HomeMy WebLinkAboutContract 32500COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.sLA
f
WHEREAS, D.R. Horton — Texas, Ltd. , hereinafter called "Developer", desires
to make certain improvements to Mark IV Parkwav, an addition to the City of Fort
Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
E. The contracts for the construction of the public infrastructue shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
Mark IV Parkway -Newer CFA 4% and Utilities 08 08 05 (2)
F.
L"
I.
J
K.
The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damazes are caused, in whole or in part, by the allee-ed neelizence of
the Citv of Fort Worth, its officers, servants, or emplovees.
Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
Mark IV Parkway -Newer CFA 4% and Utilities 08 08 05 (2)
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B L and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, 131,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $351,519.58.
Mark IV Parkway -Newer CFA 4% and Utilities 08 08 05 (2)
SUMMARY OF
COST
Mark IV Parkway
Item
Developer City Cost
Total Cost
Cost
A. Construction
$ -
1. Streets
$313,857.75
$313,857.75
2. Storm Drainage
$16,113.00
$16,113.00
3. Street Lights
$8,250.00
$8,250.00
4. Street Name Signs
$100.00
$100.00
B. Engineering Design
$
C. Construction Engineering
and Management by DOE
(4%)
$13,198.83
$13,198.83
TOTALS
$351,519.58 $ -
$351,519.58
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
Mark IV Parkway -Newer CFA 4% and Utilities 08 08 05 (2)
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, d said veIeAr,,�'
has executed this instrument in triplicate, at Fort Worth, Texas this the *)day of ..
, 2005.
Approval Recommended:
NO M&C RE-QUIRED
`IATTEST:
CU
`
Marty Hendrix
ATTEST:
Corporate Secretary
Transportation and Public Works
Department
Robert Goode, P. E.
Director
it fFrtWA
Marc Ott
Assistant City Manager
DEVELOPER
D.R. Horton — Texas, Ltd.
By: D. H on, Inc. — its Auth. Agent
B
Don E. Allen — Assistant Secretary
RECEIVED
Mark IV Parkway -Newer CFA 4% and Utili&es 08 08 05 (2)
0If d
C&B No. 013805.010
CFA Estimate for:
MARK IV PARKWAY
June 20, 2005
STREET IMPROVEMENTS
1Item No. DESCRIPTION
1
7" Pavement w/ 7" Curb
2
6" Pavement w/ 6" Curb
3
Lime Stabilized Subgrade
4
Excavation
5
Lime Subgrade
6
4' Wide Sidewalk
7
Remove Existing Asphalt Pavement
8
Remove Existing Curb
9
6" Curb and Gutter
,TOTAL
- STREET IMPROVEMENTS
QTY
UNIT
PRICE
AMOUNTI
8,935
S.Y.
25.00
223375.00
234
S.Y.
22.00
5148.00
9,917
S.Y.
2.25
22313.25
1,653
C.Y.
3.50
5785.50
149
TON
105.00
15645.00
2,560
L.F.
14.00
35840.00
750
S.Y.
2.00
1500.00
633
L.F.
4.50
2848.50
187
L.F.
7.50
1402.50
$313,857.75 11
GAJOB\013805\EST\CFAMARKIV20050808.x1s Page 4 of 5
C&B No. 013805.010
CFA Estimate for:
MARK IV PARKWAY
June 20, 2005
STORM DRAIN SYSTEM
Item No. DESCRIPTION
QTY
UNIT
PRICE
AMOUNT
1
24" RCP
81
L.F.
44.00
3,564.00
2
21 " RCP
48
L.F.
40.00
1,920.00
3
STD 10' Rec Curb Inlet
3
EA.
2,500.00
7,500.00
4
Const. 4'MH Top of Ex. Drop Inlet
1
L.S.
2,000.00
2,000.00
5
Remove & Dispose of Exist. Drop Inlet
1
L.S.
1,000.00
1,000.00
6
Trench Safety
129
L.F.
1.00
129.00
(TOTAL - STORM DRAINAGE SYSTEM $16,113.00 1
GAJOB\013805\ESTICFAMARKIV20050808.x1s Page 3 of 5
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS
0 EA $ 2,000
$0,000.00
MID -BLOCK RESIDENTIAL
0 EA $ 2,000
$0,000.00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2,000
$0,000.00
MID -BLOCK COLLECTOR
0 EA $ 2,000
$0,000.00
MID -BLOCK ARTERIAL PARKWAY
0 EA $ 2,500
$0,000.00
MID -BLOCK ARTERIAL MEDIAN
3 EA $ 2,500
$7,500.00
RELOCATE EXISTING LIGHT
0 EA $ 1,500
$0,000.00
Subtotal
$7,500.00
City's Cost
$00,000.00
Developer's Subtotal
$7,500.00
10% Contingency
$750.00
Project Total
$8,250.00
Adjacent
Developer's Cost
$00,000.00
Developer's Cost
$8,250.00
REVISED 8/09/2005
2% Inspection Fee
CFA CODE #2005093
DEVELOPER'S COST: $8,250.00
MARK IV PKWY STA 110+95.00 TO
134+61.17
Fort Worth, Texas
August 9, 2005
PAGE I OF Exhibit C ----
1 1„
o� r'J
II. STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the
approximate locations shown in Exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2. Streetlights on residential and /or collector streets can be installed
using overhead or underground conductors with the approval of the Director
of Transportation and Public Works.
3. The City will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to
pay the city the amount shown below prior to the City starting its design
efforts.
4. Streetlights on arterial streets shall be installed with underground
conduit and conductors.
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for the
installation of any electrical transformers required for the proper
operation of the street lights
6. The estimated cost of this street light installation is detailed on page 1
of exhibit C and is summarized below, the street lights will remain the
property of, and will be maintained by the City of Fort Worth.
DEVELOPER'S COST: $8,250.00
MARK IV PKWY STA 110+95.00 TO 134+61.17
July 30, 2005
FORT WORTH, TEXAS
CFA CODE #2005093
Page II of Exhibit C
III
"STREETLIGHTS"
MID BLOCK ARTERIAL MEDIAN
MARK IV PARKWAY 3 (DOUBLE ARMS)
MARK IV PKWY STA 110+95.00 TO STA 134+61.17
Page III of Exhibit C
'; � ;✓�� ';�; a ._ .�
IV
STREET NAME SIGNS
The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following one (1) intersection at a cost to
the Developer of $100.00:
Mark IV Pkwy & (un-named street)
Mark IV Pkwy
CFA code: 2005093 July 27, 2005
i
CEDAR
I � ANYON
I �
aWESTERN CENTER BOULEVARD 1 NOT TO SCALE
r GLOBE I zl I
SELL
GLEN
CORRIN
J IFAGAN
GILL \
0° I TYSON
AMERICANA Z
CONTINEN1+4L c�
m 7d
w
it
/ U
BLUE MOUND I
\ 4
S EETWOOD
1a I I I
CHADWICK
RE
I
PROJECT
.00ATION
I11
35�1/
8
1
z 28
o J,
�0
O
I
LD
)MB
SAMSOM L..._
11
�I
'e I
�I
1
Q: 1
I�
� � 1
a �
r — _ 820 — e
NO--'9AST
n / i
FlYll
Vvis,
LOCATION MAP
_�.
MARK IV PARKWAY
-
rre 11n-t-" nn Tn IIa.t-61 17
Carter Burgess
CARTER & BURGESS, INC.
777 MAIN STREET
FORT WORTH, TX 76107
(817( 775-6000
PROJECT NO. G13510.030.1.0001
40
43442,41 39
38
T\
STRLL`f i%-----------
01
U
-I
. LEGEND
PROP. 28' B/ B VIIIA
ROADWAY/ 1 1 0' ROW
PROP. 4' S I DEWALK
(BY HOMEBUILDER)
PROP. 4' S I DEWALK
(BY DEVELOPER)
LIMITS OF PROJECT
StTREET
32
33
34
0 35 nON
36 SCALE, 1" = 200'
B
/07
\11
!09
STREETS
EXHIBIT 'B'
MARK IV PARKWAY
STA ll0 + 95.00 TO 134 + 61.17
Carter Burgess
CARTER & BURGESS, INC.
777 kWN STREET
FORT WORTH, TX 76102
IM 7) 735-60M
PROJECT NO. 013510.030. 1.0001
4L
MEET 27,
C.
S,
LEGEND
PROP. STORM DRAIN LINE
PROP. INLET
PROP. MANHOLE
PROP. HEADWALL
EXIST. STORM DRAIN LINE
LIMITS OF PROJECT
r
40
43 42 41 3339
wo
34
N
38 CCU 35 no
36 SCALEal" = 200'
37
9
04- 107
108
109
ol
STORM DRAIN
EXHIBIT 'B-l'
MARK IV PARKWAY
STA 110 + 95.00 TO 134 + 61.17
Carter V, Burgess
CARTER & BURGESS, INC.
777 MAIN STREET
roirr WORTH' TX 76102
J8171 735-6000
PROJECT NO. 013510.030.1.0001
. . . . . . . . . . . . . .
48
8-r�a��ET 27
---'
|�(����
����..�
PROP. 20OW HP5 SINGLE
STREET LIGHT
EXIST. 200Y HP3 SINGLE
STREET LIGHT (ON STEEL
:'OLE)
]K|5T. 10OW HP3 SINGLE
)TREET LIGHT (ON STEEL
"OLE WITH STREET AND
;TOP SIGNS ATTACHED)
'R0P. STREET SIGN
lK|3T. STREET SIGN
|M|TS OF PROJECT
'
^`/ ^�141 �_��
/ / 3m
38
/