Loading...
HomeMy WebLinkAboutContract 33968 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.5N(&� WHEREAS, Riverbend Investment, Ltd., by: RBE Investment Corp., Managing General Partner hereinafter called "Developer", desires to make certain improvements to Lakes of River Trails, Phase VI, an addition to the City of Fort Worth, Texas; and WHEREAS,the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Kenneth Newell, its duly authorized President, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: 1. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section Il,paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section 11, of the Policy. i N.,1 0` q^tI"-"I r� ��V 1�i CFA RE!!SF f{� T>,040804.doc 1 CI f JETU?E i1 F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: CFA REVISED FORMAT-040804.doc 2 Water (A) None; Sewer (A-1)None; Paving (B) attached; Storm Drain (13- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $219,908.19. Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $178,892.72 178,892.72 2. Storm Drainage $19,769.00 19,769.00 3. Street Lights $13,200.00 13,200.00 4. Street Name Signs $100.00 100.00 B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ (4%) 7,946.47 7,946.47 TOTALS 219,908.19 $ - 219,908.19 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. CFA REVISED FORMAT-040804.doc 3 v{��j�`L� Ilo i IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed and said Developer has executed this instrument in triplicate,at Fort Worth, Texas this the day of ,200k Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. NO hI&C RE-QUIRED� Director ATTEST: City Of Fort orth i By: rf52YJ ��'XNiakbtt City Secretary Assistant City Manager Approved Form: 7z Assistant torney ATTEST: DEVELOPER Corporate Secretary Kenneth Nevell, President HICIA 'ECI ND CFA REVISED FORMA T-040804.doc 4 Cllyl ORE VAG Y Lakes of River Trails,Phase VI Item No.Descri tion Qt /Unit Unit Price Amount PAVING 1. 6-Inch Concrete Paving 5,969 SY 19.50 $ 116,395.50 2. 6-inch Temp.Asphalt Turn-around 1,166 SY 21.00 $ 24,486.00 3. 6-Inch Stabilized Sub rade 7,364 SY 1.65 $ 12,150.60 4. Hydrated Lime 110 Ton 97.00 $ 10,714.62 5. 7-Inch Integral Curb 3,648 LF 2.00 $ 7,296.00 6. Adjust Manholes 8 EA 300.00 $ 2,400.00 7. Install Barricades 3 EA 1,350.00 $ 4,050.00 8. Remove ex.Barricades 2 EA 100.00 $ 200.00 9. Adjust Water Valves 8 EA 150.00 $ 1,200.00 TOTAL -PAVING.. $ 178,892.72 ........... . ... .. . . .... .... ........... ...... ..... . STS)RRDRM, 0 i GE,F tt AL1 F�: CT 10. 5'x 4'RCB 8 LF 215.00 $ 1,720.00 11. 48-Inch RCP Pipe 16 LF 130.00 $ 2,080.00 12. 48-Inch Plug 3 EA 165.00 $ 495.00 13. 5'x 4'RCB Plug 1 EA 899.00 $ 899.00 14. 7'x TMH 1 EA 7,700.00 $ 7,700.00 15. 6'x 6'MH 1 EA 6,600.00 $ 6,600.00 16. JTrench Safety 1 LS 275.00 $ 275.00 TOTAL -STORM DRAINAGE FACILITIES.. ... ........... . .... .. ...... . . $ 19,769.00 17. 8-Inch DR-14 PVC Pie 1,900 LF 16.30 $ 30,970.00 1B. 8-Inch valve 4 EA 830.00 $ 3,320.00 19. 6-Inch valve 3 EA 550.00 $ 1,650.00 20. Fire Hydrant 3 EA 1,685.00 $ 5,055.00 18. Connect to Existing 8-Inch 2 EA 345.00 $ 690.00 19. 1-Inch Water Service 70 EA 420.00 $ 29,400.00 20. Cast Iron Fittings&Blocking 1 LS 1 2,065.00 $ 2,065.00 21. Testinq 1 EA 1,050.00 $ 1,050.00 22. Trench Safety 1 EA 275.00 $ 275.00 23. Lab 1 EA 3,850.00 $ 3,850.00 24. 113onds 1 1 EA 4,400.001 $ 4,400.00 TOTAL -WATER FACILITIES. $ 82,725.00 lV. SANITAR" fR CIWl ON.5�:' z., .:?. 25. 8-Inch PVC Pipe 1,522 LF 13.50 $ 20,547.00 26. Connect to Existing 8-Inch 2 EA 450.00 $ 900.00 27. Std.4-foot Dia.Manhole 7 EA 2,130.00 $ 14,910.00 28. Adjust Ex.MH 1 EA 350.00 $ 350.00 29. 4-Inch Sanitary Sewer Service w/Two Way Clean Out 60 EA 350.00 $ 21,000.00 29. Testing 1 EA 1,815.00 $ 1,815.00 30. Trench Safety 1 1 EA 275.00 1 $ 275.00 TOTAL - SANITARY SEWER FACILITIES .. ... ... ... . ................ . . $ 59,797.00 V: = SANIT..ARY_SEMR F 1 1IT[ER(Q ..,.. _ , , ,F . ; 31. 15-Inch PVC Pie 872 LF 27.20 $ 23,718.40 32. 8-Inch PVC Pie 915 LF 13.50 $ 12,352.50 33. Connect to Existing Stub 1 EA 450.00 $ 450.00 34. Std.4-foot Dia.Manhole 5 EA 2,130.00 $ 10,650.00 35. 4-Inch S.S.Service w/Two Way Clean Out SCR-35 32 EA 340.00 $ 10,880.00 36. 4-Inch S.S.Service w/Two Way Clean Out SDR-26 14 EA 235.00 $ 3,290.00 37. Testin 1 EA 1,925.00 $ 1,925.00 38. Trench Safety 1 EA 275.10 $ 275.10 39. Lab 1 EA 1,650.00 $ 1,650.00 40. Bonds 1 EA 1 1,430.00 $ 1,430.0 TOTAL - SANITARY SEWER FACILITIES. . . . . $ 66,621.0 ;, � � � .... ......... ... . . .. .. I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 1 EA $ 2, 000 $2, 000 . 00 MID-BLOCK RESIDENTIAL 5 EA $ 2, 000 $10, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 .00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0 , 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1,500 $0, 000. 00 Subtotal $12,000.00 City' s Cost $00, 000 .00 Developer's Subtotal $12,000.00 10% Contingencies $1,200.00 Project Total $13,200.00 Adjacent Developer's Cost $0, 000.00 Developer's Cost $13,200.00 2% Inspection Fee $0,00.00 DEVELOPER'S COST: $13, 200.00 LAKES OF RIVER TRAILS, PHASE VI May 19, 2004 Fort Worth, Texas May 25, 2004 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C" , immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department . 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3 . The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets, the developer agrees to pay the city the amount shown below prior to the City starting it's design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors . 5 . The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6 . The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $13,200.00 LAKES OF RIVER TRAILS, PHASE VI May 19, 2004 FORT WORTH, TEXAS Page 11 of Exhibit C III. "STREETLIGHTS" INTERSECTIONS RIVER LAKES DR & WINTERFALLS DR 1 MID- BLOCK TRINITY VISTA TRL 2 WINTERFALLS DR 3 LAKES OF RIVER TRAILS, PHASE VI Page III of Exhibit C IV STREET NAME SIGNS 1 . The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2 . The Developer will pay for the street name sign installations required for this development to the extent of $100 . 00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3 . This development creates the following one (1) intersections at a cost to the Developer of $100.00: Winter Falls Dr & Riverlakes Dr (Trinity Vista Tr & Riverlakes Dr is existing) Lakes of River Trails Phase 6 CFA code: 2004048 Date: May 7, 2004 IP A C9,PE oony�. DO TR. m s`' x 817 118d5MOB 'O8 3N8l1OB73W l 3N80 s7N8183% P-4 W o � P-4 `` v, > W O ctf o � cf)t O U� W a w � w 0 o � "Gy dr OZB 'H'1 �i `HI'O`C4" V Z N ALVI r�.d� 5 G� a y _ w W anIso STV91213nI9 ^ " _ v J U � W �V W ?3 r n W - cEyz+ CID C _ R ^ R - q C n C q SI V2 AlNf2LL 3 a C :r Vi � �m _ M1 M1 rv�O N _ _ 3A1NQ STY8193MY I I ry m ffi _ c I I - I n n w h h h h - ry I CQ _ ry W ffi m n _ t65 n I M1 b z ry n '^ En to IN n E"pl- n I I R n ^ C O a. R ce cn it n - C M1 _ o cn v� z R � R 2 3 S71VHJ, AJINIHJ, SIIVHJI JUINRll h _ ry ffi a w w w R R ry ry M1 ry ry ry h ry � & � ) f " , ~ � �azJ HAW pVWL8AI8 rl a . _ , a ; ce, J \ R & ® % . \ O m . § � W \ � n = - ) \ E-- Q6 Q6 § / m m m S7, Vail 5 ± b ± � � ■