Loading...
HomeMy WebLinkAboutContract 34016 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. al (M&C Not Required) COUNTY OF TARRANT b WHEREAS, the City of Fort Worth (City) and GSWW, Inc, (Engineer) made and entered into City Secretary Contract No. 32129, (the Contract) which was authorized by the City Council by M&C C- 20821 on the 28th day of June, 2005; and WHEREAS, the Contract involves engineering services for the following project: Water and Sewer Replacement Contract 2004 , STM-H WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 19, 20061 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $18,875.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $121,215.00. ICI C10�I0 U2�gg�T 'S" . RIUINAI 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. y EXECUTED on this the ` day of , 20061 in Fort Worth, Tarrant County, Texas. ATTEST: p A Marty Hendrix, ity Secretary 1�t1C xi (ZU�.0 °° APPROVED: aOVD: A. Douglas Rademaker, P.E. Marc A. O t Director, Department of Assistant City Manager Engineering GSWW, Inc. ENGITR Name:David Washin tan PE Senior Vice Presicient 3950 Fossil Creek Blvd. Fort Worth, TX 76137 APPROVED ZFORMLEIGALITY- Assistant Attorney -2- s GSWW, Inc. Civil/Environmental Engineers■Planners Dallas■ Fort Worth■Midland■Austin Predecessor Firms: Gutierrez,Smouse,Wilmut&Assoc.,Inc. Washington&Associates,Inc. July 19, 2006 City of Fort Worth Department of Engineering 900 Monroe Street, 2nd Floor Fort Worth, Texas 76102 Attention: Mr. Rakesh Chaubey, P.E., Project Manager Re: Supplemental Authorization Request, WATER AND SANITARY SEWER REPLACEMENT CONTRACT STM-H; City Project No. 00193; DOE No. 4893; GSWW No. 0350-002 Water Project No. P253 531200 603170019351 Sewer Project No. P258 531200 703170019351 Proposed Amendment No. 1 to City Secretary Contract No. 32129; Mr. Chaubey: This letter is our formal request for Supplemental Authorization to be compensated for additional engineering services as requested by the City. Justification The original engineering contract did not include any services for permanent easements, temporary construction easements, or temporary right-of-entry documents because it wasn't known at that time how many were going to be needed if any. We will need four "Permanent Sanitary Sewer Easements with Adjacent Temporary Construction Easements" on Lot 15 & 16, Block 5 and Lots 20 & 21, Block 2 in Westcliff Addition and four additional "Temporary Construction Easements" on the lots adjacent to the permanent easements. This is for the Shelby Drive Sanitary Sewer Line to be "pipe enlarged" as shown on plan sheet 21. We will also need four "Temporary Construction Easements" on Lots 1, 5R, 6, & 9, Block 6 of Mockingbird Lane Addition (Ann Arbor Court Sanitary Sewer Line to be partially open cut and partially pipe enlarged as shown on plan sheet 14) and three "Temporary Construction Easements" on Lots 8, 10, & 12, Block 23 of Westcliff Addition (Corto Avenue Sanitary Sewer Line to be pipe enlarged as shown on plan sheet 22). Four "Temporary Right-of-Entry" exhibits will also be needed (one on Corto Avenue and three on Ann Arbor Court). n • � ^�rN1j,on 6,11��11�� 3950 Fossil Creek Boulevard,Suite 210, Fort Worth,Texas 76137 . 817.306.1444 . 81 7.306.1555 Fa ■ vttuvMl itl�'"t \\Serv+e2k\$project\350-002\Amendments to Eng Contract\350-002-amendk01_doc H. i N City of Fort Worth July 19,2006 Paae 2 DOE#4893 Summary of Easement Documents Needed: 4 - Permanent Easements (with Temporary Construction Easement) 11 - Temporary Construction Easements 4 - Temporary Right-of-Entry documents The additional costs are summarized below: • Additional drafting, coordination with surveyor, coordination with City staff, and four TROE documents with exhibits $ 5,000.00 • Four Permanent Easements with TCE's and eleven Temporary Construction Easements (MWBE firm) $13,875.00 TOTAL FOR PROPOSED AMENDMENT NO. 1 FEE $18,875.00 PROJECT FEE DETAILS Contract Item Description Fee Original Contract Water and SS Repl Contract 2004 $ 102,340.00 Amendment No. 1 Permanent Easements, TCE's, and TROE's $ 18,875.00 TOTAL PROJECT FEE $121.215.00 If you have any questions or need additional information concerning this request, please call me. Respectfully submitted GSWW, Inc. j 4P;jj�ect s, P.E. ate d Manager Enclosures \\Server2k\$ro Conaact\350-002-emend#01.doc (`�ge np`.! P 1ect\350-002Nmendments to Eng 4r C�EV�IS ',,�}iY