13 W HI E �g
8 VO
t1
2BA C 28A
27 13 2081 •P 6-0 17 •1320-00 0 0
27A
2—A—27 28 29 1 2112. 27 26 F 2-4 5� O "' 2 1 10 9 6 m
26 3 26 3 gg 6 4 3 " 5 4 3 2 1
25 4 25 4 26 r 2 2 23 4
30 32
24 5 30 5 25 3 3 22 2 10 28 18' 12 7 2D Z
29 0 9 —a
- 23 29 6 24 — 4 4 21 17.5' 11 27 13 2B B t
22 7 24 7 23 5 "5 20 - Z_ 9 18 16
21 8 23 i0 U 32 2fi U' `p 14 27 10 17 JK—
= B 22 6 fi 19
d 13 25 Q 15 26
2D 9 22 9 21 7 7 18 17.5' - 1q 16 25 A
U) 11 16
24
19 1D 21 8' 10 20 7.5' B 17 15 23 12 15
31 11 20 11 17 19 2D 21 22 24
30 19 9 16 76 18 19 2D _ 22 R R ST. i4 8
8' 19 12 1D 1s 23
29 13 1s 13 15 16 19 f1 12 13 74 17 H W ET " 21 4" 31
15 16 17 6
14 17 14 6"
18 6., E 5T" 6 6,-
' S.. 34 3 4 7 B
9 l0 11 12 13 14 15 16 57 18 19 24 25 26 27 28 29
37 R3 19 26 21 22 23 24 25 26 27 20 29 31 32 33 V 1 2
5 6
6 7 1� 70 11 12 i3 l4 15 16
9
8 TR 38
A3
EE A TR 3A
A 7 5' A4 TR SC
ss`` 69 A DD
5, 48 4_ .. 16 F 1 8 8 CC C TR 2A
eo'
47 O� 49 0L 17 20 5B C �7 BB Z 2 TR 3
[1 50 16 21 17.5' a 67
14 A 45 22 - iv 66 1 E w E Z v) ,F 1
13 51 75 F 17.5• 3 TR 4
A T TACHMENT "E"
(SHEET 3)
(COUNCIL DISTRICT 8)
HAMPSHIRE BLVD.
(HAYNES AVE. TO OAKLAND BLVD. S.)
A%k WA TER REPL ACEMENT
ODNSULTANTs,L.L.C. WATER AND SANITARY SEWER SCALE 1" - 400'
ENIOEERINO REPLACEmEzgr CONTRACT 2005 WSM--D WTR 2076-388
SURVEYORS
PLANNERS
2072-358
1781 RIVER RUN / SUITE 010 / FORT INORTK TK70107 �n�+
ie17 f336-8904 / FAX1xi8171338-8960 MAPCO 78 H&M
Jr10600501mIsc1050EXHIB"dgn 7/24120068:31:43AM
17.5• 6G 6 D 18Dj -L.117.9' 11 12 2 17.5' q 4 26
23A IC 36D 218 18 a g• EM RSDN 9 !0 ST 1 3 -1 Vi 3 29
238 L rn 37 `5 21A 17.5 1 5 p2!j r�2 2 39
24F M 3BA �p�s�9 2DA 13 S2C 4 •' M 1 i-'1 L 1 1 31
x46 N o 0 � 38B 1s P 15 14 J i1 10 9 B 7 6 5 �' 3 1 EME SDN
2DB g 6"
3 23 2
156 1 2 U o 7 B 9 0 11 150 2 3 4 5 6 7 H 9 16 t B 20 2i 22 25 0 24 26 o m 7 6 6 7
6 8
13 s 4 S RE p ti $T. yr P R ED ST 5 _ 5
60 B„ S 4 m 4 9
]p 13 14 15 n 4 4
R 3 4 5 6 7 8 11 12 J 16 1 ti R"01 15 14 IJ ]2 11 ID 9 H 7 6 5 3 3� 3 3 2D10
L G 2 2 2 2 11
0 a q 19 20 21 22 �' 24 25 26
M 677 3029 28 27 26 25 24 23 0 21 20 k9 18 p fi93 1 1 1 14
E R z 3, IM N IM N ST 17 4 3 z4 1s 17 WMA DR t
D 0lil „ I A
14
C PL
2 3R 4RR 5R fiR 7B HR 9R IDR lk 12R 13R MR ISR__ B 23A k 2 3 d 5 6 7 f 9 A L 12 2 14 7.S
1/y C 238 ! 15
13 13 16
B 0 U- 2BR 5D ixJ 3V
R 2HR 9R 18R 25R 24R 23R 22R 2OR 16R D 22R 242-1 0 2i 20 19 1B o 56 15 1q - 4 32 12
N
DM N HE S E 1 OM C E ST. in 11
t3 ST S 6„O7 1 19
6„ 2D.5. 21R L 6 10 10
18 1 18 aN1 P P ❑ R S T U9R DR 1R 2R 4R G 2DB [+ 7511 ] HU - 9 - 917 B2DA J gH21w3 J J I H G E D C o A 9 > 7 22
24 23 22 u 20 193 78 16 75 14 13
a 4 is E S LAD Hf EH LL n ST 10 s s 23
5 14 H A �� 6.. R 19
A. 6 11 5 -9 24
7 12 in 8 R C n CR I. 1 2 3 4 7 g 9 1D tl 12 Sa 3 50 25
�G 26
g 71 50' 016 _ 16 PGR�S 2 2
ST.9 P GRAYSDN ST. u' 2a 23 N z1 zo is le n u 15 o t3 1a
78 EA TL Np 15
1 1 2H
ls• z¢ t 12” 12"
1R 22R 37 7R 1R
� 2R 17'$ lb 2R 2R 6 2R �
RO L EA, `xlR 4 en 23R 20R 75R 3R 3R 13R 3R 16' 6 50'
n 10
4R 19R 14R 4R 4R 12R 14R B t 3 7R792A'H m 17 16 15 14 13 12 11 - 7R.2BA 3
,D SR 18R Z 13R 5R 6R a 11R R J ST. m 4
7-5' R 17R 12R 6R R 1OIDR7 27 2S"6 5 6 7R i6R 11R 7R I S YLOR ST."' 1 2 3 4 A g y 11 3
BR 15R U IN HR B [.;�
!^ 7
9R R 12 a0 4
4R o 26
-S�' B 1 t2 1 10 i - 0 25 - 10 5 61 60 59 50 57
7DR 13R co - 22 21 20 18 17 P X14 5
17.5' 2 17.5' 2 0 3
11R 12gRP�O� 4 63 1 6 3 10 3 9 2 24 Cil IL 18 t5 " VC a,
g 3 „P 1 7 1
126 5R 4 9
t G 7 4 257615 1 26 I 27 2 2
67710 9 9 13 B 7 5
12 17 5' R
1H' O B 74 11 7 8 5D' S 24 2 2 17.5' 3 7.5' 3 17.5
11 23 3 24 3 - 25 4 10 9
6•, 22 12 �7J 0 10 5D'
10 4
13 6 g❑ 4 9 1 ,5\ 1 I �"2 O HO' 4 a 23 4 24 5
14 5 50 7 g G r V G �1 21 3 5 22 5 23 6 12 5 6 7 B
'L J� 2 5' 5 21 5 22 7
15 4 4 8 .7 _ _
i4R 6
JL
19 7 28 7 `� 21 B1324 39 3C 4 18 B 19 6 50' 14
3AR17 9 1B 9 19 N7 15G7
4 16 1 10 17 10 18 i1 D- 76 17.5
A T TACHMENT "E"
(SHEET 4)
(COUNCIL DISTRICT S)
BAYLOR ST.
A (FREDDIE ST. TO MILLER AVE.)
A/w WA TER REPL ACE-MEN T
CONSUL TANTS.L.L.C. WATER AND SANITARY SEWER SCALE= Y' 400'
ENI�EERINII REPLACEMENT CONTRACT 2005 WSM D W�TR 2072-j76�
6URVEYOR6
PLANNERS MAPSCO 78Z
wrl
1701 RIVER RUN / SUITE $10 / FORT WORTH•T1C.i8107
[8171336-8800 / FAX11118171335-DO55
JA0600501misc1054FXHIB.dgn 712412006&32:46AM
I7.5• 6C 6 D 190 17.5' 17 12 2 17.5• a 4 26
23A K 3fio 210 IB l0 F
9
s• EMR ON LO �r C ST. 1 3 3 3 29
238 L Jm 37 'l 21A 17.5'(J,��1 5 6"
24A M Z 364 O` �Q� 20A fl_ S/ 2 W a 13 12 R,i o¢ 121 L2 1 2 30
zaR M o o' i9 J is la f� to s e 7 s 5 1 EME SON
38B 209 ( 11 I_
3 6 1 SD 23 2
1 - 8 i6 , B 20 21 22 0 24 d m 7 6 5 7
15H 13 2 7 fl 2 3 4 5 6 7 9 R EU 25 26 1
6 4 5 ST 6 5 5 8
_ 5 RE 0 ST.
4 4 9
~ - 14 15 4 4 �1
H In 1 3 4 10 72 f3 8-01 15 14 13 12 11 10 9 8 7 6 5 - 3 3 2 10
k SD' 2 5 6 7 B 11 C 16 1 3 3
O L L 2 2 11
6 G 2 2
677 30 29 213 27 26 25 24 23 - 21 20 19 76 a 691 0 19 20 21 22 114
24 25 26 1 4"f"FRZ31 IM N ${ S7� 424 1fi 17 NWMAUR
0 0
c P<n 2 3R 4RR4 5R OR 711 OR 9R IOR 11R 12R 13R 14R 15R - 0 23A 7 y } 4 5 6 7 6 9 10 11 12 14
F
1 1 f 1 L 2 4 Al7.5•
O 230 - 13 13 75 56
13 00- 21IR
.4 31 ]26R 25R 241123R 22R'^. 20R IRR 18R t6R p 24 23 21 2p 19 is - 1 D ¢ 12 Q 12
OR
so• A R 7-5 OM HE a 22R OM NC E M 6 ST,,a a 5 4 tt In
n
t3 ST.S W. 205' 21R 6uDI 6 ]0 in 19
P
,e 1 18 R P 4 R S T U 9R ink 711 2R 38 4W G _ 4 4 s 8 9 ID 11 72 , 9 t7 9 20
M
Na B 13 27
77 � 20A
Lw! 3 •i6 0 K J J 1 R G E B Cvn A I 12]2.1122 in L2�'irjO16 16 i5 l4 t3 722
a 4 E S LA i) J I LL ST. 10 s 6 23
p 14 A K F
r 19 60 11 5 5 24
6 13 B ((jj'C O• OR L 1 2 3 4 5 6 7 8 9 10 11 12 12 4 4
7 12 25
N f1�T�
6 16 �� - 5D' 3 5
8 n so• o V (] _ 2s
u1 ^c{� m 14 2 2
ST.9 1O GRAYSON ST. H z4 z3 N zt 20 is 16 17 [11, t5 o J
- 7R EA 7L NU 15 1 1 28
19' 7 12" 12"
1R 22R OF-,, 111 1R ♦- RD. N 1 2 3 4 5 a 7 B 9 EM
2g 21Ri6 202R 2R p 4 -1 IX 1 50,
3R 2oR 15R 3R 13R 3R _ 6 7
- p 10
4R 19R 14R 4R 12k 4R 3 TR.22A i6 m 17 16 15 14 13 12 11 S TR.26A 3
B
in 511 18R Z 13R Sit - Ilk 5R p ! e 1 19 8 R 5T, �1 m 4
7-5' R 17R � @R 6R 1-tO IOR Stt 7 2 7 2 B„DI 2 5
6 3 6 5 6
7R ,6k F- t18 7R 9R - 1 2 3 4 v 11 3
8R 15R So' 7R"' 5 YLDR 5 $T.°' r A B 9 0
(¢j lOR OR 8 n V 7
9R 17.5' IS' 8" 2B 72 m 4
R 5�' 6 1 12 1 10 1 25 105 61 60 5958 57
10R 13R p b 22 21 20 '". 18 17 A 74 5
11R 12R 40� f 2 U 2 24 N 4U IL 16 75 3
6P 8•. C $„
e c 3 --Pvc , , 7
25 G 7 26 1 13 e 5 1015 212 .78' 8 7 6 1) 2 f2�
3 Y7.T 3 77.5
11 14 11 10 9
g 22 23 3 - 24 3 25 4
12 71 10 5 /`� LLJ 10 4
0 4 y� 1 ]��V 2 (� On* 4 ¢ 23 4 q 24 5 11
13 6 9 (.0 J C• C11 yJ• 21 35 22 5 23 6 5 6 7 B
14 50 , S V �051 12
27.5' 6 21 6 22 7
75 4 8 �v •7 - "
14R oa tB 7 20 7 21 8 73 1026 7 B
AIH 3 9 6
13R - 24 [� 3C a t6 6 19 B 50' 9 14
5
2
U20 5 TR. 15
12 S; 10A1A 5 3Aft 17 9 16 9 19 to F i0 7
TR. G
21 4 ,DAI 4 16 70 17 70 16 11 0. 16 17.5' 6
A T TAC IVENT "E„
(S EET 5)
(COUNCIL DISTRICT 5)
SAN ROSE DR.
A (REED ST. TO BAYLOR ST.)
A%4% WA Tf-R Rf-PL ACf-Mf NT
CONSULTANTS.L.L.C. WATER .AND SANITARY SEWER pf
TMGIEEMM
REPLACEMENT CONTRACT 2005 WSEYORS ,a
"c� ��
1701 RIVER RUN/ SUITE 970 / FORT WORTH.T%.78107 �� u„t?#Z
(8171335-9900 / FAXW(817)335-9956
7
J:10600501m1sc405UEXMI8.dgn 7124120068:32:15AM
DA
ne 25 31-08BK• 3 1s G 16 a 16 3 16
31+02AH 4 ts3B' Is 4 is _ s
� 5
! 19' 11 S t3 III 6 13 Wb 13
5 S 27(3) 3 }
1 E., 12 z 7 12 7 1 7 D'12 S
1-0
N R �QURH 12A 12B 12C 25 f+� - 2A 11 W a 11 6 H O a 11
7.3E -3fi 2 10 9GRA SDN1° e m
s a-A 7 2 a n 4 s-a sc 6a 4•7 29B 4 16 O 26+32
r 1 a1 8" 3 8
227 2i•D0 "
N 5 A 6h 6C 6D • 29C W1 JO 2 Lr) 1 2d 1R 1R - 22a
5T. L-2T57 L- -3 33 50' P L
1.07E 6„ 6„ 23-98E �1� S J IB O�u t9 2 SD 3RN 21R J
o• SE p 2aR
IRh 'a^ 4R 4R tsR IIS
6 2R 3 AA a8 5A 5B 6 lA 1B 2 3 6? Q( - 4 �•
N n V�. s' t0 SZ' w 5R 5R 13'96
7 N In 5 ��` +19
-22 4A 4B m Q 5 6R 6R 17R
20+p 4c s
1'PUC ' I M R8 7R 1R' 7R
04-44
R A 12 11 m w 9 T JIDIA 8' R71g• 4+65E eft RBA B87A 7B SA 1 2 3 9R fiy BR
22'
ST. 5. OE 22A 9 DR
ko
17+69 I -3000 5' 4A R1A 11R t2R 1-
ko
9.7 E - 5 6. 6 E 17.57 7 6_ M TA U 5 9 sRl
5 6 1 2 3 1_R HR CR DR
1' Z 5-R A 2 3 4 5 S a. 34 2-R 2"S
5?
7-R I 0 1 2 5, 3+ 1 3R2
13+29
B-15-53 rry 4$ 2+77
z cp 12R
B 7 SD, 11 ID AB C D L ' 3 N L H H Q P Q R 5 R T 5 SR 7R HR 9fl mfl 11R
13R
I
ST. - & Y OR -� L 3 3 ST. a
2 O
10.77E
o 13* 8 1p+ 5 B 12 4.46 4 RR
0
I- 13R a
m � m' >n 5 � I
6 H 1 2 1 4'm A B (D ° ° E SA 3B 4A 40 6A SH 1 2 3 4 5-1 5-2 R Q P D N IA I. K --
N 3 B 2- ,B 6A 15 12 J b
6 A A A 14
15+24
6 T L-22
L 12 11 ]D 9 SA BB 7B ]p 8 7 6 5 A R C D E F D H I i B m J 14 a
tz v 10 6„ =621: I ARE AN L 3 3 1x 1 ST,
34+30E 6.00 6" 6" - 8 12+ 3
CO N L ES RI T' 2174 17' p 6
0 6 74
5 6 1 2 3 y $ 10 YI 12 13 1 2 a 4 5 6 7 B
a t 2 J 5 6 f 2 3 4R 5R 6 9 fn
IQ 50'
29 27 26 25 24 23 J 21 2D 19 16 1] 16 15 Ej 23 22 21 20 19
L-2253 6„ 2� 20+19E /+ //AI ,t 1 TR T Hi DR SS -3 3 -418 ST
c B A tx 11 fo 9 $ T Cr V/Y 6J 4.51 6" 6" 3*19 3+5pE m 6"
12 11 10 P 9 B T
24.91 3-20 W N 1 «5
o H dn
5T, 1 2 3 5 6 ] 3 9 1] 12 11 14
4 in
p•zpe -
5+9i Fo
- C] 26 27 26 25 24 23 22 2A 19 IB 17 16 15
x W 26 25 24 2] 22 21 2P 19
5 6 J 1 2 3 34 5 6 1 3 A B fC 5 64 K[L I 1 .9 Y1 1 (q N ST
o 0 6• s.. 6„
Z L 225 W 2 o zB o, 4 11 w RD 1 +5
N t
1B 19.25 6" 24+43E ' 11 = M '� 3 4 5 6 N 9 w 11 12 13 14 0 3 4 5 S 7 B 9
1d w
H T 12 A B A $ 9 B 7 1 12 w 9A 9H 6A BB 7 lO - 19 Z
R D S
25 25 24 23 til 21 21 1B 17 16 26 25 14 23 22 21 20 19
ST. 74 ¢
A T TACHMENT "E"
- (SHEET 6)
(COUNCIL DISTRICT 5 & 8)
A, ]BAYLOR ST.
(WICHITA ST.TO VAUGHTN BLVD.)
A�k SEWER REPLACEMENT
CONSULTANTS WATER AND SANITARY SEWER SCALE; 1" 61 400'
sURVEYOEFS �-s �1 qONTi�f'�CT 2005 W7R 2066-376
PLANNERS REPLACEMENT I. vVSI�ll MAPSCO 78Y
Y
1701 RIVER RUN/ 6UITE 810 / FORT WORTH,TR.78107
16171886-9900 / FAX018171886-8866
d3060050%miscT60EXH1B.dgn 7124120088:30:26 AM
L T365
w 7.39 ii 9-39E
N
m
6 N A AR 9WF 1 213 3 00E 23 5 co 13 1 2
a? GR % D
7 N 2 27 2 27 W 2 96 24 D 3A 14 2 3 1A 7
MF g.19 E 6+25
g 3 26 3 2a 4 25 7 t5 3
A TR 13
4 9R
E 9
271 a 22.5' 4 25 5 24 BAR 12 16 4 5 5 4.97
410 5 24 5 6 23 98 9A
AT
E B 9 2
17 17 5
_ —11 6 12' 6 23 ' 7 22 11113 10A 10 79 g 7 6 E N VIRGNI
72 7 7 22 8 21 I (D 118 11A IN
7 G
7 13 23 8 21 W 8 21 9 20 12B 12A g 9 0 1 01
D14 22 9 213}N 9 213 x 10 19 Z 915 21 10 19S 313 19 11 14 Q I 10 10 ER18 5 20 ip 11 18 11 18 12 ;7 75 11 12 12 8TR TR
4 1g 12 17 12 17 13 i6 J e21 D12 139 73A 1 2 SA T 3 16 114 15 13 1414 S 15 14 15 23PANOLA 4.311 3.96 1,3526 7 1 35 34 3S 32 31 m 47*58
1 26 3 26 227 2 - 23 6 L 1 li] 1 14 1
25 2 25 2 25 3 m I n 2 1+03£ a
24 O 3 24 3 1 I'3 24 a 26 3 209 a"1• 4E - +97 2 26
23 O 4 23 1s 25 4 _ 20A 5 28 3 25 2
4 23 5 24 27
22 I 5 22 5 226 19 3 a ' 24
_ 23 €J 6 TV N 2B 5 23 Q
Q 3
7
b
ev 22 7 1 18 E,J 6 J 25 Z 6 22 q
m 7 g
19 > 21 e 4 7 24
g J
¢ N m 19 e � 19 w 926 g 2p 9 Y 7 21 5
19 9 I 16 9 iap 18 �{ 113 l9 i13 23 O 8 213 5*00
17 _ 10 17 113 7 L 25 9 22
16 v W 1s n - L-1617 n 5+ B L-272 L T 06 2t 1, 9 Lis 7
5*72 1 ❑5 „ 1+2 E ,0 3E ED' 2613 8
15 19' 12 00 15 12 415 16 12 13 q 15 JSI
29 .3 E 5 16 U 22 223 11 12 180 14 15 5 88 7+ g 5 61 9
13 14 f3 6.7 IRE 12 13 14 LVE 16 17 18 ]s 20 111 13 5 16+17 1p
7+4 7+63
L-2651 12
8 50 A 2eA t M2.L
p. 1+03E 55*65
7 8 v e9 27 58, 2 27 25 25 24 9 7 6 8'
w 1 29 L-1 1 m
w 3 n 2fi 3�19 1 7 E 7*15 5 4 3 2 1 10 7 7 6 5 4 3 �, 5 4 3 2 7
(`7 a25 4 m 26 6.. 2 .1g 23 C7 6" 25 11 15-3 + - 1
30 32
30 5 25 z 3 7 20 Z
2' 22 U lD 5' 28 12 T
ry
29 841] 19 U-
24 .
6 •- 2B 6 4 — qq
7 p 24 IA 7 23 5 11.0 21 V Il 27 Z 28 glry /n1�9 m 1fi2.
8 23 2D 121^ 12 26 C7 14 11 27 f0 I �V
9 p; 22 6 I 19 13 13
9 22 9 N 21 7 18 50' 25 15 J 26 it 16
10 21 - 14 24 50' 18 «p 44+00 l2 15 Q A
ID� m 20 B m 17
1 11 7o- 11 19 2 t5 3 63 1+08E 17 1911 21 22 za B
0° 9 13 25 16 L 1 78 22 2n 5�3 la
B 12 7912 79 113 p*56 16 IB 19 2 is R 23 4+21 6+04
29 13 11 13 1s 1s 11 6' 1415 17 I"I w ET 21 5 25+50 26*50E - 339
r4 15 17 14 8E 17 L 159 213.00 ,
1a+7p is
se „A,
'* ' 6, m 9 113 11 '12 13 10. 15 16 17 B 24
ST, 25 2B 27 29 24
21-9
2 23 24 26 27 2B 29 31 32 33 34 1 2 3 4 5 6 7 8 8
7 8 9 l0 11 12 13 14 15 16 37 78 39 f 22
-
23
TR 38 e'
1 + A3 6'
1 _ EE A TR 3A
�9 A A W 9 A4 o- TR 3C
w H 16 47 W 48 r P 4B AVE79 _ 9 e 3 CC C 3' ^ 711 2A
00 88cxx
U 49 [V'p 20 Ol C C 13 so-• 12 3
2 (p a TR
14 E
-1 15 P` "' 46 N - 2 21 67� D ° AA E
Z p SD 16
A ¢ 45 N 5' Q 15 `1 22 B6� F 4.43
E 2 J S E T 711 4
1.3 I q 51 17 55 F F 13
A T TACHMENT "E"
(SHEET 7)
(COUNCIL DISTRICT 8)
11"PSHIRE BLVD.
® (HAYNES AVE. TO OAKLAND BLVD. S.)
Sf-WER REPL ACEMENT
A001LTANT6,L.L.C. WATER AND SANITARY SEWER
SCALE= 1i1 - 400'
ENIOEERINO REpLACENIENT CONTRACT 21305 WSM--D WTR 2075-,388
SURVEYORS
PI.ANNEii6 2/APSCO 072--+3/'88
1701 RIVER RUN / SUITE 810 / FORT WORTIR TX.7e107 M 78 H&M
48171336-BBDO / FAXtltf 8471936-9866
J30600505misclD517EXHI[3.dgn 7124120068:31:05 AM
2
p3 368 213 17.5' BC & 160 5 R 9 10 1, 12 2 4 4 4
23� y, { 1B EMER NN i7 5' ST_ t 50 3 3 3
23e i [E 1O p 7 24A ^ 27A 5 X1'2+OBE 1+94 fi" 6' 3.Sg 2 2
24B N 50� 11 6A. o5�V 26A 2 W- L 4�8� 4' p L-4 8 O 4 - 5*00 3 31
V 1 I 14 ,5 t4 3 211 1I1 S C 7 6 5 1 , ,
�3A�4149 L 4143 v� L-474 a 3 p EME sON
77. 6,. 2
15H 1z 2 6 7 8 9 10 11 1 62 3 4 5 6 7 8 n 13+39 16 17 }B 39 Zp 21 22 23 24 25 26 1 fl fi 6 6
W 13 3 4 s 50. 9 8p' R ED ST 5 17.5 S 6
* to ST. 6*93E 6" - 1 •60
5 4 4 9
4
p+15E
R R flI2
1E66 7 H13 34 15 z t5 1b 13 i2 ; 10 9 e 7 6 5 3 3L 43 3 L 1 7 2
G ip L +1g 2 2- 2 16 17 ,a 19 20 21 22 23 2q 25 26 I 1 1430 Z9 20 19 10 iIt1
+0 E 1y W I AN 2'ST 107 4 6+ IM DR. /
g+p1
fia 24
6+8 3*5 6" w is
R to 1 I 5' A N •n t 50'
14E 311 4R 23A 1 2 3 4 5 ^ 7 $ 9 1p 17
4 SR 6R 7R BR 9R IOR 12 53 14 u
C 1 P 2 3 R R 14 15 w�6 ., 17 m 2
too L 4 34 - 3 4 nl R R 236 F 9 13 0 F3 15
14C a 0 m 3, 6 77 2 26 27 24 23 22 21 6,• IB 17 ,6 C 4 2 T3 Ig 'I'j 16 IS 14 13Q - 3 17
14 59' A R 16' 32 2SR 2]d1 R R R R R R 20 I� R R R p 2R G MA G E ST. a 4 12 i6
33 C M AN 11 R T. _ .20 s tt tl
14A 13 ST.14 21R 'n
5.50 �' � 6• 3E 6" 12 m 6 ns• to 2u
k R o R 5TU 9R IOR 31R 12R aft 14 _ �T-21 2 3 4 5 6 7 B n 10 '^ 7 g LJ L_4 7 6^ ,.5 [-
405-01)
6 1 3 16 r} o k 3 J I H G F E p C 8 A + I 2a 23 21 20 19 18 17 16 15 14 13 9 7 7 22
s 4 15 E S p �7 HI EN L ST. -so- 6 w 6
is tg, 1,I 6*83E - e} M
4 5 N7 A Of A' 17.5' K 3.13 it 5 ^ 5
3 W s 13 0 6' fE BURS �� L 1 2 3 4 5 6 7 B 1 10 n 2 12 4 � 4
7 50'
2 12 N EASTLAND ELEMENTARY on
1 p R v ej G SC1400L 5 n N w 14 2 ;0 2 27
B to R gGRE 50. 713 _ 12] 23 2 23 20 19�1. 17 16 75 14 3 I 175'17+1g GRAYSDN ST. cR 00EA TLNp 0.03• 1 t
10,.
1R _ 22R 1] lR N 15 7R Q 1 5-E 14 44+83
m !"t+D N�n 20 1 2 3 4 5 6 7 B 9 d � 1
2R 21R tE 2F = 14 7R N 2 80'
4 1 HTR. 2
3R zox SR 3R 13R 28
3R A Nf
A 4R tsx q 4R 4R 12R 17.V ul
TR.22A' L8A 11 16 15 ,a 13 12 11 D 28A A7 3
13*96 t L-3 22 -362 9+fig BA LDST. 7.5' 6 q
17R 12R 8„ 5.52E •,16gR 6R s t7 5 44 *g7R 16R(37 IN 7R t•1g7 g71n Hx I.S� 7R 'BAYSL R 4 o
p 8R 15R Ch 20' IDfl 8R p
9R lO 9R t4R W 9R17.5' 4
ML rn 1 12 3+ O 10 1 Et: � 25 fit 60�59 58
MR lift 1} 7 1� 2 11 2 0 23 22 21 26 19 18 17 16 fl 13 5
RR pR 9 2 24 OU IL L- 7 0 6•• 6*92 B" 1
,la V,`• 4+62 4 i. 6 3 1p 3
4 3.66E. t _ 1* 8
3 N 5-R 4 9 4 7 t''I n 1
25 I h 2+7fi *86 27 2 1 2
' 9 12 5p• 5 7 4 26 1 B N 2
5 5 n 24 2 n 25 17.5' 25 3 12.5' 3 so
1622 Q 9 74 ll 7 6 23 17 24 3 50' 2-.-
W
1U 9
2z h 7"' 15 ID 2 `• 1 34 22 W 7 26 no 4
' 1W 60 16 9 U`� G� �io 4 73 4 Q 24 5 11 1(]
G A �� 21 5 22 5 '23 6 p 5 6 7 B
2
O 14
50 n $ I" 2n 6 21 6 «69 22 7 12 —z 4+ 3
14R o 15 17.5 18 7 406,02 59 7 20 7 21 6 I 13 fi 7 B
19 17.5• e}
74
13R ep �I 2 20 5 4 Q5 18 S 79 H 20 4 5
-j is 17 9 19 9 39 ID 75
12 9 7• 21
16 10 io 17 70 1B 11 i6
A T TACHMENT "E"
(SHEET 8)
(COUNCIL DISTRICT 5)
BAYL OR ST.
AL (FREDDIE ST. TO MILLER AVE.)
A%kSEWER REPLACEMENT
CONSULTANTS,L.L.O. WATER AND SANITARY SEWER ,
� SCALE: 1 400,
EN—E DR3 REPLACEMENT CONTRACT 2005 WSM D WTR 2072-376
1701 RIVER RUN /N SUITE 816 / FORT WDRTK 7X76167
�wAPSCO 78z
18171336-9900 / FAXNg817J335-9955
J:10630501misc1060EXHIB.dgn 7124120068:35:45AM
J 36B 219 17.5 BL ca 6 IBD 5 4 9 111 1, 12 2 4 4 q
23A F. � - W { - 16 EMER D 175' T 1 50' 3
s39 d. Z 7 G� 21A 5 2+OBE 1+94 6" 6" 3*59 2 2
74A N �} O Sy�O O 2 L 4 S 4' 0 n L-4 V 4 S*DO 2
(� 9A 'y� V 2DA W - 7 31
246 N 50 I n>}R 51 {'� 0 19 J 15 14 13 V 11 to 9 ^ 7 6 5 1 1 EME 50
%49 �u- -474-9 D 3 O
12 73, 6" 2
2 E 7 B 9 1D 11 m 1 fit 3 4 5 6 7 B 13• 9 16 17 IB 19 20 21 22 23 24 25 26 n 7 R 6 7
,SH 1 6 17.5'
W l3 3 4 5 50'ST- 9 DD R ED ST 5 5 3
6.93E 6" -TT
1 •B❑ 5 y 4ft
9
I JM 1 D♦rja 1! +1164'[I'l
^ 0 4 4B y 57 8 9 10- D«t5E 12 10- 9 8 7 653jD
Rl"I'l ,
L 43 .3 - 13 14 15 11 } 3G Lo L- 3 3 _ 7 2 2 2 2
2 ]9 29 21 22 23 24 25 26 1 1 14
F Ch N ��E9 2$27 26 25 24 23 22 2019 18 Q 3 1 I j I
sa L J W N W I AN 21 ST 17 4 6a M DR.1 h/
-Di qn/
15A5
o 0 A 24 6a6 3+5 5 u1 1 0 5D'
°p o
tot: 1 3R 4 9R IDR ,7 13 1 .5` 7 B 9 to 31 14 t4
C '� P 2 6 SR Eft 7R Sfl JI R R U 155 ,p B 6 12 y 2
149 N L 4 4 MI L 236 3 13 C5 13 15
14C 6 0 31 6 1 7771
77 26 27 74 23 22 25 6„ 16 17 15 42' -
14 50 A R is, 32 28R 27R R R R R R R 2D 19 k R fl 22R 74 �3211 20 19 7a 17 16 15 14 13 qa 4 12 {9 12 16
13 $T 14 33
C M AN Hk R T ME ST. «2D 5 n n
0
n
5'OD 5+50 N P D R F 21R 6* 3E 6" pn 6 10
T v 9R IBR 11R 12R 13R 14 a (n 1 18 k- 51 L4 7 " R 206 7 9 9
7 2 ] N 20A � B B B 21
6+56
6 r 3 16 tF P R I H G F E D C B A p I �} 24 23 0 21�2.0 19 18 17 16 15 10. 13 9 7 7 22
5 , 15 _ E 5 LAD d `I I EH LL ST. 5P 6 w 6
4 W 5 14 18• n1 R 6+83E - 11 5
A BLJRTo� �6 t7 19 5*3 6" 10 r%1 5
3 W S t3 e C L 1 2 3 4 5 6 7 B 10 11 2 12 4 d. 4
7 SD' N
2 EASTLAA?D FLEMENTA7Y ro M L-4333 Q 13 3 3
t p R n 6 0 SCHOOL �^ .%1 N M 14 -
A �_7 76 24 23 0 21 7976 t7 16 15 14 3 22" GRAYSON ST. AC sD' -
�,.Wj
TL ND 0+03- 1 ns j
GR _
70„
22R n >R N 15 1R 0 1 55*74 44*B
N
AD ED) m 1 2 3 4 5 6 7 6 9 p 1
$R 11 21R II 14 2R r1 M 2 4 B0' 20
j QTR. 2
3R sox 26
A 4R 19R 17.5' y Tft.22A 1B 18A 17 15 15 14 13 12 11 0 ' W 28A Al 3
SR 13+96 L-3 22 ' -362 $ t g 1 19 ABA LO 6 a
RR t7x g•• D B„ 9*6B 7 2 7 2 0) 5+52E 6„ +2
10
18' #R 9R BR 6 17.5' 6 3 I 5'44 a9
]R 1sR 9R R r] t 2 3 5 6 7 g tD 11 3
9R 15R 2D' 19R $R r BR j'S1 7R 5 4 BAYLO 57- o -
O
9R u] gR 14R W 9R17-5' 4
HIR 1331 n _ 1. 1 12 1 +y 10 1 Wa 25 51 611 59 56
•` 7 -!~ 2 It 2 23 22 21 20 19 18 17 is D 13 5
1Re 12R AOR q w j 6 3 9 2 �J f 24 Qu L L- 7 0 6+92 B"
1D 3 13.66E I1+ 8
r e
Z3 2V) 5-R 4 m 9 4 7 4 d 25 1 °I 2+2Aj 6 9•86
27 2 7
6. 2 10 9 0, 12 5U• 5 B [V
52
6 6 5 n74 2 25 17.5' 25 3 12.5` 3 5❑
19' LE3n p B 14 13 7 9
11 23 17.5' 24 3 25 50' 9 1U
2x 12 7 LJ J 15 1D I2 '�- j 34 S2 W ' 10 1,7 4
(�(� 4 23 4 4 24 5
Q73 "
6n 16 9 l `� �7 5 V 1J 11 11�
S p I u 147 21 5 22 5 ,23 6 w 5 6 7 B
io 1, O
17 R G �'" 12
zD R 21 6 *69 22 7 a+ 3
taq O o O 17.5' 19 2 g.p2 19 7 20 7 21 8 I 13
m 3 19 17 6 7 B
t3R a. tl 4 O�j 1B R 19 B 2o- y 74 5
20 5
17 9 1B 9 19 1D 15
9 4 Z' S
A T TACHMENT "E"
(SHEET 9)
(COUNCIL DISTRICT 5)
SAN ROSE DR.
(REED ST. TO BAYLOR ST.)
A%k SEWER REPLACEMENT
C4NSULTANTS.L.L.R. WATER AND SANITARY SEWER SCALE: 1" a 400'
ENI[iEERIN[3 REPLACEMENT CONTRACT 2005 WSM—D W rf 2072-J76
SURVEYOR1i
PLANNERS MAPSCO 78Z
1701 RIVER RUN / SUITE 610 / FORT WORTH,T%-78107
(6171396-990D / FAXw(817)336-9856
J:106005Q%misd059EXHIB.dgn 7124=068:29:513AM
Page i of J
City of Fod Ififatth, Texas
Mary®r and Council Communication
COUNCIL ACTION: Approved on 7/11/2006 -Ordinance No. 17038-07-2006
DATE: Tuesday, July 11, 2006
LOG NAME: 30WSM-D ANA REFERENCE NO.: **C-21552
SUBJECT:
Adopt Appropriation Ordinance and Authorize Execution of an Engineering Agreement with A.N.A.
Consultant, L.L.C., for Water and Sanitary Sewer Replacement Contract 2005, WSM-D (City
Project No. 00386)
RECOMMENDATION:
It is recommended that the City Council:
1 Authorize the transfer of $234,787.00 from the Water and Sewer Operating Fund to the Water Capital
Projects Fund in the amount of$ 168,182.00 and Sewer Capital Projects Fund in the amount of$67,799.00;
2. Adopt the attached Appropriation Ordinance increasing estimated receipts and appropriations in the
Water Capital Projects Fund the in the amount of $168,018.00 and the Sewer Capital Projects Fund in the
amount of$66,769.00; and
3. Author; Z fy MankW to execute an Engineering Agreement with A.N.A. Consultant, L.L.C., in
the amountof$199,015.00 for Vater and Sanitary Sewer Replacement Contract, 2005 WSM-D.
DISCUSSION:
This project consists of the preparation of plans and specifications for water and/or sanitary sewer line
replacement as indicated for the following streets:
Street From To Scope of Work
Collett Little Rd. US Hwy 287 Loop 820 Service Rd. Water
Baylor Street Wichita Street Vaughn Blvd. Water/Sewer
Baylor Street 150 ft. E of Freddie St. Miller Ave. Water/Sewer
Hampshire Blvd. Haynes Ave. Oakland Blvd. Water/Sewer
San Rose Drive Reed St. Baylor St. Water/Sewer
All disturbed segments of pavement will be permanently repaired with asphalt after the proposed
improvements are complete. A.N.A. Consultant, L.L.C., proposes to perform the necessary design work
for a lump sum fee of$199,015.00. City Staff considers this fee to be fair and reasonable for the scope of
services proposed.
In addition to the contract amount, $35,772.00 (Water $26,552.00; and Sewer $9,220.00) is required for
project management by the Engineering Department.
A.N.A. Consultant, L.L.C., is in compliance with the City's M/WBE Ordinance by committing to 24%
http://www.cfwnet.org/council_packet/Reports/m"rint.asp 7/21/2006
rage z or s
M/WBE participation. The City's goal on the project is 24%_
This project is located in COUNCIL DISTRICT 5 and 8, Mapsco 93 P, 78Y, 78H and M, 78Z.
FISCAL INFORMATIONICERTIFICATION:
The Finance Director certifies that upon approval of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of
the Water and the Sewer Capital Projects Funds.
TO Fund/Account/Centers FROM Fund/Account/Centers
1 & 2) $168,018.00 � $7,862.00
P253 472045 6051700386ZZ P258 531200 705170038651
1 & 2) $66,768.00 3) $4,969.00
P258 472045 7051700386ZZ P258 531200 705170038633
2) $1203.00 ;3A $29,812.00
P253 531350 605170038610 P258 531200 7051700386932
$1,203.00 � $14_,906.00
. P253 531350 605170038620 P258 531200 705170038631
$6,413.00 3 $33,117.00
P253 531350 605170038631 P253 531200 605170038651
21 $32,505.00 3) I $10,835.00
P253 531200 605170038631 P253 531200 605170038633
2) $12,825.00 � $65_,009.00
P253 531350 605170038632 P253 531200 605170038632
21 $65,009.00 3 $32,505.00
P253 531200 605170038632 - P253 531200 605170038631
P253 531350 605170038633 $2,138.00
1 PE45 538070 0709020 $66,769.00
1 PE45 538070 0609020 $168,018.00
21 $10835.00
P253 531200 605170038633 '
2 $33117.00
P253 531200 605170038651 —,
2) $1,710.00
P253 531350 605170038660
21 $11000.00
P253 531350 605170038673
2 $60.00
P253 533010 605170038681
2 $160.00
P258 531350 705170038610
21 $160.00
P258 531350 705170038620
2 $2,325.00
P258 531350 705170038631
21 $14,906.00
P258 531200 705170038631
21
http://www.cfwnet.org/counciLpackeMeports/mc�_print,asp 7/21/2006
Page 3 of 3
P258 531350 705170038632 $4,650.00
2) $29,812.00
P258 531200 705170038632
2 $775.00
P258 531350 705170038633
2) $4.969.00
P258 531200 705170038633
2) $7,862.00
P258 531200 705170038651
P258 531350 705170038660
$620.00
2) $500.00
P258 531350 705170038673
2) $30.00
P258 533010 705170038681
Submitted for City Manager's Office by_. Marc Ott (6122)
Originating Department Head: A. Douglas Rademaker(6157)
Additional Information Contact: A. Douglas Rademaker(6157)
http://www.cfwnet.org/council_packet/keports/nc�_print.asp 7/21/2006
City of Fort Worth, Texas
Mayor and Council Communication
............. m 7 ........
...........................
COUNCIL ACTION: Approved on 7/1112006 - Ordinance No. 17038-07-2006
—......_._.x._._._...
DATE: Tuesday, July 11, 2006
LOG NAME: 30WSM-D ANA REFERENCE NO.: **C-21552
SUBJECT:
Adopt Appropriation Ordinance and Authorize Execution of an Engineering Agreement with A.N.A.
Consultant, L.L.C., for Water and Sanitary Sewer Replacement Contract 2005, WSM-D (City
Project No. 00386)
E.. .......................
RECOMMENDATION:
It is recommended that the City Council:
1 Authorize the transfer of $234,787.00 from the Water and Sewer Operating Fund to the Water Capital
Projects Fund in the amount of$ 168,182.00 and Sewer Capital Projects Fund in the amount of$67,799.00;
2. Adopt the attached Appropriation Ordinance increasing estimated receipts and appropriations in the
Water Capital Projects Fund the in the amount of $168,018.00 and the Sewer Capital Projects Fund in the
amount of$66,769.00; and
3. Authorize the City Manager to execute an Engineering Agreement with A.N.A. Consultant, L.L.C., in
the amount of$199,015-00 for Water and Sanitary Sewer Replacement Contract, 2005 WSM-D.
DISCUSSION:
This project consists of the preparation of plans and specifications for water and/or sanitary sewer line
replacement as indicated for the following streets:
Street From TO Scope of Work
Collett Little Rd. US Hwy 287 Loop 820 Service Rd. Water
Baylor Street Wichita Street Vaughn Blvd. Water/Sewer
Baylor Street 150 ft. E of Freddie St. Miller Ave. Water/Sewer
Hampshire Blvd. Haynes Ave. Oakland Blvd. Water/Sewer
San Rose Drive Reed St. Baylor St. Water/Sewer
All disturbed segments of pavement will be permanently repaired with asphalt after the proposed
improvements are complete. A.N.A. Consultant, L.L.C., proposes to perform the necessary design work
for a lump sum fee of $199,015.00. City Staff considers this fee to be fair and reasonable for the scope of
services proposed.
In addition to the contract amount, $35,772.00 (Water $26,552.00; and Sewer $9,220.00) is required for
project management by the Engineering Department.
A.N.A. Consultant, L.L.C., is in compliance with the City's M/WBE Ordinance by committing to 24%
M/WBE participation. The City's goal on the project is 24%.
Lognarne: 55SPINKS RAMP Page 1 of 3
This project is located in COUNCIL DISTRICT 5 and 8, Mapsco 93 P, 78Y, 78H and M, 78Z.
FISCAL INFORMATIONICERTIFICATION:
The Finance Director certifies that upon approval of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of
the Water and the Sewer Capital Projects Funds.
TO Fund/AccounVCenters FROM Fund/AccounVCenters
P253 472045 6051700386ZZ $168,018.00 258 531200 705170038651 $7.862.00
8
P258 472045 7051700386Z $66,768.00 258 531200 705170038633 4
P253 531350 605170038610 1 203.00 258 531200 7051700386932 $29,812.00
P253 531350 605170038620 1 2Q3.DQ 258 531200 705170038631 $14,906.00
21 P253 531350 605170038631 6 413,00 P253 531200 605170038651 $33,117.00
$32,505.00 3) $10,835.00
P253 531200 605170038631 P253 531200 605170038633
21 253 531350 605170038632 $12,825.00 253 531200 605170038632 $65,009.00
2 $65,009.00 3) $32,505.00
P253 531200 605170038632 P253 531200 605170038631
21 P253 531350 605170038633 $2,138.00
�PE45 538070 0709020 $66,769.00
1)PE45 538070 0609020 $168,018.00
2) $10,835.00
P253 531200 605170038633
2 $33,117.00
P253 531200 605170038651
2 $1,710.00
P253 531350 605170038660
2 $1,000.00
P253 531350 605170038673
2 $60.00
P253 533010 605170038681
P258 531350 705170038610
160.00
21$ 60.00
P258 531350 705170038620
2) $2,325.0
P258 531350 705170038631
2 $14,906.00
P258 531200 705170038631
4
P258 531350 705170038632
650.00
2 $29,812.00
P258 531200 705170038632
Logname: 55SPINKS RAMP Page 2 of 3
P258 531350 705170038633
775.00
P258 531200 705170038633
4 969.00
P258 531200 705170038651
7 862.00
P258 531350 705170038660
620.00
P258 531350 705170038673
500.00
21 30.00
P258 533010 705170038681
Submitted for City Manager's Office by: Marc Ott (6122)
Originating Department Head: A. Douglas Rademaker(6157)
Additional Information Contact: A. Douglas Rademaker (6157)
Logname: 55SPINKS RAMP Page 3 of 3