Loading...
HomeMy WebLinkAboutContract 33830-A3 AMENDMENT NO. 3 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.33$3o- A3 (MSC Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Teague Nall and Perkins, Inc. , (Engineer) made and entered into City Secretary Contract No. 33830, (the Contract) which was authorized by the City Council by MSC C-21582 on the 25th day of July, 2006 and subsequently revised by two previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sevier Rehabilitation Contract LXXIV (74) . WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated April 27, 2010, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $7,500.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $253,426.00. OFFICIAL RECORD{ CITE SECRETARY FT WORTH.TX All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 1 �' day of 2010, in Fort Worth, Tarrant County, Texas. p4'Q�j1n �p��oR 01 ATTEST: pr Qvo X00 d a 0 Marty Hendrix * o* City Secretary0 0000 4Y 4Y PRn$i�► �iED xx AP ED• _-- S. Frank Crumb, P. Fernando Costa Director, Water D ent Assistant City Manager fvr TEAGUE NALL AND PERKINS, INC. Engineer NO M&C r-u(-NpU�r3�� By: Name:Ty Hilton, P.E. , Principal 1100 Macon Street Fort Worth, TR 76102 APPROVED AS TO RM AND LEGALITY: Assistant Ci ttorney -2- N!" TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning April 27, 2010 Ms. Susan Schwinger, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Fort Worth,Texas 76102 Re: Sanitary Sewer Rehabilitation Contract 74 Amendment No.3 TNP No. FTW 05313 Dear Ms. Schwinger: Teague Nall and Perkins, Inc. is submitting this feeAmendment to the above referenced contract based on additional services rendered. The following is a brief description and cost for the additional services provided on this project: Additional Design Services Our original design contract,dated August 14, 2006, had a fee item for acquiring a TxDOT permit and associated traffic control plans for the M-163 sanitary sewer line crossing at Camp Bowie Blvd. and Home St. During the course of this project, sanitary sewer line M- 163 was pulled from Contract 74 and put into Contract 52, Part 1,which was much closer to construction. As scoped in our contract, we submitted traffic control plans for M-163 and obtained the required TxDOT permit. Recently,the City's traffic department has required an expansion in the scope of the traffic control plan to address City roadway issues in addition to the State Highway. Also you might notice that this contract was executed under the City's previous contract language, prior to traffic control being the responsibility of the Contractor. Due to this unforeseen requirement,Teague Nall& Perkins has incurred additional design effort to complete this project and will also be responsible for acquiring a new TxDOT permit. M-163 is the last line that the Contractor has to install before he can complete Contract 52, Part 1,so we plan on addressing the Traffic Departments comments as soon as possible to bring the project to closure. We have already met with the City's traffic department twice and anticipate 2 additional meetings to finalize the traffic control plan. For your reference and information,I have attached the traffic department's comments with this letter. The following is a breakdown of additional costs incurred for the expansion in scope. Additional Engineering Design............................................................$ 5,440 (Based on an additional effort,plan sheets and traffic stages) Meetings.............................................................................................$ 560 (Based on an additional 4 meetings at$140 per meeting) Additional TxDOT permit.....................................................................$ 1,500 OFFICIAL.RECORD CITY SECRETARY FT.WORTH,TX 1100 Macon Street•Fort Worth,Texas 76102.817.336.5773 phone• 17.336.2813 f www.trip-on[Ine.ram a Ms.Susan Schwinger,PE,April 27,2010,Page2 of 2 Total Contract Amendment No.3: $ 7,500 Summary of Contract Fee: Original ContractAmount: $ 202,705 Amendment No. 1: $ 8,300 Amendment No. 2: $ 34,921 Amendment No. 3: $ 7,500 Revised ContractAmount $ 253,426 Thank you for consideration of this contract amendment request. If you have any questions,please do not hesitate to call me. Sincerely, TEAGUE NALLAND PERKINS, INC. Tom Dayton,' E. Copy: Mr. Ty Hilton, PE-TNP „cam„c a»«4vaunvosa,�aoc�oor*s conmtwr ,mm.dw A L RECORD CRETARY RTH, TX