HomeMy WebLinkAboutOrdinance 19526-01-2011Ordinance No. 19526-01-2011
AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS
IN THE WATER CAPITAL PROJECTS FUND IN THE AMOUNT OF $50,673.53 AND IN
THE SEWER CAPITAL PROJECTS FUND IN THE AMOUNT OF $14,915.33, FROM
AVAILABLE FUNDS, FOR THE PURPOSE OF FUNDING THE STORM WATER UTILITY
PROJECT; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE
CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN
CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS:
SECTION 1.
That in addition to those amounts allocated to the various City departments for Fiscal Year 2010-2011 in the
Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of $50,673.53 and in the Sewer Capital Projects Fund in the
amount of $14,915.33 from available funds, for the purpose of funding the Storm Water Utility Project -
Berkshire-Hallmark Drainage Improvements, 150 Victorian Drive Drainage and Wedgwood Storm Drain
Deleted.
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way
impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining
provisions shall be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance No.19355 and all other ordinances and appropriations
amending the same except in those instances where the provisions of this ordinance are in direct conflict
with such other ordinances and appropriations, in which instance said conflicting provisions of said prior
ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
A RO S TO FORM AND LEGALITY:
r
Assistant City Attorney
ADOPTED AND EFFECTIVE: January 25, 2011
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 1/25/2011 -Ordinance No. 19526-01-2011
DATE: Tuesday, January 25, 2011 REFERENCE NO.: **C-24686
LOG NAME: 20AMEND1 BERKSHIRE HALLMARK
SUBJECT:
Authorize Amendment No. 1 in the Amount of $262,746.60 to City Secretary Contract No. 35581, an
Engineering Agreement with Slater Engineering, Inc., for the Storm Water Utility Project Berkshire-Hallmark
Drainage Improvements and Adopt Appropriation Ordinance (COUNCIL DISTRICT 6)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of $65,588.86 from the Water and Sewer Operating Fund to the Water Capital
Projects Fund in the amount of $50,673.53 and the Sewer Capital Projects Fund in the amount of
$14,915.33;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of $50,673.53 and the Sewer Capital Projects Fund in the
amount of $14,915.33 from available funds; and
3. Authorize the City Manager to execute Amendment No. 1 with Slater Engineering, Inc., in the amount of
$262,746.60 to City Secretary Contract No. 35581, thereby, revising the total contract cost to
$684,551.60.
DISCUSSION:
The Storm Water Management Program was established to reduce flooding in Fort Worth, preserve
streams, minimize water pollution and to operate the storm water system in a more effective manner to
fully comply with state and federal regulatory requirements. This will be accomplished by infrastructure
reconstruction and system maintenance, master planning, enhanced development review, and increased
public education and outreach.
On September 22, 2009, (Ordinance No. 18838-09-2009) the City Council approved the issuance and
sale of $45,000,000.00 in revenue bonds for Storm Water Capital Project Bond 2009 Fund, to fund atwo-
year storm water capital project program.
A Request for Qualifications (RFQ) to provide drainage design was issued by the City in January of 2006.
Twenty-four design consultants submitted statements of qualifications, including Slater Engineering, Inc.
Slater Engineering, Inc., was selected to provide design services for drainage improvements for the
Berkshire-Hallmark Drainage Improvements and Wedgwood Storm Drain project (City Project No. 00480).
On June 12, 2007, (M8C C-22173) the City Council authorized the City Manager to execute an
engineering agreement with Slater Engineering, Inc., (City Secretary Contract No. 35581) in the amount of
Logname: 20AMENDI_BERKSHIRE_HALLMARK Page 1 of 3
$421,805.00 for the design of Berkshire-Hallmark Drainage Improvements.
The need for additional design scope, including water and sewer, has been identified. The original
contract for the Berkshire-Hallmark project was based on recommendations from a drainage study
completed in 2005. During design, the 2006 Stormwater Management Design Manual criteria was used
and resulted in a change in the conceptual alignment for the Berkshire-Hallmark area and extension of the
project limits for both the Berkshire-Hallmark and Wedgwood areas. In addition, the City now requires
subsurface utility engineering and traffic control plans on all projects, which were not included in the
original contract. Amendment No. 1 will provide the following: alignment study for the Berkshire-Hallmark
subdivision, subsurface utility engineering, traffic control plans, additional survey, additional reproduction,
additional design services for the Wedgwood subdivision, and additional design, bid phase, and
construction phase services for a storm drain and water line design along Alava Drive. The Alava Drive
portion of the project is new and was not part of the original contract.
Slater Engineering, Inc. proposes to perform the design services for a lump sum fee of $262,746.60. City
staff considers the fee to be fair and reasonable for the scope of services proposed. The estimated
construction cost of the total project is $8,620,000.00. The project includes four project locations and it is
anticipated will be bid as four separate bid packages. The construction estimate for each location is as
follows: Berkshire-Hallmark ($4,920,000.00), Victorian Drive ($50,000.00), Wedgwood ($3,040,000.00),
Alava Drive ($610,000.00).
Slater Engineering, Inc., agrees to maintain its initial M/WBE commitment of 21 percent that it made on
the original agreement and extend and maintain that same M/WBE commitment of 21 percent to all prior
amendments up to and inclusive of this Amendment No. 1. Therefore Slater Engineering, Inc., remains in
compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the
Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its
company.
This project is located in COUNCIL DISTRICT 6, Mapsco 89Q, 89U and 103C.
FISCAL INFORMATION /CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations
and the adoption of the attached appropriation ordinance, funds will be available in the current capital
budgets, as appropriated, of the Storm Water Capital Project Bond 2009 Fund, the Water Capital Projects
Fund, and the Sewer Capital Projects Fund and in the current operating budget, as appropriated, of the
Water and Sewer Fund.
FUND CENTERS:
TO Fund/Account/Centers
1 & 2) P253 476045 6061700480XX
1 & 2)P258 476045 7061700480XX
2)P253 531200 606170048030
2)P253 531200 606170048051
P258 531200 706170048030
CERTIFICATIONS:
Submitted for City Manager's Office by;
FROM Fund/Account/Centers
$50,673.53 1) PE45 538040 0609020
$14,915.33 1) PE45 538040 0709020
$45,903.53 3) P253 531200 606170048030
4 770.00 ~ P253 531200 606170048051
$14,915.33 3) P258 531200 706170048030
3)P227 531200 206280048030
3)P227 531200 206280048051
Fernando Costa (6122)
$50,673.53
$14,915.33
$45,903.53
4 770.00
$14,915.33
$123.283.74
$73,874.00
Logname: 20AMENDI_BERKSHIRE_HALLMARK Page 2 of 3
Orictinating Department Head:
Additional Information Contact:
William Verkest (7801)
Chad Simmons (8178701129)
Logname: 20AMENDI_BERKSHIRE_HALLMARK Page 3 of 3
MAYOR AND COUNCIL COMMUNICATION MAP
Berkshire-Hallmark Storm Drain Extension
�.i"'kl , t,K 1 f : + +. Tbt+'h`A*Y�kx.,$FS'.�k3'' t W,, do M c,p'aF .. „� a.
S -`
• . / + "�'s s+a 4 :s' '",..177,-...-,.--..,..,. +, 19 ti„�, �,+"""`xi , t- �+C A ''.� '+, ,14i*�N
' C C.. °�' � . ▪ ,`� 7, '�
—4
'^.� � �` ,� � � -, briar ake ,, .�` '� y_ ii -..EB �' ��
�,��' "����°� -31,-,t,-Green �— ��
� 2# ;0
�. _ . LASG0�I�62D O_
._ EDGE L ' � �� k` �� €NGBLAD DR' ' _ tra
`0
4., U _
.h3� ti* -w. �. ..y `*'.i '&r> eit �r� ,^- �:• '-ice- �' z '^�/� --1,00'..-':, /`�"
%�,� l Y� + fie, `°i • �
�� *'-ry�1 * � '^nj' � � Sly"V+ 1 .t '..:-.,,Y,-,,,;."::'4,''-',' �,w Wit, d I7#LISA ®L�/D
'� rr.. , . # �, ?�a e rc w.s � ",7-`:";';,',"..:1-'-'-' „�,.0 •x` ail- - ”„
-�'" �t "110.. °d �' �' �- JOEL EAST RD -t
+�, G
h.Y M.N- '»S a T�'� 3d.. .r„ ,Y.. '-SY, � {t,,':V' �,y S N' �,,,r
}
1`-
I k
,,y 3 ,x`�" ®" > Q
. ' `N'''S`a.� �5. F T� 5t T i 3} 'b ��Y .V}� - �,y s { w- {'�,`�/ - � n LL Q >,
• z� '.- /.,a. 2s �,a'-.'—'.tom ; N ..� ...,.. - _ li - c----.-- ti,
£
., @> 13
$ y �*° p'. F T 9 r: �'�'�`II'�� �F it caw N V/ 4f' . �:3#4".
g ; Y ;ti; x c^s.a 'L.��' - „, .' r cn�" C) '� 0 EN-- RD ,..4.
ties .+P f �.. !SAL'ffi icy+ O • O ,
t"
cn�BER�SIIR N LN
e „"' - ,: 1-- '' -04.:''',,", . ., - - ki.,...4,-t,,,, _AP , p •u)-
t
1
,� 0 Ft
,e �
r <_ i 3,000 1,500 0 3,00
.
_j P
«�„ :D �' 300 150 0 300 Ft., ..,„ Eill.„ , ....,
N iiiiit
DETAIL OF PROJECT LOCATION Council District 6
Project No. 00480