Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 51633
Received Date: 12/12/18 Received Time: 11:05 a.m. I Developer and Project Information Cover Sheet: Developer Company Name: NEC 287/Bonds Ranch,Ltd.,a Texas limited partnership Address, State,Zip Code: 3102 Maple Ave.#350,Dallas,TX 75201 Phone&Email: 214-720-6600,dpalmerng.weitzmangroup.com Authorized Signatory,Title: David Palmer ,Vice President Project Name: Bonds Ranch Marketplace Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: Northeast Corner of E.Bonds Ranch Plat Case Number: FP-15-074 Plat Name: Bonds Ranch Marketplace Mapsco: Council District: 7 CFA Number: 2016-020 City Project Number: 100048 OFFICIAL RECORD Ci of Fort Worth,Texas CIN SECRETARY S:dard Community Facilities Agreement-Bonds Ranch Marketplace CFJA Official Release Date:02.20.2017 FT. WORTH,TX Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.ti l lei WHEREAS, NEC 287/Bonds Ranch, Ltd., a Texas limited partnership, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Bonds Ranch Marketplace ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas --, Standard Community Facilities Agreement-Bonds Ranch Marketplace OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 2 of 11 CITY SECRETARY FT. WORTH,TX iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. Ci of Fort Worth,Texas Sta idard Community Facilities Agreement-Bonds Ranch Marketplace CF L Official Release Date:02.20.2017 Pa 4 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) M_ Sewer(A-1) N_Paving(B)Ag, Storm Drain(B-1) Z, Street Lights & Signs (C) ®. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2)years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Bonds Ranch Marketplace CFA Official Release Date:02.20.2017 Page 3 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. Cit of Fort Worth,Texas S dard Community Facilities Agreement-Bonds Ranch Marketplace CF k Official Release Date:02.20.2017 Paj e 5of11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Bonds Ranch Marketplace CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and (2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. Ci y of Fort Worth,Texas Sti ndard Community Facilities Agreement-Bonds Ranch Marketplace Cf A Official Release Date:02.20.2017 P e7of11 Cost Summary Sheet Project Name: Bonds Ranch Marketplace CFA No.: 2016-020 City Project No.: 100048 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 348,279.73 2.Sewer Construction $ 61,871.63 Water and Sewer Construction Total $ 410,151.36 B. TPW Construction 1.Street $ 375,600.61 2.Storm Drain $ 67,918.50 3.Street Lights Installed by Developer $ 48,272.00 4. Signals $ - TPW Construction Cost Total $ 491,791.11 Total Construction Cost(excluding the fees): $ 901,942.47 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 8,203.02 D. Water/Sewer Material Testing Fee(2%) $ 8,203.02 Sub-Total for Water Construction Fees $ 16,406.04 E. TPW Inspection Fee(4%) $ 17,740.76 F. TPW Material Testing(2%) $ 8,870.38 G. Street Light Inspsection Cost $ 1,930.88 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 28,542.02 Total Construction Fees: $ 44,948.06 Choice Financial Guarantee Options,choose one Amount Mark one' Bond=100% $ 901 942.47 Completion Agreement=100%/Holds Plat $ 901 942.47 Cash Escrow Water/Sanitary Sewer-125% $ 512,689.20 Cash Escrow Paving/Storm Drain=125% $ 614,738.89 Letter of Credit=125%w/2yr expiration period $ 1,127,428.09 x City of Fort Worth,Texas Standard Community Facilities Agreement-Bonds Ranch Marketplace CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER NEC 287/13onds Ranch,Ltd.,a Texas limited partnership s J.Chapa(Dec 018) Jesus J. Chapa Assistant City Manager Date: Dec 10,2018 �avu7�a%vicer David Palmer(Dec 10,2018) Recommended by: Name: David Palmer Title: Vice President r KJ Dec 10,2018 Evelyn Robe 5(Dec 10,2018) Date: Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the Approved as to Form &Legality: person responsible for the monitoring and administration of this contract, including Fioh rrG7,4 ivlocrgG-on ensuring all performance and reporting Richard A.McCracken(Dec 10,2018) requirements. Richard A.McCracken Assistant City Attorney �3owl— M&C No. N/A Jennifer Ezernack on behalf of(Dec 10,20181 Date: Name: Janie Morales Form 1295: N/A Title: Development Manager FORT ATTEST: O� O� CJ Mary 7, K�se�^ Mary J.7ajser(Dec Ir2 �( Mary J. Kayser/Ronald Gonzale . XP� City Secretary/Assistant City Sec Ci y of Fort Worth,Texas OFFICIAL RECORD SlU ndard Community Facilities Agreement-Bonds Ranch Marketplace CITY SECRETARY C Official Release Date:02.20.2017 Pae 9 of 11 FT. WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map Exhibit A: Water Improvements Exhibit A-1: Sewer Improvements Water and Sewer Cost Estimates ® Exhibit B: Paving Improvements Paving Cost Estimate Exhibit 13-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Bonds Ranch Marketplace CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100048 None. Cil of Fort Worth,Texas Sta lard Community Facilities Agreement-Bonds Ranch Marketplace CF Official Release Date:02.20.2017 P 11 of 11 \ j . 6 2 o ir !� LL, § x e u § o \ Wow / uZ 2 m & � 5 < & & ■ ' 6 / G co o < < do � C-) � LL � � , ■ Ad� ) § § z r, U | , . G b £ k � ZzLL, oxV) w o |o \ § / w | | OQc! § f & ) ICU k . ■ . z z LLI | § q � 2 § u = > § ) § a- m W§ . �_ __ 2 = o k o k`m§ B B 8 8 ® m m ■ ■ « | §ee 3 2 z 2 (n � t o f o E E E E ■ o ■ � \§§§ . w@@@ 0 0 0 0 ■ 1— 0 u x x x CL CL CL (L � � w CL CL CL (L � ■ | ` §2 I b 4 \ gg. § _. .° \ \ \\ — � �2 • « ® .j Z \ ' � % ' - ` ■ A , � J. ' ƒj 0MLU .. . §Z) \ / «® ±�~ �L� < / /J Ek§§/o ® 22>�^s 0 < »< �^ W}CL,(� / \ �L) ¥ , iz z eq[0(LS ma'A3a m\a#z\M»em\jn-naga a � s XXr �o � ir o Z zWw cD ��Q N 00 O� W � WUZ V N N zLio a woZ�Na ril (iir mQ W 40 Y O Q IL>co,°� Q * 3 p wOwUicop � m �¢JFfNOF , 0 �' > o�a�;�� a O > w O ¢ Li =)Z �ZNg-Z Z o � Nay ZQ w > zLLIc2¢Oa0 ~zLUZ O OarD V 0 m N U 2 N Q Q O = O U w N _ W L I F c+) x m C) w m O a W a a a vwCE i C o W � 0 a c� o00o F w Z C9 C9 C9 N N N W W U Z Z LLI z z z 0 0 0 0 = w a a a a U) = J N N N 0 0 0 0 R x x a a a a w w w a a a a a • � 6 i o i Z o - -"Iaa M091F3M� 931FIS CID < $ I ►► ►► 0 e a WIc T R jo x 8® yj�iU ® r a 'JMO'11BIHX3 S31VM\SIIGIHX3\M3N—JMO\o1Z0—LZO\S9M0\78 j ^ \\ 0 j / ±� [ / y z = ! >E [ = o � e o \f 3 §2 \ ° ~ e y z �2 II ss- k » « j £ K ° ) §/§\g\ § b / gg § . a_ LU . cr 2 � § z LLI CL � 0 \ > } \ / + 9§7 ° - 0 _ % § © _ ' 3 3 @)¥3 2 d � ® 4 _ ~ � ) � / z 0 0 CL o Z z z � u ± ± $ ƒ E ƒ o § § b § / K e E E o = _ _ _ A § W o ± § Lu z o 0 o E G E E = E m / § § § E E E E \ & E 2 o q@ 0 0 0 0 § o � � j E I I E ) o } z I f � % ■ m ■ o ! . � | 2$ { \)10 ) ' + CA� : � ��� .j % � § � % ■ § ` . IN ( ` \ � � ■ , . . .. | n � � r ! . . % § � k ��| k ■ P.; m § � �,� ■ � � k � � / \ § ® � + OMa*IIS I«3a31Vgem\M3N eM(1\12-2\ga\ L04 F N � Q y W 0 0 m m Q z � O N a U N w U z 'F 3 g ~ a �AF uj �Z II a � d UF=- $ ¢ y y � 0 Q z d m Nle X: DQ> ow • Z cn .6 s §- zoz , V N W m w m r 0�8UJ F LL X: 0 t jx lip W W w Z i \ i ro i w 01 I gg w o J OZ w z a- 0 0 (n (n Q z z Q Y I w N N o 0 m Cix x w w w a s J Q J LO—J I + } o to O� w Ob U O W 04 04 QL 0�¢ �¢ ; 0) C. N � Q aLU UOco 0 IX O N ' v N F U v� �p� cO i 8 0: L Ll 2 U H Q NY � oaZ 300 3 20 �26 � Z o w m 9zoZ , V }} z i. • U U F: O 00 I— z 1 o_LLJ cn W LL m mCLm0 O Z a F w l K rw of w W Z z w v=i Is co . 08 w Ld o /\ x `c z w / z a M a / M a o 0 0 0 / Z �! N00 / w x x o_ o_ w w a a / J / rs // O I • •,L / Z O aw H / O� w J / UJOZN 0_ r W~ZCL w n N❑ / W >< W WN L W Q J H O H • j O WX L)Q Q 0�g�� wwo¢2o 30m0CL ) O 0MU'1191HX3 a3M3S\SIIBIHX3\M3N-JMa\3120-LZO\S9M0\78 \ k z q - ¥ ■ \k « / « B \/ CLN a � O R s § & D § k 2 b z CIDLu \\k ) ± Fjc §\5\2@ cc $ / L E § W LUg s/ 2 $ 2 z k / / § } $2 2 B CO S e § E C-) 0 > UJ E § § § § e)§?/k k Z §\/<I\ _& & z § Z { u R § G / & § § e ± e § E LU _ G (L k � ' � w zLu 3 ƒ cc D § LU f \ |% ) %0 C) X82 % 2}} _J�■% } to d � � & ~ | �IR N Wl. §a C*4 $ ¢8 � in «$4 » UJ ma161Hq mo Sl \,eHx\*3N-ma&2-2\ga\a 0)CN 5 } a _ a Z 00 O (/q(q/�� Z d' ��� a FW N W p X F- U �q� 00 O w N Z g N F- U $ Z LLTQa ¢ U FS N wL_•WnCNyp d x I o ap 0�Qg�QX`�'Q ¢ m 3 } O WC7W WNL � � O F-- W m Y Wwa~tOU (� _ O Erw 0 a C v� U � N w W Q 2 0 Z O Z V �Uc+,aaU m N H } O m p p O ( N YZ Z U � N N I` m wLLJ m LL W a W z W W V Z Z W (A 2 o � � 11 11 11 11 \ i. i' _ _ _ _ _ RAIMOMOOV yf.'.-w..:�faJ:r•.'S•il�y�'�,�':l.l�tu � l:Y. Z• Ti + �JV Y'.�• 1 r� FpCtR " F 1111 \ J < C) cd ®1 JMa•1191HX3 9NIAVd\SIISIHX3\M3N—JMO\Otzo—LZO\S9Ma\.a 0 L 5 z O `� o N Q ys� o O J#y„ a w ¢ Z O M)LLU N Z U N W U Z H ZWp OM)N r O j U)CO> d w � Of Q Z W Q W W N m o m i W 0a~�V (� _ O w W W W 04 Q 2 O Z !n .� V Z U F<a U Z O Z r o = VO) UJ V) W 03 04 Xm 0 w m = F- O W a ~ w i W Z Z W W U) 2 r cc cc t•1G�. y FN3i• y d•t: HIR AbO . - ".�:. RI(;FiFOF-WA'A'.• ����y.•� .FF�n'.`r't;::��:S:f;•...'''J. •�A-� �o. INST. .Gaoeo5e3e<r', `d 1 �',:, y,•,:t: - •,xh'•^ , b �'. N a sa R J ii 8 S sma*IISIHX3DNIAVd\SL81HX3\k3N-9Ma\otzo-LZO\SJMO\7a L s Z C Ir JIM Q ZFI� a r N Z W C) JC F C-)IX p 00 0 7 w F U N F Q U ZLLI �8 �Z SII J U F- O�04 ¢ C7 U Z F- O F a D wHZnN0 Y I mo a xJ z Ir ao5x '>u ^o z � UW j o m U w u Z ><-q-W p ir > w w pQE 0OU¢ W V O ? w (7 (7 (n (n Z�g N Z N Q Z Z p p 2 LL - JAZ Z JZ ZUc �d� F. Z p Zn w 0 0 N ♦- O � LLI w w a a a m Z W U N w J qq N xmzwm = V LL W a F- 1 U 1 Ld W U Z Z w v=i x i I till, I I, i amua mouva" a? r.c W V it \ � s0 5a J F, ' W o V z o � W�h 9M0'1191HX3 SNI1Hon\S1191HX3\M3N-9Ma\3120-LZO\Soma\.7b e § §\ \ « © \� (ƒ E ko § k§ _ %§ E �2 ? EL \ 2 - \ \ Z j L \ = = o § 8jr LU§kI-q� $ Cq @ ° � Eo §_ § = o Z o e$U)2§ CO o < _ C-) = _ = °5< « < ¥ » 3 o0E $ 99 (2§/§ dIM Lu § § \ / -1 z §\k§j/ W 3 j k Ld x x o& E aw §\§A/\ § k LL. z u E § b § S q ■ 04 X § ) w / 2 | LL 0 LU04 3 E e » 2 E of 3 $ T | +� � a ` cc 4 .j \ �O 0 ■ \ ��� $ � � ��¥� ■ % - . . ,. . . , . . . . ,.. $ Ic | § � ■ � ■ § ■ " I-$ � « ��■ ■ L� - - ma eA3ONI am\an3\Ak3N-ga a2-2«ga\a u142 43 DM-BID PROPt)W_ PW 1 a•2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-Revised MAY 18,2018 UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlisto. DDescription , . _ N. Measure u id Nanu Unit Price Bid Value UNIT 1: Q n W, v 0241.1012 Remove 6"Water Line 024114 LF 10 S13.98 5139.75 0241.1013 Remove 8"Water Line 02 41 14 LF 110 515.05 51,655.50 0241.1015 Remove 12"Water Line 024114 LF 936 519.35 518,111.60 0241.1302 Remove 6"Water Valve 024114 EA 2 5322.50 5645.00 0241.1303 Remove 8"Water Valve 024114 EA 2 5430.00 5860.00 0241.1305 Remove 12"Water Valve 024114 EA 1 S%7.50 5967.50 0241.1511 Salvage Fire Hydrant 02 41 14 EA 2 S967.50 $1,935.00 3311.0141 6"PVC Water Pie 33 n 10.33 11 12 LF 142 543.00 16,106.00 3311.0241 8"PVC Water Pipe 33 a 10.33 11 12 LF 1529 547.30 572,321.70 3311.0441 12"PVC Water Pipe 33 11 10.33 11 12 LF 1282 556.98 573,041.95 3312.0117 Connection to Existing 4"-12"Water Main 331225 EA 2 54,300.00 58,600.00 3305.0109 Trench Safety 330310 LF 2953 51.08 53,174.48 3311 0001 Ductile Iron Water Fittings w/Restraint 331111 TON 4.2 55,375.00 122,575.00 3312.3002 6"Gate Valve 331220 EA 10 $1,290.00 512,900.00 3312.3003 8"Gate Valve 3312-10 EA 8 51,827.50 514,620.00 3312.3005 12"Gate Valve 3312:0 EA 8 S3,440.00 527,520.00 33124107 12"x8"Tapping Sleeve&Valve 331225 EA 1 55,375.00 55,375.00 3312.2801 3"Water Service and Vault 331210 EA I S14,000.00 S14,000.00 33122203 2"Water Service 331210 EA 10 52,257.50 $22,575.00 3312.2103 1 1/2"Water Service 331210 EA I S2,0%,25 S2,0%.25 3312.0001 Fire Hydrant 331240 EA 6 S516000 $30,%0.00 33121002 2"Combination Air Release Valve 331210 EA I 58,100.00 58,100.00 5348,279.73 UNIT H:SANI- WEMENTS 3305.0109 Trench Safety 330310 LF 295 51.08 5317.13 3301.0002 Post-CCTV Inspection 33 01 31 LF 295 51.08 5317.13 3301.0101 Manhole Vacuum Testing 330130 EA 7 5215.00 51,505.00 3331.3101 4"Sewer Service 3331 So EA 4 S967.50 S3,870.00 3331.3201 6"Sewer Service 33030 EA 1 51,182.50 S1,182.50 33313301 8"Sewer Service 33 3130 EA I S 1505.00 51,505.00 33314115 8"Sewer Pipe 3311 10.33 31 12 a 31 211 LF 1 259 542.10 S10,903.68 3331.4116 8"Sewer Pipe,CSS Backfill 3311 u1,n 31 12,33 3120 LF 36 S67.10 52,415.57 3339.0001 Epoxy Manhole Lina 333960 VF 7 $200.00 51,400.00 3339.1001 4'Manhole 33 39 14 33 39 20 EA I 15,160.00 55,160.00 3339.1002 4'Drop Manhole 33 39 111,33 39 20 EA 2 55,320.00 S10,640.00 3339.1003 4'Extra Depth Manhole 33 w u1,113920 VF 33 S295.63 59,755.63 3305.0106 Manhole Adjustment,Major 330514 EA 4 53,225.00 512,900.00 TOTAL UN561,871.63 IHENTS 3341.0201 21"RCP,Class 111 334110 LF 8 S96.75 5774.00 3341.0205 24"RCP,Class 111 334110 LF 436 $118.25 $51,557.00 3341.0208 27"RCP,Class 111 334110 LF 5134.38 3201.0121 4'Nide Asphalt Pvmt Repair.Arterial .120117 LF 526.88 3349.0001 4'Storm Junction Box 3-14910 EA I 54,300.00 54,300.00 3349.5001 10'Curb Inlet 3349 2" EA 3 53,762.50 511,287.50 3349.7001 4'Drop hllet 3340-10 EA 53,332.50 3349,1003 24"Flared Headwall,1 pipe 334940 EA S2,042.50 3349.1004 27"Flared Headwall,I pipe 1 334940 1 EA I 52,365.00 567,918.50 UNITIV:PAVINGI PROVEMENTS 0241.1000 Remove Cone Pvmt 024115 S1- 3238 57.26 523,495.74 0241.0100 Remove Sidewalk 024113 SF 5190 50.81 54184.44 0241.1100 Remove Asphalt Pvmt 024115 SY S7.26 0241 1300 Remove Cone Curb&Gutter 0.241 15 LF 1365 55.38 S7,336.88 31250101 SWPPP>I acre 3125x. LS I 510,000.00 CITY of FORT WORM 1TANnARD CON1TRIICTION SPECIMATION RX U44.1 N 1S-17:'61.1 0MR AWARINP PRDIIXTS I-V-APIR 2,2014 004143 WPnprW_13APA u.W3-la•IR.�6 tri 4k 4) DAP-Bm PRE11 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-Revised MAY 18,2018 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidhstoltem Description Sp fins. senior;. Measure &d Quannq NUnit Price Bid Value 3213.0301 4"Conc Sidewalk 32 13 m SF 5601 $6.18 534,621.18 3213.0402 7"Concrete Driveway 32 13 20 SF 1457 $5.38 $7,831.38 3216 0101 6"Conc Curb and Gutter 3216 a LF 1460 57.53 S10,986.50 3213.0103 8"Conc Rmt 321313 SY 3570 $67.73 $241,778.25 3213.0105 10"Conc Pvmt 32 U D SY $76.43 3211 0502 6"Lime Treatment 321129 SY 162 $8.65 $1,401.30 321 10502 8"Lime Treatment 32 F1 29 SY 3570 58.71 $31,094.70 3212 0302 2"Asphalt Pvmt Type D 321216 Sl• S!1434 3211.0122 6"Flexible Bax,Type A,GR-2 321123 SY $12.42 3213.0506 Barrier Froc Ramp,Type P-1 3-13 2u EA 6 $478.38 52,870.25 3217.0002 4"SLD Pvmt Marking HAS Y (double line) 321723 LF 50.86 3217 0004 4"BRK Pvmt Markin HAS W 32 17 23 LF $0.86 3217.0201 8"SLD Pvmt Marki HAS(W)(turn lane) 32 17 23 LF $1.72 3217.0501 24"SLD Pvmt Markin HAS W 32 17 23 LF $7.53 3217 2102 REFL Raised Marker TY 1-C 3212 23 EA $4.30 32122103 REFL Raised Marker TY II-A-A 3212 23 EA $4.30 3217.1002 Lane Legend Arrow 321723 EA $161.25 3217.1004 Lane Legend Only 3217'23 EA $16125 3217.0501 24"SLD Pvmt Markin HAS(W).Crosswalk 3217 23 LF 57.53 3217.0001 4"SLD Pint Markin HAS(W)((edge stripes) 3'-17-3 LF 50.86 3217.0202 8"SLD Amt Markin HAS(Y)(cross stripes) 32 n 23 LF $1.72 UNIT IV:PAVING IMPROVEMENTS $375,600.61 N V• JaLg=G IMPROV ENILM 2605.0131 Salvage Electrical Equipment 2-6 0510 LS 1 $20,000.00 $20,000.00 2605.3015 2"Condt PVC Sch 80(T) 260533 LF $56 $12.00 $10,272.00 3441.3021 Ornamental Assimbly,Simple 34 41210 EA 5 $2,800.00 514,000.00 3441.3303 Rdw Ilium Foundation 344121 EA 1 5 5800.00 $4,000.00 TOTAL NIT V:STREET LIGHILN 'IMPR V' ENT $48,272.00 Bid Summary UNIT 1:WATER IMPROVEMENTS 5348,279.73 UNIT 11:SANITARY SEWER IMPROVEMENTS $61.871.63 UNIT 111:STORM SEWER IMPROVEMENTS 567,918.50 UNIT IV:PAVING IMPROVEMENTS S375,600.61 UNIT V:STREET LIGHTING IMPROVEMENTS 548,272.00 Total Construction Bid 5901,942.46 Contractor agrees to cooplete WORK for FINAL ACCEPTANCE within calendar days after the date when the CONTRACT eomoprovided aaCrs to ran as in the General Conditions. CATES-CLARK 8c ASSOCIATES LLP 14800 QUORUM DRIVE, SUITE 200 ENDOFSEC710N DALLAS, TEXAS 75254 ) CITY 31F FLIRT K URTI I NTANUARD CONS UCI ION SM:CIFIC•A7N)N t XIJML•N S•IIl:V1:UM'FRAWARI)R)PR(XRI' ,' F.vw Vown.402.2014 004243 frit Pn�,..d_DAPaiai>tn1L;-la-IN.�I.r