Loading...
HomeMy WebLinkAboutContract 32496COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract Nox'C"1' WHEREAS, Two SR, L.P., a Texas Limited Partnership by Centamtar Terras, L.L.C., its General Partner, hereinafter called "Developer", desires to make certain improvements to Sendera Ranch East Phase VI, Section IB , an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Mehrdad Moavedi, its duly authorized Manager, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. CADocuments and Settings\Laura.DFWDEVELOPMENI Local StttingsJemporary Internet Files\OLK352\013723CFArevised.doc 013723CFArevised.doc F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its ofricers, servants, or emplovees G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. CADocuments and Settings\Laura.DFWDEVELOPMENT Ucal SVings\Temporary Internet Files\OLK352\013723CFArevised.doc 013723CFArevised.doc Water (A) None; Sewer (A-1) None; Paving (B) attached, Storm Drain (B- 1) attached, Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $ 1,956,479.25. Item A. Construction 1. Streets 2. Storm Drainage 3. Street Lights 4. Street Name Signs Developer Cost B. Engineering Design C. Construction Engineering and Management by DOE (4%) _ $ TOTALS $ 1,334,105.75 $ $ 452,171.50 $ $ 97,350.00 $ $ 1,400.00 $ 71,452.00 $1,956,479.25 City cost Total Cost $ $ 1, 334,105.75 $ 452,171.50 $ 97,350.00 $ 1,400.00 $ 71,452.0j $1,956,479.25 Notes: 1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets. Sidewalk cost is included under street cost. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. CADocuments and Settings\Scottsh\Local Settings\Temporary Inte3let Files\OLK29\0I3723CFArevised.doc 013723CFArevised.doc IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed,�said D ve o er has executed this instrument in triplicate, at Fort Worth, Texas this the �.day of .2005. Approval Recommended: I NO M&C REQUIRED ATTEST: City Secretary Approve to Form: ssistC. Attorney Transportation and Public Works Department Robert Goode, P. E. Director At ort Worth Olt Assistant City Manager ATTEST: DEVELOPER By: Two SR, L.P. A Texas Limited Partnership By: Centamtar Terras, L.L.C. A Texas Limited Liability Company General Partner Corporate Secretary By: Mehrdad Moayedi Manager RECEIVED CADocuments and Settings\Laura.DFWDEVELOPMENI\LocaI Settings\Temporary Internet Files\OLK352\013723CFArevised.doc 013723CFArevised.doc UNIT III: STORM DRAIN SYSTEM (Furnish and install, including all appurtenant work, complete in place, the following items) Item Approx Unit Item Description Unit Price Total No. Quantity Measurement "D" Item reference Amount 1. 357 L.F. TX 4" RCB: Per Linear Foot: Two Hundred Eiqhty Five Dollars & No Cents $285.00 $101,745.00 2. 10 L.F. 6' X 4' RCB: Per Linear Foot: Two Hundred Twenty Dollars & No Cents $220.00 $2,200.00 3. 448 L.F. 48" Class III R.C. Pipe: Per Linear Foot: One Hundred Two Dollars & No Cents $102.00 $49,776.00 4. 1,153 L.F. 39" Class III R.C. Pipe: Per Linear Foot: Seventy Nine Dollars & No Cents $79.00 $91,087.00 5. 762 L.F. 36" Class III R.C. Pipe: Per Linear Foot: Sixty Four Dollars & No Cents $64.00 $48,768.00 6. 1,301 L.F. 30" Class III R.C. Pipe: Per Linear Foot: Forty Nine Dollars & No Cents $49.00 $63,749.00 N:\JOB\013723\Spec\01372301.00A.doc B-8 7. 10. 11. 12. 166 L.F. 24" Class III R.C. Pipe: Per Linear Foot: Thirty Nine No 293 L.F. 21" Class III R.C. Pipe: Per Linear Foot: Thirty Two No 4,530 L.F. Trench Safety: Per Each: No Twenty Five 2 Ea. 20' Standard Curb Inlet: Per Each: Three Thousand Four Hundred No 4 Ea. 15' Standard Curb Inlet: Per Each: Two Thousand Eiaht Hundred No 6 Ea. 10' Recessed Curb Inlet: Per Each: Two Thousand Five Hundred Twenty No Dollars & Cents $39.00 $6,474.00 Dollars & Cents $32.00 $9,376.00 Dollars & Cents $0.25 $1,132.50 Dollars & Cents $3,400.00 $6,800.00 Dollars & Cents $2,800.00 $11,200.00 Dollars & Cents $2,520.00 $15,120.00 N:\JOB\013723\Spec\01372301.00A.doc B-9 3 Ea. 1 Ea. 8 Ea. 1 Ea. 1 Ea. 10' Standard Curb Inlet: Per Each: Two Thousand Three Hundred Twenty Five Dollars & No Cents 5' Square Manhole: Per Each: Two Thousand Eight Hundred Dollars & No Cents 4' Square Manhole: Per Each: Two Thousand Seven Hundred Dollars & No Cents 4' STD Manhole Riser: Per Each: One Thousand Eight Hundred Dollars & No Cents 7' X 4' Type B Headwall, Including Wingwalls: Per Each: Four Thousand Seven Hundred Dollars & No Cents $2,325.00 $6,975.00 $2,800.00 $2,800.00 $2,700.00 $21.600.00 $1,800.00 $1,800.00 $4,700.00 $4,700.00 372301.00A.doc B-10 1 Ea. 76 S.Y. 1 L.S. 48" Type B Headwall: Per Each: Two Thousand Seventv Five Dollars & No Cents Rock Rubble Rip Rap, (18" X 24" Diameter): Per Square Yard Fifty Six Dollars & Fifty Cents h Storm Water Management: Per Lump Sum: Five Hundred Dollars & No Cents $500.00 $2,075.00 $2,075.00 TOTAL AMOUNT BID STORM DRAIN Summary $56.50 TOTAL AMOUNT BID WATER $ 353,142.50 TOTAL AMOUNT BID SEWER $ 314,573.05 TOTAL AMOUNT BID STORM DRAIN $ 452.171.50 TOTAL, PAYMENT, PERFORMANCE, & MAINTENANCE BOND $ 24.000.00 GRAND TOTAL AMOUNT BID $ 1,143,887.05 $4,294.00 $500.00 $ 452,171.50 ;pec\01372301.00A. d oc I PART B - PROPOSAL (Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 70 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. X B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. N:VOB\013723\Spec\01372301.00A.doc B-12 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, Four D Construction, Inc. By: Jas n J. ni s Titl E ecu 'ive V.P. Address 11200 Seagoville Road Balch Springs, TX 75180 Telephone: 972-286-0094 (Seal) Date: July 21 , 2005 N:\JOB\013723\Spec\01372301.00A.doc B-13 PART B — PROPOSAL DEVELOPER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents TO: Two SR, L.P. DEVELOPER c/o Carter & Burgess, Inc. PROPOSAL FOR: STREET IMPROVEMENTS FOR SENDERA RANCH EAST, PHASE VI SECTION 1 B D.O.E. NO. 4806 Includes the furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for the installation of street improvements and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: SENDERA RANCH EAST PHASE VI SECTION 1 B Pursuant to the foregoing 'Notice to ,Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, aP4 the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Public works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Engineering of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: Part-B Proposal N:\JOB\013723\Spec\01372301.00B.doc B-1 UNIT IV: PAVING IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITHUNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) Item Approx. Unit Item Description Unit Price Total No. quantity Measurement "D" Item Description Amount 1. 55,628 S.Y. 6" Lime Stabilized Subgrade: Per Square Yard: One Dollars & Sixty Cents $1.60 $89,004.80 2. 25,717 S.Y. 8" RC (3000 PSI) Pavement with T' Curb: Per Square Yard: Twenty Dollars & Thirty Cents $20.30 $522,055.10 3. 28,496 S.Y. 6" RC (3000 PSI) Pavement with 7" Curb: Per Square Yard: Eighteen Dollars & Ten Cents $18.10 $515,777.60 4. 834 Ton Hydrated Lime (30#/SY): Per Ton: Eighty One Dollars & No Cents $81.00 $67,554.00 N AJOB\013723\Spec\01372301.00 B.doc B-2 5. A 7 0 5 Ea. Temporary TY III Barricade Per Each: Five Hundred Dollars& No Cents $500.00 32,869 S.F. 4' Sidewalks (including along Diamondback Rd.): Per Square Foot: Three Dollars & Twenty Five Cents $3.25 23 S.Y. Rock Rip Rap Per Square Yard: 1 L. S. 12 Ea. One Hundred Dollars & No Cents $100.00 Traffic Control: Per Lump Sum: Three Thousand Dollars & $2,500.00 $106,824.25 $2,300.00 No Cents $3,000.00 $3,000.00 Sidewalk Ramps (D. Back Ln.) Per Each: Three Thousand No NAJOB10137231Spec101372301.00B.doc B-3 Dollars & Cents $850.00 $10,200.00 10. 1 L.S. Storm Water Management: Per Lump Sum: One Thousand Dollars & No Cents $1,000.00 $1,000.00 11. 1 L.S. Payment, Performance, Maintenance Bond: Per Lump Sum: Thirteen Thousand Eight Hundred Ninetv Dollars & No Cents $13,890.00 $13,890.00 TOTAL AMOUNT BID PAVING $ 1,334,105.75 GRAND TOTAL AMOUNT BID $ 1,334,105.75 NAJOB\013723\Spec\01372301.00B.doc B-4 PART B - PROPOSAL (Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within ten (10) calendar days after issue of the work order, and to complete the contract within 45 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. X B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. N:\JOB\013723\Spec\01372301.00B.doc B-5 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, Mari Sin ola & o Excavatinq, Inc. -BY' i me Micha inacola, Vice President Address 10950 Research Road Frisco, TX 75034 Telephone: (214) 387-3900 (Seal) Date: August 15, 2005 N:\JOB\013723\Spec\01372301.00B.doc B-6 I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 11 EA $ 2,000 $22,000.00 MID -BLOCK RESIDENTIAL 12 EA $ 2,000 $24,000.00 CHANGE OF DIRECTION RESIDENTIAL 7 EA $ 2,000 $14,000.00 MID -BLOCK COLLECTOR 13 EA $ 2,000 $26,000.00 MID -BLOCK ARTERIAL PARKWAY 0 EA $ 2,500 $00,000.00 MID -BLOCK ARTERIAL MEDIAN 1 EA $ 2,500 $2,500.00 RELOCATE EXISTING LIGHT 0 EA $ 1,500 $0,000.00 Subtotal $88,500.00 City's Cost $00,000.00 Developer's Subtotal $88,500.00 10% Contingency $8,850.00 Project Total $97,350.00 Adjacent Developer's Cost $00,000.00 Developer's Cost $97,350.00 2% Inspection Fee $00,000.00 CFA CODE #2005114 DEVELOPER'S COST: $97,350.00 SENDERA RANCH, PHASE VI -SECTION IB Fort Worth, Texas August 30, 2005 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the city the amount shown below prior to the City starting its design efforts. 4. Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $97,350.00 SENDERA RANCH, PHASE VI -SECTION IB August 27, 2005 FORT WORTH, TEXAS CFA CODE #2005114 Page II of Exhibit C III "STREETLIGHTS" INTERSECTIONS SIERRA VISTA WAY & SAN FELIPE TRL 1 SAN FELIPE TRL & COYOTE TRL 1 SAN FELIPE TR & PONCHO IN 1 SILKWOOD DR S ROSARIO IN 1 SILKWOOD DR & PONCHO IN 1 SAND HILLS DR & ROSARIO IN 1 MEXICALI WAY & ROSARIO IN 1 MEXICALI WAY & BAJA DR 1 ESPERANZA DR & STREET A 1 DIAMONDBACK IN 6 SILKWOOD DR 1 DIAMONDBACK IN & BAJA DR 1 MID BLOCK RESIDENTIAL SAN FELIPE TRL 3 SILKWOOD DR 2 SAND HILLS DR 1 MEXICALI WAY 1 ROSARIO LN 1 PONCHO LN 2 BAJA DR 1 COYOTE TRL 1 CHANGE OF DIRECTIONS SIERRA VISTA WAY_ 1 SAND HILLS DR 1 SAN FELIPE TRL 1 MEXICALI WAY 1 ROSARIO IN 1 FIREBUSH IN 1 KACHINA IN 1 MID BLOCK COLLECTOR DIAMONDBACK IN 13 MID BLOCK MEDIAN SENDERA RANCH BLVD & DIAMONDBACK LN 1 Page III of Exhibit C IV STREET NAME SIGNS The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following fourteen (14) intersections at a cost to the Developer of $1,400.00: Diamondback Lane & Sendera Ranch Blvd Diamondback Lane & Esperanza Dr Diamondback Lane & Coyote Tr Diamondback Lane & Baja Dr Diamondback Lane & Silkwood Dr (NW) Diamondback Lane & Silkwood Dr (SE) San Felipe Tr & Coyote Tr San Felipe Tr & Sierra Vista Way Pancho Lane & San Felipe Tr Pancho Lane & Silkwood Dr Mexicali Way & Baja Dr Mexicali Way & Rosario Lane Rosario Lane & Sand Hills Dr Rosario Lane & Silkwood Dr Sendera Ranch, Phase VI, Section 1 B CFA code: 2005114 August 27, 2005 i b NOT TO SCALE LOCATION MAP SENDERA RANCH PHASE VI - SECTION 113 Carter u Burgess CARTER S BURGESS, INC. FOIT WOUH, Tx 76m I6171735- 6 PROJECT NO. 013723.010.1.0630 LLULIVU SWAY/ 50' ROW /I '. 55' B/ B )WAY/ 80' ROW P. 4' S I DEWALK ..................• HOMEBUILDER),r P. 4' S I OEWALK DEVELOPER) ITS OF PROJECT ----- ----- 11 �p12 IJ /I 15 16 17 18 I 2 I J I / I 5� I Z6 _____________ _9 pQ j1 27 6 11 2 _ ___-_.-_.-_____ _ 28 1 Z --- -. -,.. ..� ._ ... .._ _ .. J rn --___ N Jo s /I '7 m Is ' . _ _ _ _ _ _. _ . _ _ _ _: � 52 J 16 2 f J JJ 2 a peiG}1 Ep SS Je 5 35 7 I 9 1 PL9. II .0 1T =R J 10 _ 13 • I I I ��sr /2 k I (N) SCALEl l" = 300' I I I STREETS EXHIBIT 'B' SENDERA RANCH PHASE VI - SECTION 113 AM1�Oµ C!`t4w Bul CARTER & BURGESS, INC- TT7 MMN STREET FOIrr WORM, TX 761U2 (817) 735- 6= PROJECT NO. 013723.010.0630 56iY(F,ri avol 15 r p•, • - r 21 LEGEND P. 2 9' B/ B K1111A DWAY/ 50' ROW )P. 55' B/B ffm %DWAY/ 80' ROW P 4' S I DEWALK ..................•. HOMEBUILDER) P. 4' S I DEWALK DEVELOPER) ITS OF PROJECT N SCALEg l" = 300' STREETS EXHIBIT 'B' SENDERA RANCH PHASE VI - SECTION 113 Bu CARTER & BURGESS, INC. m nwN SMEr FORT WORTH, U 76102 PROJECT NO. 013723.010. 1. 0630 L L V L I • V �P. STORM DRAIN LINE ,P. INLET P. MANHOLE P. HEADWALL ST. STORM DRAIN LINE ITS OF PROJECT r 0 N SCALE1 1" = 300' n,.NCH � a '�• SE • } ------------- •----t I 12 13 14 15 / -- --- -- 6 l7 IB I 2 7 14 5 -�J I I _.__.__r._ 26 9 IR. 71 z2 2] z9 _ -- -- ------ 27 B 1�� z0 t ----' '--- - -•- ze 7 /t+om 2 _ ________-__ 30 5 14 7 in is _ __----- _-____• !z 7 16 33 .. .. ...., ., F «rilc yAg\0� >r 75 s l7 a 9 z 14 r�SRE _ - _ di'r � z1• •� vr� , j_ ..._... 12 G z • 4 50 I I I STO RM D MI N a""` / EXHIBIT 'B—l' SENDERA RANCH PHASE IV - SECTION I C=Hhw s CARTER & BURGESS, INC. m MAN SOM FORT WORTH,TX 76102 1817) 735-6000 PROJECT NO. 013723.010. 1.0630 PN�S� O.E:�•42 = zs r z rn V1 � m LEGEND )P. STORM DRAIN LINE )P. INLET T )P. MANHOLE -� )P. HEADWALL 0 ST. STORM DRAIN LINE _ _ = :g= SITS OF PROJECT (N) SCALE1 1" = 300' 46 17 ° 5 7� c� 2 19 �� 3 24 7J Z4' 75 as 50 z sl I 19 70 71 94 57 17 /B ' 43 909�IG YppY. I ''J 11 Iz 40 J6 Ji 38 J fN_ MH 4 0' 19 z e l e 3 5 7� 24— 10' /> 70 4 6 6' 52 71 5 16 r, 7 Jl 77 6 15 B 34 S0 zJ 7 9 n6N2�..6V 35 /1 J6 �iP 29 z1 13 B to Hk4J� j10• i�• 37 78 ? �. l7 9 11 39 18 77 76 25 _ .... 11 to !z WA I 9 I IO I 11 l /7 l /J ® IS 16 I l7 ( le I l9 l ZO 717z O 71 25 26 ` STORM DRAIN EXHIBIT 'B-l' SENDERA RANCH PHASE IV - SECTION 1 Cmrhw Burgess CARTER & BURGESS, INC. m MAIN STREET FORT WORTH, TX 76102 16�71735-6000 PROJECT NO. 013723.010. 1.0630 —11 a — .. LLV LIrLJ '. SINGLE STREET LIGHT ,T. SINGLE STREET LIGHT O N STEEL POLE WITH STREET STOP SIGNS ATTACHED) STREET SIGN SCALE• 1 " = 300' T. STREET SIGN Q w L�.�.•.-..� .-.I TS OF PROJECT SOP, c z g SI j;. .... � ........,.�...-....-..:.. t.. 1I'k '+:;;ter?i�.;ia„„...,. .1.... ..... 13 } ) 1stN 6�vD sooj) p, E• SBB2 s 20 29 7 I 29 6 y f! !� 5 /I !I AM U 22 2! 21 7 i STREET LIGHTS EXHIBIT 'C' SENDERA RANCH PHASE VI - SECTION 113 Canter :: Burgess CARTER & BURGESS, INC. 777 hovel STREET FORT WORTH, TX 76102 (617) 735-6000 PROJECT NO. 013723.010. 1.0630 oerr in nr TT i - 1, . �. � P E• �\ , '40 20 f V �Y1 aSP�(N R I6 17 1 /i) If 20 zi T2 LEGEND SINGLE STREET LIGHT SINGLE STREET LIGHT O EEL POLE WITH STREET 3P SIGNS ATTACHED) STREET SIGN STREET SIGN OF PROJECT i PUBIC PAM. ! f P,00 r. Poky - (N) SCALE, )" = 300' STREET LIGHTS EXHIBIT 'C' SENDERA RANCH PHASE VI - SECTION 1B Carter r, Burgess CARTER & BURGESS, INC. 181 T wx WORK nc ra PROJECT NO. 013723.010. 1.0630