HomeMy WebLinkAboutContract 33939-A5 AMENDMENT NO. 5 TO AGREEMENT
FOR ARCHITECTURAL DESIGN SERVICES
GUINN ELEMENTARY SCHOOL RENOVATION
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. 33g39_A5
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Komatsu Architecture, Inc. (Architect) made and entered into City
Secretary Contract No. 33939(The Contract)which was authorized by the City Council by M&C C-21619,
the 15th day of August, 2006; and
WHEREAS, further amendment is necessary to reimburse the Architect for interiors build out part of the
project as part of the design services agreement; and
NOW THEREFORE, City and Architect, acting herein by and through their duly authorized
representatives, enter into the following agreement which amends the Contract:
1.
Article 1.1, SECTION I —SERVICES OF THE ARCHITECT, the following paragraph is added to read as
follows:
"Provide additional design and construction phase services to accommodate programmatic
changes (office layouts) and associated design services for different primary occupants of the
building. The cost of this additional service is $2,765.13. The scope of services is described more
fully in the Komatsu letter dated July 19, 2010, subject: Proposal for Add-services for Phase II —
Guinn Elementary School — Modifications per CoFW requests, which is attached hereto as
Attachment"A"and made a part of this Agreement."
2.
Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows:
"The total compensation for all of the assignments to be performed by Architect as described in
CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of
$271,302.13 plus up to$6,418.00 in reimbursable expenses. "
3.
All other provisions of this Contract which are not expressly amended herein shall remain in full force and
effect. irl, 1
EXECUTED this the day of N1 2010, in Fort Worth, Tarrant County, Texas. ,v4���1'ctitl�n�
p FOR 7`*��
KOMATSUA HI CTURE, IN APPROVED: ° o0.
o° 0
By: By: d~O 00
K,Arl 9. Komatsu', AIW Fernando Costa o d
President Assistant City Manager JJ�� o0 00d
( 4000000000 �Ay
��aanA�XR4,od
APPROVAL RECOMMENDED: RECORDED: U
By: �. � By:
William A.V est, P"irector Marty Hendrix
Transportation& Public Works Department City Secretary
APPROVED AS ND LEG M&C Not Required for this Amendment
Contract Authorization
By:
Amy J. RamieJ OFFICIAL RECORD
Assistant City Attorney CITY SECRETARY
FT.(NORTH,TX
ti,►,
KOMATSU,? S
July 19, 2010
Mr. Ronnie Clements
Architectural Services Division
Transportation and Public Works Department
City of Fort Worth
401 W. 13th Street
Fort Worth, Texas 76102
RE: Proposal for Add-services for Phase II — Guinn Elementary School —
Modifications per CoFW Requests (see attached plan sketches)
Dear Mr. Clements —
This proposal is for additional services to accommodate programmatic changes
requested by the City of Fort Worth that will affect the construction documents for
Phase II of the Guinn Elementary School Renovation and Restoration. Please see
the attached copy of the spreadsheet reflecting the cost values for the A/E services
involved. Note: per our discussions, the costs reflected here are a not to exceed
basis. Billings shall be developed based on actual hours expended by Komatsu
Architecture and by the actual amounts invoiced by KA consultants. A revised
spreadsheet will be provided with the invoicing for these additional services.
SCOPE
Architectural —the work shall include but not limited to:
1 . Modifications to the floor plans for first floors,
2. Modifications to the floor pattern plan, first floor.
2. P;ddiflcati6ns.to reflected ceiling plan, first floor,
4. Modifications to east/west building section,
5. Modifications to Room Finish Schedule
6. Modifications to Door Schedule
7. Modifications to Specifications including:
a.' Door Hardware
8. Coordination of revised power/tel/data connectivity and revised plan
layouts
9. Coordination with MEP for revised layouts of:
a. Ceiling mounted registers and grilles for HVAC,
b. Layout of power/tel/data connectivity.
KOMATSU
nRc. �J3IEc , iJpE
MEP
1. Verification of HVAC load calculations driven by floor plan revisions;
2. Revised HVAC plan per revised Architectural plan layout.
3. Revised electrical:
a. Lighting layouts,
b. Power plan layouts,
c. IT connectivity layouts.
DELIVERABLES
1. 95% Resubmittal of plans and specifications for review.
2. Submittal of 100%sealed and signed drawings and specifications for
Bidding or Sealed Competitive Proposals purposes.
SCHEDULE: TBD.
Thank you for this opportunity to further serve the City of Fort Worth planning
needs.
KOMATSU ARCHITECTURE
Gordon Mtarchar t,AIA
Project Manager
XC: KA file 2004.1496.3.A
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
A&E PROPOSAL
NAME OF FIRM
Komatsu Architecture, Inc.
PROJECT TITLE DESCRIPTION
Guinn Elementary School Phase Additional Rework of Construction Docs to mod for Phase Two
Two as directed by City of FW 6-16-10
LOCATION KOMATSU PROJECT NO: TIME(DAYS) EST.COST OF CONSTRUCTION
Fort Worth,Texas 2004.1498
NO.OF EST.NO.OF HOURLY
DRAWINGS HOURS RATE TOTAL ESTIMATED COST
BY A&E BY CONSULTANT
A 8
DRAWINGS
A. Project Manager 2.0 $57.02 $114.04
B. Architect $41.50 $0.00
C. Structural Engineer $0.00
D. MEP Engineer $1,600.00
E. Interior Design $0.00
F. Civil Engineer $0.00
G. Cost Estimator $0.00
H. Landscape Architect $0.00
o J. Fire Protection Engineer $0.00
m K. Other(TAS Evaluation/report) $45.00 $0.00
L. Draftsman: (1) Architectural 4.0 $40.00 $160.00
(2) Structural $0.00
(3) Mechanical/Elec/Plumb.
Q (4) Electrical $0.00
o (5) Civil $0.00
m (5) Landscape $0.00
(5) Kitchen $0.00
(5) A/V $0.00
(6) Other(Specifications) $0.00
TOTAL DRAWINGS 0 $274.04 $1,600.00
N
G
° SPECIFICATIONS
m
jU A. Spec/Report Writers 0.0 $57.02 $0.00
y B. Typist 0.0 $20.00 $0.00
TOTAL-SPECIFICATIONS 0 $0.00
DOCUMENT REVIEW $0.00
A. Coordination Review 2.0 $57.02 $114.04
TOTAL DESIGN COST $388.08 $1,600.00
OVERHEAD 159.0 % X $ $388.08 $617.05
PROFIT 0.0 % X $1,005.13 $0.00
TOTAL COLUMN A(Ind.Overhead)+B $2,605.13
PROFIT ON CONSULTANT: 10 % X $ $1,600.00 $160.00
TOTAL COLUMNS A(Incl.Overhead)+B+Profit $2,765.13
TOTAL SECTION A-1 $2,765.13
C:\Documents and Settings\clemenr\Local Settings\Temporary Internet Files\OLK18B\Add Services Fee Proposal
Plan Mods Worksheet 7-19-10.xlsx
07/20/2010
1 of 3
A&E PROPOSAL
NAME OF FIRM
Komatsu Architecture, Inc.
PROJECT TITLE DESCRIPTION
Guinn Elementary School Phase Additional Rework of Construction Docs to mod for Phase Two
Two as directed by City of FW 6-16-10
LOCATION KOMATSU PROJECT NO: TIME(DAYS) EST.COST OF CONSTRUCTION
Fort Worth,Texas 2004.14913
Construction Administration-
Architectural 0.0 HRS @ $ $45.00 $0.00
OVERHEAD 159.0 % X $0.00 $0.00
PROFIT 10.0 % X $0.00 $0.00
m E TOTAL ARCHITECTURAL $0.00
a a Structural $0.00
m a MEP $0.00
rn N
c Civil $0.00
U
Fire Protection $0.00
Landscape $0.00
PROFIT ON CONSULTANT: 0 % X $ $0.00 $0.00
TOTAL SECTION B $0.00
_ y As-Built Sheets 0.0 HRS @ $ $40.00 _ $0.00
o OVERHEAD
00 3 159.0 % x $0.00 $0.00
PROFIT 0.0% X $0.00 $0.00
TOTAL SECTION C $0.00
in 'a Consultant Printing 0.0 HRS @ $ $0.00 $0.00
o OVERHEAD 159.0 % X S0.00 $0.00
Z PROFIT 0.0 % X $0.00 $0.00
TOTAL SECTION D $0.00
1. SITE INVESTIGATION
A. Sub-Soil Investigation @ $0.00
B. Surveys: Party Days Days @ $0.00
C. Field Investigation(TAS) Man Days 0 Days @ $32B.00 $0.00
U
w D. Environmental Analysis $0.00
rn 2. CONSULTANTS,SUB-CONTRACTORS OR OTHER SPECIAL COSTS(Specify)
o rn
c
Renderings @ $0.00
Reports(TAS) 0 @ $0.00
w` Other(Explain) @ $0.00
SUBTOTAL SECTION E(ITEMS 1 &2) $0.00
PLUS PROFIT 10 % X $0.00 $0.00
TOTAL SECTION E $0.00
OFFICIAL RECORD
CITY SECRETARY
FT WORTH,TX
C:IDocuments and SettingslclemenrlLocal Settings\Temporary Internet Files10LK18B1Add Services Fee Proposal
Plan Mods Worksheet 7-19-10.xlsx
07/20/2010
2of3
A&E PROPOSAL
NAME OF FIRM
Komatsu Architecture, Inc.
PROJECT TITLE DESCRIPTION
Guinn Elementary School Phase Additional Rework of Construction Docs to mod for Phase Two
Two as directed by City of FW 6-16-10
LOCATION KOMATSU PROJECT NO: TIME(DAYS) EST.COST OF CONSTRUCTION
Fort Worth,Texas 2004.1496
ESTIMATE:REPRODUCTION-(See Attached Printing Breakdown)
Bond Printing Full Size
Bond Printing Half Size
Mylar Full Size Ploting(Final and As Builts)
a Cost Estimate Printing
o a Specifications Printing
Review Comments Printing
Design Analysis Printing
CD's(As Builts)
SUBTOTAL SECTION F $0.00
PLUS PROFIT 0 % X $0.00 $0.00
TOTAL SECTION F $0.00
TRANSPORTATION
Milage 0 Miles @ $0.51 $0.00
AirfaIr Trips @ $0.00
C7 Per Diem(TAS onsite) 0 Days @ $50.00 $0.00
m
m Rental Car Days @ $0.00
(n ~ Parking Days @ $0.00
Hotel(design review Austin-based only) 0 $150.00 $0.00
SUBTOTAL SECTION G $0.00
PLUS PROFIT 0 % X $0.00 $0.00
TOTAL SECTION G $0.00
TOTAL DESIGN(SECTION A FROM FRONT) $2,765.13
TOTAL SECTIONS B,C,D,E,F&G ABOVE $0.00
GRAND TOTAL.FEE PROPOSAL $2,765.13
July 20,2010
SIGNATURE Percentage #DIVIO! DATE OF PROPOSAL 30-Jun-08
C:1Documents and SettingslclemenrlLocal SettingslTemporary Internet Files\OLK18B1Add Services Fee Proposal
Plan Mods Worksheet 7-19-10.xlsx
07/20/2010
3 of 3