Loading...
HomeMy WebLinkAboutContract 34071AMENDMENT NO. 1 r-�Ir j( STATE OF TEXAS S CITY SECRETARY CONTRACT NO.�`C�f`1 (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Multatech Engineering, Inc., (Engineer) made and entered into City Secretary Contract No. 31233, (the Contract) which was authorized by the City Council by M&C C-20825 on the 28th day of June 2006; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street Reconstruction, Water and Sewer Main Replacements Portions of Wimbleton Way (Walton Ave to Wilkie Way) and Wales Court (Waltham Ave to Wedgmont Circle South), 2004 CIP Contract Year 2, Contract 20, Project No. 00164; DOE No. 4839 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 30,2006, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $7,215.00. 2l �� I� l:' �'� J�{ ' I li1, ��.�; IlS �V;(^' °�1 I� i �,* � v :.. ' l ` LN� �\'l� ����,,'�:; I'`+'LS IU'`�'��,; !, �� �) ��I� •r.,1 �.�ij, } �( �l h e �1-,i u�• 1�'ri �I �b . a i " ° � _ _ �- �c C' �c'� -� P� ll�J �-' MULTATECH ENGINEERING, INC. ALFRED SAENZ WILLIAM A. MANNING, P.E. VICTOR A. WEIR, II, P.E. JOE T. ROMINE, P.E. LAURENCE J. MALONEY, P.E. JACK A. OTTESON, P.E. July 30, 2006 Mr. Gopal Sahu Project Manager City of Fort Worth Engineering Department 1000 Throckmorton Street Fort Worth, TX 76102 RE: CFW Project 00164, Street Reconstruction, Wimbleton Way, Wales Ct. Mr. Sahu: As you are aware, Multatech provided additional engineering services outside the original scope of work for this project. This work included the design of a 42" storm drain line in Wimbleton Way for a future drainage project. This additional work comprised the following: • Subcontract work from Slater Engineering for preliminary storm drain design. (Invoice attached) • Additional Engineering and CAD for the addition of Sheet SD-1 and revisions to 5 other sheets. • Reproduction: 130 additional full-size sheets and 1 Mylar The cost for these additional services is $7,215.00 and is detailed on the attached spreadsheet. We request that you issue a change order to our contract in this amount. Should you have any questions, please contact me at (817) 877-5571. Sincerely, Multatech Engineering, Inc. 1407 TEXAS STREET SUITE 200 L n FORT WORTH, TEXAS � � 76102-3428 Ja k A. Otteson, P.E. PHONE [817] 877-5571 Vice President METRO [817j 429-7457 FAX [817] 877-4245 E-MAIL business @ multatech.com Cc: File 04031.00 Encl. (2) 4 , � _ , � � �.� � � Sl. �J �.1' ��� 'l��'�� � ;i�;;o,.,; i�Z�4� ''�''�51 r, �uj,�/ � �J U ul L� �� � �:i 1� L- '�^::1. ! J, Uo ���� `.J ��i: U'�.� �i ` � �. 9 �''� � r- - ._w_ r__�.. m._..-. INVOICE SL�fiT�I� �NC�lN��1: INC�, ING, �',O, DOX 165�3 5280 Tl�itlL L�K� p1�lV� SUIT� 14 �n�-r w��-rh. r�x�5 �<��<2 Bill To Multatech Engineering Inc. Jack Otteson, P.E. 1407 Texas Street Ste200 Fort Worth, TX 76102-3428 Terms Due Date Account # Due on receipt � 7/10/2006 Item Description ENGINEER IV EMERGENCY - PRELIMINARY WORK ON WIMBLETON WAY STORM DRAIN TECHNICIAN I EMERGENCY - PRELIMINARY WORK ON WIMBLETON WAY STORM DRAIN ENGINEER III EMERGENCY - PRELIMINARY WORK ON WIMBLETON WAY STORM DRAIN ENGINEER III EMERGENCY - PRELIMINARY WORK ON WIMBLETON WAY STORM DRAIN ENGINEER IV EMERGENCY - PRELIMINARY WORK ON WIMBLETON WAY STORM DRAIN ENGINEER III EMERGENCY - PRELIMINARY WORK ON WIMBLETON WAY STORM DRAIN ENGINEER III REVISIONS TO WIMBLETON WAY STORM DRAIN TECHNICIAN II REVISIONS TO WIMBLETON WAY STORM DRAIN 6 It's been a pleasure working with you! Project / Job Hours / Quant... 3.00 Phone # Fax # E-mail 817-346-6520 817-346-6523 sslater0l@msn.com 5.00 4.00 4.00 4.00 4.00 6.00 3.00 Date I Invoice # I 7/10/2006 I 2006001 Description of Services Rendered: REVIEWED EXISTING PLANS/PROFILES OF STREETS, STORM DRAINS, WATER AND SEWE PREPARED DRAINAGE AREA MAPS, CALCULATED TIME OF CONCENTRATION, WEIGHTED RUNOFF COEFFICIENT3 AND 100 YEAR RUNOFF. DETERMINED CAPACITY OF EXISTING STREETS AND STORM DRAINS AND ESTIMATED PIPE SIZES REQUIRED TO CARRY RUNOFF WITHOUT FLOODING PRIVATE PROPERTIES. Rate I Serviced I Amount 135.00 6/2/2006 405.00 52.50 6/2/2006 262.50 90.00 6/6/2006 360.00 90.00 6/7/2006 360.00 135.00 6/8/2006 540.00 90.00 6/9/2006 360.00 110.00 7/6/2006 660.00 75.00 7/6/2006 225.00 Tota I $3,,,2.So �= —. ,_. ,, �� i�,�' ''' o �'�' =� �`� � �.; �.�J�> >--�'l .,:��� �� :��J Z;ry��^°; �.1,J,,:-���(�SII.,';�,r�''��i `J li C. �i1 bu.u!1;� 7 ;+n^,r'�'i� }� R9 ;�J I �V�rii '� �. J � a .; •�� �I�; �� I�, �I � ui ��:, �': a Change Order #1 Additional Engineering Services City of Fort Worth Year Two, 2004 Capital Improvement Program, Contract No. 20 CFW PROJECT No. 00164 Item Description Unit Qty Unit Cost Total Subcontract Engineering Services (Slater 1 Engineering) LS 1 3,172.50 3,173.00 2 Additional Engineering - Engineer HR 6 125.00 750.00 3 Additional Engineering - CAD HR 24 105.00 2,520.00 4 Meetings HR 4 125.00 500.00 5 Reproduction - Additional full-size bond EA 130 2.00 260.00 6 Reproduction - Additional Mylar EA 1 12.00 12.00 Total: $ 7,215.00 r;���J��,1�=�.� ���rJv.°?�' 'NJ U,' '�n�'�Iy�l� ��1� �:7 ��/ c i� L��: �' S'�. �$�j � r�n it � � ] U �'.r�'�` � ^ �� :d. � IJ 1 � �.S L , o :% � � :