Loading...
HomeMy WebLinkAboutContract 51609 Received Date: 12/6/2018 Received Time: 12:21 p.m. Developer and Project Information Cover Sheet: Developer Company Name: Raider Express Inc. Address, State,Zip Code: 2400 Cold Springs Rd. ,Fort Worth,TX 76106 Phone&Email: 817-529-5800, mikeeg letonsr(&raiderexpress.com Authorized Signatory,Title: Michael R.Eggleton Sr.,President Project Name: Raider Express Water Line Brief Description: Water Project Location: South of Moss Drive and East of Willow Springs Rd. Plat Case Number: FS-18-005 Plat Name: Raider Express Mapsco: Council District: 7 CFA Number: 18-0127 City Project Number: 101706 OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51609 WHEREAS, Raider Express Inc. , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto("Improvements")related to a project generally described as Raider Express Water Line ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires t -Developer- r- further City of Fort Worth,Texas OFFICIAL.RECORD Standard Community Facilities Agreement-Raider Express Water Line CITY SECRETARY CFA Official Release Date:02.20.2017 Page 2 of 11 FT.WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) l _ Sewer(A-1) Q. Paving(B) F1- Storm Drain(B-1) ❑. Street Lights & Signs (C) L_ E. ✓- E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (1001/6) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date:02.20.2017 Page 4of11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date:02.20.2017 Page 5of11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and (2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Raider Express Water Line CFA No.: 18-0127 City Project No.: 101706 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 227,769.81 2.Sewer Construction Water and Sewer Construction Total $ 227,769.81 B. TPW Construction 1.Street $ - 2.Storm Drain $ - 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ - Total Construction Cost(excluding the fees): $ 227,769.81 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 4,555.40 D. Water/Sewer Material Testing Fee(2%) $ 4,555.40 Sub-Total for Water Construction Fees $ 9,110.80 E. TPW Inspection Fee(4%) $ - F. TPW Material Testing(2%) $ - G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ - Total Construction Fees: $ 9,110.80 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 227,769.81 x Completion Agreement=100%/Holds Plat $ 227,769.81 Cash Escrow Water/Sanitary Sewer-125% s 284,712.26 Cash Escrow Paving/Storm Drain= 125% $ - Letter of Credit=125%w/2yr expiration period $ 284,712.26 City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Raider Express Inc. Jesus J.Chapa(Dec 4,2018) Jesus J. Chapa Assistant City Manager mk,& G jE#46� Date: Dec 4,2018 Michael Eggleton(W3,2018) Name: Michael R. Eggleton Sr. Recommended by: Title: President , Date: Dec 3,2018 E-1, Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form &Legality: administration of this contract, including ensuring all performance and reporting 16_Z A 7�� requirements. Richard A.McCracken(Dec 4,2018) Richard A. McCracken .Tame 5cark,,&Marales Assistant City AN Janie Scarlett Morales(Dec 4,2018) Attorney M&C No. Name: Janie Morales Date: Title: Development Manager Form 1295: N/A F OST ��0.. •.120 ATTEST: AIN,sDec 4,7018) y � •' 7g Mary J. Kayser/Ronald Gonzale14 AS City Secretary/Assistant City Secr OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment I Attachment 1 -Changes to Standard Community Facilities Agreement Location Map Exhibit A:Water Improvements ❑ Exhibit A-1: Sewer Improvements 1� Water and Sewer Cost Estimates ❑ Exhibit B: Paving Improvements ❑ Paving Cost Estimate ❑ Exhibit 13-1: Storm Drain Improvements ❑ Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements I Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101706 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Raider Express Water Line CFA Official Release Date:02.20.2017 Page 11 of 11 004243 DAP-BED PROPOSAL Page 1 of 1 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value NIT I:WATER IMPROVEMENTS 1 0241.1118 4"-12"Pressure Plug -_ `02 41 14 EA __2 _$1,533.00 _ $3 066.00 2 3201.012710 Wde Asphalt Pvmt Repair,Arterial 32 01 17 LF 23.6 $84.75 __$2,000.10 3 3292.0200 Seeding,Broadcast 32 92 13 SY 4622 $0.25 $1,155.50 4 3305.0109 Trench Safety 33 05 10 LF 2772.66 $1.00 _ 2,772.66 5 3311.0001 Ductile Iron Water Fittin,qs wl Restraint 33 11 11 TON ,_1 $13,764.00_$13,764.00 6 3311.0241 8"Water Pipe 33 11 10,33 LF 15 $53.80 $_807.00 7 3311.0441 12"Water Pipe _ _ 3311 10,33 LF 2737.66 $62.84 _$172,034.55 8 3311.0442 12"Water Pipe,CSS Backfill 3311 10,33 LF �_ 20 $79_.55 $1,5_91.00 9 3312.0110 Connection to Existing 36"Water Main 331225 EA _1 _$14,398.00 $14,398.00 10 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 1 _$1,674.00 $1,674.00 �11!3_312.2203_2"Water Service _ _ 33 12 10 EA 2 _$2,735.50 $5,4_71,00 12 3312.3003 8"Gate Valve -� 33 12 20 EA 2 2,394.00 $4x788.00 13 3312.3005 12"Gate Valve 33 12_2_O EA 1 $4,248.00 $4,248.00 14 3471.0061 Traffic Control 3471 13 MO 1 $5,000.00 $5,000.00 TOTAL UNIT 1:WATER IMPROVEMENTS $227,769.81 Bid Summary UNIT I:WATER IMPROVEMENTS $227,769.81 UNIT II:SANITARY SEWER IMPROVEMENTS UNIT III:DRAINAGE IMPROVEMENTS UNIT IV:PAVING IMPROVEMENTS UNIT V:STREET LIGHTING IMPROVEMENTS UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS - Total Construction Bid $227,769.81 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 30 calendar days after the date when the CONTRACT commences to run as provided in the General ConditiOBL WIL ONE STRUCTION, LLC 9 -4-!$ rgna Date Jot( -F-7 r� me (OcAj j— re CI Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Farm Version September 1,2015 00 42 43 Bid Proposil AP �C-)�oP� i W Q i -,j P ¢ tii �oRr� 0 Gs, 2 PROJECT LOCA TION 3 0 J 3 VICINITY MAP N0 L 0 CA TION MAP MAPSCO NO. TAR-19B COUNCIL DISTRICT 7 DEVELOPER: MUCKLEROY & FALLS 5801 EDWARDS RANCH RD, STE 100 FORT WORTH, TX 76107 TEL: (817) 289-7988 CONTACT: CLINT MOYES DATE: 8/27/2018 RAIDER EXPRESS m m la PROJECT # 2981-00-01 aM agkiserbp wnrsyYp rr .arddbcturs pWydrq • K. CHOW tbpe registration number. f 2759 DRAWN BY. tbpls regtatratlon/Ikx numbs 10086000 PLAT INFORMATION 5 1 9 e a.9 t b o r d e r CHECKED BY. R. CRON/N arlInytantexas 76010 & VICINITY MAP 6 1 7—4 6 9—1 6 7 1 fax: 617-274-6757 SHEET NO: 1 OF 3 rrr.m m a t e x a s.c am I � Ex e•WA M?LPW LOT B, BLOCK 6 A dLOT 18 LOT 17 \ LOT 16 LOT 15 WILLOW SPRINGS RANCH CAB. A, SLIDE 8425 P.R.T.C.T. cq'1 BL 5 WILLOW SP INGS RANCH CAB. A, SIDE 8425 P.R.T.C.T. J _ . . -_-ACCESS EASEMENT ,Oaw�7 ma _ I 5.76 ACRES PAUL A. THA VOL ;0674 624AP.R. S TMl ED.G L-� 2-WATTERER SEANCES !- .NG D206074a44 WT%U E003 2-FW SEAWCE — P.R.TGT. �.N0.D20a034944 — P.R.T.C.T. f TESL EST. ' —� V1177,PG 419 OL I P.R.T.C.T. I REMAINDER OF 16.00 ACRES �. GREY F. BECK&CONNIE LYNN BECK NO. D212252566 P.R.T.C.T. 10'TESCO ESMT. I \ OL 3337 P.U.CP�.NO CAS GAS 6.98 ACRES 1, BLOCK 1 RAIDER EXPRESS TERMINAL - II i NO TE ALL WATER LINES ARE 12" UNLESS OTHERWISE NOTED LEGEND WATER LINE 200 0 100 200 400 ►� GATE VALVE 1 inch = 200 ft. DATE: 8/27/2018 m1 m a PROJECT # 2981-00-01 RAIDER EXPRESS I aM q wv�+a r+�w�ne1lR.ae..a••+v DRAWN BY. K. CHOW EXHIBIT A m s reg abonAllmse reglWatim W;,'�-1275 WATER EXHIBITS n a a,t h o r d e r CHECKED BY.• R. CRONIN arlI gtaa, teas 76010 SHEET 1 OF 2 fo817-469-1671 >t: 817-274-8757 SHEET NO: 2 OF 3 Wes.m mate.ae.Com 5.76 ACRES PAUL A. SPINDOR &NATHAN SCARBER VOL 10674 1624 P.R.T.C.T. I I I I REMAINDER OF 4.53 ACRES CIPROCTS LLC DOC. NOG 02612X5778 P.R.T.C.T. I I \� REMAINDER OF 16.00 ACRES O,C�REY F. BECK 2 NIE LYNN BECK `��C N0. 02122525525 _66 P.R.T.C.T. 70'TESLA E- 1337,Pa.41B P.R.T.C.T. L. 5.12 ACRES I RICHARD DAVM HOLDINGS. LLC DOC. NO. D213310455 P.R.T.C.T. / � is- WA IER LINE 10' 033370 Pa.41 P.R.T.C.T. u � 15.24 ACRES Ili LOT 2, BLOCK 1 RAIDER EXPRESS TERMINAL t \ I r N v rt� I . NOTE ALL WATER LINES ARE 12" UNLESS OTHERWISE NOTED LEGEND WATER LINE 200 0 100 200 J40U ►� GA TE VAL VE 1 inch = 200 ft. DATE: 8/27/2018 m I m a PROJECT #: 2981-00-01 RAIDER EXPRESS I atN w•moo tlaso.p•.rehll.eb..pL..ra DRAWN BY. K. CHOW EXHIBIT A mpe rl4*atim number. f-2759 tbpls registraliae/Ileense mlmbxr: 10088000 WATER EXHIBITS 519 e a s t b a r A e r CHECKED BY. R. CRONIN arIIngtan, teras 76010 SHEET 2 OF 2 8 1 8 1 7 2 7 1 8 7 1 laa: B17-274-8757 SHEET N0: 3 OF 3 0v w.m m a to x Cam