HomeMy WebLinkAboutContract 47997-A3 AMENDMENT No.3 Q c���S� TO CITY SECRETARY CONTRACT No. 47997 WHEREAS, the City of Fort Worth (CITY) and Dunaway Associates L.P. , (ENGINEER) made and entered into City Secretary Contract No . 47997 , (the CONTRACT) which was administratively authorized by M&C 27806 on the 28 day of June, 2016 in the amount of $293, 763; and amended under City Secretary Contact No . 47997-A1, (the CONTRACT) which was authorized by M&C C-28398 on the 26 day of September, 2017 in the amount of $166, 910; and amended under City Secretary Contact No . 47997-A1, (the CONTRACT) which was authorized by M&C C-28773 on the 7th day of August, 2018 in the amount of $40, 000; WHEREAS, the CONTRACT involves engineering services for the following project : RANDOL MILL RD IMPROVEMENTS (INTERSTATE 820 TO PRECINCT LINE RD) ; and WHEREAS, it has become necessary to execute Amendment No . 3 to the CONTRACT to include an increased scope of work and revised fee; and WHEREAS, an error was made to Section 2 of Amendment No . 1, which will be corrected in this Amendment No . 2 ; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT : 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated August 22, 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $27, 000. 00. (See Attached Funding Breakdown Sheet, Page -3-) . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount up to $527, 673 . 00. City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL RECORD PMO Official Release 8/1/2012 Page 1 of CITY SECRETARY FT. WORTH,TX 3. For clarification purposes, Section 2 of Amendment 1 , which amended Article II of the CONTRACT (M&C C-28398 , September 26, 2017) , should have recited a revised contract amount of $460, 673 . 00 . 4 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . REMAINDER OF PAGE INTENTIONALLY BLANK SIGNATURES AND EXHIBITS/ATTACHMENTS FOLLOW City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. APPROVED: City of Fort Worth ENGINEER J)4 Dsociates, L.P.. 4e< Susan an s Daniel Tre per, P.E. Assistant City Manager Discipli Lead, Associate DATE: ,31 t DATE: 11-06-2018 AP RO RECO MENDED: V to en Cooke Interim Director, Transportation/Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: 61-2c&� Date: t( — Douglas W. ack , 20($ 3q S-�`ig Assistant City Attorney ATTEST: N[ r J. Ka s xir City Secrek�jl U t ry City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL RECORD PMO Official Release 8/1/2012 Page 3 of CITY SECRETARY FT. WORTH,TX Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Wilma Smith/ 0a/� 1�p Name of Employee/Signature Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature „L EC®R® ETARY TH,TX Funding Breakdown Sheet CSN: 48125 Characters needed in each box: 5 7 7 6 6 4 8 Fund Department Account Proj # Activity Bdg Yr CF2 Ref Amount 34014 200431 5330350 100278 002330 2019 14040199 $27,000.00 $ 27,000.00 DA No. 2008279.005 August 22, 2018 Ms. Lissette Acevedo, P.E., PTOE, PMP Program Manager City of Fort Worth Transportation & Public Works Department Capital Delivery Division Fort Worth, Texas 76102 Reference: Task Order Contract -Amendment No. 3 Randol Mill Road Paving and Drainage Improvements Project City Project No.100278 Ms. Acevedo: This letter constitutes formalization of your request for changes in the scope of the current contact and our request for supplemental authorization for Tasks outside the scope of services of the current contract and amendments. Dunaway will provide thefollowing: SCOPE OF SERVICES The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have clearly defined the work to be performed and address the needs of the Project according to objectives listed below: WORK TO BE PERFORMED Task 1. Project Management Task 2. Final Design 100% TASK 1. PROJECT MANAGEMENT ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. Anticipated project timeline is 10 months (remaining design and construction). 1.1. Managing the Team Lead, manage and direct design team activities. • Task and allocate team resources. • Communicate internally among team members. • Ensure quality control is practiced in performance of the work. • Communicate directly with City on all design aspects. City of Fort Worth,Texas Amendment#2 Page 1 of 5 1.2. Communications and Reporting • Attend a pre-design coordination meeting with CITY. • Attend one (1) additional submittal review meeting with the CITY and with Stormwater Department staff. • Follow up PM correspondence with Stormwater Staff to gain their approval. ASSUMPTIONS • One (1) additional monthly project status report included. • One (1) additional submittal review meeting included with City staff. DELIVERABLES A. Monthly status reports (1 Total) B. Submittal Review meeting with minutes and action items TASK 2. FINAL DESIGN (100 PERCENT) Final plans and cost estimate shall be submitted to CITY per the approved Project Schedule. 2.1. Revision of Final Design Drawings shall include the following: • Revise Construction Plans to add proposed concrete drainage channel along south parkway of Randol Mill Rd per Stormwater comments. • Update bid quantities and prepare Change Order#1 to contractor. • Revise Supplemental Drainage Report for the Roundabout- Supplemental HEC RAS Drainage Model will be revised and analyzed for drainage system within the project limits as follows: • Evaluate drainage capacity for Roundabout and adjacent drainage ditches. Model height of water over Randol Mill Rd and affectsfrom upstream drainage crossing the road. • Update and re-submit Final Supplemental Drainage Study Report to City. • Revise Drainage Ditch Plan and Profiles at Roundabout. • Revise Storm Drain Plan and Profiles. Incorporate final hydraulics and design changes resulting from re-grading of ditches. • Add additional concrete channel design and details to the plans. City of Fort Worth,Texas Amendment#3 Page 2 of 5 • Prepare revised 100% OPCC resulting from Change Order#1. ASSUMPTIONS • All storm water calculations shall conform to the 2015 CITY iSWM Criteria Manual for Site Development and Construction (iSWMM). All storm water design shall conform to iSWMM where possible, any deviations will be agreed upon between the CITY and the ENGINEER in writing and noted in the plans. • 3 sets of half-size and 2 sets of full-size plans will be delivered for the 100% design. • 5 sets of OPCC's will be delivered for the 100% design, and bid proposal revised. • DWF files and PDFs created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. • All submitted documents and checklists will be uploaded to the designated project folder in Buzzsaw. • Total of 20 revised plan sheets will be assumed for 100% submittal to Cityfor Change Order#1 package. DELIVERABLES A. Final Design Drawings for the Roundabout B. Final Revised Drainage Report for the Roundabout C. Change Order#1 package with revised bid proposal D. Opinion of Probable Construction Cost (OPCC) ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scooe of Services.— CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be City of Fort Worth,Texas Amendment#3 Page 3 of 5 agreed upon in writing by both parties before the services are performed. These additional services include the following: o Negotiation of easements or property acquisition. o FEMA floodplain modeling. o CDC Floodplain Permitting for Trinity River Basin. o Negotiation of Utility Relocations. o Construction inspection services. City of Fort Worth,.Texas Amendment#3 Page 4 of 5 BASIC FEE A summary of the total project is as follows: MIWBE Provided Current Authorization $ 27,000 0.00% Previous City Authorizations S 500.673 36.61% Subtotal $ 527,673 34.74% Original Contract Total Budget Approved $ 293,763 Summary for Amendment#2 by firm: Percentage of Amendment Dunaway Associates, L.P. $ 27.000 100% Total $ 27,000 100.00% Please review the enclosed information and call me if you have any questions orrequire additional information regarding this amendment. Sincerely, DUN ASSOCiAT ES, L.P. Daniel Trempe P.E. Associate, Senior Discipline Lead City of Fort Worth,Texas Amendment#3 Page 5 of 5 } ! |�) ;�!!�a 2! |!a§ ! !I ® !° � :)\ ■ RLu LU m 0 00 m 00 V)_ oca to . 2 . kz w ` � CL _ m # ##am . ■88$$ $88 22 k; 7 & °A& $ .. K�§rte K�� . ; N /a �no k ; g01 / � w� ` - EC 3 � %2� r- O � - �200 ;2 W © �� _ � E � I k ` r�° § m „� Z . Efj 2 ` _ \ j u i § � ${ 0 k� } W.0 ■ % { Z5 ! ` e\ j) §J7 cr§\\ /}/\ƒ \j/ {/ \ a . � , }fo ) !DDT.:)ƒ)A0 {)! ;;Q Q;;!% ;2\ § \72 m � m � n � O � LL 0 Z W U Ir U m E E g m E 75 ° � N LL " m � � r = �y � m p � U m $ n N 3 v 6 z C � '� E � E Z g 8 8 E U 3Ir � m � m Y U 12K co 888888888888888888888 S :8.880 000 f LL N N N N 6 N O N'� N t3 g N m L O A b N -� n n n n n n Q Q Q Q Q Q QQ Q Q ^ Q Q Q Q Q m m 6 6 d6 N D D d, N IrE m I mmm � � Z g m C., w 8 m t g ts z CL m E I I m U U m R d g � 111Eco Um � U � g $ „ _8 ppy. rpop pC�.pp pp ��pp pp pp p 8 �p�pmmpp o pp pp pp �Cp�pp ppb 8 S O O a O b S O S N S N 8 ' R ' N l7 O N S O N O N On lm ml N N N N th �y ae U p M&C Review Page 1 of 3 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA Fa"�H COUNCIL ACTION: Approved on 11/6/2018 REFERENCE ** 20RANDOL MILL ROAD DATE: 11/6/2018 NO.: C-28919 LOG NAME: IMPROVEMENTS CHANGE ORDER 1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 3 to City Secretary Contract No. 47997 with Dunaway Associates, L.P. in the Amount of$27,000.00 for Randol Mill Road Part 2, and Authorize Execution of Change Order No. 1 to City Secretary Contract No. 50812 with JLB Contracting, LLC, in the Amount of$211,061.71 for Randol Mill Road Part 2 (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of Amendment No. 3, in an amount of$27,000.00, to the Engineering S-wices Agreement with Dunaway Associates, L.P., City Secretary Contract No. 47997, for the additional design of Randol Mill Road at Precinct Line Road to provide pedestrian and drainage requirements for a revised contract amount of$527,673.00; and 2. Authorize the execution of Change Order No. 1 to City Secretary Contract No. 50812 with JLB Contracting, LLC, in the amount of$211,061.71 for Street Improvements on Randol Mill Road at Precinct Line Road, Phase 2, Intersection, thereby increasing the contract to an amount up to $1,364,818.42. DISCUSSION: Dunaway Associates Professional Engineering Agreement. On June 28, 2016, City Council approved Mayor and Council Communication (M&C C-27806) authorizing execution of an Engineering Services Agreement in the amount of$293,763.00 with Dunaway Associates, City Secretary Contract No. 47997, to provide complete design plans for these improvements. On September 26, 2017, City Council approved M&C C-28398 authorizing Amendment No. 1, in the amount of$166,910.00, for additional professional engineering design work and construction management services. On August 7, 2018, City Council approved M&C C-28773 authorizing Amendment 2, in the amount of $40,000.00 which provided for additional professional engineering services with scope changes regarding modifications to landscaping and pedestrian access to reduce long term maintenance costs and improve pedestrian safety. As the result of scope changes in Amendment 2, additional drainage improvements were required. Dunaway Associates proposes to perform these additional professional services in an amount not to exceed $27,000.00. Staff considers this fee to be fair and reasonable for the scope of services to be provided. $Amounts Project Description M&C No. Approved Initial Contract $293,763.00 Design capacity C-27806 06/28/2016 improvements for Randol Mill Rd Amendment 1 $166,910.00 Dividing the project 2 C-28398 09/26/2017 phases and updating the drainage report Amendment 2 $40,000.00 Scope change for C-28773 08/07/2018 Pedestrian Improvements http://apps.cfwnet.org/council packet/mc review.asp?ID=26434&councildate=11/6/2018 11/15/2018 M&C Review Page 2 of 3 Amendment 3 $27,000.00 Design additional drainage Pending Pending improvements Total 1 $527,673.00 1 - I - - JLB Contracting Construction Contract. On May 1, 2018, Mayor and Council Communication (M&C C-28649) the City Council authorized a contract with JLB Contracting, LLC, in the amount of $1,153,756.71 for Street Improvements on Randol Mill Road at Precinct Line Road, Phase 2, Roundabout Intersection. This Change Order No. 1, in the amount of$211,061.71, includes the addition of sidewalks, curb ramps, crosswalks, signage and pavement striping as well as modifications to drainage facilities to accommodate these improvements. These additional improvements were added to provide pedestrian crossings at each approach of the intersection and improved pedestrian movement around the intersections. JLB Contracting has delayed commencement of the project until the final design modifications were completed and this change order issued. The project will begin construction in November 2018 and is expected to be completed in November 2019. A portion of this project will use 2014 Bond Funds. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official intent to reimburse, that was adopted as part of the ordinance canvassing the bond election (Ordinance no. 21241-05-2014) and subsequent actions taken by the Mayor and City Council. M/WBE OFFICE - JLB Contracting, LLC agrees to maintain its initial MBE commitment of 23% that it made on the original contract and extend and maintain that same MBE commitment of 23% to this first change order. Therefore JLB Contracting, LLC remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MBE Commitment form executed by an authorized representative of its company. The project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget as appropriated, of the 2014 Bond Program Fund. Prior to an expenditure being incurred, the participating department has the responsibility to validate the availability of funds. TO Fund Department Account Project Program Activity Budget Reference# Amount ID IDYear (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 Submitted for City Manager's Office by: Susan Alanis (8180) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Wilma Smith (8785) ATTACHMENTS http://apps.cfwnet.org/council_packet/mc_review.asp?ID=26434&councildate=l 1/6/2018 11/15/2018 M&C Review Page 3 of 3 Form 1295 Dunaway - Randol Mill Amend3.pdf Form 1295 Randol Mill Roundabout .pd Map Randol Mill.pdf httv:Happs.cfwnet.org/council packet/mc review.asp?ID=26434&councildate=11/6/2018 11/15/2018 MAYOR AND COUNCIL COMMUNICATION MAP 20RANDOL MILL RD 100278 tib r �N Z BETTY p BRIDGES � ELLEN N� _ � � p D O z w 183 183 c7 10 0 D Y f _ g W N = LATHAM O a D > Y TRINITY IV ST Z -y' v N a w W P�RQO� o A d TRIN 0 1,500 3,000 6,000 Ft C7 W J4 J� C� Q �Q I I I Y , �� a ELBE �� rn TYNE o N o SAND ^CREEpE � MIDWAY '��� Y w TRAMMEL DAVIS 1 / Z ® W 2 N Z a0 1 I J = L) Z ��t,�`- N Q Q Z l '� W v_) DECOY C.1 Il ru-p t W JACK NEWELL W /' m 6' O 4 �✓ Z a W � a O Uj Cl) e OQ c J ' —� LOWERY IlF�s RgCQU.\ E'g 3o�Lo �o ,N, LL 3 z N GAF FTC(UQ 3 vi ] SAR ��� 0 O y�0 co JOHN T.WHITE TAIN I LAMAR Q Y Q, N F- W BOLA BATON = QI F_ Cn W Q �� O� X ANDERSON 3 ERSON ADRIANA z P`N��0 Wr TWIN ELMS BRIDGE gp NTWrEXIT 28EXIT 30 TIyOODmarmgg i-r EDERVILLE w EO Z Lu N a BRENTWOOD �_ y w O0 LU _J Z -_j W p 2 VOLA A V y - 4 � � 1 a, 02� STONEGATE � � # LLj C) 00 LOWERY W 's ' SARTAIN 5J��� I I EASTLAND GRAYSON RANDOL MILL ROAD AT PRECINCT LINE ROAD I o Copyright 2016 2016 City of Fort Worth. Unauthorized reproduction is a violation of applicable laws. The product is for CITY PROJECT#100278 informational purposes and may not have been prepared for or be suitable for legal,engineering,or surveying purposes. DOE#6800 It does not represent an on-the-ground survey and represents only the approximate relative location of property boundaries. The City of Fort Worth assumes no responsibility for the accuracv of said data.