Loading...
HomeMy WebLinkAboutContract 47353-A5 AMENDMENT NO. 5 TO AGREEMENT 4 STANDARD AGREEMENT FOR PROFESSIONAL SERVICES COMMUNITY CENTERS EXPANSION PROJECT �oQ�A°s(Eugene McCray &Handley-Meadowbrook Community Centers Expansion) STATE OF TEXAS CITY SECRETARY CONTRACT NO. 353' 5 COUNTY OF TARRANT WHEREAS, The City of Fort Worth ("City") and GSBS Batenhorst, Inc. ("Architect") made and entered into City Secretary Contract No. 47353 (the Contract) which was authorized by the City Council by M&C C-27564, the 15th day of December, 2015, for Eugene McCray Community Center Expansion & Hand ley-Meadowbrook Community Center Expansion; and Amendments No. 1, 2, 3 & 4 were administratively executed in the total amount of $79,756.00 to perform the Hand ley-Meadowbrook plat submittal's iSWM report, to revise approved schematic design plans, to revise previously approved parking layouts for both Community Centers, to modify civil & architectural construction plans including a written narrative of the parking changes to the City of Fort Worth plans examiner, respectively; and WHEREAS, further amendment is necessary to reimburse the Architect as part of the design services agreement for additional structural engineering design services to repair existing structural construction deficiencies in the existing restroom area's concrete floor slab at Eugene McCray Community Center. NOW THEREFORE, City and Architect, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, (6) — Scope of Services, a paragraph shall be added to read as follows: Provide additional design services to repair existing structural floor slab construction at the Eugene McCray Community Center. The cost of this additional structural engineering service is $3,750.00 with no additional reimbursable expenses. The scope of services is described more fully in the GSBS's letter, Attachment "J" dated October 9, 2018, subject: "Re: Eugene McCray Community Center". 2. Article II, (1) — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "J". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "J". However the total fee paid by the City shall not exceed a total of $266,206.00 which includes $10,000.00 for reimbursable expenses, unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly. OF(FiCIAL RECORCD VTYECRI, Tn `011" Amendment No. 5 , Eugene McCray&Hand ley-Meadowbrook Community Centers Expansion November 2018 L� _ - 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. Executed and effective this the. day of Dece,mlpeY _' 2018. BY: BY: CITY OF FORT WORTH ARCHITECT GS S tenhorst, Inc. l Jesus J. Chapa —T omas E. tatenhorst, IA Assistant City Manager Prin ip I Date: 'G4 Date: L v✓ APPROVAL COMMENDED: B ables, Interim Director grte e anagement Department APPROVED AS TO FORM AND M&C No.: M&C Not Required LEGALITY M&C Date: N/A By. 7 hn B. Strong Assistant City Attorney .:; RT' A (�� X1295 Certification: N/A Mary J. Kayser ( City Secretary ''r�&ntract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.col� )�)1-wVvQ I Brian R. Glass, AIA Architectural Services Manapir OFFICIAL RECORD CITY SECRETARY Amendment No. 5 FT. Ifj,2TX Eugene McCray&Hand ley-Meadowbrook Community Centers Expansion ATTACHMENT "J" GSBS MA October 9, 2018 Alfonso Meza City of Fort Worth Property Management Department 401 W. 13th Street Fort Worth, TX 76102-4616 Re: Eugene McCray Community Center Dear Alfonso, Pursuant to the Contract executed for the "CITY OF FORT WORTH, TEXAS AGREEMENT FOR ARCHITECTURAL SERVICES COMMUNITY ENTERS EXPANSION PROJECT" dated 12/15/15, the following additional services proposal is presented for your review and consideration for Professional Services as described below. The following is a summary of the change of work as broken down on the Scope of Services Worksheets as provided. Scope of Work (the Work): We understand the scope of the required additional services to be repair of the existing slab-on-void within the original building due to additional trenching for underground plumbing. It is our understanding that there was a leak in the plumbing line and approximately 63'-0" of slab in the north-south direction was removed. Additional finishes and coordination of the project are required for room 108, Women. The scope of our services is to review and document the field conditions and develop repair drawings for replacement of the structural slab. Also, one additional engineering site observation to review the repairs prior to placing concrete. Basic Services: Design Phases: No Change to original contract. Bidding: No Change to original contract. Contract Administration: No Change to original contract. Consultants: As noted below for Structural. Owner's Consultants: No Change to original contract. Cost of the Work: Appropriate costs associated with Scope of Work changes as noted above. Not Included: No Change to original contract. 375 WEST 200 SOUTH 7291 GLENVIEW DRIVE SALT LAKE CITY,UT 84101 FORT WORTH,TX 76180 €'801.521.8600 f 817.589.1722 1 801.521.7913 1 817.595.2916 www.gsbsarchitects.com Compensation: We propose to complete the Scope of Work Changes to the Eugene McCray Community Center described above for a stipulated sum for Basic Services of: Item 1- Architectural Services: $750 Architect 2 3 hrs @ $145= $435 Architectural Technician 3 4 hrs @ $65= $260 Office Technician 1 1 hr @ $55= $55 Item 2- Engineering services: Lump Sum with estimated hours below $3,000 Senior Project Manager 2 hrs @ $175.00/HR = $350 Project Engineer 16 hrs @ $120.00/HR = $1,920 Senior Technician 8 hrs @ $90.00/HR = $720 Total $3,750 If additional services are required by the Owner the Architect will provide a written proposal for approval and authorization in writing by the Owner to proceed with such work. Reimbursable Expenses: No Change to original contract. Design Schedule: As mutually agreed by all parties. Accessibility: No Change to original contract. Energy Code Compliance: No Change to original contract. Sincerel T omas E. Batenhorst, AIA GSBS Architects STANDARD HOURLY BILLING RATES G S B S MMd JUNE i,ZU15 ARCHITECT Architect 1 $225.00 Architect 2 $145.00 Architect 3 $115.00 Architect 4 $95.00 LANDSCAPE Landscape Architect 1 $145.00 ARCHITECT Landscape Architect 2 $115.00 Landscape Architect 3 $95.00 Landscape Architect 4 $65.00 INTERIOR DESIGNER Interior Designer 1 $90.00 Interior Designer 2 $75.00 Interior Designer 3 $55.00 Interior Designer 4 $45.00 URBAN PLANNER Urban Planner 1 $145.00 Urban Planner 2 $115.00 SUSTAINABILITY & Sustainability Services/Energy Specialist 1 $145.00 ENERGY CONSULTING Sustainability Services/Energy Specialist 2 $125.00 SERVICES Sustainability Services/Energy Specialist 3 $95.00 Sustainability Services/Energy Specialist 4 $80.00 ILLUSTRATOR/ Architectural Illustrator* $125.00 GRAPHIC DESIGNER Graphic Designer 1 * $115.00 Graphic Designer 2* $75.00 ARCHITECTURAL Architectural Technician 1 $95.00 TECHNICIAN Architectural Technician 2 $85.00 Architectural Technician 3 $65.00 Architectural Technician 4 $55.00 Architectural Technician 5 $45.00 OFFICE TECHNICIAN Office Technician 1 _ $55.00 Office Technician 2 $45.00 Office Technician 3 $35.00 *A surcharge will be billed in addition to Standard Hourly Rate for computer renderings, models, mock-ups& graphic presentations. Charge to be determined at the time of the request for specific services. Hourly rates are subject to periodic adjustment. 375 WEST 200 SOUTH 7291 GLENVIEW DRIVE SALT LAKE CITY,UT 84101 FORT WORTH,TX 76180 P. 801.521.8600 P.817.589.1722 F.80 1.521.7913 F.817.595.2916 GSBS ARCHITECTS IMP Sustainable Design Ezrellenre Mw