HomeMy WebLinkAboutContract 34045 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Freese & Nichols, Inc. , (Engineer) made and entered into City Secretary Contract No. 33095, (the Contract) which was authorized by the City Council by M&C C-21241 on the 10th day of January 2006; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services : Street Reconstruction, Water and Sewer Main Replacements Portions of Avenue H (S Ayers Ave to Miller Ave) , Avenue A (Nashville Ave to Thrall St) , Newark Ave (Avenue C to E Rosedale St) , Avenue I (S Collard St to Bishop St) , Court Street (N Dead End to E Vickery Blvd) , Parkdale Ave (Koch St to Vickery Blvd) and Avenue G (S Beach St to Binkley St) , 2004 CIP Contract Year 3, Contract 39, Project No. 00275; DOE No. 5145 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 24,2006, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $15,439.00. �_ 16RIGINA, 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $250,590.00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 2006, in Fort Worth, Tarrant County, Texas . T Marty Hendri City Secretary I NO M&C REQUIRED ROVAL RECOMMENDED: APPRO 7 A: A. Douglas Rademaker, P.E. Marc A. Ott Director, Department of Assistant City Manager Engineering Freese & Nichols, Inc. ENGINEER By:_ Name: Richard G. Kelley, P.E. Group Manager / Principal 4055 International Plaza, Suite 200 Fort Worth, Texas 76109 APPROVED AS TO FORM AND LEGALITY: Assistan Ci y Attorney :'AMY M I Freese and Nl c h o ls, Inc. Engineers Environmental Scientists Architects 4055 International Plaza,Suite 200 Fort Worth,Texas 76109 817 735-7300 817 735-7491 fax www.freese.com Gopal Sahu,P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 August 24, 2006 Re: Adding Professional Geotechnical Services to 2004 C1P Neighborhood Street Reconstruction Project: Avenue H, Avenue A, Newark Ave., Avenue I, Court Street, Parkdale Ave., Avenue G Dear Mr. Sahu, This letter is written in response to your request for a fee proposal for adding professional geotechnical services to the above mentioned project. Project Scope Please see attached geotechnical scope of services. The geotechnical study deliverables are summarized as follows: Geotechnical Engineering Report including the following(Six bound copies) 1. Plan of Borings 2. Boring Log 3. Summary of Laboratory Results 4. Discussion of Subsurface Soil and groundwater conditions 5. Calculated potential vertical rise 6. Pavement Thickness Calculations 7. Recommendations for subgrade stabilization 8. Recommendations regarding earthwork and site grading Prosect Schedule The geotechnical study will be complete 5 weeks from the time authorization is received. The results of the study will be included in the preliminary engineering report for the project. VG�!� P� V n ''f�MY ���I7 Compensation Freese and Nichols proposes to provide the above mentioned basic services for a lump sum fee of$11,039.00. Subconsultant Geotechnical Study Fee $10,035.00 Freese and Nichols Markup(10%) $1,004.00 Total: $11,039.00 If you have any questions concerning this proposal, please do not hesitate to call Chris Bosco,P.E. at 817-735-7359. Thank you for this opportunity, Richard Kelley, P.E. Principal/Infrastructure Group Manager _- . 40 _ ' I ' F L, Freese and N 1• C h o ls, Inc. Engineers Environmental Scientists Architects 4055 International Plaza,Suite 200 Fort Worth,Texas 76109 817 735-7300 817 735-7491 fax www.freese.com Gopal Sahu,P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 j August 24,2006 Re: Adding Right-of-Way Document Services to 2004 CIP Neighborhood Street Reconstruction Project:Avenue H,Avenue A,Newark Ave.,Avenue 1,Court Street,Parkdale Ave.,Avenue G 4 Dear Mr.Sahu: This letter is written in response to your request for a fee proposal for adding surveying services to prepare right-of-way documents for four(4)parcels on Avenue"A". Proiect Scope Freese and Nichols will amend our subcontract agreement with Gorrondona and Associates to prepare 4 right-of-way documents for four (4) parcels on Avenue "A". Freese and Nichols will deliver four (4) original copies of the right-of-way documents for each of the four(4)parcels. l Proiect Schedule The right-of-way documents will be complete three weeks from the time authorization is received. Compensation Freese and Nichols proposes to provide the above mentioned basic services for a lump sum fee of $4,400.00. SubCO .ult _t �.' xv °f1 :nt zf ti x 'S'"�'t'�' .s f . '"" k t{_ %r:#a.,� d * `' xy -.' •s--t forts '' rr. xr £- rxs y..zrrcf ,z r OU :5iztv� TamnYp � tfit#kxFa.4 `a �, , � r 'x �..w�' t �• . �"��',„ #„t�x �� eta @ ��t.r7,£e . a <y is T 'n 75 $ i;i �ts4.p3w,a�� .41 �r - S 1 P Prricipalfr asucftlrbi cjlip' V�anager * Y