Change Order Request Breakdown
Project Namel HMAC 2017-5 Street Rehabiliation at Various Locations City Sec# 1 50567
Client Project#(s)l 101265
Contractorl JLB Contracting,LLC PM Kristian Sugrim Inspectorl Martina Salinas
Change Order Submittal# Date 10/2612018
Dept. T/PW Contract Time
Totals CD
Original Contract Amount $1,945,950.00 $1,945,950.00 210
Extras to Date 15
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,945,950.00 $1,945,950.00 225
Amount of Proposed Change Order $60,604.10 $60,604.10 21
Revised Contract Amount 2,006,554.10 $2,006,554.10 246
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $60,604.10 $60,604.10
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.11%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,432,437.50
JICA-TION(R�A$6NS)i CR CHANGE ORDER
This Change Order submittal will i}i ovidk%for 1 ie.rehabilitation c-an existing Sanitary Se ZrManhole on Overton Pa,k Drive. Also,a procedu.-ai change had to be made,on
Overton Park Drive,because of changes in elevation;so additional quantities needed to be added to pulverization/stabilization items,and removed from the milling item.
Staff concurs with the Contractor's request for an additional 21 calendar days.
F
ENUAL RECURV,
CITY SECRETARY
ET. WORTH,Tx
r.
City of Fort Worth
Change Order Additions
Project Name HMAC 2017-5 Street Rehabiliation at Various Locations City Sec# 50567
Client Project# 101265
Contractor JLB Contracting,LLC PM Kristian Sugnm InspectorlF Martina Salinas
Change Order Submittal# 0 Date 10/26/2016
AUDI I IUNS
y Unit Unitos o a
new e w aniary Sewer Manhole 1.UUUUUUUU EA 71= $/,Ibb.Uu
Pavement u veriza ion
Cement o i ica ion
Roadbond
--3TTn—e—wT Epoxy Lining for SS Manhole
T/PW $76,699.10
Sub Total Additions 76, 10
Change Order Additions Page 1 of 1
FORIT WORTH City of Fort Worth
- -VI - Change Order Deletions
Project Name HMAC 2017-5 Street Rehabiliation at Various Locations City Sec# 50567
Client Project# 101265
Contractor JLB Contracting,LLC PM Kristian Sugrim Inspector Martina Salinas
Change Order Submittal# 0 Date 10126/2018
UtLtl IUNb
m n os otal
Surtace
T/PW $16,095.00
Sub Total Deletions 16,095.
Change Order Deletions Page 1 of 1
M/SBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO
None
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
CFW Change Order Approval COAppr-01 Page 1 of 4
Routing
Assigned To: Due Date:
Assigned By: Due Time:
Links 2
fortworthgov/Infrastructure Proiects/101265 - HMAC (2017-5)/Contractor/Change Orders/APC H2O17-
5 101265 COLD&
fortworthgov/Infrastructure Proiects/101265 - HMAC (2017-5)/Contractor/Change Orders/co 1 - Duly&mh on
overton/Change Order Breakdown - col mh Duly overton aaoroved.xlsm
Attachments(0)
No Attachments have been added to this form.
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/13/2018
CFW Change Order Approval COAppr-01 Page 2 of 4
FORT WORTH. city of Fort Worth
--.-• .-� Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 1
Change Order No.: COAppr-01 Date Started: 2018-11-26
City Sec. No.: 50567 Date Due: 2019-01-15
Project Name: HMAC (2017-5)
Project Numbers: 101265 DOE Numbers:
Project HMAC 2017-5 Street Rehabilitation; Removal and replacement of
Description: broken and non-functional curb and gutters, driveways and
sidewalks, followed by the pulverization and stabilization of
the existing pavement and a 2" HMAC overlay.
Project/Contract
Compliance Kristian Sugrim City Inspector: Martina Salinas
Manager.
Contractor: JLB Contracting, LLC.
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
TPW $ 60,604.10 30100-0200431-5740010-101265-0 21
Total Cost: $ 60,604.10 Total Requested Days: 21
Approval Status:
https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/13/2018
CFW Change Order Approval COAppr-01 Page 3 of 4
Approved: Yes
Comments:
User: Sam Davis
Date: 2018-11-26 4:26 PM
Approved: Yes
Comments:
User: Kristian Sugrim
Date: 2018-11-28 10:20 AM
Approved: Yes
Comments:
User: Sam Davis
Date: 2018-11-29 4:28 PM
Approved: Yes
Comments:
User: Kristian Sugrim
Date: 2018-11-29 4:43 PM
Approved: Yes
Comments:
User: Lane Zarate
Date: 2018-12-03 4:25 PM
Approved: Yes
Comments:
User: Ricardo Matute
Date: 2018-12-04 4:25 PM
Approved: Yes
Comments:
User: Signing for TPW Director Role Approvals
Date: 2018-12-06 9:19 AM F®RTS'
Approved: Yes
Comments: /
User: Doug Black
Date: 2018-12-10 3:28 PM Wald P. Gonzales, s .City
Approved: Yes
Comments:
User: Susan Alanis
Date: 2018-12-12 5:29 PM -- �-
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?Siteld=51500&Proces... 12/13/2018
CFW Change Order Approval COAppr-01 Page 4 of 4
Action Required:
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/13/2018
r" H City of Fort Worth
ACCEPTANCE OF PREVIOUS MBE COMMITMENT FORINT
(for use with CHANGE ORDERS or AMENDMENTS greater than$50,000)
To be Completed by City Project Manager
Change Order(for Construction Contract)
Project Name: City Project Number
HMAC 2017-5 Street Rehabilitation 101265
City Project Manager
Contractor: Kristian Sugrim
JLB Contracting, LLC City's MBE Project Goal: 11
Original Amount of Contract: $1,945,950.00 Accepted MBE Commitment: 11 %
Total of Previous Change Orders: $0.00 Date of Last MBE Report:
Amount for this Change Order: $60,604.10 Change Order#: 1
Revised Amount of Contract: $2,006,554.10 Date: 11/2112018.
Language to be inserted in the M&C for this Contract
JLB Contracting, LLC agrees to maintain its initial MBE commitment of 11% that it made on the
original contract and extend and maintain that same MBE commitment of 11%to this first change
order. Therefore JLB Contracting, LLC remains in compliance with the City's BIDE Ordinance and
attests to its commitment by its signature on the Acceptance of Previous MBE Commitment'form
executed by an authorized representative of its company.
To be Completed by the Representative of the Contractor
Sam Davis President �� - 11/21/18
Printed Signature 'Title Authorized Signature/Date
JLB Contracting, LLC
Company Name Contact Name(if different)
PO Box 24131 sdavis@jlbcontracting.com
Address E-mail address
Fort Worth, Texas 76124 817-261-2991 817-261-3044
City/State/Zip Phone number Fax Number
55 % (paid to MBE/work completed) as of 10/15/18
MBE%Paid to Date Date
City Project Manager has reviewed the work associate wit this Change Order,
considers it the same or similar to work in the original Contract, and recommends that the
Contractor havq the option to retain a con rrm its existing MBE commitment.
Kristian Sugrim %`. 11/21/2018
City Project Manager City Project Man ger Signature Date
Attach Comp/eComp/ete Change Order Documentation
CompletedTo be Compliance
M/WBE Compliance Staff ID# MBE Current% Level via Last Report Recd
M/WBE Signature Date
Contract Compliance Manager
Re: Change Order No. 1 ($60604.10)
Contractor: JLB Contracting, LLC
Project Name: HMAC 2017-5 Street Rehabilitation
City Secretary No.: 50567
Project No.: 101265
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract including ensuring all performance and reporting
requirements.
ame of Employee
Promect Manager
Title
j
E
ECURCETA Y
H, T