HomeMy WebLinkAboutContract 33830-A2 AMENDMENT NO. 2 2 C
STATE OF TEXAS S CITY SECRETARY CONTRACT NO. J v D _
(M&C Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Teague Nall and
Perkins, Inc. , (Engineer) made and entered into City Secretary
Contract No. 33830, (the Contract) which was authorized by the City
Council by M&C C-21582 on the 25th day of July, 2006 and subsequently
revised by one previous amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Rehabilitation Contract LXXIV (74) .
WHEREAS, it has become necessary to execute Amendment No. 2 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1 .
Article I, of the Contract is amended to include the additional
engineering services specified in M&C C-23595, adopted by the City
Council on the 16th day of June 2009, and further amplified in a
proposal letter dated March 2, 2009, copies of which are both attached
hereto and incorporated herein. The cost to City for the additional
services to be performed by Engineer total $34, 921 .00.
2 .
Article II, of the Contract is amended to provide for an increase
in the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid
by the City for all work and services shall not exceed the sum of
$245, 926.00.
OFFICIAL RECORD
CITYSECRETARY
FT:9h+0 TH,TX
P02:44 I "I
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the � day of 2009 in
Fort Worth, Tarrant County, Texas.
ATTEST: - C_
n-�bul-'�k/v\
Cont
)ract Autnorizatioa
Marty Hendrfhc
City Secretary Date
APP VAL RE NDED: APPROVED:
S. Frank Crumb, P.E . Fernando Costa
Director, Water Department Assistant City Manager
TEAGUE NALL AND PERKINS, INC.
Enginee
,,__,BY:
Name:Ty Aiton, P.E. , Principal
1100 Macon Street
Fort Worth, TX 76102
APPROVED AS TO FORM AND LEGALITY:
Assistant ney
-2-
OFFMAL RECORD
CITY SECRETARY
FT•WORTH,TX
V16G1. itevlew rdgr, 1 Vl
Official site of the City of Fort Worth,Texas
CITY COU NCI L AGENDA FORH
COUNCIL ACTION: Approved on 6/16/2009 -Ord. No. 18667-06-2009
DATE: 6/16/2009 REFERENCE NO.: 'C-23595 LOG NAME: 60SS74A2-TNP
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Amendment No. 2 in the Amount of$34,921.00 to City Secretary Contract No.
33830 with Teague Nall and Perkins, Inc., for Sanitary Sewer Rehabilitation Contract
LXXIV on Eldridge Street, Bonnell Avenue, Alleyway Between Bonnell Avenue and
Kilpatrick Avenue and Alleyway Between EI Campo Avenue and Pershing Avenue and
Adopt Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of$34,921.00 from the Water and Sewer Fund to the Sewer Capital Projects
Fund;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Sewer Capital Projects Fund in the amount of$34,921.00, from available funds; and
3. Authorize the City Manager to execute Amendment No. 2 in the amount of$34,921.00 to City
Secretary No. 33830, with Teague Nall and Perkins, Inc., for Sanitary Sewer Rehabilitation Contract
LXXIV for additional engineering services thereby increasing the contract amount to $245,926.00.
DISCUSSION:
On July 25, 2006, (M&C C-21582) the City Council authorized the City Manager to execute an
Engineering Agreement with Teague Nall and Perkins, Inc., in the amount of$202,705.00 for Sanitary
Sewer Rehabilitation Contract LXXIV (74) (Project 00360).
The original scope of services provided design services for the replacement of deteriorated sanitary
sewer laterals and mains located in all Council Districts.
The Agreement was subsequently revised by Amendment No. 1 in the amount of$8,300.00,
administratively approved by the City Manager on September 24, 2007, that provided for additional
survey on the project.
Amendment No. 2 will provide compensation for the following:
Additional design and survey services for the replacement of severely deteriorated sanitary sewer
located on the following streets:
Street From To
Eldridge Street Kilpatrick Avenue Bonnell
Avenue
Bonnell Avenue Eldridge Street Driskell Street
Alleyway between Bonnell Avenue and Bryant Irvin RoadHorne Street
Kilpatrick Avenue
Alleyway between Pershing Avenue Bourine Street Hervie Street
ittp:Happs.cfwnet.org/council—packet/mc—review.asp?ID=l 1599&councildate=6/16/2009 6/16/2009
d&C Review Yage 2 of 1
Additional easement preparation on the project; and
Additional printing on the project.
Teague Nall and Perkins, Inc., proposes to perform the necessary additional design work for a lump
sum fee of$34,921.00. City staff considers this fee to be fair and reasonable for the scope of services
proposed.
Additional M/WBE participation is not necessary on this amendment due to the fact that the
requested amount is less than $50,000.00.
The improvements proposed in this amendment are located in COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations and adoption of the attached appropriation ordinance, funds will be available in the
current capital budget, as appropriated, of the Sewer Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
1 U22 1) PE45 538040 0709020 $34.921.00
P258 476045 7071700360ZZ X34,921.00
3) P258 531200 707170036033 $34,921.00
2) P258 531200 707170036033 $34,921.00
Submitted for City Manager's Office by: Fernando Costa (6122)
Originating Department Head: S. Frank Crumb (8246)
Additional Information Contact: Rakesh Chaubey (6051)
ATTACHMENTS
� 'ISS74A2-TNP AOC.doc
f:,SS74A2-TNP MAP 1.pdf
69SS74A2-TNP MAP 2.pdf
60SS74A2-TNP MAP 3.pdf
ittp://apps.cfwnet.org/council packet/mc_review.asp?ID=11599&councildate=6/16/2009 6/16/~009
X-? TEAGUE NALL AND PERKINS
Civil Engineering Surveying Landscape Architecture Planning
March 2, 2009
Ms. Susan Schwinger, P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton
Fort Worth, Texas 76102
Re: Sanitary Sewer Rehabilitation Contract 74
Amendment No. 2
TNP No. FTW 05313
Dear Ms. Schwinger:
Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract
based on additional services requested. The following is a brief description and cost for the
additional services provided on this project:
Additional Field Services
Based on our recommendations and subsequent meetings with the City, several lines need
additional design effort to complete this project. The following are the lines and a general
description of work required.
■ L-2150—A recommendation by City Staff per the M-272D2 drainage study was to
include replacement of the segment between Sta. 11+00 and 17+20. Adding this to
our project will join the east and west sections that we are currently designing for
replacement;
■ L-6665— In order to avoid the replacement of a 26' deep manhole and sewer line,
750 feet of line(Alternate#3)along the creek will be re-aligned(requires additional
easement);
■ L-2139—This item includes replacement of approximately 410 feet of pipe upstream
from the section included in this project where the existing concrete pipe shows
cracking in several locations and an obstruction 292 feet from the upstream
manhole where TV inspection had to be abandoned;
■ L-2876 — add an additional 80 feet of pipe to re-align the sewer line and avoid
damaging or destroying the large oak tree at the Ridglea Country Club entrance;
■ L-4523—This sewer main will be realigned down Driskell to Bonnell and within the
right-of-way to an existing line in a shorter distance than if replaced in its current
alignment. Seven services will require realignment to the sewer main in the street.
Future service and maintenance of this line will not require entry into private
property.
■ L-2188 — Add an additional manhole in Curzon Avenue to provide for future
maintenance.
1100 Macon Street •Fort Worth,Texas 76102•817.336.5773 phone•817.336.2813 fax
www.tnp-online.com
Ms.Susan Sch%Mnger,PE,March 2,2009,Page 2 of 2
Additional Design Survey and Easement Documents.......................................... $ 14,490
Additional Engineering Design............................................................$ 16,283
(Based on an additional construction cost of$260,000 x 7.4%x.85%per original contract)
Meetings..............................................................................................$ 3,360
(Based on an additional 24 meetings at$140 per meeting)
Printing................................................................................................$ 717
Subtotal Additional Engineering ........................................................................... 20,431
Total Contract Amendment No. 2: $ 34,921
Summary of Contract Fee:
Original Contract Amount: $ 202,705
Amendment No. 1: $ 8,300
Amendment No. 2: $ 34,921
Revised Contract Amount $ 245,926
Thank you for consideration of this contract amendment request. If you have any questions, please
do not hesitate to call me.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
Mich I Wellbaum, P.E.
Copy: Mr. Ty Hilton, PE -TNP
\\corpdst\projectsVcRVtw05313\docs\contract\_contract amend 01.doc