Loading...
HomeMy WebLinkAboutContract 34191AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO,34 �qj (M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Stream Water Group, (Engineer) made and entered into City Secretary Contract No. 32125 , (the Contract) which was authorized by the City Council by M&C C-20814 on the 28th day of June 2005; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street Reconstruction, Water and Sewer Replacement on Bertrose Ave (Mattison Ave to Dorothy Ian), Clarke Ave (Camp Bowie Blvd. To Virginia P1), and Modlin Ave (Haskell St to West Dead End), 2004 CIP Contract Year 2, Contract 23, Project No. 00167: DOE No. 4912 Water Project No. P253-0671700167 Sewer Project No. P258-0771700167 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 31, 2006, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $30,590.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall exceed the sum of $132 , 066.00 . 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. II EXECUTED on this the w4h day o kA�, 2006, in Fort °, Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: A.Douglas Rademaker, P.E. Director, Department of Engineering Stream Water Grow, Inc. Engineer By: Name: Shamsul Arefin, P.E. President 6737 Brentwood Stair Rd, Suite 230 Fort Worth, TX 76112 APPROVWAS TO FO GAL A ROVED: f � 4 j � , Marc A. Ott Assistant City Manager ATTEST: Marty Hend , City Secretary Con` -a L �+utho i.zati0'a Date ';1 CITY ! . �sw> Group May 31, 2006 Mr. Joseph Bergeron, P.E. Project Manager Department of Engineering City of Fort Worth 1000 Throckmorton St. Fort Worth, TX 76102 Phone: 817 392 2384 RE: Contract Amendment No. 1 Engineering Design Services: Street Reconstruction, Water and Sewer Replacement on Bertrose Ave (Mattison Ave to Dorothy Ln), Clarke Ave (Camp Bowie Blvd to Virginia PI), and Modlin Ave (Haskell St to west dead-end), 2004 CIP Contract Year 2, Contract 23, Project No. 00167; DOE No. 4912 Water Project No. P253-0671700167 Sewer Project No. P258-0771700167 Dear Mr. Bergeron: The following is a summary of additional work requested for Amendment No. 1 to the above referenced project, per recent design meetings with City of Fort Worth officials. The proposed utility easements are necessary for several reasons. First, the existing 4' alley lacks adequate room to install a new sanitary sewer and its associated appurtenances. Second, structures encroach on the existing alleyway and the existing sanitary sewer. Installing a new sanitary sewer either by open -cut or by other than open cut is simply not feasible in the existing easement. Lastly, new easements will provide access for future maintenance and will clearly define the private and public portions of the sanitary sewer system. Amendment No. 1: Additional Water Replacement length = 160 L.F. Additional Sewer Replacement length = 1950 L.F (L-907 and L-6960) Engineer's Opinion of Probable Construction Cost in amendment no. 1= $274,242 Amendment no. I Design Fee and Survey Water Replacement ($1210 _ $ 1,920.00 Amendment no. I Design Fee and Survey Sewerr Replacement ($1210 _ $23,400.00 Sub -Total Amendment No. 1 Design Fee and Survey = $25,320.00 6737 Brentvrood Stair Rd Suite 230 Fort Worth, TX 76112 Phone: 817.446.4171 Fax: 817.446.4135 X�XV W. stream%Vatergruup.ciun Group Mr. Joseph Bergeron, P.E., Project Manager April 28, 2006 RE: Contract Amendment No. 1 Page 2 of 2 Engineering Design Services: Street Reconstruction, Water and Sewer Replacement on Bertrose Ave (Mattison Ave to Dorothy Ln), Clarke Ave (Camp Bowie Blvd to Virginia Pl), and Modlin Ave (Haskell St to west dead-end), 2004 CIP Contract Year 2, Contract 23, Project No. 00167; DOE No. 4912 Water Project No. P253-0671700167 Sewer Project No. P258-0771700167 The total cost to perform the additional services included in Contract Amendment No. 1 is as follows: WATER SEWER Additional Sewer and Water Line Design $1,920.00 $23,400.00 And Surveys Temporary Const. Easement Document Preparation (2 ea @ $75/ea) $150.00 Permanent Easement Document Preparation (12 ea @ $400%a) $800.00 $4,000.00 10% ofM/WBE Subcontractors $26.00 $294.00 Sub -Total Amendment No. 1 $2,746.00 $27,844.00 Total $30,590.00 The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the Street Reconstruction, Water and Sewer Replacement, 2004 CIP Contract Year 2, Contract 23 is as follows: Original Contract Amount = $ 101,476.00 Amendment No. 1 Amount = $ 30,590.00 Total Contract Amount including Amendment No. 1 = $ 132,066.00 Please process Amendment No. 1, to the Street Reconstruction, Water and Sewer Replacement, 2004 CIP Contract Year 2, Contract 23 in the amount of $30,590.00. If you require any additional information or have any questions regarding this matter, please do not hesitate to give me a call at 8 17-446-417 1. We appreciate the opportunity to provide Engineering design services for the City of Fort Worth. Sincerely, Stream Water ro , Inc. Shamsul Are P.E. President Copy: File, Dena Johnson, P.E. (City of Fort Worth), Charles Leist, P.E. (SWG) 6737 Brentwood Stair Rd • Suite 230 • Fort Worth. TX 76112 • Phone: 817.446.4171 • Fax: 817.446.4,35 www. stream %ater rou}?.com City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 9/26/2006 - Ordinance No. 17185-09-2006 DATE: Tuesday, September 26, 2006 LOG NAME: 30AMENDlBERTROS REFERENCE NO.: **C-21708 SUBJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 32125 with Stream Water Group, Inc., for Additional Services of Pavement Reconstruction and Water and Sanitary Sewer Replacement on Portions of Bertrose Avenue, Clarke Avenue and Modlin Avenue ( Project No. 00167) and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to transfer of $36,757.00 from the Water and Sewer Operating Fund to the Water Capital Projects Fund in the amount of $3,317.00 and Sewer Capital Projects Fund in the amount of $33,440.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of $3,317.00 and Sewer Capital Projects Fund in the amount of $33,440.00 from available funds; and 3. Authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 32125 with Stream Water Group, Inc., for Engineering, Surveying and Plan Preparation for the replacement of Sanitary Sewer Lateral L-6960 in Dorothy Lane from Camp Bowie Boulevard to the alley between Clarke Avenue and Bunting and in the alley from Dorothy Lane to Belle Place, for the replacement of L-907 i Iley between Modlin Avenue and West Seventh Street and for construction of a new Water line in Hos,kell S from Modlin Avenue to the alley between Modlin Avenue and Seventh Street, in the amount clf 30,590.00, thereby increasing the original contract amount to $132,066.00. DISCUSSION: The 2004 Capital Improvement Program (CIP) includes funds for Pavement Reconstruction on Bertrose Avenue (Mattison Avenue to Dorothy Lane), Clarke Avenue (Camp Bowie Boulevard to Virginia Place) and Modlin Avenue (Haskell Street to West Dead End). On June 28, 2005, (M&C C-20814) the City Council authorized execution of an engineering agreement with Stream Water Group, Inc., in the amount of $101,476.00, for pavement reconstruction and water and sanitary sewer main replacement Bertrose Avenue (Mattison Avenue to Dorothy Lane), Clarke Avenue (Camp Bowie Boulevard to Virginia Place), and Modlin Avenue (Haskell Street to West Dead End). This amendment to the project consists of the preparation of Plans and Specifications for replacement of Sewer Laterals and Water Lines in the above -identified locations adjacent to the area described above. Stream Water Group, Inc., proposes to perform the additional necessary design work f a lump sum fee of $30,590.00. City Staff considers this fee to be fair and reasonable for the scope of servi es proposed. frig, .. Logname: 30AMENDIBERTROS Page 1 of 2 In addition to the contract amount, $6,167.00 (Water $ 571.00, Sewer $ 5,596.00) is required for project management by the Engineering Department. Stream Water Group, Inc., is in compliance with the City's M/WBE Ordinance by committing to 13 percent M/WBE participation on this Amendment/Change Order No. 1. This project is located in COUNCIL DISTRICT 7, MAPSCO 75D. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval of the above recommendations, and adoption of the appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Water and Sewer Capital Projects Funds. TO Fund/Account/Centers 1&2)P253 472045 6071700167ZZ 1&2)P258 472045 7071700167ZZ 2)P253 531350 607170016731 2)P253 531350 607170016732 2)P253 531200 67170016732 2)P253 531350 607170016733 2)P253 531200 607170016733 2)P253 531350 607170016760 2)P258 531350 707170016731 2)P258 531350 707170016732 2)P258 531200 707170016732 2)P258 531350 707170016733 2)P258 531200 707170016733 2)P258 531350 707170016760 Submitted for Citv Manager's Office bv: Oriainatina Department Head: Additional Information Contact: FROM Fund/Account/Centers $3.317.00 1)PE45 538070 0609020 $33.440.00 1)PE45 538070 0709020 337.00 3)P253 531200 607170016732 180.00 3)P253 531200 607170016733 $1.831.00 3)P258 531200 707170016732 30.00 3)P258 531200 707170016733 915.00 24.00 843.00 $2.048.00 $18.563.00 $2.431.00 $9.281.00 274.00 Marc Ott (8476) A. Douglas Rademaker (6157) A. Douglas Rademaker (6157) $3.317.00 $33.440.00 $1.831.00 915.00 $18.563.00 $9.281.00 Logname: 30AMENDIBERTROS Page 2 of 2