Loading...
HomeMy WebLinkAboutContract 33985 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. a�p Glz�,-7 WHEREAS, One Prairie Meadows, Ltd. , hereinafter called "Developer", desires to make certain improvements to The Villages of Woodland Springs West, Phase VI Section 4 , an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acne A V't""E . City. E. The Developer shall award all contracts for the co stlution .of, H'21,,L community facilities in accordance with Section 11, paragraph 7 of the Policy. 11 q AIJ 13 1I 1 F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged neg-ligence of the City of Fort Worth, its officers, servants, or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to 2 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B 1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $607,035.24. C11-MIC-111i�: Re SUMMARY OF COST Villages of Woodland Springs West Phase A Section 4 Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $365,831.60 $365,831.60 2. Storm Drainage $214,783.05 $214,783.05 3. Street Lights TRI-Count $2,496.00 $2,496.00 4. Street Name Signs $700.00 $700.00 B. Engineering Design $ C. Construction Engineering and Management by DOE 4%) $23,224.59 $23,224.59 TOTALS $607,035.24 $ - $607,035.24 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. z IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the day of , 2006. RECEIVED Approval Recommended: JUN 0 7 2006 Transportation and Public Works Department Robert Goode, P. E. Director MOtt rt 6�� NO MtL _ e`L T.-2- D Assistant City Manager ATTEST: naaA± 1n Marty Hendrix V City Secretary Appro to Form: a f c-xA5 Liw� rD —PAT T1VCF--`1P Assista Cit Attorney B y� CcNtRw�T14 2 'TE22,h5 , �-•�•C Q f eXAs Liwi I TFb La Ad/t 11y e,&MPAWY, .i Ts 6ENGxAt f WarIYEr ATTEST: DEVELOPER By: ��� Corporate Secretary AC-HX-b1kb A40AYF01, QAr1Ac-7FR MR] 5 01/06/2006 13:58 8177351613 CONSTRUCTION OFFICE F'41(3E 02 OFFICE PHONE GILCO COKTRA.CTING, INC. FAX NUMBER: (817)735-1600 4200 S. HULEN$T.,SUITE 513 (817)735-1613 FORT"WORTH,TEXAS 751M PROPOSAL_ PROJECT:THE VILLAGES OF WOODLAND SPRINGS WEST OWNER: One Prattle Meadows, LTD. BID DATE January 6,2006 < ITEM NO DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL BID Phase V,Section 8 1 6"Lime Stabili and Subgrade SY 14,412 $1.75 $25,221.00 2 Hydrated Lune 0 30lbs/SY TON 216 $98.00 $20,520.00 3 6"Reinforced Concrete Street Pavement SY 13.982 $19.95 $278,940.90 with 7"Curb 4 Remove Barricade LS 1 $250.00 $250.00 5 End of Road Barricade LF 28 $55.00 $1,540.00 6 V Sidewalk SF 587 $3.00 $1,761.00 7 Street Header LF 28 $7.50 $210-00 8 InstallationNaintainance of Stormwater Mgmt LS 1 $250.00 $250.00 Phase V,Section 8 Subtotal x i28,69Z 9d Phase 1/l,SecOcw 4 1 6'Lime Stabilized Subgrade SY 15,374 $1.75 $26,904.50 2 Hydrated Lime @ 30WSY TON 231 $95.00 $21,945.00 3 V Reinforced Concrete Street Pavement SY 14,898 $19.95 $297,215.10 with 7"Curb 4 Side-walks SF 3,856 53.00 $11,568.00 5 Dam Sidewalk SF 1,200 $5.00 $6.000.00 6 Remove Existing Pavement LF 89 $15.00 $1,335.00 7 Remove Existing Sidewalk SF 354 $1.00 $364.00 8 Remove Existing Barricade EA 1 $250.00 $250.00 9 Storm Water Management LS 1 $250.00 $250.00 Phase WJ,SoCiion 4 Subtotal 5365,631.60 Total Amount Bid b694,5?A.50 Page 1 of 2 M 'i � nrr,� n J �-G1 o 01/36r2D06 :::5fi 8177351613 CONSTRUCTION OFFICE PAGE 0? OFFICE PHONE GILCO CONTRACTING r =C_ J FAX NUMBER: (817)735-1600 4200 S. HULEN ST.,SUITE 513 (817)-735-1613 PORT WORTH,TEXAS 76109 PROPOSAL i PROJECT;THE VILLAGES OF WOODLAND SPRINGS WEST OWNER: One Prairie Meadows, LTD. 810 DATE: January 6,2006 IDD NO DESCRIPTiON 1UNfflQ9AFV_TY1UR1_TPRICEJ TOTAL BID QUALIFICATIONS AND/OR EXCLUSIONS: 1. Gtico's bid Is based on one move-in for all work quoted in this proposal. 2. Gilco sloes not include testing,staking.layout,AGC dues,permit fees,inspection fees, sodding,sodding, hydromulching,erosion control devices,pavement markings,electrical or Irrigation conduits,sleeves,or street signs. 3. Gilco does not include sates taxes on materials Incorporated into this project. 4. Giloo win accept subgrade at plus or minus one tenth of a foot with aspect to plan grades. 5. Gilco does not include clean-up of parkways,etc after franchise utility companies. S. This proposal shall remain good for 15 days.These prices are based upon this work being performed within 6 months of the bid date.Should the project be decayed longer than 6 months for any_reason,than Grlco reserves the right lA re-negotiate the unit prices due to the large fluctuations in material prices caused by the volatile prices of W. 7. Gilco will submit monthly pay applications for work complete through the end of the month. Payment shall be due on the 10th of the fallowing month. 8. Gilco reserves the right to approve Owner's credit prior to executing an agreement. 9. It iS the intent of this proposal that all monks due Gilco. Including final retainage,w111 be paid within 30 days of City acceptance of the project Any stoppage of work more than 30 days not directly attributable to Gi1co will be cause for immediate payment of all retainage and any other amounts which are owed at that time. 10. Owner to provide adequate clearing to property construct streets full-wW11b utilizing a slip form paver, concrete belt placer and concrete haul trucks, 11. G11co does not include the cost of exposing or relocating franchise utilities. 12. G41co does not Include design,Implement0on,or operating a storm water pollution prevention plan. 13, Gilco does not Include relocating dr instalrmg a construction enbanoe.If Gilco is required to r+alocate or Install a constructien entrance,a charge of$1,500.00 per each shall be applied. 14.Gilco's bid is based on Owner providing subgrade that Is suUble for lime stabilization.Any rock encountered shag be undercut and replaced with suitable material.This applies to street and/or alley subgrade and parkway areas_ If required,Gilco can perform this work on an hourly basis. 15.Gilco does not inclu&sulfate treatment; if sulfate's are encountered then Elco will price according to the City or Lab requirements for Sulfate Treatment 16. Giico's construction schedule is SubJeCt to the availability of local raw materials at the time of ooh90iction. 17. Owner to provide an on-site suitable location for Ggco-to erect and operate a portable concrete batch punt. 18. Gilco wig complete this project within 40 VVORtUNG days, Sincerely, GILCO CONTRACTING, INC. Jamey C. 13urchett Contract Manager Page 2 of 2 01/09/2006 14:00 FAX 11722869178 Z002/003 Four D Construction, Inc. 1 I 11200 Old Seagoville Road Balch Springs,TX 75180 Phone: (972)286-0094 FAX: (972)266-9178 www,Fovrt7Gon:tn+ct�oe.com Date: 1/9/2006 To: Ms.Jean Marie Alexander Carter&Burgess,Inc. 777 Main Street Fort Worth,Texas 76101 Project/ Villages of Woodland Springs West-Phase VI,Section 4 Location: Fort Worth,Texas Four D Construction,Inc.is pleased to provide a quote for the above referenced project Please review the following bid Items and associated costs.This quote is based on plans provided by: Carter&Burgess,Inc. BID ITEM ITEM DESCRIPTION QTY UofM UNIT PRICE EXTENDED PRICE 1 8'PVC DR-14 3543 LF $19.55 $69,265.65 2 8"GATE VALVE 10 EA $850.00 $8,500.00 3 6"PVC OR-14 808 LF $15.00 $12,120.00 4 6"GATE VALVE 8 EA $657.00 $5,256.00 5 FIRE HYDRANT 6 EA $2,460.00 $14,760.00 6 1'COPPER SERVICE 118 EA $386-00 $45,548.00 7 METER BOX FOR 1"SERVICE 118 EA $100,00 $11,800.00 8 CAST IRON FITTINGS 2.12 TN $3,222.00 $5,830.64 9 TRENCH SAFETY 4351 LF $0.25 $1,087.75 10 CLASS B RC(2500)ENCASEMENT 5 CY $80.00 $400.00 11 CLASS E RC(1500)ENCASEMENT 5 CY $70.00 $350.00 12 CRUSHED LIMESTONE 10 CY $35.00 $350.00 13 BALLAST STONE 10 CY $30.00 $300.00 14 STORM WATER MANAGEMENT 1 LS $250.00 $250.00 15 2'COPPER IRRIGATION SERVICE 2 EA $1,465.00 $2,930.00 SUB-TOTAL $179,748.04 21 8"SDR-35 PVC 3385 LF $23.00 $77,855.00 22 8"SDR-26 PVC 807 LF $26.70 $23,160.90 23 8"SDR-26 PVC Wl CEM_STAB. BACKFILL 420 LF $32.00 $13,440.00 24 4'MANHOLE 17 EA $2,720.00 $46,240.00 25 4"SEWER SERVICE(SDR-26) $1 EA $380.00 $19,38.0.00 26 4-SEWER SERVICE(SDR-35) 67 EA $370.00 $24,790.00 27 TRENCH SAFETY 4612 EA $0.35 $1,614.20 28 CLASS B RC(2$00)ENCASEMENT S CY $80.00 $400.00 29 CLASS E RC(1500)ENCASEMENT 5 CY $70.00 $350.00 30 CLAY DAM 15 EA $200.00 $3,000.00 31 BALLAST STONE 10 CY $30.00 $300.00 32 CRUSHED LIMESTONE 10 CY $35,00 $350.00 33 MANHOLE VACUUM TEST 17 EA $100.00 $1,700.00 34 STORM WATER MANAGEMENT 1 LS $250.00 $250.00 SUB-TOTAL $212,830.10 41 48"CLASS III RCP 164 LF $117,00 $19,188.00 42 36"CLASS Ili RCP 38 LF $76.35 $2,901.30 43 33"CLASS III RCP 269 LF $67.00 $18,023.00 44 27"CLASS 111 RCP 466 LF $51.25 $23,882.50 45 24"GLASS III RCP 286 LF $43.00 $12,298.00 01;09/2006 14:00 FAX 9722869.178 Q003/003 45 21'CLASS III RCP 158 LF $37.50 $5,925.00 47 TRENCH SAFETY 1381 LF $0.25 $345.25 48 10'STD.CURB INLET 7 EA $2,530.00 $17,710.00 49 15'STD.CURB INLET 2 EA $3.100.00 $6.200.00 50 48'TYPE B HEADWALL 1 EA $2,175.00 $2,175.00 51 24"31 TYPE C HEADWALL 1 EA $1,240.00 $1,240.00 52 4'SQUARE MANHOLE 3 EA $2.800.00 $8,400.00 53 5'SQUARE MANHOLE 1 EA $3,600.00 $3,600.00 54 18"-24"ROCK RIP-RAP 108 SY $65.00 $7,020.00 55 18"-24"DAM ROCK RIP-RAP 935 SY $65.00 $60,775.00 56 18"-24"SPILLWAY ROCK RIP-RAP 355 SY $70.00 $24,850.00 57 STORM WATER MANAGEMENT 1 LS $25x.00 $250.00 SUB-TOTAL $214,783.05 71 PAYMENT,PERFORMANCE&MAINT.BOND 1 LS $14.750.00 $14,750.00 SUB-TOTAL $14,754.00 TOTAL $622,111.19 PROVISIONS: 1.Erosion control for stage one inlet protection(inlet bottoms only)Is included and all other erosion control and maintenance by others. Z.All underground utility Conflicts to be relocated by others. 3.Proposal based on utility work being installed prior to any new gas,electric,cable or other utilities. 4.Utility spoils will be stockpiled onsite at a location approved by owner, 5.Excluslons_ a.Tree Protection and Clearing f. Inspection Fee:and Permits b.Lan(Zcaping and Sprinklers g.Construction Staking,Layout and Surveying c.Traffic Control h,Additional Mobilization d.Seeding,Sodding and Hydromulching i. Lab Cost and Water Meters e.Density and Soils Tasting 6.Roadway sub-grade must be+/-0.20 of a foot prior to construction and will be returned to like condition upon completion. 7.Due to erratic pipe prices,this pricing is valid for 7 days from date above. Signed: Name: Jason J. aniels Title: Executive Vice President III. STREET LIGHTS: 1 . STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 6 EA $ 0, 000 $00, 000. 00 MID-BLOCK RESIDENTIAL 7 EA $ 01000 $00, 000. 00 CHANGE OF DIRECTION RESIDENTIAL 3 EA $ 01000 $00, 000. 00 MID-BLOCK COLLECTOR 0 EA $ 01000 $ --0-- MID-BLOCK ARTERIAL PARKWAY 0 EA $ 01000 $ --0— MID-BLOCK ARTERIAL MEDIAN 0 EA $ 01000 $ __0__ RELOCATE EXISTING LIGHT 0 EA $ 0, 000 $ --0-- 0 (200 watt lights) x $7. 05 (per light) x 24 months = $00, 000. 00 16 (100 watt lights) x $6. 50 (per light) x 24 months = $2,496.00 Total: $2,496.00 The Street Lights will be installed by TRI County Electric Cooperative the developers initial 24- month power charge will be $2,496.00 After the initial 24-month power charge the City of Fort Worth, WILL ASSUME THE POWER COST. CFA CODE #2005109 THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE VI-SECTION IV August 27, 2005 Fort Worth, Texas August 31, 2005 PAGE I OF EXHIBIT C 2. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of THE Director. 3. Streetlights on arterial streets shall be installed with underground conduit and conductors . 4 . The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit at a depth not less than 30 inches and at least 18-inch behind the curb, "clear from all other utilities". 5. The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit between streetlights proposed for installation and the power source to become operational . 6. A 3-inch schedule 80 PVC conduit is required when crossing streets at a depth not less than 30 inches, unless indicated otherwise on the plans concrete pull boxes shall be provided at the crossing points. 7 . The developer shall pay the initial two year power cost to TRI- COUNTY ELECTRIC COOPERATIVE, after the initial two year cost the City of Fort Worth, will assume the power cost. 8 . The developer or their contractor shall contact City' s street light division 48 hours prior to starting any installation of conduit and/or streetlights at (817) 871-6596 to insure proper inspection of work. TOTAL DEVELOPER' S COST $2,496. 00 THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE VI-SECTION-IV August 27, 2005 Fort Worth, Texas August 27 , 2005 PAGE II OF EXHIBIT C CFA CODE #2005109 "STREET LIGHTS" INTERSECTIONS DOGWOOD SPRINGS DR & WOODS EDGE TRL 1 DOGWOOD SPRINGS DR & LONESOME PINE PL 1 WOODS EDGE TRL & PINE HOLLOW DR 1 WOODS EDGE TRL & LONE TREE IN 1 WOODS EDGE TRL & TIMBERLAND BLVD 1 LONESOME PINE PL & LONE TREE IN 1 MID BLOCK DOGWOOD SPRINGS DR 2 LONESOME PINE PL 1 WOODS EDGE TRL 2 LONE TREE LN 1 PINE HOLLOW DR 1 CHANGE OF DIRECTIONS DOGWOOD SPRINGS DR 1 LONE TREE LN 1 PINE HOLLOW DR 1 THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE VI-SECTION IV PAGE III OF EXHIBIT C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following seven (7) intersections at a cost to the Developer of $700.00: Woods Edge Tr & Timberland Blvd Woods Edge Tr& Lone Tree Lane Woods Edge Tr & Dogwood Springs Dr Woods Edge Tr &Pine Hollow Dr Lonesome Pine PI & Lone Tree Lane Lonesome Pine PI & Dogwood Springs Dr Dogwood Springs Dr& Lone Tree Lane Villages of Woodland Springs West, Phase VI, Section 4 CFA code: 2005109 August 20, 2005 D h Q Jy � ?�tY t V i ......._.KE1.LER.- ASLEr RD.......... ................. ......... _........ �A _ WESTPORT ...... - - - PKWY. /a 3P U ? S rj S ,0 Y, h 2 { PRO J CT ' SI '� o .., �MBER�plk) L.VD 4/ 2 � m � '^ KELIER HICKS 2 ;w 0000- m; or PRIG ST. J j GOLDEN )nI a4 � TRIANGLE BLVD. OO � 0 I�Q O � U�LJI O FM 1709 0 ��I D �o DD D a NOT TO SCALE LOCATION MAP THE VILLAGES OF WOODLAND SPRINGS WEST PHASE VI - SECTION 4 L �n-7, !gess U ,INC Ya F® 16 fern )10. 1.0001 DCN=g:\job\ 013892\cjv\ 8921c-fc.dgn PACE 1 OF 7 N SCALE: 1" = 300' PI O I� .......... .... .... .... .... ..... PRIVATE I i- I` ....• OPEN SPACE I P N SD DI I I ` PUBLIC ' •I z W PARK 0 :1 \\ . . ...... ........ ..- • ............ _...... •, ... �y L N E :. ......... ......... TIMBERLAI.Iij BOULEV -- LEGEND PROP, 29' B/B / STREETS ROADWAY/50' ROW f EXHIBIT 'B' PROP. 4 1 ' B/B THE VILLAGES OF ROADWAY/60' Row WOODLAND SPRINGS WEST PROP. 4' S I DEWA-K ....... PHASE VI — SECTION 4 ............................. ( BY HOMEBUILDER) PROP. 4' S I DEWALK Carter r Burgess ( BY DEVELOPER) CARTER $ BURGESS,INC. 777 MANN STREET LIMITS OF PROJECT -------- FORT WORTH,T%76102 18171 7JS-6000 PROJECT NO. 013892.010. 1.0001 DGN=g:\job\ 013892\civ\ 8921cfc.Ogn PAGE 4 OF 7 N SCALE: i" = 300' — PI IlO 4'MHCP RIVE 10, 33"RCP PRIVATE J OPEN SPACE - Ex.27•.RCPI 1 f 4'MH �21"RCP 21"RCP I ,; I 10, 1 48,Rk ID G O 36"RC 4 CP— 5'MH 8" !............. 1" HOWL S G RI �. CP '?•. .c 4'MH 1. ' 15 .`" .__......... 21'RCP 1 PUBLIC L `. C7 PARK z w 1 w I \ x \ c� �a o, AI \ C7 O a9.y p� 1 � rJ TIMBERLAND B ULO EV- ARD STORM DRAIN LEGEND EXHIBIT 'B-l' PROP, STORM DRAIN LINE THE VILLAGES OF PROP, INLET T WOODLAND SPRINGS WEST PROP, MANHOLE PHASE VI - SECTION 4 PROP, HEADWALL Carter Rx Burgess r EXIST, STORM DRAIN LINE _____________ CARTER & BURGESS,INC. 777 MNN STREET L IMI TS OF PROJECT ------ FORT WORTH,Tx 76102 (817)7356000 PROJECT NO. 013892. 010, 1.0001 DCN=g:\job\ 013892\civ\ 8921cfo.ogn PAGE 5 OF 7 Iry WN SCALE: ]" = 300' ---_ H L O D I _ O �� ! P RrVATE OPEN I SPACE .. ........... DO \ S S R_ C 1 � . PUBLIC PARK r� 0 '-- - � - _- 'ITMBERLAND BOULEyARD ----- STREET LIGHTS LEGEND EXHIBIT 'C' PROP. SINGLE STREET LIGHT THE VILLAGES OF EXIST. SINGLE STREET LIGHT WOODLAND SPRINGS WEST ( ON STEEL POLE WITH STREET PHASE VI - SECTION 4 AND STOP SIGNS ATTACHED% PROP. STREET SIGN Carter;'u Burgess EX I ST. STREET SIGN Q CARTER & BURGESS,INC. LIMITS OF PROj'-CT --------- 777 WH STREET FO0.T WORTH,TX 76102 (917)735-6000 PROJECT NO. 013892.010. 1.0001 DGN=g:\job\ 013892\civ\ 892icfa.Ogn PAGE 6 OF 7