HomeMy WebLinkAboutContract 33918 Amendment No. 1
STATE OF TEXAS § CITY SECRETARY NOAZWC
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and Carter & Burgess, Inc.
(Engineer) made and entered into City Secretary Contract No. 31048 (the
Contract) which was authorized by the City Council by M&C C-20333; and
WHEREAS, the Contract involves engineering services for the following
project:
Pavement Reconstruction and Water and Sanitary Sewer
Replacement on Childress Street (Wichita Street to Erath Street),
Eastland Street (Wichita Street to Nolan Street), Grayson Street
(Wichita Street to Foard Street) and Cutter Street (Foard Street to
Nolan Street)
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised maximum
fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly-authorized representatives, enter into the following agreement
which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services and provide additional contract time as specified in a
proposal letter dated August 16, 2006, a copy of which is attached hereto
and incorporated herein. The cost to City for the additional services to be
performed by Engineer total $1,000.00.
2.
Article II of the Contract is amended to provide for an increase in the
maximum fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City for all
work and services shall not exceed the sum of $87,926.00.
VAFFIv k
R lG I NAL
Contract Amendment No. 1
Page 1 of 2
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
Executed on this the day of 2006, in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED: APPROVED:
A. Douglas Rademaker, P.E. NWc A. Ott
Director, Department of Assistant City Manager
Engineering
CARTER & BURGESS, INC.
ENGINEER
ATTEST:
By:
Darrell Thomps n, P.E.
Vice President
Marty Hendri , City Secretary
NO M&C REQUIRED
APPROVEZAO FORMIGALITY:LE
Amy am
Assistant City Attorney
®FFICmi,L C
Contract Amendment No. 1
Page 2of2 —
M&C Request Review Page 1 of 2
WAN ,, 1rEC}RI'�
Horne , Council Agenda I M&C I Employee Direclory , Morning Report I Ads I PRS I IT Online I Departments I Site map
Print M&C
I
COUNCIL ACTION: Approved on 10/12/2004
DATE: 10/12/2004 REFERENCE NO.: **C-20333 LOG NAME: 30CIPCHILDRESS
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Engineering Agreement with Carter& Burgess, Inc.for Pavement Reconstruction and Water and
Sanitary Sewer Main Replacement for Portions of Childress Street, Eastland Street, Grayson
Street and Cutter Street
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute an engineering agreement
with Carter& Burgess, Inc. in the amount of$86,926 for pavement reconstruction and water and sewer main
replacement for Childress Street(Wichita Street to Erath Street), Eastland Street(Wichita Street to Nolan
Street), Grayson Street(Wichita Street to Foard Street), and Cutter Street(Foard Street to Nolan Street).
DISCUSSION:
The 2004 Capital Improvement Program (CIP) includes funds for pavement reconstruction of Childress Street
(Wichita Street to Erath Street), Eastland Street(Wichita Street to Nolan Street), Grayson Street(Wichita
Street to Foard Street), and Cutter Street(Foard Street to Nolan Street).
This project consists of the preparation of plans and specifications for pavement reconstruction and water
and sanitary sewer main replacement for the above identified streets.
Carter& Burgess, Inc. proposes to perform the necessary design work for a lump sum fee of$86,926. City
Staff considers this fee to be fair and reasonable for the scope of services proposed.
In addition to the contract amount$12,848 (water: $11,605, sewer: $1,243) is required for project
management by the Engineering Department.
Carter& Burgess, Inc., is in compliance with the City's M/WBE Ordinance by committing to 27% M/WBE
participation. The City's goal on the project is 22%.
This project is located in COUNCIL DISTRICT 5 and 8, Mapsco 78X and Y; and 92B, C, F, and G.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of the
Water and Sewer Capital Project Funds and the Street Improvement Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
P264 531200 608170002731 $5,081.88
P264 531200 608170002732 $10.163.77
P264 531200 608170002733 $1,693.96
CITY,
E ERn nY P264 531200 608170002751 $4,068.75
�g'a 1,v J:� P274 531200 708170002731 $1,623.75
http://www.cfwnet.org/councilpac e me review.asp?refnum=C-20333 8/18/2006
_ .asp.re um=C-20333 8/18/2006--r—
M&C Request Review Page 2 of 2
P274 531200 708170002732 $3,247.50
P274 531200 708170002733 $541.25
P274 531200 708170002751 $4,068.75
C200 531200 208400002731 $14.489.67
C200 531200 208400002732 $28.979.33
C200 531200 208400002733 $4,829.89
C200 531200 208400002751 $8,137.50
Submitted for City Manager's Office by: Marc Ott(8476)
Originating Department Head: A. Douglas Rademaker(6157)
Additional Information Contact: A. Douglas Rademaker(6157)
ATTACHMENTS
0FFIC-',Jl,I ARECv '
http://www.cfwnet.org/council_packet/mc_review.asp?refnum=C-20333 8/18/2006
777 Main Street
Fort Worth,TX 76102
Carter"Burgess P.O.Box 901058
Fort Worth,TX 76101-2058
Phone: 81 T735.6000
Fax:817.735.6148
www.c-b.com
August 16, 2006
Mr. Richard Argomaniz, P.E.
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102
Reference: 2004 Capital Improvement Project—Contract 14
Contract No: 31048
D.O.E. No: 4580
Dear Mr. Argomaniz:
Carter & Burgess, Inc. intends to contract LOPEZGARCIA GROUP (LGGROUP) to provide
additional surveying services for the preparation of a Permanent Right-of-Way Easement at
Eastland Street and Vaughn Boulevard for the City of Fort Worth.
LGGROUP proposes to perform the field surveys, analyze their findings and prepare a parcel
map and description of the Permanent Right-of-Way Easement for a lump sum fee of $1,000.00.
LGGROUP will provide the parcel map and description within ten (10) working days, weather
permitting, after receiving written authorization to proceed.
Sincerely,
CARTER & BURGESS, INC.
6 6,�. Jb- d, P�
Sheri Holcombe Boyd, P.E.
Project Manager
11 ®FFICIAI 1ECu.r
P Hi.,
Carter&Burgess,Inc. Carter&Burgess Consultants,Inc.
C&B Architects/Engineers,Inc. C&B Architects/Engineers, P.C. C&B Nevada,Inc.