HomeMy WebLinkAboutContract 33968 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.5N(&�
WHEREAS, Riverbend Investment, Ltd., by: RBE Investment Corp., Managing
General Partner hereinafter called "Developer", desires to make certain improvements to
Lakes of River Trails, Phase VI, an addition to the City of Fort Worth, Texas; and
WHEREAS,the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Kenneth Newell, its duly
authorized President, and the City, acting herein by and through Marc Ott, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
1. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section 11, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section Il,paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section 11, of the Policy.
i N.,1
0` q^tI"-"I r� ��V 1�i
CFA RE!!SF f{� T>,040804.doc 1 CI f JETU?E i1
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such iniuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers,servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
CFA REVISED FORMAT-040804.doc 2
Water (A) None; Sewer (A-1)None; Paving (B) attached; Storm Drain (13-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $219,908.19.
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $178,892.72 178,892.72
2. Storm Drainage $19,769.00 19,769.00
3. Street Lights $13,200.00 13,200.00
4. Street Name Signs $100.00 100.00
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
(4%) 7,946.47 7,946.47
TOTALS 219,908.19 $ - 219,908.19
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA REVISED FORMAT-040804.doc
3 v{��j�`L�
Ilo
i
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary,with the corporate seal of the City affixed and said Developer
has executed this instrument in triplicate,at Fort Worth, Texas this the day of
,200k
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
NO hI&C RE-QUIRED� Director
ATTEST: City Of Fort orth
i
By:
rf52YJ ��'XNiakbtt
City Secretary Assistant City Manager
Approved Form:
7z
Assistant torney
ATTEST: DEVELOPER
Corporate Secretary Kenneth Nevell, President
HICIA 'ECI ND
CFA REVISED FORMA T-040804.doc 4 Cllyl ORE VAG Y
Lakes of River Trails,Phase VI
Item No.Descri tion Qt /Unit Unit Price Amount
PAVING
1. 6-Inch Concrete Paving 5,969 SY 19.50 $ 116,395.50
2. 6-inch Temp.Asphalt Turn-around 1,166 SY 21.00 $ 24,486.00
3. 6-Inch Stabilized Sub rade 7,364 SY 1.65 $ 12,150.60
4. Hydrated Lime 110 Ton 97.00 $ 10,714.62
5. 7-Inch Integral Curb 3,648 LF 2.00 $ 7,296.00
6. Adjust Manholes 8 EA 300.00 $ 2,400.00
7. Install Barricades 3 EA 1,350.00 $ 4,050.00
8. Remove ex.Barricades 2 EA 100.00 $ 200.00
9. Adjust Water Valves 8 EA 150.00 $ 1,200.00
TOTAL -PAVING.. $ 178,892.72
........... . ... .. . . .... .... ........... ...... ..... .
STS)RRDRM, 0 i GE,F tt AL1 F�: CT
10. 5'x 4'RCB 8 LF 215.00 $ 1,720.00
11. 48-Inch RCP Pipe 16 LF 130.00 $ 2,080.00
12. 48-Inch Plug 3 EA 165.00 $ 495.00
13. 5'x 4'RCB Plug 1 EA 899.00 $ 899.00
14. 7'x TMH 1 EA 7,700.00 $ 7,700.00
15. 6'x 6'MH 1 EA 6,600.00 $ 6,600.00
16. JTrench Safety 1 LS 275.00 $ 275.00
TOTAL -STORM DRAINAGE FACILITIES.. ... ........... . .... .. ...... . . $ 19,769.00
17. 8-Inch DR-14 PVC Pie 1,900 LF 16.30 $ 30,970.00
1B. 8-Inch valve 4 EA 830.00 $ 3,320.00
19. 6-Inch valve 3 EA 550.00 $ 1,650.00
20. Fire Hydrant 3 EA 1,685.00 $ 5,055.00
18. Connect to Existing 8-Inch 2 EA 345.00 $ 690.00
19. 1-Inch Water Service 70 EA 420.00 $ 29,400.00
20. Cast Iron Fittings&Blocking 1 LS 1 2,065.00 $ 2,065.00
21. Testinq 1 EA 1,050.00 $ 1,050.00
22. Trench Safety 1 EA 275.00 $ 275.00
23. Lab 1 EA 3,850.00 $ 3,850.00
24. 113onds 1 1 EA 4,400.001 $ 4,400.00
TOTAL -WATER FACILITIES. $ 82,725.00
lV. SANITAR" fR CIWl ON.5�:' z., .:?.
25. 8-Inch PVC Pipe 1,522 LF 13.50 $ 20,547.00
26. Connect to Existing 8-Inch 2 EA 450.00 $ 900.00
27. Std.4-foot Dia.Manhole 7 EA 2,130.00 $ 14,910.00
28. Adjust Ex.MH 1 EA 350.00 $ 350.00
29. 4-Inch Sanitary Sewer Service w/Two Way Clean Out 60 EA 350.00 $ 21,000.00
29. Testing 1 EA 1,815.00 $ 1,815.00
30. Trench Safety 1 1 EA 275.00 1 $ 275.00
TOTAL - SANITARY SEWER FACILITIES .. ... ... ... . ................ . . $ 59,797.00
V: = SANIT..ARY_SEMR F 1 1IT[ER(Q ..,.. _ , , ,F . ;
31. 15-Inch PVC Pie 872 LF 27.20 $ 23,718.40
32. 8-Inch PVC Pie 915 LF 13.50 $ 12,352.50
33. Connect to Existing Stub 1 EA 450.00 $ 450.00
34. Std.4-foot Dia.Manhole 5 EA 2,130.00 $ 10,650.00
35. 4-Inch S.S.Service w/Two Way Clean Out SCR-35 32 EA 340.00 $ 10,880.00
36. 4-Inch S.S.Service w/Two Way Clean Out SDR-26 14 EA 235.00 $ 3,290.00
37. Testin 1 EA 1,925.00 $ 1,925.00
38. Trench Safety 1 EA 275.10 $ 275.10
39. Lab 1 EA 1,650.00 $ 1,650.00
40. Bonds 1 EA 1 1,430.00 $ 1,430.0
TOTAL - SANITARY SEWER FACILITIES. . . . . $ 66,621.0 ;, � � �
.... ......... ... . . .. ..
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 1 EA $ 2, 000 $2, 000 . 00
MID-BLOCK RESIDENTIAL 5 EA $ 2, 000 $10, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 .00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0 , 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1,500 $0, 000. 00
Subtotal $12,000.00
City' s Cost $00, 000 .00
Developer's Subtotal $12,000.00
10% Contingencies $1,200.00
Project Total $13,200.00
Adjacent Developer's Cost $0, 000.00
Developer's Cost $13,200.00
2% Inspection Fee $0,00.00
DEVELOPER'S COST: $13, 200.00
LAKES OF RIVER TRAILS, PHASE VI
May 19, 2004
Fort Worth, Texas
May 25, 2004
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C" , immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department .
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets, the
developer agrees to pay the city the amount shown below prior to the
City starting it's design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
5 . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6 . The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER'S COST: $13,200.00
LAKES OF RIVER TRAILS, PHASE VI
May 19, 2004
FORT WORTH, TEXAS
Page 11 of Exhibit C
III.
"STREETLIGHTS"
INTERSECTIONS
RIVER LAKES DR & WINTERFALLS DR 1
MID- BLOCK
TRINITY VISTA TRL 2
WINTERFALLS DR 3
LAKES OF RIVER TRAILS, PHASE VI
Page III of Exhibit C
IV
STREET NAME SIGNS
1 . The City of Fort Worth will install the street name signs upon
final approval of the street construction. The street name signs
will remain the property of, and will be maintained by, the City
of Fort Worth.
2 . The Developer will pay for the street name sign installations
required for this development to the extent of $100 . 00 per
intersection. This unit cost will be revised annually by the
Department of Transportation and Public Works to reflect
prevailing costs of materials and labor.
3 . This development creates the following one (1) intersections at a
cost to the Developer of $100.00:
Winter Falls Dr & Riverlakes Dr
(Trinity Vista Tr & Riverlakes Dr is existing)
Lakes of River Trails Phase 6
CFA code: 2004048 Date: May 7, 2004
IP A
C9,PE
oony�.
DO TR.
m s`'
x
817 118d5MOB
'O8 3N8l1OB73W l
3N80 s7N8183% P-4
W
o � P-4
`` v, > W O
ctf
o � cf)t
O
U�
W
a
w
� w
0
o �
"Gy
dr
OZB 'H'1
�i
`HI'O`C4" V
Z N ALVI r�.d�
5
G� a
y
_ w W
anIso STV91213nI9
^ " _ v
J U
� W
�V
W
?3
r n
W - cEyz+
CID
C
_ R ^
R -
q
C n C q
SI V2 AlNf2LL 3 a C :r
Vi
� �m
_ M1 M1 rv�O
N _
_ 3A1NQ STY8193MY
I I
ry m ffi _
c I I
-
I
n n w h h h h
-
ry I
CQ
_ ry W ffi m
n _
t65 n I M1 b z ry n '^
En
to
IN
n E"pl-
n I I R n ^ C O a.
R
ce
cn
it
n - C
M1 _ o
cn
v� z
R � R
2
3
S71VHJ, AJINIHJ, SIIVHJI JUINRll
h _ ry ffi
a
w w w
R
R ry ry M1 ry ry ry h ry
�
&
� )
f "
, ~ �
�azJ
HAW pVWL8AI8
rl
a . _
, a ;
ce,
J
\ R
& ®
% . \ O
m .
§ � W
\
� n =
-
)
\ E--
Q6 Q6
§ /
m m m
S7,
Vail 5 ± b ±
� � ■