HomeMy WebLinkAboutContract 32496COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract Nox'C"1'
WHEREAS, Two SR, L.P., a Texas Limited Partnership by Centamtar Terras,
L.L.C., its General Partner, hereinafter called "Developer", desires to make certain
improvements to Sendera Ranch East Phase VI, Section IB , an addition to the City of
Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Mehrdad Moavedi, its duly
authorized Manager, and the City, acting herein by and through Marc Ott, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
CADocuments and Settings\Laura.DFWDEVELOPMENI Local StttingsJemporary Internet Files\OLK352\013723CFArevised.doc
013723CFArevised.doc
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its ofricers, servants, or emplovees
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof.
CADocuments and Settings\Laura.DFWDEVELOPMENT Ucal SVings\Temporary Internet Files\OLK352\013723CFArevised.doc
013723CFArevised.doc
Water (A) None; Sewer (A-1) None; Paving (B) attached, Storm Drain (B-
1) attached, Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $ 1,956,479.25.
Item
A. Construction
1. Streets
2. Storm Drainage
3. Street Lights
4. Street Name Signs
Developer
Cost
B. Engineering Design
C. Construction Engineering
and Management by DOE (4%) _ $
TOTALS
$ 1,334,105.75 $
$ 452,171.50 $
$ 97,350.00 $
$ 1,400.00 $
71,452.00
$1,956,479.25
City cost
Total Cost
$
$ 1, 334,105.75
$ 452,171.50
$ 97,350.00
$ 1,400.00
$ 71,452.0j
$1,956,479.25
Notes:
1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CADocuments and Settings\Scottsh\Local Settings\Temporary Inte3let Files\OLK29\0I3723CFArevised.doc
013723CFArevised.doc
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed,�said D ve o er
has executed this instrument in triplicate, at Fort Worth, Texas this the �.day of
.2005.
Approval Recommended:
I NO M&C REQUIRED
ATTEST:
City Secretary
Approve to Form:
ssistC.
Attorney
Transportation and Public Works
Department
Robert Goode, P. E.
Director
At
ort Worth
Olt
Assistant City Manager
ATTEST: DEVELOPER
By: Two SR, L.P.
A Texas Limited Partnership
By: Centamtar Terras, L.L.C.
A Texas Limited Liability Company
General Partner
Corporate Secretary By:
Mehrdad Moayedi
Manager RECEIVED
CADocuments and Settings\Laura.DFWDEVELOPMENI\LocaI Settings\Temporary Internet Files\OLK352\013723CFArevised.doc
013723CFArevised.doc
UNIT III: STORM DRAIN SYSTEM
(Furnish
and install, including all appurtenant work, complete in place,
the following
items)
Item
Approx
Unit
Item Description
Unit Price
Total
No.
Quantity
Measurement
"D" Item reference
Amount
1.
357
L.F.
TX 4" RCB:
Per Linear Foot:
Two Hundred Eiqhty Five
Dollars &
No
Cents
$285.00
$101,745.00
2.
10
L.F.
6' X 4' RCB:
Per Linear Foot:
Two Hundred Twenty
Dollars &
No
Cents
$220.00
$2,200.00
3.
448
L.F.
48" Class III R.C. Pipe:
Per Linear Foot:
One Hundred Two
Dollars &
No
Cents
$102.00
$49,776.00
4.
1,153
L.F.
39" Class III R.C. Pipe:
Per Linear Foot:
Seventy Nine
Dollars &
No
Cents
$79.00
$91,087.00
5.
762
L.F.
36" Class III R.C. Pipe:
Per Linear Foot:
Sixty Four
Dollars &
No
Cents
$64.00
$48,768.00
6.
1,301
L.F.
30" Class III R.C. Pipe:
Per Linear Foot:
Forty Nine
Dollars &
No
Cents
$49.00
$63,749.00
N:\JOB\013723\Spec\01372301.00A.doc B-8
7.
10.
11.
12.
166
L.F.
24" Class III R.C. Pipe:
Per Linear Foot:
Thirty Nine
No
293
L.F.
21" Class III R.C. Pipe:
Per Linear Foot:
Thirty Two
No
4,530
L.F.
Trench Safety:
Per Each:
No
Twenty Five
2
Ea.
20' Standard Curb Inlet:
Per Each:
Three Thousand
Four Hundred
No
4
Ea.
15' Standard Curb Inlet:
Per Each:
Two Thousand
Eiaht Hundred
No
6
Ea.
10' Recessed Curb Inlet:
Per Each:
Two Thousand
Five Hundred Twenty
No
Dollars &
Cents $39.00 $6,474.00
Dollars &
Cents $32.00 $9,376.00
Dollars &
Cents $0.25 $1,132.50
Dollars &
Cents $3,400.00 $6,800.00
Dollars &
Cents $2,800.00 $11,200.00
Dollars &
Cents $2,520.00 $15,120.00
N:\JOB\013723\Spec\01372301.00A.doc
B-9
3 Ea.
1 Ea.
8 Ea.
1 Ea.
1 Ea.
10' Standard Curb Inlet:
Per Each:
Two Thousand
Three Hundred Twenty Five Dollars &
No
Cents
5' Square Manhole:
Per Each:
Two Thousand
Eight Hundred
Dollars &
No
Cents
4' Square Manhole:
Per Each:
Two Thousand
Seven Hundred
Dollars &
No
Cents
4' STD Manhole Riser:
Per Each:
One Thousand
Eight Hundred
Dollars &
No
Cents
7' X 4' Type B Headwall,
Including
Wingwalls:
Per Each:
Four Thousand
Seven Hundred
Dollars &
No
Cents
$2,325.00 $6,975.00
$2,800.00 $2,800.00
$2,700.00 $21.600.00
$1,800.00 $1,800.00
$4,700.00 $4,700.00
372301.00A.doc B-10
1 Ea.
76 S.Y.
1 L.S.
48" Type B Headwall:
Per Each:
Two Thousand
Seventv Five Dollars &
No Cents
Rock Rubble Rip Rap, (18" X 24"
Diameter):
Per Square Yard
Fifty Six Dollars &
Fifty Cents h
Storm Water Management:
Per Lump Sum:
Five Hundred Dollars &
No Cents $500.00
$2,075.00 $2,075.00
TOTAL AMOUNT BID STORM DRAIN
Summary
$56.50
TOTAL AMOUNT BID WATER $ 353,142.50
TOTAL AMOUNT BID SEWER $ 314,573.05
TOTAL AMOUNT BID STORM DRAIN $ 452.171.50
TOTAL, PAYMENT, PERFORMANCE,
& MAINTENANCE BOND $ 24.000.00
GRAND TOTAL AMOUNT BID $ 1,143,887.05
$4,294.00
$500.00
$ 452,171.50
;pec\01372301.00A. d oc
I
PART B - PROPOSAL (Cont.)
After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver
an approved Surety Bond and such other bonds as required by the Contract Documents, for the
faithful performance of the Contract. The attached bid security, if required is to become the property
of the Developer.
The undersigned bidder certified that he has obtained at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978, and
that he has read and thoroughly understands all the requirements and conditions of those General
Documents and the specific Contract Documents and appurtenant plans.
The successful bidder shall be required to perform the work in accord with the following
publications, both of which are incorporated herein and made a part hereof for all purposes:
1. The General Contract Documents and General Specifications for Water
Department Projects dated January 1, 1978, which may be purchased from the Water
Department.
2. The Standard Specifications for Street and Storm Drain Construction which
may be purchased from the Department of Transportation & Public Works.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors, or employment agency in either furnishing or referring employee
applicants to the undersigned are not discriminated against as prohibited by the terms of City
Ordinance No. 7278 as amended by City Ordinance No. 7400.
The Bidder agrees to begin construction within 10 calendar days after issue of the work order,
and to complete the contract within 70 working days after beginning construction as set forth in
the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Non resident bidders in the State of , our principal
place of business, are not required to underbid resident bidders.
X B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
N:VOB\013723\Spec\01372301.00A.doc B-12
I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (Initials)
Respectfully submitted,
Four D Construction, Inc.
By:
Jas n J. ni s
Titl
E ecu 'ive V.P.
Address
11200 Seagoville Road
Balch Springs, TX 75180
Telephone: 972-286-0094
(Seal)
Date: July 21 , 2005
N:\JOB\013723\Spec\01372301.00A.doc B-13
PART B — PROPOSAL
DEVELOPER AWARDED CONTRACTS
This proposal must not be removed from this book of Contract Documents
TO: Two SR, L.P.
DEVELOPER
c/o Carter & Burgess, Inc.
PROPOSAL FOR: STREET IMPROVEMENTS FOR
SENDERA RANCH EAST, PHASE VI SECTION 1 B
D.O.E. NO. 4806
Includes the furnishing of all materials, except materials specified to be furnished by the
City, equipment and labor for the installation of street improvements and all necessary
appurtenances and incidental work to provide a complete and serviceable project
designated as:
SENDERA RANCH EAST
PHASE VI SECTION 1 B
Pursuant to the foregoing 'Notice to ,Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, aP4
the General Contract Documents and General Specifications for Water Department
Projects, the General Contract Documents and General specifications for
Transportation and Public works Projects, the site of the project and understanding the
amount of work to be done, and the prevailing conditions, hereby proposes to do all the
work, furnish all labor, equipment and material except as specified to be furnished by
the City, which is necessary to fully complete the work as provided in the Plans and
Contract Documents and subject to the inspection and approval of the Director of the
Department of Engineering of the City of Fort Worth, Texas; and binds himself upon
acceptance of this Proposal to execute a contract and furnish an approved Performance
Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be
required by the Contract Documents for the performing and completing of the said
work. Contractor proposes to do the work within the time stated and for the following
sums:
Part-B Proposal
N:\JOB\013723\Spec\01372301.00B.doc B-1
UNIT IV: PAVING IMPROVEMENTS
ITEM APPROX. DESCRIPTION OF ITEMS WITHUNIT TOTAL
NO.
QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work, complete in place, the following items)
Item Approx.
Unit Item Description Unit Price
Total
No. quantity
Measurement "D" Item Description
Amount
1. 55,628
S.Y. 6" Lime Stabilized Subgrade:
Per Square Yard:
One Dollars &
Sixty Cents
$1.60
$89,004.80
2. 25,717
S.Y. 8" RC (3000 PSI) Pavement
with T' Curb:
Per Square Yard:
Twenty Dollars &
Thirty Cents
$20.30
$522,055.10
3. 28,496
S.Y. 6" RC (3000 PSI) Pavement
with 7" Curb:
Per Square Yard:
Eighteen Dollars &
Ten Cents
$18.10
$515,777.60
4. 834
Ton Hydrated Lime (30#/SY):
Per Ton:
Eighty One Dollars &
No Cents
$81.00
$67,554.00
N AJOB\013723\Spec\01372301.00 B.doc B-2
5.
A
7
0
5 Ea. Temporary TY III Barricade
Per Each:
Five Hundred Dollars&
No Cents
$500.00
32,869 S.F. 4' Sidewalks (including along
Diamondback Rd.):
Per Square Foot:
Three Dollars &
Twenty Five Cents
$3.25
23 S.Y. Rock Rip Rap
Per Square Yard:
1 L. S.
12 Ea.
One Hundred Dollars &
No Cents
$100.00
Traffic Control:
Per Lump Sum:
Three Thousand Dollars &
$2,500.00
$106,824.25
$2,300.00
No Cents $3,000.00 $3,000.00
Sidewalk Ramps (D. Back Ln.)
Per Each:
Three Thousand
No
NAJOB10137231Spec101372301.00B.doc B-3
Dollars &
Cents
$850.00
$10,200.00
10. 1 L.S. Storm Water Management:
Per Lump Sum:
One Thousand Dollars &
No Cents
$1,000.00 $1,000.00
11. 1 L.S. Payment, Performance,
Maintenance Bond:
Per Lump Sum:
Thirteen Thousand
Eight Hundred Ninetv Dollars &
No Cents $13,890.00 $13,890.00
TOTAL AMOUNT BID PAVING $ 1,334,105.75
GRAND TOTAL AMOUNT BID $ 1,334,105.75
NAJOB\013723\Spec\01372301.00B.doc B-4
PART B - PROPOSAL (Cont.)
After acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver an approved Surety Bond and such other bonds as required by the Contract Documents,
for the faithful performance of the Contract. The attached bid security, if required is to become
the property of the Developer.
The undersigned bidder certified that he has obtained at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978,
and that he has read and thoroughly understands all the requirements and conditions of those
General Documents and the specific Contract Documents and appurtenant plans.
The successful bidder shall be required to perform the work in accord with the following
publications, both of which are incorporated herein and made a part hereof for all
purposes:
1. The General Contract Documents and General Specifications for
Water Department Projects dated January 1, 1978, which may be purchased from
the Water Department.
2. The Standard Specifications for Street and Storm Drain Construction
which may be purchased from the Department of Transportation & Public Works.
The undersigned assures that its employees and applicants for employment and those of any
labor organization, subcontractors, or employment agency in either furnishing or referring
employee applicants to the undersigned are not discriminated against as prohibited by the terms
of City Ordinance No. 7278 as amended by City Ordinance No. 7400.
The Bidder agrees to begin construction within ten (10) calendar days after issue of the work
order, and to complete the contract within 45 working days after beginning construction as set
forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Non resident bidders in the State of , our principal
place of business, are not required to underbid resident bidders.
X B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
N:\JOB\013723\Spec\01372301.00B.doc B-5
I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (Initials)
Respectfully submitted,
Mari Sin ola & o Excavatinq, Inc.
-BY'
i me
Micha inacola, Vice President
Address
10950 Research Road
Frisco, TX 75034
Telephone: (214) 387-3900
(Seal)
Date: August 15, 2005
N:\JOB\013723\Spec\01372301.00B.doc B-6
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS
11
EA
$
2,000
$22,000.00
MID -BLOCK
RESIDENTIAL
12
EA
$
2,000
$24,000.00
CHANGE OF
DIRECTION RESIDENTIAL
7
EA
$
2,000
$14,000.00
MID -BLOCK
COLLECTOR
13
EA
$
2,000
$26,000.00
MID -BLOCK
ARTERIAL PARKWAY
0
EA
$
2,500
$00,000.00
MID -BLOCK
ARTERIAL MEDIAN
1
EA
$
2,500
$2,500.00
RELOCATE EXISTING LIGHT
0
EA
$
1,500
$0,000.00
Subtotal
$88,500.00
City's Cost
$00,000.00
Developer's Subtotal
$88,500.00
10% Contingency
$8,850.00
Project Total
$97,350.00
Adjacent Developer's Cost
$00,000.00
Developer's Cost
$97,350.00
2% Inspection Fee
$00,000.00
CFA CODE #2005114
DEVELOPER'S COST: $97,350.00
SENDERA RANCH, PHASE VI -SECTION IB
Fort Worth, Texas
August 30, 2005
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the
approximate locations shown in Exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2. Streetlights on residential and /or collector streets can be installed
using overhead or underground conductors with the approval of the Director
of Transportation and Public Works.
3. The City will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to
pay the city the amount shown below prior to the City starting its design
efforts.
4. Streetlights on arterial streets shall be installed with underground
conduit and conductors.
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for the
installation of any electrical transformers required for the proper
operation of the street lights
6. The estimated cost of this street light installation is detailed on page 1
of exhibit C and is summarized below, the street lights will remain the
property of, and will be maintained by the City of Fort Worth.
DEVELOPER'S COST: $97,350.00
SENDERA RANCH, PHASE VI -SECTION IB
August 27, 2005
FORT WORTH, TEXAS
CFA CODE #2005114
Page II of Exhibit C
III
"STREETLIGHTS"
INTERSECTIONS
SIERRA VISTA WAY
&
SAN FELIPE TRL 1
SAN FELIPE TRL
&
COYOTE TRL 1
SAN FELIPE TR
&
PONCHO IN 1
SILKWOOD DR
S
ROSARIO IN 1
SILKWOOD DR
&
PONCHO IN 1
SAND HILLS DR
&
ROSARIO IN 1
MEXICALI WAY
&
ROSARIO IN 1
MEXICALI WAY
&
BAJA DR 1
ESPERANZA DR
&
STREET A 1
DIAMONDBACK IN
6
SILKWOOD DR 1
DIAMONDBACK IN
&
BAJA DR 1
MID BLOCK RESIDENTIAL
SAN FELIPE TRL 3
SILKWOOD DR 2
SAND HILLS DR 1
MEXICALI WAY 1
ROSARIO LN 1
PONCHO LN 2
BAJA DR 1
COYOTE TRL 1
CHANGE OF DIRECTIONS
SIERRA VISTA WAY_ 1
SAND HILLS DR 1
SAN FELIPE TRL 1
MEXICALI WAY 1
ROSARIO IN 1
FIREBUSH IN 1
KACHINA IN 1
MID BLOCK COLLECTOR
DIAMONDBACK IN 13
MID BLOCK MEDIAN
SENDERA RANCH BLVD & DIAMONDBACK LN 1
Page III of Exhibit C
IV
STREET NAME SIGNS
The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following fourteen (14) intersections at a
cost to the Developer of $1,400.00:
Diamondback Lane & Sendera Ranch Blvd
Diamondback Lane & Esperanza Dr
Diamondback Lane & Coyote Tr
Diamondback Lane & Baja Dr
Diamondback Lane & Silkwood Dr (NW)
Diamondback Lane & Silkwood Dr (SE)
San Felipe Tr & Coyote Tr
San Felipe Tr & Sierra Vista Way
Pancho Lane & San Felipe Tr
Pancho Lane & Silkwood Dr
Mexicali Way & Baja Dr
Mexicali Way & Rosario Lane
Rosario Lane & Sand Hills Dr
Rosario Lane & Silkwood Dr
Sendera Ranch, Phase VI, Section 1 B
CFA code: 2005114 August 27, 2005
i b
NOT TO SCALE
LOCATION MAP
SENDERA RANCH
PHASE VI - SECTION 113
Carter u Burgess
CARTER S BURGESS, INC.
FOIT WOUH, Tx 76m
I6171735- 6
PROJECT NO. 013723.010.1.0630
LLULIVU
SWAY/ 50' ROW /I
'. 55' B/ B
)WAY/ 80' ROW
P. 4' S I DEWALK ..................•
HOMEBUILDER),r
P. 4' S I OEWALK
DEVELOPER)
ITS OF PROJECT
----- ----- 11 �p12 IJ /I 15 16 17 18 I 2 I J I / I 5�
I
Z6
_____________
_9 pQ j1
27 6 11 2 _
___-_.-_.-_____ _
28 1 Z
--- -. -,.. ..� ._ ... .._ _ .. J
rn
--___
N
Jo s /I '7 m
Is
' . _ _ _ _ _ _. _ . _ _ _ _: � 52 J 16 2
f J
JJ 2 a
peiG}1 Ep
SS Je 5
35 7
I 9
1 PL9. II
.0 1T =R J 10
_ 13
• I I I ��sr /2
k I
(N)
SCALEl l" = 300'
I I I STREETS
EXHIBIT 'B'
SENDERA RANCH
PHASE VI - SECTION 113
AM1�Oµ
C!`t4w Bul
CARTER & BURGESS, INC-
TT7 MMN STREET
FOIrr WORM, TX 761U2
(817) 735- 6=
PROJECT NO. 013723.010.0630
56iY(F,ri avol 15
r
p•,
•
- r
21
LEGEND
P. 2 9' B/ B
K1111A
DWAY/ 50' ROW
)P. 55' B/B
ffm
%DWAY/ 80' ROW
P 4' S I DEWALK
..................•.
HOMEBUILDER)
P. 4' S I DEWALK
DEVELOPER)
ITS OF PROJECT
N
SCALEg l" = 300'
STREETS
EXHIBIT 'B'
SENDERA RANCH
PHASE VI - SECTION 113
Bu
CARTER & BURGESS, INC.
m nwN SMEr
FORT WORTH, U 76102
PROJECT NO. 013723.010. 1. 0630
L L V L I • V
�P. STORM DRAIN LINE
,P. INLET
P. MANHOLE
P. HEADWALL
ST. STORM DRAIN LINE
ITS OF PROJECT
r
0
N
SCALE1 1" = 300'
n,.NCH � a '�•
SE •
}
-------------
•----t I 12 13 14 15 /
--
--- -- 6 l7 IB I 2 7 14 5
-�J I I
_.__.__r._ 26 9 IR.
71 z2 2] z9
_ -- -- ------ 27 B 1�� z0 t
----' '--- - -•- ze 7 /t+om 2
_ ________-__
30 5 14 7 in
is
_ __----- _-____• !z 7 16
33
.. .. ...., ., F
«rilc yAg\0� >r 75
s
l7 a 9
z 14
r�SRE
_ - _ di'r � z1• •� vr� , j_ ..._... 12 G z •
4 50
I I I STO RM D MI N
a""` / EXHIBIT 'B—l'
SENDERA RANCH
PHASE IV - SECTION I
C=Hhw s
CARTER & BURGESS, INC.
m MAN SOM
FORT WORTH,TX 76102
1817) 735-6000
PROJECT NO. 013723.010. 1.0630
PN�S� O.E:�•42
= zs
r
z
rn
V1 �
m
LEGEND
)P. STORM DRAIN LINE
)P. INLET T
)P. MANHOLE -�
)P. HEADWALL
0
ST. STORM DRAIN LINE _ _ = :g=
SITS OF PROJECT
(N)
SCALE1 1" = 300'
46
17
°
5
7� c� 2 19 �� 3
24 7J Z4'
75 as 50 z
sl I
19 70
71 94 57
17 /B
' 43 909�IG YppY.
I ''J
11 Iz
40
J6 Ji 38
J
fN_
MH 4 0' 19 z e
l e 3 5 7�
24— 10' /> 70 4 6 6'
52 71 5 16
r, 7
Jl 77 6
15 B
34 S0 zJ 7 9 n6N2�..6V
35 /1 J6 �iP 29 z1
13 B to Hk4J� j10• i�•
37 78 ? �.
l7 9 11
39 18 77 76 25 _ ....
11 to !z
WA
I 9 I IO I 11 l /7 l /J ® IS 16 I l7 ( le I l9 l ZO 717z O 71 25 26 `
STORM DRAIN
EXHIBIT 'B-l'
SENDERA RANCH
PHASE IV - SECTION 1
Cmrhw Burgess
CARTER & BURGESS, INC.
m MAIN STREET
FORT WORTH, TX 76102
16�71735-6000
PROJECT NO. 013723.010. 1.0630
—11 a — ..
LLV LIrLJ
'. SINGLE STREET LIGHT
,T. SINGLE STREET LIGHT O N
STEEL POLE WITH STREET
STOP SIGNS ATTACHED)
STREET SIGN SCALE• 1 " = 300'
T. STREET SIGN Q w L�.�.•.-..� .-.I
TS OF PROJECT
SOP, c z
g
SI
j;.
.... � ........,.�...-....-..:.. t.. 1I'k '+:;;ter?i�.;ia„„...,. .1.... .....
13
} )
1stN 6�vD
sooj) p, E• SBB2 s
20
29 7 I
29 6 y
f!
!� 5 /I
!I AM
U
22 2! 21
7
i
STREET LIGHTS
EXHIBIT 'C'
SENDERA RANCH
PHASE VI - SECTION 113
Canter :: Burgess
CARTER & BURGESS, INC.
777 hovel STREET
FORT WORTH, TX 76102
(617) 735-6000
PROJECT NO. 013723.010. 1.0630
oerr in nr TT
i - 1, . �. � P E• �\ , '40
20
f V
�Y1 aSP�(N
R
I6 17 1 /i) If 20 zi T2
LEGEND
SINGLE STREET LIGHT
SINGLE STREET LIGHT O
EEL POLE WITH STREET
3P SIGNS ATTACHED)
STREET SIGN
STREET SIGN
OF PROJECT
i
PUBIC PAM.
! f
P,00 r. Poky -
(N)
SCALE, )" = 300'
STREET LIGHTS
EXHIBIT 'C'
SENDERA RANCH
PHASE VI - SECTION 1B
Carter r, Burgess
CARTER & BURGESS, INC.
181 T wx WORK nc ra
PROJECT NO. 013723.010. 1.0630