Loading...
HomeMy WebLinkAboutContract 48098-CO1 CITY SECRETARY CONTRACT N0. FO RT WO R,T H City of Fort Worth p go Change Order Request S Project Name: Big Fossil Creek Parallel Relief Sanitary sewer M402A,Phase i City Sec No.: r 48098 Project No(s). 56M"700l n5740010,59607.OMi057400lo DoE No. N/A city Proj.No.: 01303 Project Descripifon Big Fossil Parallel Relief Sanitary Sewer,Phase 1,Makom City Meter Station and Halton Cary Slower Outfall,Phase 3 Contractor: Oscar Renda Construction,Inc. Change Order p Date: 10l?/2018 City Project Mgr. Walter Norwood' City Inspector: I Judy Die Phone Number. 817--392-5026 Plane Number; 817-392-8452 Dept. Sewer Unit 1 Sewer Unit 2 Sewer Unit 3 Totals Contract Time I (Calender days) Original Contract Amount $6,217,747.00 $263,408.00 $1,492,566.00 $7,973,721.00 330 Extras to Date 043 Credits to Date Perming Change Orders(in M&C Process) Contract Cost to Date $6,217,747.00 $263,408.00 $1,492,566.00 $7,973,721.00 373 Amount of Proposed Change Order $72,101.45 $72,101.45 162 Revised Contract Amount $6,289,848.45 $263,408.00 $1,492,566.00 , 5;$U* 535 Original Funds Available for Change Orders S398,700.00 $398,700.00 Remaining Funds Available for this CO $398,700,00 $398,700.Q0 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.90% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) J$9,967,15125 Change Order No.l will provide for the following: • The installation of warren expoxy structure liner for the new diversion structure • The removal of neenah steel stop log hatches as requested by field operations • Bypass pumbing to allow for the construction of a junction structure. Staff concurs with the contractor's request for 162 additional call dr Y f/,,—he change order. a 0: Q Atte T. � `_. MaryKa a ity Secret at It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(bath time and money)for all costs arising out of,or incidental to,the above Change Order. Oscar Renda Construction,Inc. Rudy V.Renda ID-Ir-4 I—Ir-4Iis z ( M&C Number NIA M&C Date Approved NIA F�MCt�_ RECORD CITY SECRETARY FT. WORTH,TX FO RT «O RT H City of Fort Worth Change Order Additions Project Name Big Fossil Creek Parallel Relief Sanitary Sewer M402A,Phase I City Sec No.: 48098 Project No.(s): 56006-0700130-5740010,59607-0700430-5740010 DOE No. N/A City Proj.No.: 1 01303 Project Big Fossil Parallel Relief Sanitary Sewer,Phase 1,Haltom City Meter Station and Haltom City Sewer Outfall,Phase 3 Description Contractor Oscar Renda Construction,Inc. Change Order:= Date: 10/Z/2018 (( City Project Mgr. Walter Norwood City Inspector Judy Die ADDITIONS ._ t .,. 50 Warren Epoxy Structure Liner Sewer Unit 1 575.00 SF $12.50 $7,187.50 51 Removal of Neenah stop log hatches Sewer Unit 1 1.00 LS $30,176.00 $30,176.00 52 Bypass pumping Mob/Setup/Demob @ New Diversion Structure Sewer Unit 1 1.00 LS $35,646.00 $35,646.00 53 Bypass Pumping Equip rental&24 hr,pump monitoring Sewer Unit 1 1.00 LS $31,342.00 $31,342.00 Sewer Unit 1 5104,351.50 Sewer Unit 2 Sewer Unit 3 Page 2 of 4 Additions Sub Total $104,351.50 �4 RT Wo RT H City of Fort worth W- Change Order Deletions Project Name Big Fossil Creek Parallel Relief Sanitary Sewer MA02A,Phase I City Sec No.: 48098 Project No.(s): 56006-0700130-5740010,59607-0700430.5740010 DOE No. N/A CityProj.No.: 1 01303 Project Description Big Fossil Parallel Relief Sanitary Sewer,Phase 1,Haltom City Meter Station and Haliom City Sewer Outfall, Phase 3 Contractor Oscar Renda Construction,Inc. Change Order: Date 10/212018 City Project Mgr, Walter Norwood City Inspector; Judy Die DELETIONS m . olscttloN ' ` .. gir xi. ;_ ui;t . s o �t�cot^ Io :._ 49 Construction Allowance Sewer Unit 1 0.1172729 I-S $275,000.00$32,250.05 I I Sewer Unit 1 $32,250.05 Sewer Unit 2 Sewer Unit 3 Page 3 of 4 Deletions Sub Total $32,250.05 MMBE Breakdown for this Change Order MWBE Sub . , Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total Page 4 of 4 Contract Compliance Mana-ger By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature 1dJ,*/Avr Name of Employee 'PY♦tee e4 I ana r r'- Title OFFICIAL.RECORD CITY SECRETARY FT. WORTH,TX