Loading...
HomeMy WebLinkAboutContract 33972 s COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.c�T"OL��}} S WHEREAS, Hillwood Residential Services,L.P., hereinafter called "Developer", desires to make certain improvements to Heritage Addition Phase 3B Section 3, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Brian Carlock, its duly authorized Vice President of Hillwood Development Company, a Texas limited liability company, General Partner of Hillwood Residential Services, L.P., a Texas limited partnership and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. CFA-tpw-sec3.doc 1 � 6� � `5�� iun �U .:v l�:uti it ifr..e E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. CFA-tpw-sec3.doc 2V� L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water(A) None; Sewer(A-1)None; Paving(B) attached; Storm Drain (B- 1) attached; Street Lights and Signs (C) attached. H. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $633,329.48. Item Developer City Cost Total Cost Cost A. Construction 1. Streets $235,186.50 $ - $235,186.50 2. Storm Drainage $355,188.00 $ - $355,188.00 3. Street Lights $19,000.00 $ - $19,000.00 4. Street Name Signs Name Blades Only) $340.00 $ - $340.00 B. Engineering Design C. Construction Engineering and Management by DOE 4% $23,614.98 M $23,614.98 TOTALS $633,329.48 $ - $633,329.48 Notes: 1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets. Sidewalk cost is included under street cost. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction CFA-tpw-sec3.doc 3 inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the day of , 2006. RECEIVED MAY 0 5 2006 Approval Recommended: Transportation and Public Works Department NO M&C REQUIRED Robert Goode, P. E. Director ATTEST: City Of Fort VVorth By: � c Ott City Secretary Assistant City Manager Approved as to Form: J Assistan tty Atomey DEVELOPER Hillwood Residential Services,L.P. A Texas limited partnership ATTEST: By: Hillwood Development Company, a Texas limited liability company, its gener :rtner By. Corporate Secretary ria Carloc c, ice President CFA-tpw-sec3.doc 4 MY/ n. ' wl, �ELL CK I LU A 0 N —R GLE 1:1 63 1 OLDEN I ,IRIAN L RAY SHITE PR JECT L064N L %\ HERITAGE TRAC UM > W nl IF H v RAY WH I TE at id II BAS 000 NOT TO SCALE l lCo6; FIElI"ik L I1�ol �17:1 LOCATION MAP HERITAGE ADDITION Carter Burgess PHASE 3B — SECTION 3 CARTER & BURGESS,INC. 777 MAN STREET FW WORTH,TX 76102 1817)735-6000 PROJECT NO. 011540.030. 1.0630 DGN=gl\job\ 011540\civ\ phose3\ 540p3lcfcl.dgn PAGE 1 OF 6 SCALE: 1" = 300' 11 21 11 'o 11 JI 32 3' SM N AY ........................ ----- ..................................... . ....... .... ..... ..... 21 13 6 15 0 ...... 15 r ' CIRCLE ' 1 10 CAH .. ... ....... .......... --------- 13 12 2 a 16 Is top 0 LEGEND L__. ......................... PROP. 29' B/B STREETS ROADWAY/50' ROW EXHIBIT 'B' PROP. 41 ' B/B HERITAGE ADDITION ROADWAY/60' Row PHASE 313 - SECTION 3 PROP. 4' S I DEWALK ...................................... ( BY HOMEBUILDER) Carter - Burgess PROP. 4' SIDEWALK ( BY DEVELOPER) CARTER & BURGESS,INC. 777 MAIN STREET ORT ORTH,TX 76102 LIMITS OF PROJECT ——————— (F817)73W&-6000 PROJECT NO. 011540.030. 1.0630 OGN=cj:\Iob\ 011540\civ\ phc)se3\ 540p3lcfa.dgn PAGE 4 OF 6 'DROPINLET SCALE V' = 300' 8'MH 48" 707. ——7ry ti ]B 3N Jr J711"y 1]72'HDWL ,\ S11T N as\ ..._ NI ,p 9 ... ..... .. ....... ..:. 11 IJ �• I Ia 11 7 .... ..... _.... .. �. I ra i \�y I i 1 16 O`' II I Is J I B 11 IB "EXIST'S1" 24' 60'le r I zo s 15' ... .........._..l.�1..........................:....... 54" -=====1>== ....z. CLE . = ....................\I. .........I........................ 1. I- 267' ,{ �j' 78'HDW I` u I?"78", 24" ..EXIST.i51' ...13 . ..;.I�. 24" ` 15'rz z re HDW4 15, 9'MHFi rz J I 1 n { i c� 1 ' i 5 IS �.� .. ... � � 1 " f C i I._......__........_.._......._..._..._......_....................___..� STORM DRAIN LEGEND EXHIBIT 113-1' PROP. STORM DRAIN LINE HERITAGE ADDITION PROP. I NLETr p (-CHASE 3B - SECTION 3 PROP. MANHOLE v �'1��• PROP. HEADWALL -� '" � . Ul '� � 1e SS Carter :Burge EXIST. STORM DRAIN LINE ______ _____ � ° a 1 CARTER & BURGESS,INC. 777 AWN STREET LIMITS OF PROJECT ------- (SM FORT WO»'X76102 73S-PROJECT NO. 011540.030. 1.0630 DGN= -\'ob\ 011540\civ\ hase3\ 540p3lcfo.<Jn PAGE 5 OF 6 .I a SCALE: t" = 300' a) 2e JO 3x IN WAY as 7� i 1 Ir I 1. 1 -IO 9 .... .. ...... Ir i .•,� v 11 a � .... _� ...... xi• za la ._z �. ... ... I. �E 6 I p1Q. ♦\ 1 ILI I. ..... .....I ..... .;. 1 16 J 1 IB ' i b O I ac 1 CARGI RCLE CIFi IJ Il — 10 1 I6 r .....Q• J IS � ...... ; - 1. J \ Q +�Y \�/7 \ 1 c?rF STREET LIGHTS LEGEND ;� EXHIBIT 'C' PROP. SINGLE STREET LIGHT HERITAGE ADDITION EXIST. SINGLE STREET LIGHT Q PHASE 3B - SEC'T'ION 3 ( ON STEEL POLE WITH STREET AND STOP SIGNS ATTACHED) PROP. STREET SIGN Carter Burgess EXIST. STREET SIGN 0 CARTER & BURGESS,INC. 'LIMITS OF PROJECT FOI M O STREET --------_ FORT WORTH.7X 76102 (8171735-60M PROJECT NO. 011540.030. 1.0630 DGN= -\'ob\ 011540\civ\ phase3\ 540p3lcfia.d n PAGE 6 OF 6 PART B — PROPOSAL Pfi ecce, 5 vtp (This Proposal. must not be removed from this book of Contract Documents) .flr TO: Hillwood Residential Services, L.P. PROPOSAL FOR: PROJECT NAME: HERITAGE ADDITION PHASE 3B SECTION 3 DOE NO. 5170 X NO.: 18249 Includes the furnishing of all materials (except as specified to be furnished by the City), equipment and labor for the installation of Street Improvements and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: Heritage Addition Phase 3B Section 3 Pursuant to the foregoing "Notice to Bidders," including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: (Furnish and install, including all appurtenant work, complete in place, the following items. D-No. refers to related items in Part D of the Special Conditions): DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID PART A—STREETS 210 1 9,000 S.Y. 6" Lime Stabilized Subgrade (Includes Preparation of Subgrade), complete in place for the sum of One Dollar & Sixty Five Cents per Square Yard $1.65 $14,850.00 212 2 135 TON Lime for Subgrade (30#/S.Y.) complete in'-place for the sum of Eighty Five Dollars & No Cents per Ton $85.00 $11,475.00 N:VOB\01 154Mpec\011540.030-PAV.doc SP-1 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID 314 3 8,710 S.Y. 6", 3,000psi Reinforced Concrete Pavement (Includes Joint Sealer and 7" STD Attached Concrete .Curb), complete in place for the sum of Twenty Two Dollars & Fifteen Cents per Sq. Yard $22.15 $192,926.50 4 116 L.F. Connect to Existing Pavement, Complete in place for the sum of Ten Dollars & No Cents per Linear Foot $10.00 $1,160.00 5 116 L.F. Remove and Haul Off Existing Street Barricade Five Dollars & No Cents per Linear Foot $5.00 $580.00 6 60 L.F. 4' Wide Sidewalk, complete in place for the sum of Fourteen Dollars & No Cents per Linear Foot $14.00 $840.00 7 9 Ea. Barrier Free Ramps, complete in place for the sum of Six Hundred Dollars & No Cents per Each $600.00 $5,400.00 8 1 L.S. Storm Water Pollution Prevention Maintenance One Thousand Dollars & No Cents per Lump Sum $1,000.00 $1,000.00 N:VOB\011540\Spec\011540.030-PAV.doc SP-2 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID 9 1 L.S. City Required Bonds (Payment, Performance, and Maintenance Bonds) Two Thousand Six Hundred Dollars & No Cents per Lump Sum $2,600.00 $2,600.00 10 8,710 S.Y. Construction Material Testing No Dollars & Fifty Cents per Square Yard $0.50 $4,355.00 TOTAL PART A—STREETS --- $ 235,186.50 City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the City of Fort Worth Construction Inspection Department. Owner shall be responsible for installation of all silt barriers, sediment traps, check dams,and seeding. The Earthwork contractor shall be responsible for the"Construction Entrance/Exit'installation. N:VOB1011540\SpeclOI 1540.030-PAV.doe SP-3 This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04(F) of the Texas Limited Sales, Excise and Use Tax Act. Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices. The undersigned agrees to complete all work covered by these Contract Documents within 30 working days from and after the date for commencing work, as set forth in the written Work Order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for Streets, Drainage and Utility Construction," as established by the City of Fort Worth, Texas. WithiR ten (40) days ef FeGeipt Gf R9tiGe of aGGeptaRGe ef this Ibid, the undeMigned will exeGute Respectfully submitted, Mario Sinacola & Sons Excavating, Inc. By: Michael Sinacola, Vice President Address: P.O. Box 2329 Frisco, TX 75034 (S E A L) If Bidder is Corporation Date Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 N:UOB\011540\Spec\011540.030-PAV.doc SP-4 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID SECTION C -STORM DRAIN SYSTEM 440 1 118 L.F. 24" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Fft Dollars & No Cents per Linear Foot $50.00 $5,900.00 440 2 32 L.F. 48" Class III R.C. Pipe Including Trench Excavation and Backfill, Complete in Place for the Sum of One Hundred Thirty Five Dollars & No Cents per Linear Foot $135.00 $4,320.00 440 3 387 L.F. 54" Class III R.C. Pipe Including Trench Excavation and Backfill, Complete in Place for the Sum of One Hundred Eighty t Dollars & No Cents per Linear Foot $180.00 $69,660.00 440 4 44 L.F. 60" Class III R.C. Pipe Including Trench Excavation and Backfill, Complete in Place for the Sum of Two Hundred Fifteen Dollars& No Cents per Linear Foot $215.00 $9,460.00 440 5 419 L.F. 72"Class III R.C. Pipe Including Trench Excavation and Backfill, Complete in Place for the Sum of Two Hundred Ninety Five Dollars & No Cents per Linear Foot $295.00 $123,605.00 N:UOB\01 1540\Spec\01 1540.030-Util.doc B 9 "OFFI M HMO SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 440 6 185 L.F. 78" Class III R.C. Pipe Including Trench Excavation and Backfill, Complete in Place for the Sum of Three Hundred Forty Dollars& No Cents per Linear Foot $340.00 $62,900.00 525 7 1,098 L.F. Trench Safety for the Sum of One Dollars & No Cents Per Linear Foot $1.00 $1,098.00 444 8 4 Ea. 15'Standard Curb Inlet, Complete in Place for the Sum of Two Thousand Five Hundred Dollars& No Cents Each $2,500.00 $10,000.00 444 9 2 Ea. 20' Standard Curb Inlet, Complete in Place for the Sum of Four Thousand Dollars & No Cents Each $4,000.00 $6,000.00 444 10 2 Ea. 6' Square Drop Inlet, Complete in Place for the Sum of Four Thousand Five Hundred Dollars & No Cents Each $4,500.00 $9,000.00 11 1 Ea. Standard 9' Square Manhole, Complete in Place for the Sum of Seven Thousand Five Hundred Dollars & No Cents Each $7,500.00 $7,500.00 N:UOB\OI 1540\Spec\011540.030-Util.doc B10 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 444 12 3 Ea. Standard 8' Square Manhole, Complete in Place for the Sum of Six Thousand Five Hundred Dollars & No Cents Each $6,500.00 $19,500.00 410 13 1 Ea. Type B Headwall for 72" R.C. Pipe with sloped end, Complete in Place for the Sum of Two Thousand Five Hundred Dollars & No Cents Each $2,500.00 $2,500.00 410 14 1 Ea. Type C Headwall for 78" R.C. Pipe with sloped end, Complete in Place for the Sum of 't Three Thousand Dollars & No Cents Each $3,000.00 $3,000.00 S.P. 15 301 S.Y. Rock Rubble Rip Rap (18"-24", 18" Deep Min.)for the sum of Forty Five Dollars& No Cents per Square Yard $45.00 $13,545.00 S.P. 16 1 L.S. Storm Water Pollution Prevention Maintenance for the sum of Two Hundred Dollars& No Cents per Lump Sum $200.00 $200.00 17 1 L.S. Material Testing Five Thousand Dollars & No Cents per Lump Sum $5,000.00 $5,000.00 SECTION C --- STORM DRAIN SYSTEM $355,188.00 N:UOB\011540\Spec1011540.030-Util.doc B 11 SUMMARY Section A—Water $ 97,345.00 Section B—Sanitary Sewer $ 80.701.50 Section C—Storm Drain $ 355,188.00 GRAND TOTAL $ 533.234.50 '1 N:\JOB\011540\Spec\011540.030-Util,doc B 12 PART B-PROPOSAL(Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978,which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation &Public Works. 1 The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 5 calendar days after issue of the work order, and to complete the contract within 35 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. X B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. MUOM01154MSpecM 1540.030-Util.doc B12 I (we)acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3(Initials) Addendum No. 2(Initials) Addendum No. 4(Initials) Respectfully submitted, Conastser Construction TX. L.P. By: Title Jerry Conatser, President Address P.O. Box 15448 Fort Worth, TX 76119 Telephone: 817-534-1743 (Seal) Date: N:UOB\011540\Spec\011540.030-Util.doc B 13 III STREETLIGHTS I. STREETLIGHTS COST ESTIMATE: QUANTITY UNIT COST TOTAL COST INTERSECTIONS 3 EA $ 1,900 $5,700.00 MID-BLOCK RESIDENTIAL 6 EA $ 1,900 $11,400.00 CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 1,900 $1,900.00 MID-BLOCK COLLECTOR 0 EA $ 2,600 $00,000.00 MID-BLOCK ARTERIAL 0 EA $ 3,200 $00,000.00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 3,200 $00,000.00 RELOCATE EXISTING LIGHT 0 EA $ 1,650 $00,000.00 Subtotal $19,000.00 City's Cost $00,000.00 Developer's Subtotal $19,000.00 4% Inspection fee $0.00 Project Total $00,000.00 Adjacent Developer's Cost $00.000.00 Developer's Cost $19,000.00 DEVELOPERS COST: $19,000.00 CFA CODE # 2005155 Heritage Addition, Phase III-B, Section 3 Fort Worth, Texas May 25, 2006 PAGE 1 OF EXHIBIT "C" II. STREETLIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and/or collector streets can be installed using overhead or underground conductors with the approval of the director of transportation and Public Works. 3. The City of Fort Worth will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City of Fort Worth the amount shown below prior to the City starting its design efforts, at the option of the developer and at their expense they may purchase the poles, fixtures, and mast arms from the City in order to assure compliance with city material standards 4. Street lights on arterial streets shall be installed with underground conductors 5. The developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operations of the street light system 6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is summarized below. The streetlights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPERS COST: $19,000.00 May 24, 2006 CFA CODE # 2005155 Heritage Addition, Phase III-B, Section 3 PAGE 2 OF EXHIBIT "C" III. STREETLIGHTS LOCATIONS: INTERSECTIONS: Birdville Way & Cargill Dr 1 Birdville Way & Exposition Way 1 Armour Dr & Cargill Dr 1 MID - BLOCK Birdville Way 3 Armour Dr 3 CHANGE OF DIRECTION Armour Dr 1 CFA CODE # 2005155 Heritage Addition, Phase 111-B, Section 3 May 24, 2006 PAGE 3 OF EXHIBIT .. IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following four (4) intersections at a cost to the Developer of$340.00: Armour Dr & Cargill Cir Armour Dr & Exposition Way Birdville Way & Cargill Cir Birdville Way & Exposition Way Note: Contractor installs signs, sign faces (decals) fabricated by the City of Fort Worth for $85.00 per location (4 faces). Heritage Addition, Phase 3B Section 3 CFA code: 2005155 November 30, 2005