WHEREAS, the City of Fort Worth (City) and Multatech Engineering,
Inc., (Engineer) made and entered into City Secretary Contract No. 31233,
(the Contract) which was authorized by the City Council by M&C C-20825 on
the 28th day of June 2006; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering Design Services: Street Reconstruction, Water and Sewer Main
Replacements Portions of Wimbleton Way (Walton Ave to Wilkie Way) and
Wales Court (Waltham Ave to Wedgmont Circle South), 2004 CIP Contract
Year 2, Contract 20, Project No. 00164; DOE No. 4839
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their
duly authorized representatives, enter into the following agreement which
amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated July 30,2006, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer total
$7,215.00.
2l �� I�
l:' �'� J�{ ' I li1, ��.�; IlS �V;(^' °�1 I� i
�,* � v :.. ' l
`
LN� �\'l� ����,,'�:; I'`+'LS IU'`�'��,; !,
�� �)
��I� •r.,1 �.�ij, } �(
�l h e �1-,i u�• 1�'ri �I �b . a
i " ° �
_ _ �-
�c C' �c'�
-� P�
ll�J �-'
MULTATECH
ENGINEERING, INC.
ALFRED SAENZ
WILLIAM A. MANNING, P.E.
VICTOR A. WEIR, II, P.E.
JOE T. ROMINE, P.E.
LAURENCE J. MALONEY, P.E.
JACK A. OTTESON, P.E.
July 30, 2006
Mr. Gopal Sahu
Project Manager
City of Fort Worth Engineering Department
1000 Throckmorton Street
Fort Worth, TX 76102
RE: CFW Project 00164, Street Reconstruction, Wimbleton Way,
Wales Ct.
Mr. Sahu:
As you are aware, Multatech provided additional engineering services
outside the original scope of work for this project. This work included
the design of a 42" storm drain line in Wimbleton Way for a future
drainage project. This additional work comprised the following:
• Subcontract work from Slater Engineering for preliminary storm
drain design. (Invoice attached)
• Additional Engineering and CAD for the addition of Sheet SD-1
and revisions to 5 other sheets.
• Reproduction: 130 additional full-size sheets and 1 Mylar
The cost for these additional services is $7,215.00 and is detailed on
the attached spreadsheet. We request that you issue a change order to
our contract in this amount.
Should you have any questions, please contact me at (817) 877-5571.
Sincerely,
Multatech Engineering, Inc.
1407 TEXAS STREET
SUITE 200 L n
FORT WORTH, TEXAS � �
76102-3428
Ja k A. Otteson, P.E.
PHONE [817] 877-5571 Vice President
METRO [817j 429-7457
FAX [817] 877-4245
E-MAIL
business @ multatech.com
Cc: File 04031.00
Encl. (2)
4 , � _ ,
� � �.� � � Sl. �J �.1'
��� 'l��'��
� ;i�;;o,.,; i�Z�4� ''�''�51 r, �uj,�/
� �J U ul L� �� � �:i 1� L- '�^::1. !
J, Uo ���� `.J ��i: U'�.� �i ` � �.
9 �''� �
r- - ._w_ r__�.. m._..-.
INVOICE
SL�fiT�I� �NC�lN��1: INC�, ING,
�',O, DOX 165�3
5280 Tl�itlL L�K� p1�lV�
SUIT� 14
�n�-r w��-rh. r�x�5 �<��<2
Bill To
Multatech Engineering Inc.
Jack Otteson, P.E.
1407 Texas Street Ste200
Fort Worth, TX 76102-3428
Terms Due Date Account #
Due on receipt � 7/10/2006
Item Description
ENGINEER IV EMERGENCY - PRELIMINARY WORK ON
WIMBLETON WAY STORM DRAIN
TECHNICIAN I EMERGENCY - PRELIMINARY WORK ON
WIMBLETON WAY STORM DRAIN
ENGINEER III EMERGENCY - PRELIMINARY WORK ON
WIMBLETON WAY STORM DRAIN
ENGINEER III EMERGENCY - PRELIMINARY WORK ON
WIMBLETON WAY STORM DRAIN
ENGINEER IV EMERGENCY - PRELIMINARY WORK ON
WIMBLETON WAY STORM DRAIN
ENGINEER III EMERGENCY - PRELIMINARY WORK ON
WIMBLETON WAY STORM DRAIN
ENGINEER III REVISIONS TO WIMBLETON WAY STORM
DRAIN
TECHNICIAN II REVISIONS TO WIMBLETON WAY STORM
DRAIN
6
It's been a pleasure working with you!
Project / Job
Hours / Quant...
3.00
Phone # Fax # E-mail
817-346-6520 817-346-6523 sslater0l@msn.com
5.00
4.00
4.00
4.00
4.00
6.00
3.00
Date I Invoice #
I 7/10/2006 I 2006001
Description of Services
Rendered:
REVIEWED EXISTING PLANS/PROFILES OF
STREETS, STORM DRAINS, WATER AND SEWE
PREPARED DRAINAGE AREA MAPS,
CALCULATED TIME OF CONCENTRATION,
WEIGHTED RUNOFF COEFFICIENT3 AND 100
YEAR RUNOFF. DETERMINED CAPACITY OF
EXISTING STREETS AND STORM DRAINS AND
ESTIMATED PIPE SIZES REQUIRED TO CARRY
RUNOFF WITHOUT FLOODING PRIVATE
PROPERTIES.
Rate I Serviced I Amount
135.00 6/2/2006 405.00
52.50 6/2/2006 262.50
90.00 6/6/2006 360.00
90.00 6/7/2006 360.00
135.00 6/8/2006 540.00
90.00 6/9/2006 360.00
110.00 7/6/2006 660.00
75.00 7/6/2006 225.00
Tota I $3,,,2.So
�= —. ,_. ,,
�� i�,�' ''' o �'�' =� �`� �
�.; �.�J�> >--�'l .,:��� �� :��J
Z;ry��^°; �.1,J,,:-���(�SII.,';�,r�''��i
`J li C. �i1 bu.u!1;�
7 ;+n^,r'�'i� }� R9
;�J I �V�rii '� �.
J � a .; •�� �I�; �� I�, �I � ui ��:, �': a
Change Order #1
Additional Engineering Services
City of Fort Worth Year Two, 2004 Capital Improvement Program, Contract No. 20
CFW PROJECT No. 00164
Item Description Unit Qty Unit Cost Total
Subcontract Engineering Services (Slater
1 Engineering) LS 1 3,172.50 3,173.00
2 Additional Engineering - Engineer HR 6 125.00 750.00
3 Additional Engineering - CAD HR 24 105.00 2,520.00
4 Meetings HR 4 125.00 500.00
5 Reproduction - Additional full-size bond EA 130 2.00 260.00
6 Reproduction - Additional Mylar EA 1 12.00 12.00
Total: $ 7,215.00