HomeMy WebLinkAboutContract 34098- ' : : t z �' '. B � Y` ���}�� � � ��'�, i t1 + . CITY OF FORT WORTH, TEXAS ' 3 „ � ,; , ," �� . , -__ . STANDAFtD AGREEMENT FOR �NGINEERING SERVICES This AGREEMENT is befinreen the City of Fort Worth (the "CITY"), and Halff ,4ssociates, Inc., (the "ENGINEER"), for a PROJECT generally described as: Sanitary Sewer Rehabilitation Contract, LXXII (72). Article i Scope of Services A. The Scape of Services is set forth in Attachment A. Article II Compensation A, The ENGINEER's compensa�ion is set forth in Attaehment B. Article III Terms of Payment Payrt�ents to the ENGINEER will be m�de as follows: A. Invoice and Eayment (1) The Engineer shall provide the City sufficient documentation to reasonably substantiate the invoices. (2) The ENGIN�EI� will issue monthly invoices for afl work perFormed under this AGREEMENT. Invoices �re due and payable within 30 days of receipt. (3) Upon completian of services �numerated ir� Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed ar contested billing, only tha# portion so contested will be withheld from payment, and the undisputed portian will be paid. The CITY will exercise reasonabfeness in cantesting any bill or portion thereof. No interest will accrue on any contested portion of th� billing until mutually resofved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faifh within 60 days of #he amouni due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full, including interest. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. ���l�l ��� ������ �li� �������Y �, �������, i��. Article N Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and fumishing customary services incidental thereto. B, Standard of Care The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants pertorming the same or similar services at the time such services are performed. � C. SubsurFace Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurFace investigations in connection with design and engineering work ta be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be fumished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locaXions other than where observations, explaration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or executian. These conditions and cost/execution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible plastic film sheets, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than fihe PROJECT described herein. ENGINEERING CONTRACT Page 2 of'14 E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties thaf belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set farth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECi' or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on-site inspections to discover latent defec#s in the work or otherwise check the quality or quantity of the work on the PROJECT. If, for any re�son, the ENGINEER should make an on-site observation(s), on the basis of such on-site observations, if any, the ENGINEER shall endeavor to keep the CITY informed of any deviation from the Contract Documents coming to the actual notice of ENGINEER regarding the PROJECT. (3) When professional certification of perFormance or characteristics of materials, systems or equipment is reasonably required to perForm the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality ENGINEERING CONTRACT Page 3 of 14 �����'��� �: v'. ;:�u i �,',�}�� �j� ��1;�� ���?� ��� �' �'i ���, ���� of pertormance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational faetors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITI('s actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do nof represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue befinreen the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various componenfis, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority and Woman Business Enterprise (MNVBE) participation In accord with City of Fort Worth Ordinance No. 15530, the City has goals for the particip�tion of minority business enterprises and woman business enterprises in City contracts. Engineer acknowledges the M/WBE goal established for this contract and its commitment to meet that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this agreement and debarment from participating in City contracts for a period af time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions retating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate ENGINEERING CONTRACT Page 4 of 14 and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereund�r a provision to the efFect that the subconsultant agrees that the CITY shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3)hereof. CITY shall give sub-consultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the co5t of copies at the rate published in the Texas Administrative Code in efFect as of the time copying is perFormed. K. ENGINEER's Insurance (1) Insurance Coverage and limits: ENGINEER shall provide to the City certificate(s) of insurance documenting policies of the following coverage at minimum limits that are to be in effect prior to commencement of work on the PROJECT: Commercial General Liability $1,000,000 each occurrence $1,000,000 aggregate Automobile Liabilify $1,000,000 each accident (or reasonably equivalent limits of coverage if written on a split limits basis). Coverage shall be on any vehicle used in the course of the PROJECT. Worker's Compensation Coverage A: statutory limits Coverage B: $100,000 each accident $500,000 disease - policy limit $100,000 disease - each employee Professional Liability $1,000,000 each claim/annual aggregate ENGINEERING CONTRACT Page 5 of 14 (2) Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. (a) Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. (b) Certificate(s) of insurance shall document that insurance coverage specified according to items section K.(1) and K.(2) of this agreement are provided under applicable policies documented thereon. (c) Any failure on documentation requirements. part of the CITY to request required insurance shall not constitute a waiver of the insurance (d) A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Such terms shall be endorsed onto ENGINEER's insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. (e) Insurers for all policies must be authorized to do business in the state of Texas or be otherwise approved by the CITY; and, such insurers shall be acceptable to the CITY in terms of their financial strength and solvency. (� Deductibl� limits, or self-insured retentions, affecting insurance required herein shall be acceptable to the CITY in its sale discretion; and, in lieu of traditional insurance, any alternative coverage maintained through insurance pools or risk retention groups must be also approved. Dedicated financial resources or letters of credit may also be acceptable to the City. (g) Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. (h) The City shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion, the ENGINEER may be required to provide proof of insurance premium payments. (i) The Commercial General Liability insurance policy shalt have no exclusions by endorsements unless the CITY approves such exclusions. ENGINEERING CONTRACT Page 6 of 14 (j) The Professional Liability insurance policy, if written on a claims made basis shall be maintained by the ENGINEER for a minimum two (2) year period subsequent to the term of the respective PROJECT contract with the CITY unfess such coverage is provided the ENGINEER on an occurrence basis. (k) The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. It is understood that insurance cost is an allowable component of ENGINEER's overhead. (I) All insurance required in section Liability insurance policy, shall be order to be approved by the CITY. K., except for the Professional written on an occurrence basis in (m) Subconsultants to the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When subconsultants maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. Notwithstanding anything to the contrary contained herein, in the event a subconsultant's insurance coverage is canceled or terminated, such cancellation or termination shall not constitute a breach by ENGINEER of the Agreement. L. Independent Consultant The ENGINEER agrees to perForm all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure The ENGIN�ER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in properly abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the ENGINEER will, if requested, assist the CITY in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. ENGINEERING CONTRACT Page 7 of 14 O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City-Fumished Data The CITY will make available to the ENGINEER all technical data in the CITY's possession relating to the ENGINEER's services on fihe PROJECT. The ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Properly The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's perFormance of. its services and will provide labor and safety equipment as required by the ENGINEER for such access. The CITY will perForm, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITI('s facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permi#s, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights-of-way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specificatians, proposals, and other documents; obtain advice of an attomey, insurance counselor, accountant, auditor, bond and financial advisors, and other ENGINEERING CONTRACT Page 8 of 14 consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule in Attachment A. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances and Indemnification (1) To the maximum extent permitted by law, the CITY will indemnify and release ENGINEER and its officers, employees, and subcontractors from all claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation expenses arising out of or relating to the presence, discharge, release, or escape of hazardous substances, contaminants, or asbestos on or from the PROJECT. Nothing contained herein shall be construed to require the CITY to levy, ���ess or collect any tax to fund this indemnification. (2) The indemnification and release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER'S negligence or if such hazardous substance, contaminant or asbestos is brought onto the PROJECT by ENGINEER. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Arkicle IV.E. regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Parly Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services perFormed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." ENGINEERING CONTRACT Page 9 of 14 (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shalf have no third-party beneficiary rights under this Agreement. (4) �� (1) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. CITY's Insurance The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/�nstallafion insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) J. The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate ta the PROJECT risks. Litigation Assistance The Scope of Services does not include costs of the requested assistance to support, prepare, document, litigation undertaken or defended by the CITY. In the services of the ENGINEER, this AGREEMENT shall agreement will be negotiated between the parties. K. Changes ENGINEER for required or bring, defend, or assist in event CITY requests such be amended or a separate The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for perFormance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. ENGINEERING CONTRACT Page 10 of 14 B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The final designs, drawings, specifications and documents shall be owned by the CITY. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER. D. Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonpertormance with 5 days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cast of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing storage containers, microfilm, electronic data files, and other data storage supplies or services; c.) The time requirements for the ENGIN�ER'S personnel to document the work underway at the time the CITY'S terminatian for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CtTY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Intemuption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECTs schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. ENGINEERING CONTRACT Page 11 of 14 F. Indemnification (1) The ENGINEER agrees to indemnify and defend the CITY from any loss, cost, or expense claimed by third parties for property damage and bodily injury, including death, caused solely by the negligence or willful misconduct of the ENGINEER, its employees, officers, and subcontractors in connection with the PROJECT. (2) If the negligence or willful misconduct of both the ENGINEER and the CITY (or a person identified above for whom each is liable) is a cause of such damage or injury, the loss, cost, or expense shall be shared between the ENGINEER and the CITY in proportion to their relative degrees of negligence or willful misconduct �s determined pursuant to T.C.P. & R. Code, section 33.011(4) (Vemon Supplement 1996). G. Assignment Neither �arty shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence, strict or statutary liability, or any other cause of action, except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CIIY and the ENGINEER, and their officers, employees, agents, and subcontractors. 1. Jurisdiction The law of #he State of Texas shall govern the validity of this interpretation and performance, and any other claims related to any litigation related to this AGREEMENT shall be Tarrant County, J. Altemate Dispute Resolution AGREEMENT, its it. The venue for Texas. (1) All claims, disputes, and other matters in question between the CITY and ENGINEER arising out of, or in connection with this Agreement or the PROJECT, or any breach of any obligation or duty of GITY or ENGINEER hereunder, will be submitted to mediation. If inediation is unsuccessful, the claim, dispute or other matter in question shall be submitted to arbitration if both parties acting reasonably agree that the amount of the dispute is likely to be less than $50,000, exclusive of attorney's fees, costs and expenses. Arbitration shall be in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association or other applicable rules of the Association then in effect. Any award rendered by the arbitrators less than ENGINEERING CONTRAC7 Page 12 of 14 $50,000, exclusive of attomey's fees, costs and expenses, will be final, judgment may be entered thereon in any court having jurisdiction, and will not be subject to appeal or modification except to the extent permitted by Sections 10 and 11 of the Federal Arbitration Act (9 U.S.C. Sections 10 and 1 'I ). (2) Any award greater than $50,000, exclusive of attomey's fees, costs and expenses, may be litigated by either party on a de novo basis. The award shall become final ninety (90) days from the date same is iss�ed. If litigation is filed by either party within said ninety (90) day period, the award shall become null and void and shall not be used by either party for any purpose in the litigation. K. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, itlegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable prvvision had never been contained herein. Arkicles V.F., VI.B., VI.D., VI.H., VI.I., and VI.J. shall survive termination of this AGRE�MENT for any cause. L. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulatians which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misurtderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its ofFcers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itseff or its employees. ENGINEERING CONTRACT Page 13 of 14 Article VII Attachments, Schedules, and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A- Scope of Services Attachment B — Compensation Attachment C- Amendments fo Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E- h cation Map 11 � Executed this the day of y � �, 2006. ATTEST: Marty Hendrix City e�cr a � �� � - -_ Contraci.: �i oxi�a�i�� �� �� �-�,�".�`-�-- Uac.e AND LEGALITY ATTEST: STANDARD ENGINEERING AGREEMENT (REV 10/06/OS� Page 14 of 14 CITY OF FORT WORTH ,�-i/,:�.r� �' ��v� By:�_ - Marc A. Ott Assistant City Manager APPROVAL RECOMMENDED A. Douglas Rademaker, P.E. Director, Engineering Department HALFF ASSOCIATES. INC. ENGINEER By: Russell Killen, P.E. Vice President �����ih�� ������ C�� �������� �T. �'����, ���. ATTACHMENT "A" Generai Scope ofi Services "Scope of Services set forfh her�in can on/y be modified by additions, clarifications, and/or de%tions set forth in the supplemental Scope of Services. In cases of conflict between the Supp/emental Scope of Services and the Genera! Scope of Services, the Supplemental Scope of Services shall have pr�cedence over the General Scope of Services. ° GENERAL 1) Preliminary Conference with City The Engineer shall attend preliminary conferences with authorized representatives of the City regarding the scope of project so that the plans and specifications which are to be developed hereunder by the Engineer will result in providing facilities which are economical in design and conform to the City's requirements and budgetary constraints. 2) Coordination with Outside Agencies/Public Entities The Engineer shalt coordinate with officials of other outside agencies as may be necessary for the design of the proposed street, and storm drain and/or water and wast�water facilities/improvements. It shall be the Engineer's duty hereunder to secure necessary information from such outside agencies, to meet their requirements. 3) GeoteChnicaf Investigations The Engineer shall advise the City of test borings, and other subsurface investigations that may be needed. In the event it is determined necessary to make borings or excavate test holes or pits, the Enginesr shall in coordination with the City and the City's geotechni�al engineering consultant, draw up specifications for such testing program. The cost of the borings or excavations shall be paid for by the City. 4) Agreements and Permits The Engineer shall complete all forms/applications to allow the City of Fort Worth to obtain any and all agreements and/or permits normally required for a project of this size and type. The Engineer will be responsible for negotiating and coordinating to obtain approval of the agency issuing the agreement and/or permits and will make any revisions necessary to bring the plans into compliance with the requirements of said agency, including but not limited to highways, railroads, water authorities, Corps of Engineers and other utilities. 5) Design Changes Relating to Permitting Authorities If permitting authorities require design changes, the Engineer shall revise the plans and specifications as required at the Engineers own cost and expense, unless such changes are required due to changes in the design of the facilities made by the -1- permitting authority. If such changes are required, the Engineer shall notify the City and an amendment to the contract shall be made if the Engineer incurs additional cost. If there are unavoidable delays, a mutually agreeable and reasonable time extension shall be negotiated. 6) Plan Submittal Copies of the original plans shall be provided on reproducible mylar or approved plastic film sheets, or as otherwise approved by the Department of Engineering and shall become the property of the City. City may use such drawings in any manner it desires; provided, however that the Engineer shall not be liable for the use of such drawings for any project other than the project described herein; and further provided, that the Engineer shall nof be liable for the consequences of any changes that are made to the drawings or changes that are made in the implementation of the drawings without the written approval of the Engineer. PHASE 1 7) Right-of-Way, Easement and Land Acquisition Needs The Engineer shall determine the rights-of-way, easement needs for the construction of the project. Engineer shall determine ownership of such land and furnish the City with the necessary right-of-way sketches, prepare necessary easement descriptions for acquiring the rights-of-way and/or easements for the construction of this project. Sketches and easement descriptions are to be presented in form suitable for direct use by the Department of Engineering in obtaining rights-of-way, eas�ments, permits and licensing agreements. All materials shall be fumished on the appropriate City forms in a minimum of four (4) copies each. 8) Design Survey The Engineer shall pravide necessary field survey for use in the preparation of Plans and Specifications. The Engineer shall fumish the City certified copies of the field data. 9) Utility Coordination The Engineer shall coordinate with all utilities, including utilities owned by the City, as to any proposed utility liens or adjustment to existing utility lines within the project limits. The information obtained,shall be shown on the conceptual plans. The Engineer shall show on the preliminary and final plans the location of the proposed utility lines, existing utility lines, based on the information provided by the utility, and any adjustments and/or relocation of the existing lines within the project limits. The Engineer shall also evaluate the phasing of the water, wastewater, street and drainage work, and shall submi# such evaluation in writing to the City as part of this phase of the project. -2- ���9�)��� ��� ����� �I� �������b' �, �°����, i��. 10) Conceptual Plans The Engineer shall fumish four (4) copies af the Phase 1 concept engineering plans which include layouts, preliminary right-of-way needs and preliminary estimates of probable construction costs for the Engineer's recommended plan. For all submittals, the Engineer shall submit plans and documents for street/storm drain and water/wastewater facilities. The Engineer shall receive written approval of the Phase 1 Plans from the City's project manager before proceeding with Phase 2. PHASE 2 11) Design Data The Engineer shall provide design data, reports, cross-sections, profiles, drainage calculations, and preliminary estimates of probable construction cost. 12) Preliminary Construction Plans and Technical Specifications The Engineer shall submit twenty (20) copies of Phase 2 preliminary construction plans and five (5) copies of the preliminary technical specifications for review by the City and for submission to utility companies and other agencies for the purposes of coordinating work with existing and proposed utilities. The preliminary cbnstruction plans shall indicate location of existing/proposed utilities and storm drain lines. The Engineer shall receive written approval of the Phase 2 plans from the City's project manager before proceeding with Phase 3. PHASE 3 13) Final Construction Plans The Engineer shall furnish five (5) copies of the final construction plans and contract specifications for review by the City. 14) Detailed Cost Estimate The Engineer shall furnish four (4) copies of detailed estimates of probable construction costs for the authorized construction project, which shall include summaries of bid items and quantities. 15) Plans and Specification Approval The Engineer shall fumish an original cover mylar for the signatures of authorized City officials. The Contract Documents shall comply with applicable Iocal, state and federal �aws and with applicable rules and regulations promulgated by local, state and national boards, bureaus and agencies. The Engineer shall receive written approval of the Phase 3 plans from the City's project manager before proceeding with Phase 4. -3- PHASE 4 16) Final Approved Construction Plans The Engineer shall fumish 45 bound copies of Phase 4 final approved construction plans and contract specifications. The approved plans and contraCt specifications shall be used as authorized by the City for use in obtaining bids, awarding contracts, and constructing the project. 17) Bidding Assistance The Engineer shall issue addenda as appropriate to interpret, clarify, or expand the bidding documents, and assist the owner in determining the qualifications and acceptability of prospective constructors, subcontractors, and suppliers. When substitu- tion prior to the award of contracts is allowed by the bidding documents, the Engineer will advise the owner as to the acceptability of altemate materials and equipment proposed by the prospective constructors. 18) Recommendation of Award The Engineer shall assist in the tabulation and review of all bids received for the construction of the project and shall make a recommendation of award to the City. 19) Prebid Conference The Engineer shall attend the prebid conference and the bid opening, prepare bid tabulation sheets and provide assistance to the owner in evaluating bids or proposals and in assembling and awarding contracts for construction, materials, equipment, and services. PHASE 5 20) Preconstruction Conference The Engineer shall attend the preconstruction conference. 21) Construction Survey The Engineer shall be available to the City on matters concerning the layout of the project during its construction and will set control points in the field to allow City survey crews to stake the project. The setting of line and grade stakes and route inspection of construction will be performed by the City. 22) Site Visits The Engineer shall visit the project site at appropriate intervals as construction proceeds to observe and report on the progress and the quality of the executed work. -4- 23) Shop Drawing Review The Engineer shall review shop and erection drawings submitted by the contractor for compliance with design concepts. The Engineer shall review laboratory, shop, and mill test reports on materials and equipment. 24) Instructions to Contractor The Engineer shall provide necessary interpretations and clarifications of contract documents, review change orders and make recommendations as to the acceptability of the work, at the request of the City. 25) Differing Site Conditions The Engineer shall prepare sketches required to resolve problems due to actual field conditions encountered. 26) Record Drawings The Engineer shall prepare record drawings from information submitted by the contractor. �� M&C Request Review ������������� Yage 1 ot � �QR� H Print M&C COUNCIL ACTION: Approved on 8/29/2006 - Ordinance No. 17120-08-2006 DATE: 8/29/2006 REFERENCE NO.: '`""`C-21635 LOG NAME: 30LXXI1-HALFF CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Adopt Appropriation Ordinance and Authorize Execution of an Engineering Agreement with Hafff Associates, fnc., for Sanitary Sewer Rehabilitation Contract, LXXII (72) (City Project No. 00411) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $252,386.00 from the Water & Sewer Operating �und to the Sewer Capital Projects Fund in the amount of $193,176.00 and the Water Capital Projects Fund in the amount of $59,210.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of $193,176.00 and the Water Capital Projects Fund in the amount of $59,210.0� from available funds; and 3. Authorize the City Manager to execute an Engineering Agreement with Halff Associates, Inc., in the amount of $218,040.00 for Sanitary Sewer Rehabilitation Contract, LXXII (72). DISCUSSION: The project consists of the preparation of plans and specification for the rehabilitation of the following severely deteriorated sanitary sewer main and I�terals: M-161: L-1291: L-1649: Beginning from Angle Avenue/34th Street intersection, southerty along the west right-of-way line of Angle Avenue to the Columbus Avenue/Angle Avenue intersection. Located in the alley between Livingston Avenue and Stanley Avenue, from Bowie Street to McPherson Avenue. Located in the rear of the private lots between Meadowbrvok Drive and Brandt Street, from Provine Avenue to Lynnhaven Road. L-3284: Located in the alley between �Ison Lane and Cherokee Trail from Gambrell Street to Cherokee Trail. In addition, design will be provided for the replacement of the severely deteriorated water main on Chreokee from http://www.cfwnet.org/council�ackedmc review.asp?ID=6019&councildate=8/29/2006 8/29/2006 M�(; Kequest Keview L-5020/L-5569: L-5422: L-5463/L-5509/L-5511 Seminary Drive to Surrey. Beginning from the Killian Street/Miller Street intersection, easterly along Killian Street to the Eastover Avenue/Killian Avenue intersection, then southerly along Eastover Avenue to the Wilbarger Street/Eastover Avenue intersection. In addition, design will be provided for the replacement of the severely deteriorated water main on Killian Street, Eastover Avenue and on Asbury Court from Eastover Avenue to cul-de-sac. Located on Ramey Avenue from Carruthers Drive to Debra Court. Beginning from the SW Loop 820 Frontage Road/VVestcreek Drive intersection easterly 825 feet along the south right-of-way line of Loop 820, then southerly 375 feet in the rear of lots between Wedgway Drive and Wosley Drive. In addition, design will be provided for the replacement of the severely deteriorated water mains that are located along the south right-of-way line of Loop 820 (Westcreek Drive to Wosley Drive) and also on Wedgway Drive (Loop 820 Frontage Road) to Odessa Avenue. rage L ot � All disturbed segments of pavement will be permanently repaired with asphalt after the proposed improvements are complete. Halff Associates, Inc., proposes to perform the necessary design work for a lump sum fee of $218,040.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $34,346.00 (water: $8,560.Oq; sewer: $25,786.00) is required for project management by the Engineering Department. Halff Associates, Inc. is in compliance with the City's M/WBE Ordinance by committing to 29% M/WBE participation. The City's goal on the project is 24%. The project is located in COUNCIL DISTRICTS 2, 3, 5, 6, 8 and 9, Mapsco 48 W, 76 U, 79 R, 90 J, N and 92 D. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer and Water Capital Project Funds. TO Fund/Account/Centers FROM Fund/Account/Centers 1&2)P253 472045 6091700411ZZ $59.210.00 3)P258 531200 709170041131 $36,756_00 1&2ZP258 472045 7091700411ZZ $193,176.00 3)P258 531200 709170041132 $73,512.00 http://www.cfwnet.org/council_packet/mc review.asp?ID=6019&councildate=8/29/2006 8/29/2006 M�C; l�equest iteview 2)P253 531350 609170041131 2)P253 531200 609170041131 �P253 531350 609170041132 2)P253 53120Q 6Q9170041132 �P253 531350 609170041133 2)P253 531200 609170041133 2)P253 531200 609170041151 �P253 531350 609170041160 2)P253 531350 609170041173 2)P253 533010 609170041181 2)P258 531350 709170041131 2)P258 531200 709170041131 2)P258 531350 709170041132 2)P258 531200 709170041�32 �P258 53135� 709170041133 2)P258 531200 709170041133 � P258 531200 709170041151 �P258 531350 709170041160 2)P258 531350 7091700411�3 �F�258 533010 709170041181 Submitted for City Manager's OfFice by: Originating Department Head: Additional Information Contact: 2 250.00 $11,121.00 500.00 $22.242.00 75b.00 3 707.00 $13,580.00 600.00 400.00 60.00 6 788.00 $36,756.00 $13,575.00 $73,512.00 2 263.00 $12,252.00 $44.870.00 1 810.00 $1.200.00 150.00 3)P258 531200 709170041133 �P258 531200 709170041151 3)P253 531200 609170041131 3)P253 531200 609170041132 �P253 531200 609170041133 3)P253 531200 609970041151 �PE45 538070 0709020 1�PE45 538070 0609020 Marc A. Ott (8476) A. Dougias Rademaker (6157) Abe Calderon (7963) ATTACHMENTS 30LXX11-Halff (2).doc Yage 3 ot 3 $12,252.00 $44,870.00 $11.121.00 $22,242.00 3 707.00 $13,580.00 $193,176.00 $59,210.00 http://www.cfwnet.org/council�acket/mc review.asp?ID=6019&councildate=8/29/2006 8/29/2006 EXHIBIT "A-1" SUPPLEMENTAL SCOPE OF SERVICES (SUPPLEMENT TO ATTACHMENT "A") DESIGN SERVICES: WATER AND/OR SANITARY SEWER IMPROVEMENTS The following is a clarification of the tasks that the ENGINEER will perform under ATTACHMENT "A". Work under this attachment includes engineering services for water and/or sanitary sewer improvements for the following: Sanitary Sewer Rehabilitation, Contract, LXXII (72) City Project No. 00411 Upon receipt of notice to proceed, the ENGINEER will perform the following tasks: PART A — PRE-ENGINEERING 1. Initial Data Collection a. Pre-Design Coordination Meetings ENGINEER will attend and document meetings, as required, to discuss and coordinate various aspects of the project and to ensure that the project stays on schedule. For purposes of establishing a level of comfort, two (2) meetings are anticipated. These include the following: One (1) pre-design kick-off meeting, (including the CITY's Department of Engineering and other departments that are impacted by the project). One (1) review meeting at completion of the City's review of the conceptual engineering plans. b. Data Collection In addition to data obtained from the City, ENGINEER will research and make efforts to obtain pertinent information to aid in coordination of the proposed improvements with any planned future improvements that may influence the project. ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including; utilities, City Master plans, property ownership as available from the Tax Assessor's office. EA1-1 Rev 11/02/05 The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the Engineer with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the Engineer will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the Engineer shall delay the design of the sewer service line until after the start of construction. The CITY will then direct the Contractor to de-hole the service line at the clean-out location of all buildings or structures so that the Engineer's surveyor can determine the flow line of the sewer service line. The Engineer shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. c. Coordination with Other Agencies During the concept phase the ENGINEER shall coordinate with all utilities, including utilities owned by the City, TxDOT and railroads. These entities shall also be contacted, if applicable, to determine plans for any proposed facilities or adjustment to existing facilities within the project limits. The information obtained shall be shown on the concept plans. The ENGINEER shall show the location of the proposed utility lines, existing utility lines and any adjustments and/or relocation of the existing lines within the project limits. ENGINEER shall complete all forms necessary for City to obtain permit letters from TxDOT and railroads and submit such forms to the City. City shall be responsible for forwarding the forms to the affected agencies for execution. EA1-2 Rev 11/02/05 2. Schedule Submittal and Monthly Progress Report The ENGINEER shall submit a progress schedule after the design contract is fully executed. The schedule shall be updated and submitted to the CITY along with monthly progress reports as required under Attachment B of the contract. PART B- CONSTRUCTION PLANS AND SPECIFICATIONS 1. Conceptual Engineering Surveys for Design a. ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information which will be needed for use by the ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location and buried utilities, structures, and other features relevant to the final plan sheets. For sewer lines located in alleys or backyards, ENGINEER will obtain the following: Obtain permission for surveying through private property. Locate horizontal and vertical alignment of utility lines, existing utilities, trees, fences, walls, etc., horizontally along rear lot lines in an approximately 50' wide strip. In addition, locate all rear house corners and building corners in backyards. Compile base plan from field survey data at 1" = 40' horizontal and 1" = 4' vertical scale. Profile existing water and/or sewer line centerline. b. Engineer will provide the following information: All plans, field notes, plats, maps, legal descriptions, or other specified documents prepared in conjunction with the requested services shall be provided in a digital format compatible with the electronic data collection and computer aided design and drafting software currently in use by the CITY Department of Engineering. All text data such as plan and profile, legal descriptions, coordinate EA1-3 Rev 11/02/OS files, cut sheets, etc., shall be provided in the American Standard Code for Information Interchange (ASCII) format, all drawing files shall be provided in MicroStation (DGN) or Autocad (DWG or DXF) format (currently Release 2002), or as otherwise approved in writing by the CITY, and all data collected generated during the course of the project shall become the property of the CITY. The minimum information to be provided in the plans shall include the following: 1. A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: 2. The following information about each Control Point; a. Identified (Existing City Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). 3. Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control Points. 4. No less than two bench marks plan/profile sheet. 5. Bearings given on all proposed centerlines, or baselines. 6. Station equations relating utilities to paving, when appropriate. 7. Obtain the "foot print" of all properties where the sanitary sewer service line is to be relocated or rerouted. EAl-4 Rev 11/02/O5 ;; ` ����) �'�;!� '�:���'�:� �l� ��r�?���� �► ������, i��. ii. Public Notification and PersonnelNehicle Identification a. Prior to conducting design survey, ENGINEER will notify affected residents of the project in writing. The notification letter shall be on company letterhead and shali include the following: project name, limits, DOE project no., Consultant's project manager and phone no., scope of survey work and design survey schedule. The letter will be reviewed and approved by the City prior to distribution. b. When conducting site visits to the project location, the ENGINEER or any of its sub-consultants shall carry readily visible information identifying the name of the company and the company representative. All company vehicles shall also be readily identifiable. iii. Conceptual Engineering Plan Submittal a. Conceptual plans shall be submitted to City 45 days after Notice to Proceed Letter is issued. b. The ENGINEER shall perform conceptual design of the proposed improvements and furnish four (4) copies of the concept engineering plans which include layouts, preliminary right-of-way needs and cost estimates for the ENGINEER's recommended plan. ENGINEER shall perform remaining field surveys required for final design of selected route(s). The ENGINEER shall also evaluate the phasing of the water, sanitary sewer, street and drainage work, and shall submit such evaluation in writing to the City as a part of the concept phase of the project. All design shall be in conformance with Fort Worth Water Department policy and procedure for processing water and sewer design. ENGINEER shall review the City's water and sewer master plan, other pertinent design information and provide a summary of findings pertaining to the proposed project. EA1-5 Rev 11/02/OS 2. Preliminary Engineering Upon approval of Part B, Paragraph iii (b), ENGINEER will prepare preliminary construction plans as follows: a. Overall water and/or sanitary sewer layout sheets and an overall easement layout sheet(s). b. Preliminary project plans and profile sheets on 22" x 34" sheets which show the following: Proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes etc., related appurtenances and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. c. For sewer lines, pipelines schedule for point repairs, rehabilitation and replacement will be located on the base sheets prepared from survey information gathered under Part B, Paragraph b. Conflicts shall be resolved where pipelines are to be rehabilitated on the same line segment. Base sheets shall reference affected or adjacent streets. Where open-cut and trenchless technology construction is anticipated, below and above ground utilities will be located and shown on the base sheets. d. Existing utilities and utility easements will be shown on the plan and profile sheets. ENGINEER will coordinate with utility companies and the City of Fort Worth to determine if any future improvements are planned that may impact the project. e. The design for sewer service line reroute/relocation will be provided if the flow line elevation of the sewer service can be determined from the cleanout location. If this elevation cannot be determined during design survey, the design shall be provided after award of the construction contract as specified in Part A, Paragraph 1 b. EA1-6 Rev 11/02/O5 f. The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of- way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. g. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-Section of the City's specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. h. Right-of-Way Research The ENGINEER will conduct preliminary research for availability of existing easements where open-cut construction or relocation of existing alignments is probable. Temporary and permanent easements will be appropriated based on available information and recommendations will be made for approval by the City. i. Right-of-way/Easement Preparation and Submittal Preparation and submittal of right-of-way, easements and rights-of-entry will be in conformance with "Submittal of Information to Real Property for Acquisition of Property". j. Utility Clearance Phase The ENGINEER will consult with the City's Water Department, Department of Engineering, and other CITY EA1-7 Rev 11/02/OS departments, public utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities that have an impact or influence on the project. ENGINEER will design City facilities to avoid or minimize conflicts with existing utilities. The ENGINEER shall deliver a minimum of 13 sets of approved preliminary construction plans to the City's Utility Coordinator for forwarding to all utility companies, which have facilities within the limits of the project. k. Preliminary construction plan submittal i. Preliminary plans and specifications shall be submitted to City 67 days after approval of Part B, Paragraph iii (b). ii. The ENGINEER shall deliver two (2) sets of preliminary construction plans and two (2) sets of specifications and contract documents to CITY for review. Generally, plan sheets shall be organized as follows: Cover Sheet General Notes/Legend Easement layout (if applicable) Abandonment Plan & Profile Sheets Standard Construction Details Special Details (If applicable) iii. The ENGINEER shall submit a preliminary estimate of probable construction cost with the preliminary plans submitted. ENGINEER shall assist City in selecting the feasible and/or economical solutions to be pursued. EA1-8 Rev 11/02/OS I. Review Meetings with City The ENGINEER shall meet with CITY to discuss review comments for preliminary submittal. The CITY shall direct the ENGINEER in writing to proceed with Final Design for Final Review. m. Public Meeting After the preliminary plans have been reviewed and approved by the City, the ENGINEER shall prepare project exhibits, provide the CITY with the database listing the names and addresses of all residents and business to be affected by the proposed project, and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. 3. Final Construction Plan Submittal a. Final Construction Documents shall be submitted to CITY 45 days after approval of Part B, Paragraph 2 k. Following CITY approval of the recommended improvements, the ENGINEER shall prepare final plans and specifications and contract documents to CITY (each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas) and submit two (2) sets of plans and construction contract documents within 15 days of CITY's final approval. Plan sets shall be used for Part C activities. b. ENGINEER's Estimate of Probable Construction Cost The ENGINEER shall submit a final estimate of probable construction cost with the final plans submitted. c. Mylar Submittals The ENGINEER shall submit a final set of mylar drawings for record storage as follows: 1. Water and sanitary sewer plans shall be submitted as one set of plans. Water and sanitary sewer plans shall be EA1-9 Rev 11/02/05 separate from paving and drainage plans. All sheets shall be standard size (22" x 34") with all project numbers (Water/Sanitary Sewer and TPW) prominently displayed. 2. For projects where paving/grating/drainage improvements occur on a Water Department funded project with no T&PW funding involved, a separate set of mylars with cover sheet shall be submitted for TPW. 3. Signed plans sets shall also be submitted as an Adobe Acrobat PDF format (version 6.0 or higher) file. There shall be one (1) PDF file for the Water plan set and a separate PDF file for the TPW plan set. Each PDF file shall contain all associated sheets of the particular plan set. Sinqular PDF files for each sheet of a plan set will not be accepted. PDF files shall conform to naming conventions as follows: I. Water and Sewer file name example —"X- 35667_org36.pdf" where "X-35667" is the assigned file number obtained from the City of Fort Worth, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf I1. TPW file name example —"W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the City of Fort Worth, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf Both PDF files shall be submitted on one (1) Compact Disk, which will become property of and remain with the City of Fort Worth. Floppy disks, zip disks, e-mail flash media will not be accepted. EA1-10 Rev 11/02/05 4. For information on the proper manner to submit PDF files and to obtain a file number for the project, contact the Department of Engineering Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the DOE number and proper fund codes have been assigned and are in the Department of Engineering database. PART C - PRE-CONSTRUCTION ASSISTANCE Administration a. Deliver Bid Documents The ENGINEER will make available for bidding, upon request by the CITY, up to fifty (50) sets of the final approved and dated plans and specifications and contract documents for the projects to the CITY for distribution to potential bidders. Proposal will be delivered in electronic format. b. Bidding Assistance The ENGINEER shall assist the CITY during this phase including preparation and delivery of any additional addenda prior to bid opening to plan holders and respond to questions submitted to DOE by prospective bidders. Engineer shall attend the scheduled pre-bid conference. The ENGINEER shall assist in reviewing the bids for completeness and accuracy. The ENGINEER shall attend the project bid opening, develop bid tabulations in hard copy and electronic format and return four (4) copies of the bid tabulation, along with the contract documents to the City within three (3) working days after bid openings. c. Assistance During Construction The ENGINEER shall attend the pre-construction conference for the project. The ENGINEER shall also consult with and advise the CITY on design and/or construction changes, if necessary. EA1-11 Rev 11/02/05 ATTACHMENT "B" COMPENSATION AND SCHEDULE Engineering Design Services Associated With Sanitary Sewer Rehabilitation, Contract, LXXII (72) City Project No. 00411 Compensation A. The Engineer shall be compensated a total lump sum fee of $218,040. Payment of the total lump sum fee shall be considered full compensation for the services described in Attachment "A" and Exhibit "A-1" for all labor materials, supplies and equipment necessary to complete the project. B. The Engineer shall be paid monthly as described in Exhibit "B-1", Section 1— Method of Payment. Each invoice is to be verified as to its accuracy and compliance with the terms of this contract by an officer of the ENGINEER. II. Schedule Final Plans and Contract Documents for bid advertisement shall be submitted within 190 calendar days after the "Notice to Proceed" letter is issued. A. Conceptual Engineering Plans — 45 calendar days B. Preliminary Engineering Plans and Contract Documents — 112 calendar days C. Final Engineering Plans and Contract documents — 165 calendar days D. Final Plans and Contract Documents for Bid Advertisement — 190 Calendar days ',� I� � EXHIBIT "B-1" (SUPPLEMENT TO ATTACHMENT B) Engineering Design Services Associated With Sanitary Sewer Rehabilitation, Contract, LXXII (72) City Project No. 00411 Method of Payment The Engineer shall be paid monthly as described in Exhibit "B-1 ", Section 1— Method of Payment. Each invoice is to be verified as to its accuracy and compliance with the terms of this contract by an officer of the ENGINEER. The aggregate of such monthly payments shall not exceed the following: Exhibit A-1 Desiqn Services Until satisfactory completion of Exhibit "A-1 ", Conceptual Design hereunder, a sum not to exceed thirty (30) percent of the maximum fee. Until satisfactory completion of Exhibit "A-1 ", Preliminary Construction Plans and Specifications, hereunder, a sum not to exceed sixty (60) percent of the maximum fee, less previous payments Until satisfactory completion of Exhibit "A-1", Final Construction Plans and Specifications, hereunder, a sum not to exceed ninety (90) percent of the maximum fee, less previous payments. The balance of the payments to be due and payable after the pre-construction meeting for the project. Progress Report A. The ENGINEER shall submit to the designated representative of the Director of the Department of Engineering monthly progress reports covering all phases of design by the 15�h of every month in the format required by the Director. B. If the ENGINEER determines in the course of making design drawings and specifications that the opinion of probable cost of $2,282,000 (as estimated in Exhibit "B-4") will be exceeded, whether by change in the scope of the project, increased cost or other conditions, the ENGINEER shall immediately report such fact to the City's Director of the Department of Engineering and, if so instructed by the Director of the Department of Engineering shall suspend all work hereunder. B1-1 Consulting Firm Halff Associates, Inc. M/WBE Subconsultants Gorrondona & Associates LA Blueline TOTAL FEE AMOUNT City MWBE Goal - 24% Project Description Engineering Services EXHIBIT B-3A (SUPPLEMENT TO ATTACHMENT B) SUMMARY TOTAL PROJECT FEES Engineering Design Services Associated with Sanitary Sewer Rehabilitation, Contract, LXII (72) City Project No. 00411 Prime Responsibility Engineering Special Services Subconsultant Management Surveying/Easements Reproduction Scope of Services Wastewater, Water EB-3A Total Fee $ 218,040 Fee Amount $ 130,045 $ 18,800 $ 6,275 $ 58,450 $ 4,467 $ 218,037 M/WBE Fee $ 62,917 Percent 60% 9% 3% 27% 2o�a 100% Percent 29% EXHIBIT B-3B (SUPPLEMENT TO ATTACHMENT B) Professional Services Fee Summary Engineering Design Services Associated with Sanitary Sewer Rehabilitation, Contract, LXII (72) City Project No. 00411 SEWER ENGINEERING DESIGN Opinion of Probable Construction Costs X Curve A X 85% $2,282,200 X 6.7% X 85% $ 130,045 Sewer $ 99,839 SURVEY DESIGN REPRODUCTION* ADDITIONAL SERVICES" 10% FOR SUBS" SUBTOTAL WATE R ENGINEERING DESIGN SURVEY DESIGN REPRODUCTION* ADDITIONAL SERVICES* 10% FOR SUBS� SUBTOTAL $ 44,873 $ 3,429 $ 14,433 $ 4,817 $ 167,392 Water $ $ $ $ $ $ 30, 206 13,577 1,037 4,367 1,458 50, 645 TOTAL FEE WATER DESIGN FEE $ 167,392 SEWER DESIGN FEE $ 50,645 GRAND TOTAL $ 218,037 SAY $ 218,040 * Based on percent of department construction cost/overall construction cost EB-3B EXHIBIT B-3C (SUPPLEMENT TO ATTACHMENT B) Total Fee Summary & Design Fee Breakdown Engineering Design Services Associated with Sanitary Sewer Rehabilitation, Contract, LXII (72} City Project No. 00411 A. SUMMARY OF TOTAL FEE Service Description Sewer Water Total Engineering Services/Add'I services $ 122,520 $ 37,070 $159,590 Design Survey $ 44,870 $ 13,580 $58,450 TOTAL $ 167,390 $ 50,650 $218,040 B. BREAKDOWN OF WATER, SEWER AND DRAINAGE FEES (LESS SURVEY FEES) 1 Total Sewer Fee (Less survey fee) Breakdown by Concept Preliminary and Final Desiqn a. Concept (30%) _(Total Sewer Fee - Sewer Survey Fee) x(0.3) _ $36,756 b. Preliminary (60°/o) _(Total Sewer Fee-Sewer Survey Fee)x(0.6)= $73,512 c. Final (10%) _(Total Sewer Fee - Sewer Survey Fee) x(0.1) _ $12,252 $122,520 2 Total Water Fee (Less survev fee) Breakdown bv Concept Preliminary and Final Desiqn a. Concept (30%) _(Total Water Fee - Water Survey Fee) x(0.3) _ $11,121 b. Preliminary (60%) _(Total Water Fee-Water Survey Fee)x(0.6)= $22,242 c. Final (10°/o) _(Total Water Fee - Water Survey Fee) x(0.1) _ $3,707 $37,070 EB-3C EXHIBIT B-3D (SUPPLEMENT TO ATTACHMENT B) Fees for Surveying Services Engineering Design Services Associated with Sanitary Sewer Rehabilitation, Contract, LXII (72) City Project No. 00411 Sewer TOPOGRAPHIC SURVEYS (13,220 LF x $3.18/LF) Five (5) Permanent Utility Easements Five (5) Temporary Construction Easements WATER TOPOGRAPHIC SURVEYS (3,900 LF x $3.25/LF TOTAL MWBE SUBCONSULTANT SURVEY FEE $ * Based on estimated cost for water/sewer work : � 41,995 3,000 750 45,745 * 12, 705 12,705 58,450 EXHIBIT B-3E (SUPPLEMENT TO ATTACHMENT B) FEES FOR REPRODUCTION SERVICES Engineering Design Services Associated with Sanitary Sewer Rehabilitation, Contract, LXIII (72) City Project No. 00411 REPRODUCTION FEE (LA Blueline) Preliminary Plans (44 total sheets) Construction Plans (44 total sheets) Half Size Constr. Plans (44 total sheets) SWPPP Specifications (6 sets) Mylar Reproduction (44 total sheets) Specifications (50 sets) Scan Final Plans to CD (all sheets) TOTAL REPRODUCTION FEE WATER DEPARTMENT (SEWER) SUBTOTAL WATER DEPARTMENT (WATER) SUBTOTAL SETS $/sheet SHEETS EB-3E 16 $ 0.84 50 $ 0.84 10 $ 0.21 6 $ 0.13 1 $ 9.00 50 $ 0.13 1 $ 132.00 44.00 44.00 44.00 200.00 44.00 200.00 1.00 TOTAL $ 591.36 $ 1,848.00 $ 93.28 $ 156.00 $ 396.00 $ 1,250.00 $ 132.00 $ 4,466.64 $ 3,429.15 $ 1,037.49 EXHIBIT B-3F (SUPPLEMENT TO ATTACHMENT B) Sanitary Sewer Rehabilitation, Contract, LXIII (72) City Project No. 00411 SPECIAL SERVICES (HALFF ASSOCIATES) Public Meeting TxDOT Permit 6 Monthly Coordination Meetings, meeting minutes, and 12 Monthly Reports; 2 pre-design coordination meetings Pre-Construction Services (Bid Open, Bid Tab, & Pre-Con) Post-Construction Services (Final Field/Video Inspect & Letter Report) SWPPP $ 3,000 $ 2,000 $ 4,500 $ 1,800 $ 2,500 $ 5,000 TOTAL SPECIAL SERVICES $ WATER DEPARTMENT (SEWER) SUBTOTAL $ WATER DEPARTMENT (WATER) SUBTOTAL $ EB-3F 18,800 14,433 4,367 CLIENT: City of Fort Worth PROJECT: Contract LXXII (72) DATE: 12/19/05 AVO: 1008022592 FILE NAME: Cost Estimate PREPARED BY: RV/LG Total Unit Total Item No. Descri tion L-5509 L-5511 L-5591 Quantit Cost Amount Sanitar Sewer 1 8" Sanita Sewer Pi e 0'-12' 4,448 48.0 $213,504 2 12" Sanita Sewer 0'-30' 1,172 65.0 $76,180 3 6" to 8" Rehab. B Pi e Bursiin 615 479 85 7,461 55.0 $410,355 4 Sa Ad'ustment 6" to 8" Rehab 61.5 47.9 8.5 746 62.5 $46,631 5 12" Sanita Sewer Inside 24" Casin Pi e 140 56.5 $7,910 6 24" Casin Pi e b Other Than O en Cut 140 354.0 $49,560 7 Remove Existin Manhole 2 1 44 830.0 $36,520 8 Abandon Existin Manhole 4 765.0 $3,060 9 Grout Abandoned SS 1,600 6.8 $10,800 10 Install Std. 4' Dia. Manhole 1 1 48 2300.0 $110,400 11 Fiber lass 4' Dia. Manhole 5 3530.0 $17,650 12 Wastewater Access Device 2 8 350.0 $2,800 13 Concrete Collar 28 300.0 $8,400 14 Waterti ht MH Insert 2 60 100.0 $6,000 15 Vacuum Test MH 1 1 53 135.0 $7,155 16 4" Service Taps to Main 13 3 294 440.0 $129,360 17 4" Service Pi e 35 10 2,715 25.0 $67,875 18 6" Service Ta s to Main 4 465.0 $1,860 19 6" Service Pi e 65 35.0 $2,275 20 Two-Wa Cleanouts 223 150.0 $33,450 21 Pre-Construction TV Inspection 615 478 85 7,160 2.0 $13,962 22 Post-Construction TV Inspection 615 478 85 12,775 1.5 $19,163 23 Trench Safet S stem 3,439 2,7 gg�2g5 24 As halt Pavement RepairTrench 1,040 40.0 $41,600 25 Re lace Concrete Curb & Gutier 2,571 24.0 $61,704 26 As halt Pavement Re air 4,504 41.3 $185,785 27 Drivewa 209 40.0 $8,370 28 Seedin 22 44 2,100 2.1 $4,410 29 Soddin 208 7.1 $1,463 SUBTOTAL $1,587,488 ioi Contingency $158,749 SUBTOTAL SEWER $1,752,110 This statement was prepared utilizing standard cost estimate practices. It reof., SAY $1,752,100 �������� ������ �I� ��e;��i���' �, �:'� �i�, ���. CLIENT: City of Fort Worth PROJECT: Contract LXXII (72) Item No. Description Water Remove and Replace 6" Water Pipe with 8" PVC Water P 1 includin disinfection and h drostatic testin 2 Remove and Replace 16" Conc Water Pipe 3 Ductile Iron Fitiin s 4 8"x8" Ta in Sleeve 5 8"x16" Ta in Sleeve 6 8" Gate Valve w/ Box and Lid 7 1" Ta , Saddle, Sto , and Fittin for 1" Water Service 8 1" T e"K" Co er Water Service 9 Install 1" Meter and Box 10 2" Combination Air Release Valve Furnish and Install Standard Fire Hydrant Assembly, incl� 11 lead line, barrel assembly and gate valve 12 Remove Meter Box 13 Remove and Salva e Existin Valves 14 Asphalt Pavement Trench Re air 15 Trench Safet S stem 16 Concrete Pavement Reoair was prepared utilizing standard cost esNmate practices. It �� DATE: 12/19/05 AVO: 1008022592 FILE NAME: Cost Estimate PREPARED BY: RV/LG Total Unit L-5511 L-5511 Quantity Cost :s,StSU 32.9 925 73.0 4 2750.0 1 1820.0 2 3000.0 10 1100.0 9$ 555.0 1,873 19.0 81 245.0 2 3000.0 4 2200.0 $1 100.0 10 150.0 3,002 40.0 2,165 2.7 925 60.0 SUBTOTAL WATER SAY TOTAL (WATER AND SANITARY SEWER) Total Amount 17, 746 �67,525 10,313 $1,820 $6,000 11, 000 54,390 $6,000 $8,800 $8,100 $1,500 $120, 098 $5,846 $55,500 $530,069 $530,100 CLIENT: City of Fort Worth PROJECT: Contract LXXII (72) EXHIBIT "B-4" (SUPPLEMENT TO ATTACHMENT B) Summary of Probable Construction Cost Sanitary Sewer Rehabilitation, Contract, LXXII (72) ESTIMATE OF PROBABLE COST (M-161, L-1131, L-1291, L-1301, L-1649&1649A, L-1728, L-2402, L-2846, L-2680, L-328, L-4922, L-5020 8� 5569, L-5421 & 5422, L-L-5463, L-5509, L-5511, L-5511) DATE: 12/19/05 AVO: 1008022592 FILE NAME: Cost Estimate PREPARED BY: RV/LG Total Unit Total Item No. Description Unit M-161 L-1131 L-1291 L-1303 L-1649/1649A L-1728 L-2404 L-2846 L-2680 L-3284 L-4922 L-5020/5569 L-542i/5422 L-5463 L-5509 L-5511 L-5511 Quantit Cost Amount Water Remove and Replace 6" Water Pipe with 8" PVC Water Pipe, 1 includin disinfection and h drostatic testin LF 1600 1490 490 3,580 32.9 $117,746 2 Remove and Replace 16" Conc Water Pipe LF 925 925 73.0 $67,525 3 Ductile Iron Fittin s TN 4 2750.0 $10,313 4 8"x8" Tappin Sleeve EA 1 1 1820.0 $1,820 5 8"x16" Ta pin Sleeve EA 2 2 3000.0 $6,000 6 8" Gate Valve w/ Box and Lid EA 4 4 2 10 1100.0 $11,000 7 1"Tap, Saddle, Stop, and Fittin for 1" Water Service EA 46 39 13 98 555.0 $54,390 8 1" T pe "K" Copper Water Service LF 1058 490 325 1,873 19.0 $35,587 9 Install 1" Meter and Box EA 46 22 13 81 245.0 $19,845 10 2" Combination Air Release Valve EA 2 2 3000.0 $6,000 Furnish and Install Standard Fire Hydrant Assembly, including 11 lead line, barrel assembly and gate valve EA 2 1 1 4 2200.0 $8,800 12 Remove Meter Box EA 46 22 13 81 100.0 $8,100 13 Remove and Salva e Existin Valves EA 4 4 2 10 150.0 $1,500 14 Asphalt Pavement Trench Repair LF 2658 344 3,002 40.0 $120,098 15 Trench Safe S stem LF 1600 75 490 2,165 2.7 $5,846 16 Concrete Pavement Repair LF 925 925 60.0 $55,500 SUBTOTAL WATER $530,069 SAY $530,100 TOTAL (WATER AND SANITARY SEWER) $2,282,200 ,' ' ,' .' ' . . .' a e t e casi af t' e o'ect ae an art'thereof: This staterr�ent was re ared utilizin staodard cost estimate 'rac4rces. it is u�ders#ood and a reed that this is an esGmate-onl and thaf the En meee shal[ not bz Iiabte'fo +Jwner or to a thfrd a fioren failure to accuratel esttm t h h pr � , y p P P 9 R 9 Y, 3 P�Y Y Y ATTACHMENT "C" AMENDMEN7S TO ARTICLE IV AND ATTACHMENT "A" Engineering Design Services Associated With Sanitary Sewer Rehabilitation, Contract, LXXII (72) City Project No. 00411 Article IV.K.(2) (I): Business automobile insurance is written on an accident basis. Attachment A, Item 26: Delete this Item, the Engineer will not prepare "record drawings" for this project. C-1 ATTACHMENT D-1 PROJECT SCHEDULE Sanitary Sewer Rehabilitation, Contract, LXII (72) CITY PROJECT NO.: 00411 D.O.E. NO. Projected Actual ura ion ID Task Name Duration (days) Start Finish (days) Start Finish Sanitary Sewer Replace, Contract 72 1 Notice to Proceed 1 Mon 06/12/06 Mon O6/12/O6 2 30% Conceptual Desi n 45 Tues 06/13/06 Thur 07/27/06 3 Initial Data Collection 15 Tues 06/13/06 Tues 06/27/O6 4 To o raphic Surve 30 Mon 06/19/06 Tues 07/18/O6 5 30% Conceptual Desi n 30 Thur O6/29/06 Fri 07/28/06 6 30% Conce tual Desi n Submittal 1 Fri 07/28/06 Fri 07/28/06 7 Ci of Fort Worth Review of Conce t 10 Mon 07/31/06 Wed 08/09/06 8 60% Prelimina Desi n Plans 130 Fri 08l11/06 Mon 12/18/06 9 Franchise Utili Review 120 Fri 08/11/06 Fri 12/08/O6 10 Prelimina Plan Desi n 67 Fri 08/11/06 Mon 10/16/06 11 60% Prelimina Desi n Submittal 1 Mon 10/16/06 Mon 10/16/O6 12 City of Fort Worth Review 10 Tues 10/17/06 Thur 10/26/06 13 90°/a Final Desi n Plans 45 Mon 10/30/06 Wed 12/13/06 14 Final Plan Desi n 36 Mon 10/30/06 Mon 12/04/06 15 90% Final Desi n Submittal 1 Fri 12/01/O6 Fri 12/01/06 16 Ci of Fort Worth Review 10 Mon 12/04/06 Wed 12/13/06 17 Final Construction Plan Submittal 25 Fri 12/15/06 Mon 01/08/07 18 Incorporate Final Staff Comments 18 Fri 12/15/O6 Mon 01/01/07 19 Circulate Plans for Si natures 7 Tues 01/02/07 Mon 01/08/07 20 Advertise Pro'ect 21 Tues 01/09/07 Mon 01/29/07 21 Advertisement Duration 21 Tues 01/09/07 Mon 01/29/07 22 Open Bids 1 Wed 01/31/07 Wed 01/31/07 23 M&C Circulation Process 26 Fri 02/02/07 Tues 02/27/07 24 Council Award 1 Thur 03/01/07 Thur 03/01/07 25 Execute Contract Documents 25 Mon 03/05/07 Thur 03/29/07 26 Pro'ect Construction Phase 142 Mon 04/02/07 Tues 08/21/07 27 Pre-Construction Meetin 1 Mon 04/02/07 Mon 04l02/07 28 Pre-Construction Nei hborhood Meetin 1 Tues 04/03/07 Tues 04/03/07 29 Construction 140 Wed 04/04/07 Tues O8/21/07 Page D-2 ATTACHMENT D PROJECT SCHEDULE Sanitary Sewer Rehabilitations Contract LXXII (72) City Project No. 00411 DOE # ID Task Name Duration : Start Finish une 2006 July.2006 Auqust_ 2006 September 200 October 2006 November 200 : DecembE . . _.._ .�_ _ _.-.-.- --_._ _.. _._ _ ._�,___ __. ._� _ .__e_W__ _����__�_ -.-.--- _._ _._ .._ —__.__.4 11 ;1_8 ( 25_� 2 �_9 16 ; 23 30 6 �13 20 27 E 3 :10 ,17 i 24 1.._ S � 15 :,22 29 _5 .:12 19�26 3 10 '- 1 Notice fo Proceed 1 day Mon 6/12/06 Mon 6/12/06 :; ' : 2 30 % Conceptual Design 45 days Tue 6/13/06 Thu 7/27/O6 ; ' ` _ .._ _ __ _ _ __ 3 ; Initial Data Collection 15 days Tue 6/13/06 Tue 6/27/06 : � ' ' 4 Topographic Survey , 30 days Mon 6/19/06 , Tue 7/18/06 ; � , 5 ; 30 % Conceptual Design 30 days Thu 6/29/06 ' Fri 7/28/06 ; r �� ' : i 6 � 30 % Conceptual Design Submittal 1 day Fri 7/28/06 , Fn 7/28/06 :; � . , .. _... : r � . : - 7 City of Fort Worth Review of Concept 10 days Mon 7/31/O6 Wed 8/9/06 ;: � : --- __ . _ � 8 60% Preliminary Design Plans 130 days Fri 8/11/06 Mon 12/18/06 9 ; Franchise Utifity Review 120 days Fri 8/11/06 Fri 12/8/06 ; i , ;: _....._ _ _ � : 10 Preliminary Plan Design 67 days Fri 8/11/O6 Mon 10/16/06 ;: ;; ` 11 60 % Preliminary Design Submittal 1 day Mon 10/16/06 Mon 10/16/06 :' f � 12 ; City of Fort Worth Review 10 days Tue 10/17/O6 Thu 10/26/06 ; , ' 13 � 90 % Final Design Plans 45 days Mon 10/30/06 Wed 12/13/06 ' _._..__ . . . _. _. ____ _._. ___. _ - �c . �: � --- �---� 14 Final Plan Design 36 days Mon 10/30/06 Mon 12/4/06 - 15 90% Final Design Submittal 1 day Fri 12/1/06 Fri 12/1/06' ; ' � 16 City of Fort Worth Review 10 days Mon 12/4/O6 Wed 12/13/06 ; � _. _ 17 ; Final Construction Plan Submittal 25 days Fri 12/15/06 Mon 1/8/07 I 18 ; Incorporate Final Staff Comments 18 days Fri 12/15/06 ; Mon 1/1/07 :; , � 19 Circulate Plans for Signatures 7 days Tue 1/2/07 Mon 1/8/07 . ' 20m Advertise Project 21 days Tue 1/9/07 Mon 1/29/07 ;; ___ _ __ , � 21 Advertisement Duration 21 da s Tue 1/9/07 Mon 1/29/07' i � — _ Y , 22 Open Bids 1 day Wed 1/31/07 Wed 1/31/07' : I � , _ _ 23 ; M&C Circulation Process 26 days Fri 2/2/07 Tue 2/27/07 :; ' , 0 24 Council Award 1 day Thu 3/1/07 , Thu 3/1/07 ' ; ' 25 ; Execute Conlract Documents 25 days Mon 3/5/07 , Thu 3/29/07 ;: 26 Project Construction Phase 142 days Mon 4/2/07 , Tue 8/21/07 :� ; ' , ' 27 Pre-Construction Meeting 1 day Mon 4/2/07 Mon 4/2/07 : 28 ; Pre-Construction Neighborhood Meeting 1 day Tue 4/3/07 Tue 4/3/07 ;- ' ' __ 29 Construction 140 days Wed 4/4/07 Tue 8/21/07 ;: ' Project: Sanitary Sewer Replacement Task (_ _`__ Milestone . Rolled Up Task �_ _ ;i Rolled Up Progress External Tasks ; Group By Summary Date: Wed 6/7/06 Progress Summary Rolled Up Milestone O Split ,, ,, Project Summary � °'- ��:�� Deadline Page D-1 -------------------------------------------------------------------------------------- � � �� � 11 � j � � --- i � 1 20 1 20 � 19 i 2 19 i 2 � 19 2 _J 18 . 3 18 i 3 C 18 i 3 � 17 I i 4 17 j q � � I 16 � 5 16 i 5 16 � 5 � J z I � 15 I 6 z 15 i G 15 i �,� 14 ! 7 ;;� 7 � 14 i 7 0 z 13 � 8 � g C� 13 • 8 � 12 I 9 � 12 12 ! 9 -� 11 � 10 �� � 10 �� � 10 i. /�J I F �. 18 � 18 II 18 1 17 17 i 2 �� I 2 16 I 3 16 � 3 16 I 3 i i15 ! 15 � q 15 � 5 C 14 . 5 > 14 I 5 � 6 �3 I ` 13 I 6 > � � ! 7 12 I 7 C 11 I 8 I B 11 I 8 �� I 9 10 � 9 10 9 � - � z 1 2 1 EI'� � �_ o���r �� E �v j ! s i- � i 24 1 i 24 Z � 23 z i 23 � 3 ' � 3 I 4 2� — --- i 20 5 � i 6 i 6 7 � 7 . 18 I I ! a 9 i 16 9 i 16 � � 10 � 15 10 15 � � 11 ; 14 �� I 14 j I � 12 13 12 � I Z I�i ..��� - TR.6A I�i TR.6 L I z, zq z , I. 16R ,�� - 0 250 500 � � � � � j 23 o Z � �5 Z � ! 22 3 ! 14 �� 3 �„ SCALE IN FEET — q I 4 I 3 �. � ,. — i 12 �, ' ATTACH E- L1291 PROPOSED SEWER 20 � �� _ /� SANITARY SEWEfl EXISTING SEWER --�----- 1 1 REHABILITATION PROPOSED WATER 6 i �g I �� � C�%� /� � CONTRACT LXXII(72) EXISTING WATER ----- 7 18 7 ;� j 3 ; FW LOCATOR MAP # 2042-376, 2042-380 — -- i COUNCIL DISTRICT 9 FEB 2006 8 17 S � � q � MAPSCO 76 U 9 � 16 9 � 5 � ■❑■ ,s ,o ; 15 6! :o: Halff Associates, Inc. ,o � ENCaINLERS - ARCHITECfS • SCIENTISTS � PLANh1ER5 • SURVEYORS 14 I I 7 iI e000 ro�sa ca�a aoutavwxn I I ! P�AT WOR'I4f,T2YA$ 7a37 "fEL (81]J 86'I-169. PAX (61'n ]3YJ'!81 ffi$SSSFILEffi�S�$ $$�DATEffi$S �SSTIME: Standard$�PROJECTS$ Standard6�NROJECTSS �-------- — ----------------- ------- --------------- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 9 11 �� L;K� NI� ADONIBRGOK 2 � 3 — IA 1 4 6 7 W > Q 0 14 13 12B 12A li 10 9 8 ; I I I I 1�10�R�IS IB � � 9 8 W � AVED 1 z 3 q TR. TR. p ; 64E 64� 3 TR.64B = 6 5 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12 TR.70 I TR.69 TR.69B 16 ;TR.64 I5 ° TR.64A 13 14 ' TR.74o 66A B6B TR.66 T IOB Z Z � i B 1 2 TR.47 � TR.47E � � W > A B � S z 2B Z A B J 1q 16 TR.47C TR.47D 0 250 500 SCALE IN FEET ATTACH E– L7649 PROPOSED SEWER SANffARY SEWER EXISTING SEWER �•���---- REHABILITATION PROPOSED WATER CONTRACT LXXII�72) EXISTING WATER ----- FW LOCATOR MAP # 2072�92 COUNCIL DISTRICT B FEB 2006 MAPSCO 79 A ' : Halff Associates, Inc. BNGIN � • ARCFIITF.L75 • SCIENTi5T5 • PIANNERS • SURVEYORS aom eo�u. m�a+ eov[Evnxu FOR]' WOBMiHXAS ]aS/ 'IHL (BI]) 86�-IGT2 FAX (8171 2iY9]6/ Standarci�6PROJECTfiffi ---------------------------------------------------------------------------- SS��ShILtSS$$S S�SUA I tS$$ S$$ I IMt�S$ Standard��PROJECTS� StandardSSPROJECT$S �s�s$ri�ts$sss s$sua i ts$s ��$ i inntss$ Standard$$PROJECT�� �$���ri�t�$�$� $$�ua i t�ss �s$ i iMts$$ Standard��PROJECT$$ 12R1 20 1 2 13C i TR.25D1 TR.25C1 � i 4 q 8 $ TR.25B TR25� TR.25C 6 � , 5 5 5 9 � 4 5 � 5 � 4 6 — 6 10 1 2 3 6 7 8 9 ~ � 7 � 7 11 U 1 2 3 4 ', � z 8 � KILLIAN �, a i2 , -- ------`''.�.--.—. J I � 1 M 2 3 4 5 6 7 � 2 3 t, > > > o � z � q 1i 2 2 2 � 0 6 5 q � '� TR.25J 1�1i R15-9 5 ; 3 3 3 3 3 2 � i � 6 i q 4 q 4 8 - —A�BUR i� -- R15H8 7 I 5 5 5 5 6 4 3 2 � R15F7 8 I 6 6 6 5 4 3 2 � � g i 6 6 6 6 15E ~ g � 7 7 7 7 ��' 150 ' 7 Q : N -'� 10 i S B 8 15C 15B �� !L 9 9 9 8 � ,sA 1z � ,o ,o � ,o u � I AlA 14 13 11 �� 11 11 ! 12 1z — 12 12 � `�;�i I � R:��,� F R L-�----�--------��----..—..—.. � TR. � 1 2 a 36 TR. o �? � 36A � y�^ c9 3 ��:, a � � # 2 ,`r, � w 5 - q ✓� �/�, C, ,- a'�'j,, �� q `' 6 / ��G'/� 11 = 3 � r �' � -- ���/�,� �2 IDp_ N1aY �� � �� ���� � � 3 9 5 6 6 7 12 8 13 9 8 ��� n : _ ��, 0 250 500 SCALE IN FEET ATTACH E- L5020 PROPOSED SEWER SANITARY SEWER EXISTING SEWER REHABILITATION PROPOSED WATER CONTRACT LXXII (72) EXISTING WATER — FW LOCATOR MAP # 2072-372, 2072-376 COUNCIL DISTRICT 5 FEB 2006 MAPSCO 95 D :� Halff Associates Inc. T R. 37 TR.37B 11-B TR. 37C 12 � TR.37A TR. �' 37 D 13 � 14 2B 2A 7 3 � 6 5 q 5 6 25 0 0 26 � � 0 # ■If�7iL•" 16' FI_ECF_ ' ENGINEERS • ARCHITHClS • SCLENTISTS • PLANI�RS • SURVEYORS aom eo�a cne� aovczv.vcn PORT WOkTI[,TP.][AA 76137 � �m, (e�n sa�-�aa AAX (BL'� U1-9]B1 S$�S�FILEffiffi��$ $ffi$DATEffi�$ SS$TIME Standard��PROJECT�$ s$sssri�t�ssas s�sua i t$ss ss$ i iMt��$ Standard�SPROJECT�� , \ 23 22 13 �8 27 � 5 �' 13 �'t �V 'E�T A�, _. — 26 .�� 6 14 17 \ `� 15 \ \� 3 4 5 7 8 9 10 11 7 .� ,•1 � 2 12 24 .•� \ 8 1 B ;� � .�" ' .. 13 23 9 �z `� .�P 1 q \ 19 `; Cr`� 34 33 32 31 `� 15 22 � 35 30 z9 � � � �'',, 10 \ C� \ 28 � 16 � . 6'., 20 \, ��� `` �� I N 27 z6 23 6„ �-�` �� 21 20 � 1 ,\ � 22 �� \ 22 21 ; \ � � 3 4 ���� 21 20 18 19 •,� __ _ _ 5 19 �-_.�` ,` � 43 ` 4�.. 6 7 18 `� 42 e 9 10 11 16 17 �� 42 12 14 � 5 ��, ,�. 3 9 13 15 _ 1 �'� � 38 �o ;' 16 ��\ �, 37 36 1 �--, 14 1 17 A1 �i � 35 34 33 _ l' 18 19 ' 2 32 6„ A2R \ �� 3 31 4 30 29 �\ � `�. 5 28 �-..,, \ �- 6 � A2 q� �' 7 B i/;= �_ 27 26 25 � 9 - �' � 42-...�_`, 10 „ 13 ,:� �1 43 1z 14 ;; 41 40 � 17 ; S ii �, 39 3B 18 � t� ' N�1�,� ,- 37 6� �, � 3�° 35 � " � 54 34 33 � ' ;' � �� 63 �� �,^ � 32 15 31 1 � � � SSO Q 29 � � � 1, 14 - � .� � N 3 ! 2 8 ,� 1 � 13 3 —+ ' •- 27 2 / � r � 4 � � 2 16 ` 6�_ •-�—.. ( i 26 i�/9 � `\ 15 /! s��, ; a ; � h , a ` s, o � 5 ' 8 � / 14 � � 25 � � " 4 17 ;� 50 �� P� 10 7 ��1 � �� 13 � 49 � c° � 9 7 '� 8 i 6 5 16 �' 48 Z 3 i 9 `� �� ` �i 8 23 \ \� 9 . 6 11 15 ;� � 4 8 22 '� � / 4� � ./� 7 10 8 14 ! �/ 6 CF 11 21 10 � , 5 G� q ! `� � � 3 � \\ `C`� 20 ,z , 46 j � a 12 ,'\ '� ,4 �� 19 �'� 0 250 500 i i ; � -�- � � `� � 17 � 10 �'" 16 14 \y8 � _—�g��� oFo 16 � �� SCALE IN FEET �a � ATTACH E- L5509 PROPOSED SEWER ' / �. zp ^��"�� \ �� \�;'� SANITARY SEWER EXISTWG SEWER -------- �� �� 18 37 2 CONTBRACT TILXXII (72) EX ST NGDWATERR ----- FW LOCATOR MAP # 2036-364, 2042-364 COUNCIL DISTRICT 6 FEB 2006 MAPSCO 90 N o: Halff Associates, Inc. ENGINEERS • ARCHI1F.CfS � SC'�N1TST5 • PLANNERS - SURVP.YORS aDw ro�a caeaa so[n.svnrzn ronT wonr�c���eras �m9� 1F1 (8t/) 84"I-1422 P.ix I�n 27�s� �SSS$FILE�$S$S $$�DATES�S �$$TIME: Standar�$PROJECT$$ N BLOCK i A I zl 24 1 2 3 � 6 5 4 3 � 1 12 10 9 8 7 S�Ih� TR. 5A TR.3 TR.4 4 6 � �q 11 15 10 16 9 17 S 18 7 19 6 20 21 4 22 3 23 2 24 1 32ND 13 12 14 11 15 10 16 9 17 8 ,a , � 7 5 5 i 5 5 16 6 6 P 15 � 6 15 7 7 19 � 7 ° 14 8 G 8 13 � 8 13 9 c 9 12 � 9 12 10 � 10 11 � 10 11 JT� I il 10 11 10 I 11 9 12 9 i 12 13 8 13 I 13 14 7 14 7 i 14 15 2 6 15 3 6 � 15 4 �- 5 16 5 i 16 17 '��� 4 17 4 I 17 18 3 �`•. 1 B 3 � 18 19 2 ��'��� 19 z � 19 � 1 ��� 1 '_. 3�TH �\. I. ST=.. 13 12 13 12 13 � I 14 � 14 11 14 11 I 14 � 15 — — - 1p 15 10 16 9 I 16 � 9 16 16 17 8 I 18 7 I 19 I 20 5 I 21 4 I 21 22 3 I 22 23 2 I 23 �o��� I 13 14 15 16 17 18 19 20 21 22 23 24 13 14 15 16 17 18 12 11 10 9 8 �7 61 5 4 3 2 1 12 11 10 9 8 7 6 17 8 17 , 7 18 19 " 19 i 20 i 5 20 5 21 ' 4 21 4 22 I 3 zz 3 z 23 2 ;F � z i----- ���-., i z t 3 i � il � 11 �} � �q il � � 10 �k 10 1 � 15 1 � �6 � 9 � ,� 9 � � 16 g i 17 \; �4� � 17 7 18 I '� 18 6 19 ,� 6� '' 19 5 0 250 500 4 z SCALE IN FEET � ATTACH E- M761 PROPOSED SEWER SANITARY SEWER EXISTING SEWER -..—..—. REHABILITATION PROPOSE� WATER CONTRACT LXXII (72) EXISTING WATER — 12 FW LOCATOR MAP # 2036-472 — COUNCIL DISTRICT 2 FEB 2006 MAPSCO 48 W 10 9 :o: Halff Associates, Inc. S ENGAI8ER5 • ARCIIITECIS • SCCfENN1TSTS • PLANNEItS • SURVEYORS 1 aoao �n cx�a souievwxn 7 PORi WORIH.7EXAS 76737 ]II. (�]) 64]-1422 - PAX (8I� 3TY1164 �SQ3�FII FSQ��� ���f1CTFffi�ffi ffi�$TIAdFS�ffi StandardSSPROJECT$S StandardSSNROJECTSS � TR.25D1 TR.25C1 7 I q I q g 8 j TR.258 j TR25� TR.25C 6 S 5 5 � 5 9 � I I ol � 4 5 > 5 �I 4 6 H 6 10 2 3 6 7 8 9 � �I �� � I 7 I 7 �� U 1 2 3 4 � � Z e j �: � �\ i s �z _ ,-------�—�--------�T. --�� � � , 2 3 4 5 6 7 1 2 3 ��� � I 1 1 1 1 z I 4 i 2 � 2 2 9 R15-9 5 I 3 I TR.25J 6 5 1 � 3 I 3 3 3 2 6 i q 4 V q 4 R15N8 \ e ASBUI�Y � a s 5 � s 5 ��6 4 3 2 R15F7 8 � 6 i 6 � ��, 6 5 4 3 2 � J 15E B j 6 6 � 6 6 ~\a\\�� � 9 j 7 7 j 7 7 ���\ 7 150 'O I I N \�\ � 15C � 8 � 8 8 ~'' 15B �� -�1-! 9 9 1 9 � 8 �'�, �sa �� � io ,o '� ,o i ti � �i ! �� I 2 I AlA � 14 13 I 11 � 11 11 � �'� I u 12 12 1 � I 12 �� 9 s I �_ � 13C � �-----�A` —1---- �—�-- --------��---------- r .,����� TR. ��` --------- WI�BARG-R �— �� ! 37 � TR. � � 1 a � 2 0 36 � I TR. oo , 1 TR.378 ��' 36A 11-B � TR. y�' � 1 3 0 37C ��/�� a y 2 ,. r � 12 �� TR.37A TR. ��! ��/, �= 5 `� q � 37D �e � j , — ��t�c '�%, '�' � �' q �li `' 6 I ��O � l 13 � y�� , � � 3 � i r='✓ : i I L, A !�, y`1` ,q t2 ---- �-------�y--�r-� � � 2B �A � � �i'i, � � � � 3 4 5 6 3 5 6 7 4 --------- C�gs:�C K ^—�, S p.'�N 1R 3R 4R 3 4 5 6 � � 75' ----t\ T�e z2 I 21 I 20 I 19 I 18 � 7 8 9 10 11 I I 1 —; 16� FIERCE � 1 12 13 9 S ;�-----------� � 0 250 500 17 SCALE IN FEET WATER MAIN PROPOSED SEWER REHABILITATION �ISTING SEWER CONTRACT LXXII (72) PROPOSED WATER EXISTING WATER — FW LOCATOR MAP # 2072-372, 2072-376 �2 3A COUNCIL DISTRICT 5 FEB 2006 MAPSCO 95 D �❑■ .o Halff Associates, Inc. ENGII�6ER5 • ARCIIITECI'S • SCffi�7TISTS • PLANNERS • SURVEYORS aaoo �a cnamc aoin.evnxn P00.T WORTH,'CPXAS 1613] "fII. iBCn A61-1622 PAX (Bln 731 l'/BI ffi$SSSFILE$SS$� S�ffiDATES�ffi ffiS$TIME�� Standard$�PROJECTS$ � 23 22 'y j 28 27 5 �� J� 13 �h B x \ -- — ---------- -----��` 2s � 17 �� � �� ��iA/E�t� �%� �� 6 �`, 14 � �'���� �`\� 7 \�,� 15 �� �i�� 2 3 4 5 7 8 9 10 11 \� �., 18 � � 12 �� �� 24 8 �° �� 13 ��, 23 9 ��`. 19 \\ C�� 34 33 32 31 14 15 �'`. 22 � 10 � ^ 35 3a 29 28 16 .�� 21 6 � � —"���I h--,���� 27 `� 1 20 � �� ��� 26 6" 17 r \ � �� �� ` 23 \\ 20 \ ��� "� 22 � 22 21 �Y�/ 1 2 3 q a I````�.� 21 20 18 \ 19 � k 5 `��� 19 ,�%�• e "� 6 � / �� 18 e` � 43 41 � �' ` i � ��� 42 8 g �� 11 � ---�-'' 16 �4 17 ��`''�� 42 �p ' �4 14 ,5 .� '"'P^�.� 39 13 15 _ �� 1 � � � 0 38 �a '� 16 ��\ �`,^ _ 37 36 14 17 `,< \ �. 35 34 18 19 A1 � � \ �o 2 ` 33 32 31 6�, � � A2R �� 3 _� - 30 �� '� 4 5 � 29 \ 1 6 � � ` 28 �����1� A2 A� � g ��G,�J�,,�_ 27 26 \ 9 _ '��=,. ` 25 ` 10 � �����`� 43 42 11 13 a� ��. 12 e ,'�-, 41 14 ` �� 40 39 17 18 �� � ����H%✓ESj ��� 3B 37 36 35 6� � � � O�p \`` �� `` 34 33 32 � 15 j — � 31 / j � ��, f � g2,� �_ j 14 �/ 29 � �� 16' WL `N ���� 1 i' 3 �3 tl! 3 28 /1� 11 I / z7 ( 2 1 16 j q 12 � �� - 6 i � i 26 j 9 15 f� ``� � � 5 11 I I O o ' P � 10 1 \ 7 � q, 9 � 8 1 \ , i' \ \ �/� 3 � �J/ �-' 12 I11 10 19 18 20 � d I V 4 I 4 $ } 25 �1 5 7 `0 7 \\ , \ 6 0 8 �� \ /� � 9 23 �`�, �� J< \\ 10 22 � 21 � 11 �!, 2p/ / �.� 12 14 16 'l, .� �� r� �� �r�° 16 �,cd f �i e *. a � ,� �a 17 �j 18 19 18 / a 14 � / 4 � 17 13 � / � 16 5 � 12 ! 6 � 15 11 �� 8 •- �1 14 ,z 18 �/\ 51 49 \ 48 \ 47 q6 50 j � / z _ � � � 9 / Z�j 3 / J � 8 !/ / � / 4 � // _� P 5 6 ��� 4 I i�� 0 250 500 SCALE IN FEET WATER MAIN I PROPOSED SEWER REHABILITATION �ISTING SEWER CONTRACT LXXII (72) PROPOSED WATER EXISTING WATER FW LOCATOR MAP # 2036-364, 2042-364 COUNCIL DISTRICT 6 FEB 2006 MAPSCO 90 N ■� ■o■ Halff Associates, Inc. ENGINE:ERS • ARQ-II1P.CI'S • SC�1'iTSTS - PLANNL'RS • SURVEYORS aoao �acca caaEa aw�.evww POAT WORTH,TEYA$ T617'/ ]EL (8f1) 64'I-14T1 Pnx Im�7 z71-��a� ffiSSSSFILEffi$�ffi$ $$SDATE�SS ffi�STIMESSS Standar�SPROJECT�$ A RD CERTIFICATE OF LIABILITY INSURANCE ioio3iz 6' PRODUCER (972) 581-4800 FAX (972) 581-4850 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Bel l Insurance Agency ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 16980 Dal l as Parkwa HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR y ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Dallas, 1X 75248 Suzanne Fl ores INSURERS AFFORDING COVERAGE NAIC # INSURED Halff Associates, IIIC. INSURERA: Hd�'tf0:'[I Ca5U3�ty Ii15. Co. Mr. Roger Burns �r,suReRs: ACE American Ins. Co. 8616 Northwest Pl aza Dr. INSURER C: Dallas, 7X 75225 INSURERD: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR DD' 7ypE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS GENERAL LIABILITY 46UUNIY5768 O%��.Z�ZOO6 O%��.Z�Z00% EACH OCCURRENCE $ ], � OOO � OO X COMMERCIAL GENERAL LIABILIN DAMAGE TO RENTED $ ], � OOO � OO CLAIMS MADE a OCCUR MED EXP (Any one person) $ ].Q � OQ i� i� Contractual Liab PERSONAL & ADV INJURY $ ]. � 000 � 00 GENERAL AGGREGATE $ Z� OOO � OO GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ Z' OOO � OO POLICY PRO- JECT X LOC AUTOMOBILE LIABILITY 46UUNIY5768 O%�I.Z�ZOOF) O%��.Z�Z00% COMBINED SINGLE LIMIT X ANY AUTO (Ea accident) $ 1� ��o � o� ALL OW NED AUTOS 80DILY INJURY $ SCHEDULED AUTOS (Per person) �± X HIRED AUTOS BODILY INJURY $ %� NON-OWNE�AUTOS (Peraccident) PROPERTYDAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO EA ACC $ OTHER THAN AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY 46XHUIY6677 O%�ZZ�ZOOF) O%�I.Z�Z00% EACH OCCURRENCE $ S� OOO � OO X OCCUR � CLAIMS MADE AGGREGATE $ S� OOO � OO A $ DEDUCTIBLE $ X RETENTION $ �.O � OO $ WORKERS COMPENSATION AND 46WENV6090 O%�I.Z�ZOOF) O%��.Z�Z00% X WC STATU- OTH- EMPLOYERS' LIABILITY j� ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $ ], � OOO � OO OFFICERlMEMBER EXCLUDED? E.L. DISEASE - EA EMPLOYE $ �. � OOO � OO Ifyes, describe under SPECIAL PROVISIONS below E.L. DISEASE - POLICY LIMIT $ �. � OOO � OO B P���SSIONAL LIABILITY EONG21673845 07/22/2006 07/12/2007 $5,000,000 Per Claim Limit laims Made $5,000,000 Aggregate Limit DESCRIPTION QF OPERATIONS / LOCATION / YEI{ICLES / EXCLUSIONS A�DED BY ENDORSEMENT / SPECIAL PROVISIONS e: Sanitary Sewer Reha�bilitation City of Fort Worth Abe Calderon 1000 Throckrtarton Fort Worth, TX 76102 SNOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL �.O DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILffY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE `�' Thomas J. Ashlev/SHF � � '' ACORD 25 (2001/08) FAX: (817)392-6828 OACORD CORPORATION 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative'or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25 (2001l08)