Loading...
HomeMy WebLinkAboutContract 34020-A1 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.JiO Q `R (M&C not required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation, (Engineer) made and entered into City Secretary Contract No. 34020, (the Contract) which was authorized by the City Council by M&C C-21636 on the 29th day of August 2006; WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LXXIII (73) . WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include additional engineering services specified in a proposal letter dated June 23, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $21, 193 .50 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $208,462 .50. LOFFICIAL,RECORDRETARYRTH!TX 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the �O day of :3 2011, in Fort Worth, Tarrant County, Texas. '�.,�;e * A' � ATTEST: F Marty Hendrix oD City Secretary ��a ° , : APPROVAL RECOMMENDED: APPROVED: Frank S. Crumb, P.E. Fernando Costa Director, Assistant City Manager Water Department Dannenbaum Engineering Corporation ENGINEER By: Name: Wayne Ahrens, P.E. Executive Vice President 6421 Camp Bowie Blvd. ; Ste. 400 Fort Worth, Texas 76116 APPROVED. AS TO FORM AND LEGALITY: i Assistant ity Attorney OFFICIAL RECORD CITY SECRETARY o Mg�G �UIR�D FT. WORTH, TX N - -2- DANNENBAUM ENGINEERING CORPORATION 4CV0 • 6421 CAMP BOWIE BLVD.,SUITE 400 FORT WORTH,TEXAS 76116-5421 (817)763.8883 YeLm of Exoellewe June 23, 2011 Mr. Rakesh Chaubey, P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: Design Fee Cost Summary— Proposed Amendment No. 1 Sanitary Sewer Rehabilitation. Contract LXXIII (73) Water Project No. P258-707170043083 D.O.E. No. 5365 Dear Mr. Chaubey: This letter is to provide information regarding the change in scope on the Water Department work on the above referenced project. The changes in scope consist of: 1, Realignment of the sanitary sewers on Race Street and McLemore Street to eliminate the back-of-lot lines that run underneath existing buildings. 2. Additional field survey for the realignment of sanitary sewers on Race Street and McLemore Street. 3. Design of the Storm Drain conflict box at the intersection of Isbell Road and Inez Drive to eliminate an existing siphon for Lateral 5113. 4. Prepare maps, plan markups, opinions of cost, and related exhibits for securing Clean Water State Revolving Funds (CWSRF)for this project. 5. Update Specifications and Contract Documents to include SRF and non-SRF funded units, and include the necessary forms and related document language to comply with the CWSRF Loan Program requirements. The fee summary for this additional work is as follows: Dannenbaum Engineering $ 18,885.50 ARS Consultants (M/WBE) 3,028.00 Total $ 21,193.50 If you are in agreement with this Proposed Amendment Number 1, our authorized compensation will increase by $21,193.50, for a total of $208,462.50. A summary of contract Amendments is shown below: Original Contract Amount $ 187,269.00 Proposed Amendment No. 1 21,193.50 Revised Contract Amount $ 208,462.50 June 23,2011 • Rakesh Chaubey Page 2 If you have any questions in the meantime, please do not hesitate to call. Sincerely, 1�2 Grady H. eachum, P.E. Project Manager cc: Mark Lorance, P.E. File 4231-32 G:1121014231-321Admin\Agreement\Supplemental#114231-32 Cover Letter Chaubey 2011-06-23.docx EXHIBIT B-3 (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF TOTAL PROJECT FEES - SUPPLEMENTAL AGREEMENT No. 1 Sanitary Sewer Rehabilitation Contract LXXIII (73) Sewer Project No. P258-707170043083 DOE No. 5365 Phase Scope of Services Fee M/WBE % M/WBE I -Design Services Design $ 17,862.70 $ - 0.00% Survey $ 3,330.80 $3,028.00 90.91% TOTAL $21,193.50 $3,028.00 14.29% Proposed M/WBE Subconsultants Services Fees % M/WBE ARS Consultants Field Survey $3,028.00 14.29% TOTALS $3,028.00 14.29% SA#1 Exhibit 13-3A 09-21-2010.xlsx Exhibit B-3 EXHIBIT B-3A (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF TOTAL PROJECT FEES - SUPPLEMENTAL AGREEMENT No. 1 Sanitary Sewer Rehabilitation Contract LXXIII (73) Sewer Project No. P258-707170043083 DOE No. 5365 BASIC ENGINEERING DESIGN FEE: FEE MfWBE % MfWBE Revise plans for new alignment in Race and McLemore $ 17,862.70 $ - 0.00% SUBTOTAL (BASIC ENGINEERING DESIGN FEE) $ 17,862.70 $ - 0.00% SPECIAL SERVICES Field Survey(ARS) $ 3,028.00 $ 3,028.00 100.00% SUBTOTAL (SPECIAL SERVICES) $ 3,028.00 $ 3,028.00 100.00% CONSTRUCTION SERVICES As-Built Drawings $ - $ - 0.00% SUBTOTAL(CONSTRUCTION SERVICES) $ - $ - 0.00% REPRODUCTION 16 Sets of Preliminary Plans(Utility Clearance)(HTA) $ - $ - 0.00% 45 Sets of Construction Plans(HTA) $ - $ - 0.00% 1 Sets of As-Built Plans(HTA) $ - $ - 0.00% 1 Set of Mylars $ - $ - 0.00% SUBTOTAL (REPRODUCTION) $ - $ - 0.00% 10% SUB-CONTRACTOR MARK-UP $ 302.80 TOTAL LUMP SUM FEE (THIS ADDENDUM) $ 21,193.50 $ 3,028.00 14.29% PROPOSED MfWBE SUBCONSULTANTS (THIS ADDENDUM) PROPOSED SERVICES FEES %CONTRACT ANA Consultants, Inc. Field Survey $ 3,028.00 14.29% TOTAL MfWBE (THIS ADDENDUM) $ 3,028.00 14.29% TOTAL LUMP SUM FEE (PROJECT TOTAL) $ 208,462.50 PROPOSED MfWBE SUBCONSULTANTS (PROJECT TOTAL) PROPOSED SERVICES FEES % CONTRACT ANA Consultants, Inc. Field Survey $ 44,303.00 21.25% Alphagraphics Reproduction $ 4,135.00 1.98% TOTAL M/WBE (CITY MfWBE GOAL=22%) $ 48,438.00 23.24% SA#1 Exhibit B-3A 09-21-2010.xlsx Exhibit B-3A Fee Summary