HomeMy WebLinkAboutContract 33974 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
W I �qCOUNTY OF TARRANT § Contract No:
WHEREAS, BBC Meadows,LP , hereinafter called "Developer", desires to
make certain improvements to Big Bear Creek Meadows,Phase 11 ,an addition to
the City of Fort Worth, Texas; and
WHEREAS,the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant,Denton and Wise Counties,Texas, hereinafter called"City",to do
certain work in connection with said improvements.
NOW,THEREFORE,KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
Big Bear Creek Meadows Ph. II-05 3106 1
CR � ;RRf1?Y
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section Il, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damwes are caused, in whole or in Part, by the alleged negligence of
the City of Fort Worth, its officers,servants, or enw ovees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed(Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
Big Bear Creek Meadows Ph. II -05 3106 2
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain(B-1)Attached; Street Lights and Signs(C)Attached.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
IL Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B,B1,and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to$620,612.24.
Big Bear Creek Meadows Ph. II -05 3106 3
SUMMARY OF
COST
Big Bear Creek Meadows Phase II
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $367,060.75 367,060.75
2. Storm Drainage $188,064.00 188,064.00
3. Street Lights $31,200.00 31,200.00
4. Street Name Signs $980.00 380.00
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
4% 22,204.99 22,204.99
D. Materials Testing by DOE $ $
2% 11,102.50 11,102.50
TOTALS 620,612.24 $ - 620,612.24
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2.Developer's column for Item C represents four percent(4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent(2%)of paving and storm drain
costs for materials testing.
Big Bear Creek Meadows Ph. II -05 3106 4 v �V�G-lam
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in triplicate,at Fort Worth,Texas this the day of
,2006.
RECEIVED
Approval Recommended: JUS! 2 r 2006
Transportation and Public Works
Department
Robert Goode,P. E.
Director
A0City o 0
1`I® tl<C ar..QIJIl�FI� MarclOtt
-_ a_ ---• Assistant City Manager
ATTET:
I'Hendrix
City Secretary
Approved to Form:
i
r
Assista ity(ttorney
ATTEST: DEVELOPER &C j L P
b-) 4Q G-encml k4oer, S400'p- m eQdvw
n1anc:�emen-�LCC
By:
Corporate Secretary Steve McKeever
General Partner
Big Bear Creek Meadows Ph. II-05 3106 5 CITY
FT.
PAVING 11"PROVEMENTS
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO QITANTITY RTI)PRICES WRTI=TN WORDS PRICE AM01TNT
(Furnish and install,including all appurtenant work,complete in place,the following items)
1. 13,555 SY 6-Inch 3,000 PST (See Sheets 13—17)
Reinforced Concrete Pavement
Twen -One Dollars
And Fifty-Five Cents $21-55 $ 292,110.25
2. 14,425 SY 6-Inch Stabilized Subgrade
de
Two Dollars
And Thirty Cents $ 2.30 $ 33,177.50
3. 216 Tons Hy-&ated Time(Estimated 30 lbs/SY)
One Hundred Dollars
And Zero Cents $ 100.00 $ 21,600.00
4. 7,692 LE 7-Tnch Tnteg-al Curb
One Dollars
And Zero Cents $ 1.00 $ 7,692.00
5. 2 EA Tnstall Traffic Bar_ricade(g) (See Sheets 13 & 17)
(T)me ITT)
One Thousand Seven Hundred Dollars
And 7.ero Cents $ 1,700.00 $ 3,400.00
6. 2 EA Remove Ex. Traffic Barricade (See Sheets 13 & 17)
One Hundred Fifty Dollars
And Zero Cents $ 150.00 $ 300.00
7. 8 EA Wheel Chair Ramp
Five Hundred Fifty Dollars
And Zero Cents $ 550.00 $4,400.00
8. 26 LE 4-Foot Concrete Sidewalk (See Sheets 13 & 14)
Twenty Dollars
And Zero Cents $24..00 $ 520.00
9. 117 LE 6-Foot Concrete Flume (See Sheets 15, 16, 18 &21)
Thi-Three Dollars
And Zero Cents $33.00 $3,861.00
P—i—R,TUi11ti--469-001_cdc RIG REAR CRFFK MEAT)nWr PRASF n
PAVING EMPROVEMENTS
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
No QUANTITY RTIC PRICES WRTTTFN IN WORDS PR TCF AMnTTNT
(Furnish and install,including all appurtenant work,complete in place,the following items)
10. 1 LS D nsi Compaction Testing
(Included in Total Bid) Dollars
And Cents $N/A $NZA
11. 1 LS Payment,Pefon-n n .emsn�d _
Maintenance Bonds
(included in Total Bid) Dollars
And Cents $N/A $ N/A
TOTAL AMOUNT BID PAVING IMPROVEMENT $ 367,060.75
STORM DRAIN FACILITIES
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO QITAh11= RITC PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install,including all appurtenant work,complete in place,the following items)
1. 201 LE 54-Tnch RCP Class TTT Pipe (See Sheet 18)
One Hundred Fifty-Right Dollars
And Zero Cents $ 158.00 $ 11,7.58.00
2. 518 LE 48-Inch RCP Class M Pine
One Hundred Dollars
And Zero Cents $ 100.00 $ 51,900.00
3. 670 LE 42-Inch RCP Class ITT Pipe
Eigbly-Seven Dollars
And Zero Cents $ 87.00 $ 58,290.00
4. 18 LE 36-Inch RCP Class TIT Pip_
Si2Lty-Seven Dollars
And Zero Cents $ 67.00 $ 1.206.00
5. 18 LE 27-Inch RCP Class M Pine
Fafty-Nine Dollars
And Zero Cents $49.00 $ 882.00
6. 43 LE 21-Tnch RCP C]2-,s TTT Pipe
Fly Dollars
And Zero Cents $40.00 $1.720.00
7. 1 EA 15-Foot Curb Tnlet
'11ree Thousand Five Hundred Dollars
And zero Cents $3,500.00 $1,500.00
8. 3 EA l 0-Foot Curb Tnlet
Two Thousand Five Hundred Dollars
And Zero Cents $2,500-00 $ 7,500.00
9. 1 EA 5-Foot Sq. Storm Drain MH
Per Std Detail S-SD 8
Three Thousand Four Hundred Dollars
And Zero Cents $2,400.00 $1,400.00
� ,wL ROD
STORM DRAIN FACILITIES
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
-Io OTIANTITY BTT)PRICES,MI=IN WORDS PRICE AMOUNT
(Furnish and install,including all appurtenant work,complete in place,the following items)
10. 2 EA 6-Foot Sq. Storm Drain MH
Per Std.Detail S-SD 9
Four Thousand Six Hundred Dollars
And Z,cro Cents $1,600-00 $9,200.00
11. 1 EA 5 Sided Junction Box
Per Std.Detail S-SD 10
4ix Thouaand Eight HLndred Dollars
And Zero Cents $5,800-00 $6,900.00
12. 1 EA 54-Tnch Type`B"Concrete Hdwl (See Sheet 18& 19)
Per Std.Detail S-SD 11A & 13B
Three Thousand Five Hundred Dollars
And Zero Cents $ 3,500.00 $1.500.00
13. 4 EA Inlet Protection
Seventy-Five Dollars
And Zero Cents $ 75.00 $ 300.00
14. 1 LS Remove Existing Rip Rap/ (See Sheet 18)
Co nection to Existing 42"RCP
One Thousand Five H undre Dollars
And Zero Cents $1,500.00 $ 1.500.00
15. 1468 LE Trench Safety System
(Deeper Than 5'1
One Dollars
And Zero Cents $ 1.00 $1,468.00
16. 131 SY 8"-12"Tn e`A' Dry Rip Rap (See Sheet 18 & 19)
Per NCTCOG Std. Spec.Tem 2.1.6
Folly Dollars
And Zero Cents $40.00 $ 540.00
17. 1 LS Density Testing
(included in Total Bid) Dollars
And Cents $N/A $N/A
18. 1 LS Bonds
(Included in Total Bid) Dollars
And Cents $N/A $N/A
TOTAL AMOUNT BID STORM DRAIN FACILITIES S 198,064.00
TOTAL AMOUNT BID PAVING $ 367,060.75
TOTAL AMOUNT BID WATER $151,242.00
TOTAL AMOUNT BID SEWER $ 1229141,00
TOTAL AMOUNT BID STORM DRAIN $1$$,064.00
GRAND TOTAL AMOUNT BID $ 92_R 507.75
04,i25/2006� 10:02 B1747BO443 JACKSON CONSTRUCTION PAGE 02/03
BIG BEAR CREEK MEADOWS, PHASE II
City of Fort Worth,Texas
BBC Meadows, L.P. Steve Haberstroh
c/o GSWW, Inc. (Mr. Joseph T. Reue, P.F.) Jackson Construction, Ltd.
3950 Fossil Creek Blvd., Suite 210 5112 Sun Valley Drive
Fort Worth, Texas 76137 Fort Worth, Texas 76119
Phone: 817 306-1444 Phone: 817 572-3303
Fax: 817 306-1555 Fax: 817 478-0443
BID PROPOSAL
Bid 8fli: 'Aid: Uhit :61d
Item: hluint : --total.
1 8"DRI 4 PVC WATER PIPE 3,918.000 LF $ 19.00 $ 74,442.00
2 8"GATE VALVE&BOX 12.000 EA $ 750.00 $ 9,000.00
3 CAST IRON FITTINGS 1.000 LS $ 5,000.00 $ 5,000.00
4 FIRE HYDRANT&ASSEMBLY 4.000 EA $ 2,100.00 $ 8,400.00
5 CONNECT TO EXISTING 8"WATER 2.000 EA $ 900.00 $ 1,800,00
6 1"SINGLE WATER SERVICE 104.000 EA $ 460.00 $ 49,920.00
7 1"IRRIGATION SERVICE 1.000 EA $ 480.00 $ 480.00
8 8"PLUG& CAP 2.000 EA $ 100.00 $ 200.00
9 TESTING (PURGING & STERILIZATION) 1.000 EA $ 2,000.00 $ 2,000.00
10 GEOTECHNICAL TESTING 1.000 LS Included Included
11 BONDS 1.000 LS Included Included
SUBTOTAL WATER $ 151,242.00
1 8" PVC SDR35 SS PIPE 2,606.000 LF $ 19.00 $ 49,514.00
2 8"PVC SDR26 SS PIPE 100.000 LF $ 20.00 $ 2,000.00
3 STD.4'DIA.MANHOLE OVER EXISTING 2.000 EA $ 2,300.00 $ 4,600.00
4 STD.4'DIA. MANHOLE WANT INSERT 10.000 EA $ 2,100.00 $ 21,000.00
5 - ADJUST RIM OF EXISTING MANHOLE 4.000 EA $ 600.00 $ 2,400.00
6 4"SERVICE W/TWO-WAY CLEANOUT SDR35 57,000 EA $ 330.00 $ 18,810.00
7 4"SERVICE W/TWO-WAY CLEANOUT SDR26 47.000 EA $ 430.00 $ 20,210.00
8 8"SEWER PLUG 2.000 EA $ 75.00 $ 150.00
9 TESTING TV 2,706.000 LF $ 1.00 $ 2,706.00
10 TRENCH SAFETY 1.000 LS $ 1.00 $ 1.00
11 TESTING-VACUUM MANHOLE 1.000 LS $ 750.00 $ 750.00
12 GEOTECHNICAL TESTING 1.000FLF�� '
Included Included
13 BONDS 1.000 Included Included
SUBTOTAL SEWER '� � $ 122,141.00
1 54"RCP CL.III 201.000 158.00 S 31,758.00
2 48"RCP CL.III 518.000 LF $ 100.00 $ 51,800.00
3 42"RCP CL.III 670.000 LF $ 87.00 $ 58,290.00
4 36"RCP CL.III 18.000 LF $ 67,00 $ 1,206.00
5 27"RCP CL.111 18.000 LF $ 49.00 $ 882.00
6 21" RCP CL-111 43.000 LF $ 40.00 $ 1,720.00
7 15'CURB INLET 1.000 EA $ 3,500.00 $ 3,500.00
8 10'CURB INLET 3.000 EA $ 2,500.00 $ 7,500.00
9 5'SQUARE STORM DRAIN MANHOLE 1.000 EA $ 3,400.00 $ 3,400.00
Jackson Construction,Ltd,Confidential 4/25/2006 Page 1
04.+25/2005 10:02 8174780443 JACKSON CONSTRUCTION PAGE 03/03
BIG BEAR CREEK MEADOWS, PHASE 11
City of Fort Worth,Texas
BID PROPOSAL
.Bid. Lltyit. Bid
Item ecwii�ll i„ :::Ctytr>�# .._.. : . tif�iit:;: :did: t1ytI:
�!
10 6'SQUARE STORM DRAIN MANHOLE 2.000 EA $ 4,600.00 $ 9,200.00
11 5 SIDED JUNCTION BOX 1.000 EA $ 6,800.00 $ 6,800.00
12 54"CONCRETE HEADWALL 1.000 EA $ 3,500.00 $ 3,500.00
13 INLET PROTECTION 4.000 EA $ 75.00 $ 300.00
14 REMOVE RIP RAPICONNECT TO 42"RCP 1.000 LS $ 1,500.00 $ 1,500.00
15 TRENCH SAFETY SYSTEM 1,468.000 LF $ 1.00 $ 1,468.00
16 8"-12"ROCK RIPRAP 131.000 SY $ 40.00 $ 5,240.00
17 GEOTECHNICAL TESTING 1.000 LS Included Included
18 BONDS 1.000 LS Included Included
SUBTOTAL STORM DRAIN $ 188,064.00
1 6"3000 PSI CONCRETE PAVEMENT 13,555.000 SY $ 21.55 $ 292,110.25
2 6"STABILIZED SUBGRADE 14,425.000 SY $ 2.30 $ 33,177.50
3 HYDRATED LIME (EST. 30LB/SY) 216.000 TN $ 100.00 $ 21,600.00
4 7"INTEGRAL CURB 7,692.000 LF $ 1.00 $ 7,692.00
5 TRAFFIC BARRICADE TYPE 111 2.000 EA $ 1,700.00 $ 3,400.00
6 REMOVE EXISTING TRAFFIC BARRICADE 2.000 EA $ 150.00 $ 300.00
7 WHEELCHAIR RAMP 8.000 EA $ 550.00 $ 4,400.00
8 4'CONCRETE SIDEWALK 26.000 LF $ 20.00 $ 520.00
9 6'CONCRETE FLUME 117.000 LF $ 33.00 $ 3,861.00
10 GEOTECHNICAL TESTING 1.000 LS Included Included
11 BONDS 1.000 LS Included Included
SUBTOTAL PAVING $ 367,060,75
TOTAL AMOUNT BID $ 828,507.75
Jackson Construction, Ltd, will hold the above pricing for 30 calendar days. We appreciate the opportunity to
offer this proposal and hope we are the successful bidder. If we can be of further assistance please do not
hesitate to call.
Jackson Construction,Ltd,Confidential 4/25/2006 Page 2
III STREETLIGHTS
I. STREETLIGHTS COST ESTIMATE:
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 4 EA $ 2,600 $10,400.00
MID-BLOCK RESIDENTIAL 5 EA $ 2,600 $13,000.00
CHANGE OF DIRECTION RESIDENTIAL 3 EA $ 2,600 $7,800.00
MID-BLOCK COLLECTOR 0 EA $ 2,600 $00,000.00
MID-BLOCK ARTERIAL 0 EA $ 3,200 $00,000.00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 3,200 $00,000.00
RELOCATE EXISTING LIGHT 0 EA $ 1,650 $00,000.00
Subtotal $31,200.00
City's Cost $00,000.00
Developer's Subtotal $00,000.00
4% Inspection fee $0,000.00
Project Total $00,000.00
Adjacent Developer's Cost $00.000.00
Developer's Cost $31,200.00
DEVELOPERS COST: $31,200.00
CFA CODE # 2006055
Big Bear Creek Meadows, Phase II
Fort Worth,Texas May 18, 2006
PAGE 1 OF EXHIBIT "C"
II. STREETLIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the approximate locations
shown in exhibit "C", immediately after final acceptance of the street construction, in
accordance with engineering plans and specifications approved by the Transportation and
Public Works Department.
2. Streetlights on residential and/or collector streets can be installed using overhead or
underground conductors with the approval of the director of transportation and Public
Works.
3. The City of Fort Worth will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to pay the City of
Fort Worth the amount shown below prior to the City starting its design efforts, at the option
of the developer and at their expense they may purchase the poles, fixtures, and mast arms
from the City in order to assure compliance with city material standards
4. Street lights on arterial streets shall be installed with underground conductors
5. The developer agrees to dedicate all easements required for the installation and
maintenance of the street lights and to provide for the installation of any electrical
transformers required for the proper operations of the street light system
6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is
summarized below. The streetlights will remain the property of, and will be maintained by
the City of Fort Worth.
DEVELOPERS COST: $31,200.00
May 15, 2006
CFA CODE # 2006055
Big Bear Creek Meadows, Phase II
PAGE 2 OF EXHIBIT "C"
III. STREETLIGHTS LOCATIONS:
INTERSECTIONS
Hanna Rose Lane & Grizzy Hills Cir (E) 1
Hanna Rose Lane & Grizzy Hills Cir (W) 1
Hanna Rose Lane & Polar Brook Dr 1
Kenny Dr & Polar Brook Dr 1
CHANGE — OF - DIRECTION
Grizzy Hills Cir (E) 1
Grizzy Hills Cir (W) 1
Polar Brook Dr 1
MID - BLOCK
Hanna Rose Lane 1
Grizzy Hills Cir 1
Polar Hbrook Dr 3
CFA CODE # 2006055
Big Bear Creek Meadows, Phase 11
PAGE 3 OF EXHIBIT "C"
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following four (4) intersections at a cost
to the Developer of$980.00:
Hanna Rose Lane & Grizzly Hills Cir (E)
Hanna Rose Lane & Grizzly Hills Cir (W)
Hanna Rose Lane & Polar Brook Dr
Kenny Dr & Polar Brook Dr
Big Bear Creek Meadows, Phase II
CFA code: 2006055 May 15, 2006
F NOISE B. All noise—sensitive uses will whose name is subscribed hereto, hereby dedicates to the use of the
5 decibel reduction from outside to public forever, all streets, alleys, water courses, drains, easements,
rights—of—way, and public places thereon shown for the purpose and
'S consideration therein expressed.
ordinance implementing the assessment
wastewater impact fees. The total amount Witness my hand this
filing date of this plat application,
the current impact fee ordinance. The --------------------day of----------------'2006
be determined under Schedule II of said ----------------------------------------------------------
ve on the date the building permit is
to the municiple water and/or
------------------------------------------------------------
Authorized Agent, BBC Meadows, L.P.
conformance with the approved roadway
sd before any building permit is issued STATE OF TEXAS §
some insyances may be adequate. ) COUNTY OF TARRANT §
the a drainage study may be required,
ettet t drainage improvement. The BEFORE ME, the undersigned authority, a Notary Public in and for said
Work to the Department re County and State, on this date personally appeared Steve McKeever known
Works Director stating awareness that a to me to be the persons whose name is subscribed to the foregoing
luired before any permit is issued. the
buyer of the some. instrument and acknowledged to me that he executed the same for the
purposes and consideration therein expressed.
beheld responsible for the IES
of GIVEN UNDER MY HAND AND SEAL OF OFFICE this the
at be
operation of any lots containing private
ntified as such on this plat. Said lots
ore not limited to: private streets. --------------------day �--------------------
and goted private entrances; recreation, ------------------------------------------ 2006.
-as; water and wastewater distribution,
----------------
.ies; and clubhouse, recreation buildings
id owners and subsequent owners of the
ision, acting jointly and severally as a --------_-----------r----------------------'------ ---'-�------
be responsible for such construction, Notary Public in and for the State of Texas
d operation of the subdivisions private
and sholl agree to indemnify and hold
h, Texas, from all claims, damages and
ing from the performance of the
Dciotion, as set forth herein.
FINAL PLA T
BIG BEAR CREEK MEADOWS
Lots 27-32, Block 1, Lots 22-42, Block 3
Lots 1 -20, Block 4, Lots 1 -34, Block 5
Lots 1 -23, Block 6 and Lot X, Block 6
BEING A 22.3986-ACRE TRACT OF LAND
AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS,
SITUATED IN THE JESSE BILLINGSLEY, ABSTRACT No. 70, TARRANT COUNTY, TEXAS.
SE II
PHA
ZONED PD 478
104 RESIDENTIAL LOTS AND 1 PRIVATE OPEN SPACE
CASE NUMBER: FP-006-018
This Plat Filed in Cabinet , Slide , Dated
W O
O
clq
V C/
LAJ
V)
Am
a�
'. 777.
. rT1
W
44 lz
71
............
a
o
W
[-�
W
�#
az
IT-
o
U E�
w a
_ as
as
J
� d £
f
-
41 ..
w N p 3 Q
pp3
11 Q: W Q
W
Q zLLJ
o � Z
cV U U Z
O
NC) CAD C4
ON
J �
" e cL Y � U
Z cp W
LLJ
— / 9 MDO78 J
� R -
I
^ F a
i
zg ........ O—.I
gR�
o
I
IS
._.. .........� R
I oto 4rfl
� � x
a W
................
.................
' I G�1 dwarf
' 1
I
s
R 1
R I
i
i
i
'n e .'1VR0%NN3ii;r .� .i•. �.,..;. 3NW ANK�.M
r ••
r
F F R e
` Vvi
y:—' - z X3079BOdPZ and :s : � m_f'.,'• R u/117 ADO 1124M Ml
uW'u
1D1BOAM0nSadM CITY
T�
�-
�E
�JZ ]GIs Y13 �
RD d YdBORl
SOMM M33W ffW F -w7 WJ1O9MIMO DR71KIMVOW b MMWm
Ll
NMO ORY I53NBY3
0
w o
N
II ?
D
J
Z
4 CL (n
a y 1-C p Ci W W
a s
Q 41
Lu a ci o
T—
CL v
U _
_ CN
goo a W
_ 37aH1�STlgl AYZkY3 Qp' a
/ ...... ..........
.....� ..—_
R i Z
0 W
E-
A O V
zi
�y e
unn AO W".i603 N
- � — 3Tad10 S1llH AYZIH914
R
j R
1 -
--1 ... .._.... . ..... ...-.. ....
d0d .ati •dodd
s R rxa3B I ^ R M1XX70Y Y L/ JVJ✓Lu 1�LSl�� �'
imi?AO HLOM MO)
QiWd 03WZ yyyry' LYl1fYJ YJINOl1 AlAY00
'AlW103 LY l SAW.W IYN _ 'I
V lot 301E r L*fm ^ l•dl d WW 5 •u
!k TJYd BfbB]M71N %,7
3N0 3S1Nd it-- qry
w3W 3% b .� t `\ a 'un i+
..M00V311 1133N0 YY>B 90 I) I\' \ ( 9m WHO aw 13iRar3 � ■ '_'�%%::U�:y �L S�`.a
C)
w N
� J �
LAJ
CL
O O
AW MOM&Md
y- m s - - -
I ���, ��j�,• 3MW 5711 A1Z2W
L F�1
e ga
E- U
ISR PM-4
1X117 UID N7rYJ41:NOI
Tl=5711 A�L
/, s
ti I I, I i
14a)'IN IM l
R
L NJOId 1 1 Mb= E e A W
8LMd C7NJ7 7W7,U1J hilkM Imi _W
�IIOD:NY 1 ,6"3l4 11^d _ 1WKA7 i!Y.AC)N 1 AINg07 x
71101 7075 V IiW71 7'1'fNO
FY)3 I7T DVJ XN J-KM v Q
NINDM 7Af 3 I �\ I 7Nri0A
, =
! 3N I mw ON,ING ONV
SMOOV3X"In)&39 VNV117 ON ISANW3