Loading...
HomeMy WebLinkAboutContract 33964 AMENDMENT NO. 6 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.2L�54 " M&C C-21632 COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Transystems Corporation Consultants (Engineer) made and entered into City Secretary Contract No. 26807 (the Contract)which was authorized by the City Council by M&C C-18572 on the 26th day of April, 2001; and subsequently revised by five (5)previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for Sanitary Sewer Main 244A Parallel Relief Study and Design. WHEREAS, it has become necessary to execute Amendment No. 6 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in M&C C-21632, adopted by the City Council on 29th day of August, 2006, and further specified in a proposal letter dated May 15, 2006, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total$33,533.06 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$1,135,319.06 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. �,JA � L � EXECUTED on this the day of , 2006_, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROV n A.Douglas Rademaker, P.E. c Ott Director,Department of Assistant City Manager Engineering TranSystems Corporation Consultants ENGINEER ATTEST: J �1 Marty Hendrix, —Ity Secretary By: Cart t u horizdtioa Name: Raul Pena III,P.E. Regional Vice-President - Date APPROV AS TO FORM AND LEGALITY: Assistant ty ttorney J�ri'1 SYSte 05-15-2006 Gopal Sahu, P.E. Department of Engineering City of Fort Worth 1000 Throckmorton Fort Worth, Texas 76102 Reference to: Summary and Scope of Services Sanitary Sewer Main 244-A Village Creek Parallel Collector Amendment No. 6 Dear Mr. Sahu, We have prepared this amendment request to cover additional services not provided for in the original contract or subsequent amendments. In summary this request is as follows: 1. Hydraulic Modeling Lump Sum 10,923.06 The Water Dept. requested that we use one of our sub-consultants to perform research and hydraulic modeling of Arlington's Rush Creek trunk sewer line along with modeling of the City's existing M-244a line. This modeling was requested by the City of Arlington based on concerns relating to possible surcharging and overflows. RJN performed this work with the assistance from TranSystems. 2. Subconsultant Management Fee (10%) Lump Sum 1,090.00 3. M-503 Relief Line (added to Hourly amendment 5) Hourly 13,600.00 During the final plan approval of the last segment of the M-244a line the City of Arlington field staff alerted the Water Dept that the City of Pantego was connected to a segment of M-503 that was to be reconstructed. After extensive research it was determined that the City of Pantego, City of Fort Worth and City of Arlington had no record plans of this connection. As a result extensive field work and surveys were performed to located this line. Design of reconnecting this line along with easement documentation and an additional UPRR permit were required. Below is a summary of work required for this effort. We are requesting that the following amount be added to the hourly maximum that was approved in amendment 5. ❖ Research and design Project Engineer 32hrs x 110.00 =3,520 CADD Technician 40hrs x 75.00 =3,000 ❖ Additional UPRR Permit Project Engineer 20hrs x 110.00 =2,200 CADD Technician 8hrs x 75.00= 600 PIC I AllI ❖ Easement Documentation E �E 11i RPLS 24hrs x 95.00= 2,280 , 1 Survey Crew 16hrs x 125.00 = 2,000 Sub-total 13,600 4. Construction Assistance (added to Hourly amendment 5) Hourly 7,920.00 We are requesting that the below hours be added to the construction assistance for shop drawing review, field visits and contractor questions. Project Engineer 72hrs x 110.00 = 7,920 Total $33, 533.06 Summary of the Contract and Amendments Original Contract $ 727,760.00 Amendment 1. $ 179,141.48 Increase Pipe Size, Far East Fort Worth HOA Study and Design/Survey Phase 1 Amendment 2. $ 18,897.00 Geotechnical Services Amendment 3. $ 72,556.00 Pipe Reduction, Odor Control, Diversion Structure, Far East Fort Worth HOA Study and Design/Survey Phase 2 Amendment 4. $ 19,546.52 36"Sewer and Structures, Environmental Information Document for SRF Funding, Break Plans into Additional Phases. Amendment 5. $ 83,885.00 Renewal of permits and Engineering Assistance during construction Sub-total $ 1,101,786.00 Amendment 6. $ 33, 533.06 — Hydraulic Modeling, M-503 plans relating to Total 1,135,319.06 Pantego and construction assistance Please feel free to cgn�act me if you should have any questions. Sincerel , Raul Pena III, E` Principal MTV". , YEN. 2 Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 8/29/2006 DATE: Tuesday, August 29, 2006 LOG NAME: 30AMEND6M244A REFERENCE NO.: **C-21632 SUBJECT: Authorize Execution of Amendment No. 6 to City Secretary Contract No. 26807 with TranSystems Corporation Consultants for Additional Services Related to Sanitary Sewer Main 244A Parallel Relief Study and Design RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 6 to City Secretary Contract No. 26807 with TranSystems Corporation Consultants for additional services related to Sanitary Sewer Main 244A Parallel Relief Study and Design in the amount of $33,533.06, thereby increasing the total contract amount to $1,135,319.06. DISCUSSION: On April 24, 2001, (M&C C-18571) the City Council authorized the City Manager to execute an engineering agreement with TranSystems Corporation Consultants for Sanitary Sewer Main 244A Parallel Relief Study and Design for a fee not to exceed $727,760.00. This contract was previously revised by five amendments. . Amendment No. 1 was approved on May 21, 2002, (M&C C-19089) for $179,141.48 for an additional 4,000 linear feet of additional sewer line. . Amendment No. 2 was administratively approved on March 3, 2003, for $18,897.00 to add geotechnical investigation. . Amendment No. 3 was approved on September 16, 2003, ( M&C C-19751) for $72,556.00 for developing plans and specifications for odor control and atonement of portions of existing sanitary sewer main M-503. . Amendment No. 4 was administratively approved on September 21, 2004, for $19,546.52 to include a 36-inch by-pass sewer along US 80 and supplemental pipe testing specifications. . Amendment No. 5 was approved on November 15, 2005, (M&C C-21151) for $83,885.00 for additional services for coordination with utilities companies, property owners, TX DOT, TRA, City of Arlington and the U.S. Army Corps of Engineers. Amendment No. 6 provides for Hydraulic Modeling requested by the Water Department for Arlington Rush Creek trunk sewer line; design of M-503 sewer line related to the City of Pantego service connection; and additional construction assistance required. These services were required based on the recommendation made by the engineer as a result of concurrent construction of this project. These services were not included in the original scope. City staff considers the proposed fee of $33,533.06 to be fair and reasonable for the scope of additional http://www.cfwnet.org/council_packet/Reports/mc_print.asp 11/9/2006 Page 2 of 2 services to be performed. This project is located in COUNCIL DISTRICTS 4, 5, and 8. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P274 531200 704170020633 $33,533.06 Submitted for City Manager's Office by: Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker (6157) http://www.cfwnet.org/council_packet/Reports/mc_print.asp 11/9/2006