HomeMy WebLinkAboutContract 33973 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary A COUNTY OF TARRANT § Contract No. WHEREAS, FULL E [kMES , hereinafter called "Developer", desires to make certain improvements to INW14A4 FAZV- 5WM f PA-Z , an addition to the City of Fort Worth, Texas; and WHEREAS,the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. 04FI C A' WREN T Eve^nan Park South Addition Phase 2 1 CIe �. , U.v U•i�UV g 3 �LG F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to ly, Everman Park South Addition Phase 2 2 °� Q�q� rY construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain(B-1)Attached; Street Lights and Signs (C) Attached. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. Il. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $243,749.70. Everman Park South Addition Phase 2 3 SUMMARY OF COST Everman Park South Addition Phase 2 Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $201,595.40 201,595.40 2. Storm Drainage $15,399.60 15,399.60 $ 3. Street Lights $13,000.00 13,000.00 4. Street Name Signs $735.00 735.00 B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 8,679.80 8,679.80 D. Materials Testing by DOE $ $ 2% 4,339.90 1 1 4,339.90 TOTALS 243,749.70 $ - 243,749.70 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. 5. Paid $58,218.25 for future improvements for Oak Grove Road. 6. Paid $48,253.75 for future improvements for Enon Road. Everman Park South Addition Phase 2 4 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, aid Delo)e has executed this instrument in triplicate, at Fort Worth,Texas this the;&day of ,2006. Approval Recommended: Transportation and Public Works Department Robert Voode, P. E. Director City o orf orth Marc Ott NO M&C REQUIREDAssistant City Manager ATTEST: Marty Hendrix City Secrefary Approve s to Form: z oe�ZI// Assistant py 4&rney ATTEST: DEVELOPER Byre ' Corporate Secretary PV L'11 F 'Y1ES O r-m-eAsi L.P. F-�'K P Kic. LA P*,fT R-ogl wSa V(CI;- PCL -.51 of n At Everman Park South Addition Phase 2 5 � '� BID TABULATIONS FOR PAVING FOR EVERMAN PARK SOUTH,PHASE 2 FORT WORTH, TARRANT COUNTY,TEXAS #1 TOTALS GILCO PAVING $201,595.40 SUBTOTAL $201,595.40 BONDS $3,500.00 OTHER $0.00 TOTAL BID $205,095.40 CALENDAR DAYS 45 CD's START DATE — NOTES: PAVING GILCO ITEM QTY DESCRIPTION UNIT I. 6,450 - 6"STABILIZED LIME SUBGRADE Sy $2.15 $13,367.50 2. 97 - HYDRATED LIME FOR SUBGRADE TON $100.00 $9,700.00 3. 6,237 - 6"REINF CONC PAVEMENT 3000 PSI SY $26.70 $166,527.90 4. 10 - BARRIER FREE RAMPS PER CITY SPEC EA $750.00 $7,500.00 5. 1 - REMOVE EXISTING BARRICADES LS $500.00 $500.00 6. 1 - PPM Bond with 2 Yr. LS $3,500.00 53,500.00 PAVING TOTAL: $201,595.40 12/20/2005 13:26 9724710167 GEE DEVELOPMENT PAGE 04 12/20/2095 11:56 9722190019 MURRAY PAGE 03 515 N.KEALY ST. L6wi5viLLE,TX 75057 (972)4364558 (972)21$0019 FAx Date: 111812W5 Subrnl(W To, Pulte Horne Of Texas L,P, Ertl Title! Everman Park South,Ph.2 Address: 1234 LaKeshore W Nurnbft Suite 750A Prol.ctLoCwUon: Oak Grove&Enon Avenue Coppell,TX 75019 Contact! Steve Gear Project CIW.$Lrta: Fort Worth,TX Phone- (972)304-2814 Fax: (972)304-2915 EnptnextAmh0mat; Welch Engineering, Inc_ Item No. Item Aosasrlpuon Estimated Quantity unit unit Prlce Total Price W14 Water Trench Safety 1,385.00 LF $0.25 $346,2$ Tota)Prioe for the above Water Item&; $70,757.75 Storm Drat aae Q01 21"Class 111 RCP 21.00 LF $33,40 $701.40 002 27"Class III RCP 239,00 LF $39,40 $9,416.80 D03 Strom Oralnetge Trench Safe ty 2ea.00 LF $4.50 $130.00 D04 10'Std.Curb inlet 2.00 EACH $2,175.00 $4,350,00 D05 Connect to Existng RCP 1.00 EACH $300.00 $300.00 006 Remove Existing Headwall 1100 EACH $250,00 $250.00 D07 Remove Existing Rip Rap 1.00 LS $251,60 $251.60 Total Pries for the above Storm Drnlnags Items: $15,399.60 Total Bid Price: M7,730.a5 Pape 2 of 3 04/27/2006 88:07 9722190019 MURRAY PAGE 04 515 N.KEALY ST. LEWISViLLE.TX 75057 (972)436.4566 (972)2190019 FAx flat&: 1 1A 12005 Submitted Tos Pulte Home Of Texas L.P. aid Tide. Everman Park South.Ph.2 Address: 1234 Lakeshore Bid Number- Sulte 750A Pmjact Lawson: Oak Grove&Enon Avenue Coppell,TX 75019 contact: Steve Gee Prefect city,stow: Fort Worth.TX Phone: (972)304.2814 fax: (972)304-2815 rnalnev Archltadr. Welch Engineering,Inc. Item No. Item Descrioan Estimated Quantity Unit Unit Price Tot 1 Price Notes: ' We do not Include sod,seed,hydronwlch,In3pectlon fees,pwmffs,erosion control devices.staking,surveying, street sub-grade verification or certdication.matedats testing,proctors,stabilized construGlon entrance,haul offsite of excess materials from the excavation(R will be deposited in the area back of the curb to the lot building line).alley leaveout at curb Inlets in alley.ROW clearing&hauling of any kind,or sales tax. ' We will require Ten(f0)working days to substantial completion. Wo will require Three(3)working days to final completion. This proposal Is aubject to a mutually agreeable start date. Material costs reflected In the bid Items above can be considered firm if ordered AND shipped by 10-06.2005. If materials are not ordered or shipped by these dates,the bid prices Hated above will be adjusted to market conditions. In addition,the construction schedule may be adjusted. Any testing reWlted after Initial test and acceptance(Post Paving) will be at an additional charge. Murrey Construction Company,Inc.Is certified and approved to instaN dry utiitiles including Atmos Gas,TXU EtecMc Energy.CoSery Electric and Southwestern 801 Telephone. Please contact us for more details. ' This bid assumes Storm Water Portion Prevention Plan Is provided by owner and IIst3 Murray Construction Co., Inc.as a certified operator. All Inspections and reports are to be supptted by and paid for by the ownor/developer with copies forwarded to Murrey Construction. A copy of the SWPPP plan is to be supplied to Murray Construction before construction begins. NOI and NOT to be filed by owner/developer. Murrey can perform any or all of the aforementioned tasks,for pricing please contact us. Payment Terme: Payment due within 20 days of date of invoice. J�Y�v�s�!'� ACCEPTED: CONFIRMED: The above prices,specillcations and conditions Murray Construction Co.,Inc. are satiatsctory and ars hereby accepted. Buyer Authorized Signature Signature Outs or Aecapta.ee Estimator. TA Page 3 of 3 __ I ............... ......... Eli N' RUN.. I W"':E-Lkn, NEIN C .... PRH -T .10.17Y.- l :7 1,9 4 ENGINEER'S ESTIMATE OF ANTICIPATED COSTS EVERMAN PARK SOUTH ADDITION, PHASE 2 Date: Dec. 28, 05 Rev: May 22, 06 B. PAVING (ENON AVENUE ESCROW-614 LINEAR FEET) .A OST:"'. �C NIT:j::;:00S Lime 30#/S.Y. 22.3 TN 105.00 2,341.50 6" Lime Sub rade Preparation 1,489 S.Y. 2.25 3,350.25 6" Reinf. Concrete pvmt. (20.5'width) 1,399 S.Y. 22.00 30,778.00 ,6" Concrete Curb 614 L.F. 2.00 1,228.00 Street Excavation 560 C.Y. 3.50 1,960.00 4' Concrete Sidewalk 614 L.F. 14.00 8,596.00 ADA/Barrier Free Ramps 0 EA 450.00 0.00 $48,253.75 EVERMAN PARK SOUTH ADDITION, PHASE 2 WELCH ENGINEERING,INC. 9001 Airport Freeway,Suite 670 North Richland Hills,Texas 76180 TEL: (817)284-1175 FAX: (817)589-0990 ENGINEER'S ESTIMATE OF ANTICIPATED COSTS EVERMAN PARK SOUTH ADDITION, PHASE 2 Date: May 2, 06 B. PAVING (OAK GROVE ROAD ESCROW-535 LINEAR FEET) ITEM DESCRIPTION QUANTITY UNIT COSTIUNIT TOTAL COST Lime 30#/S.Y. 25.6 TN 105.00 2,688.00 6" Lime Sub rade Preparation 1,709 S.Y. 2.25 3,845.25 7" Reinf. Concrete pvmt. (27'width) 1,605 S.Y. 25.00 40,125.00 6"Concrete Curb 535 L.F. 2.00 1,070.00 Street Excavation 600 C.Y. 3.50 2,100.00 4' Concrete Sidewalk 535 L.F. 14.00 7,490.00 ADA/Barrier Free Ramps 2 EA 450.00 900.00 $58,218.25 EVERMAN PARK SOUTH ADDITION, PHASE 2 III STREETLIGHTS I. STREETLIGHTS COST ESTIMATE: QUANTITY UNIT COST TOTAL COST INTERSECTIONS 3 EA $ 2,600 $7,800.00 MID-BLOCK RESIDENTIAL 1 EA $ 2,600 $2,600.00 CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2,600 $2,600.00 MID-BLOCK COLLECTOR 0 EA $ 2,600 $00,000.00 MID-BLOCK ARTERIAL 0 EA $ 3,200 $00,000.00 MID-BLOCK ARTERIAL MEDIAN 0 EA $3,200 $18,753.28 RELOCATE EXISTING LIGHT 0 EA $ 1,650 $00,000.00 Subtotal $13,000.00 City's Cost $00,000.00 Developer's Subtotal $13,000.00 4% Inspection fee $0.00 Project Total $00,000.00 Adjacent Developer's Cost $00.000.00 Developer's Cost $13,000.00 DEVELOPERS COST: $13,000.00 CFA CODE # 2006053 Everman Park South Addition, Phase II Fort Worth, Texas May 22, 2006 PAGE 1 OF EXHIBIT "C" II. STREETLIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and/or collector streets can be installed using overhead or underground conductors with the approval of the director of transportation and Public Works. 3. The City of Fort Worth will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City of Fort Worth the amount shown below prior to the City starting its design efforts, at the option of the developer and at their expense they may purchase the poles, fixtures, and mast arms from the City in order to assure compliance with city material standards 4. Street lights on arterial streets shall be installed with underground conductors 5. The developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operations of the street light system 6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is summarized below. The streetlights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPERS COST: $13,000.00 May 22, 2006 CFA CODE # 2006053 Everman Park South Addition, Phase II PAGE 2 OF EXHIBIT "C" III. STREETLIGHTS LOCATIONS: INTERSECTIONS: Cherry Bark Lane & Sunburst Dr 1 Cherry Bark Lane & Weeping Cherry Lane 1 Sunburst Dr & Weeping Cherry Lane 1 CHANGE — OF — DIRECTION: Cherry Bark Lane 1 MID - BLOCK: Weeping Cherry Lane 1 CFA CODE # 2006053 Everman Park South Addition, Phase II PAGE 3 OF EXHIBIT "C" Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $245.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following three (3) intersections at a cost to the Developer of$735.00: Cherry Bark Lane & Sunburst Dr Cherry Bark Lane &Weeping Cherry Lane Weeping Cherry Lane & Sunburst Dr Everman Park South Addition, Phase III CFA code: 2006053 May 22, 2006 w w z w w V) JOHN BURGUESSI z x CITY CITY a 35W0 o N kRAMI IE y WORTH �' a PROJL'CT p EVERMAN BARRO L; LOCATION Na RU SE VAUG N EVERMAN — MARIA E $ NEI EDNA ui EDNA ELLEY � O3 ci V CH G w PALETTE a FORUM WAY x MAN a ix 2 J ~ a a V U \ CITY N W F m \ Q Q' w W N. S. 5057 LOCATION MAP D.O.E.ERN O: P164-060164015412 SANITARY SEWER NO:"EVERMAN PARK SOUTH, PHASE 2" STREET/STORM DRAIN P17NO:4W-1757 013407 WELCH ENGINEERiNo, INC. CONSUL TING ENG/NEE-RS ENON ROAD 614 LF-20.5' PAtAkC SECTION (IA11MAiElT 80'RIGHT—or-war) 514 LF-4' C CRE SID SNB RST, DR. � Iso'RIGF+i-or—w�rl / sa.� W_ -- ----� -- .e -' z - b 1 i .—.�--- W ' M .�—. in - 29'8-e a: -Uqk ---•��---- --- O cc GyN)- ox IOOIX DEVELOPER'S COST ---- __ - 6" PAVEMENT W/ 6" CROWN EVER ON 6" LIME SUBGRADE i N PARI<qY DEVELOPER'S ESCROW ON OAK GROVE ROAD 8" PAVEMENT ON 6" LIME SUBGRADE DEVELOPER'S ESCROW ON ENON ROAD 6' PAVEMENT ON 6' LIME SUBGRADE EXHIBIT "B" D.O.E. NO: 5057 SCALE: 1--20 PAVING IMPROVEMENTS WATER NO; P164-060164015412 SANITARY SEWER NO: - "EVERMAN PARK SOUTH, PHASE 2" STREET/STORM DRAIN NO:4W-17574013407 -WELCH 1ENCyR4EERRqCy. INC. CONSUL TNVG ENGINEERS ' � I I ENON AVENUE SL NBURST DRIVE I I � wEEI � Q w J uj bi of U W U I w O f a � I J cy I _J 1 I / I I I �t EVERMANPA ---- /J _— RKWAY -- 10' INLET 100% DEVELOPER'S COST STORM SEWER AND INLET AND ASSOCIATED APPURTENANCES EXHIBIT "B-1 " SCALE: 1"=200' D.O.E. N0: 5057 STORM DRAIN IMPROVEMENTS WATER NO: P164-060164015412 SANITARY SEWER NO:"EVERMAN PARK SOUTH, PHASE 2" STREET/STORM DRAIN P17NO:4W-17577 01 3407 WELCH ENGINEERIN0, INC. CONSULTING ENG/NEE-RS