HomeMy WebLinkAboutContract 34092-A3STATE OF TEXAS S COUNTY OF TARRANT S AMENDMENT NUMBER 3 CITY SECRETARY CONTRACT NO . 3�ID�I Z-�� WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 34092, (the CONTRACT) which was authorized by the City Council by M&C C-21722 on the 26th day of September, 2006; and subsequently revised by Amendment Number 1 which was authorized by the City on the 22nd day of February, 2008; WHEREAS, the Contract involves engineering services for the following project: South Pipeline Road at Post Oak Channel Bridge Replacement (Project No. 00258; DOE No. 5406) WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated July 21, 2010, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $12,300.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $111,771.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. _ --_- i� - -- -- I� �`. � C36��9�Vf�IL �i����[ '� ; < <�a�lf ��CF2E°PA►��'� Ij : ;:��; Fpe�R'��8, T� ; Page -1- EXECUTED on this the \a-�" day of �k , 2010 in F t W th T rrant Count Texas or or , a y' ��4�� ��,�a � ���� poRr��� �� �U p°A ��¢APPROVED : ATTEST : � �,o � � � „ .d �.i o _� � �" F? Marty Hendrixv City Secretary APPROVAI� RECOM[�NDED : Willi�Verk��. � �000 � �a Fernando Costa �� b'� Assistant City Manager ;i 1`�(� ���; �������1��`t�:���� �! «.�.�. _ � -�:�� --� _ =-���. Director, Transportation/Public Works Department TEAGUE NALL and PERKINS, INC. ENGINEER � Ty i n, P.E. Principal APPROVED AS TO FORM AND LEGALITY: Amy Ramsey Assistant City Attorney Page -2- j ��FICiAfL REC�R� CI�'lf �ECREi�RI� � 0 0�r�� C N �q �At �Ti.� TEAGUE NALL AND PERK/NS Civil Engineering Surveying landscape Architecture Planning July 21, 2010 Mr. Mike Weiss, P.E. Department of Transportation and Public Works City of Fort Workh 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: SOUTH PIPELINE ROAD AT POST OAK CHANNEL BRIDGE REPLACEMENT CITY PROJECT NO. 00258 TNP No. FTW 06290 Dear Mr. Weiss: Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services provided on this project: Additional Services to Revise the Road Alignment Based on discussions with the City, revisions to the paving alignment are required to reduce the right- of-way acquisition needs for this project. Therefore, plans will be revised to shift the plan alignment of the roadway to the north to keep the roadway inside the existing roadway easement. Changes to the roadway profile will be minimal and no changes are anticipated with regard to the culvert crossing, headwall, and channel improvements. Roadway changes will be made based on minimizing the right- of-way needs and may not necessarily conform to the city's master thoroughfare plan designation for this roadway. In addition, we will coordinate the removal of trees required for the roadway embankment with the City arborist. The attached spreadsheet reflects the number of hours required and provides an outline of the revisions required to update each sheet. ■ Engineering .............................................................. ....................$ 12,300 Total Contract Amendment No. 1: $ 12,300 Summary of Contract Fee: Original Contract Amount: $ 92,721 Amendment No. 1: $ 6,750 Amendment No. 2: $ 12,300 Revised Contract Amount $ 111,771 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, T�ACUE . . �►ND PERKINS, i�lC. .:_�-- Micha I Wellbaum, P.E. Copy: Mr. Ty Hilton, PE - TNP o:\projects\ftvd06290\docslconlract\_contracl amend 02.doc � �����0��. �����:� �, ��� S�CRETARI� �� i '�e ��R�° •4 O d� _.��..-- __: 1100 Macon Street • Fort Worth, Texas 76102 • 817.336.5773 phone • 817.336.2813 fax www. tnp-onl ine. com