HomeMy WebLinkAboutContract 33830-A4 AMENDMENT No. 4 CITY SECRETAR!3i3L-�L� CONTRACT NO. TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 33830, (the CONTRACT) which was authorized by M&C C- 21582 on the 25th day of July, 2006 in the amount of $202, 705 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $8, 300 . 00 which was administratively authorized on September 24, 2007 and Amendment Number 2 in the amount of $34, 921 . 00 which was authorized by M&C C-23595 on June 16, 2009, and Amendment No. 3 in the amount of $7, 500 . 00 which was administratively authorized on September 16, 2010; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LXXIV (74) ; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 21, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $3, 600. 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $257, 026 . 00 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD 06-06-12 P03: 33 IN CITY SECRETARY Page -1- FT. WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Teague all n •Perkins, Inc. Fernando Costa Ty &1fon, P.E. Assistant City Manager Principal DATE: 4-41-Z DATE: 51Z Z S112- AP AL REC MM E S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A Douglas W. Black Assistant City Attorney IF041- pATTEST: ,o r 0000000 600 pyo M, 0 o o z� Mary J. , ser Lp I--j I o° o°* City Secretary l a00000°o°° OFFICIAL RECORD CITY SECRETARY Page -2- FT.WORTH,TX • LTi- TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning May 21, 2012 Ms. Susan Schwinger, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Fort Worth, Texas 76102 Re: Sanitary Sewer Rehabilitation Contract 74 Amendment No.4 TNP No. FTW 05313 Dear Ms. Schwinger: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services required by the City The following is a brief description and cost for the additional services that we are providing on this project: Additional Design Services The City of Fort Worth Water Dept. informed TNP at the June 1, 2010 consultants'quarterly project status meeting that the SS Rehab projects remaining for bid were being considered for State Revolving Fund (SRF) Tier II loan funding. As a result of this consideration, the Water Dept. requested TNP to submit the following exhibits: 1) USGSquad map indicating the locations of the proposed sanitary sewer improvements2) description table identifying the SS laterals and whether they were relocation or replacement lines. Per direction from the Water Dept., fie replacement lines in existing alignment will be funded by SRF and the relocated lines will be funded by the operating budget. To clarify this funding scenario, the Water Dept. requested TNP to modify the construction plan set and spec book to identify and label the replaced lines in existing alignment as Unit 1 and the relocated lines as Unit 2. This work involves labeling SS lines as Unit 1 or Unit 2 in the layout sheets and plan & profile sheets. The work also consists of adding specific TWDB (SRF Tier II Funding) language to the contract spec book, as well as, breaWng out the proposal bid items into Units 1 and 2 in the contract spec book The following is a breakdown of additional costs incurred for the expansion in scope. Label SS lines in plans, modify spec book and proposal....................$ 2,880 (Includes modified spec book and proposal-2 days each for cad tech and Ein Prepare TWDB quad map and table description.................................$ 720 (0.5 day each for cad tech and EIT) Total Contract Amendment No.4: $ 3,600 1100 Macon Streets Fort Worth,Texas 76102.817.336.5773 phone•817.336.2813 fax www.tnp-online.com Ms.Susan Schwinger, PE,May 21,2012,Page 2 of 2 Summary of Contract Fee: Original ContractAmount: $ 202,705 Amendment No. 1: $ 8,300 Amendment No. 2: $ 34,921 Amendment No. 3: $ 7,500 Amendment No. 4: $ 3.600 Revised Contract Amount $ 257,026 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALLAND PERKINS, INC. Tom Dayto P.E. Copy: Mr. Ty Hilton, PE-TNP