HomeMy WebLinkAboutContract 34093-A5AMENDMENT NO. 5 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. �� � I�`5� (No M&C Needed) COUNTY OF TARR.ANT WHEREAS, the City of Fort Worth (City) and Dunaway Associates, L.P., (Engineer) made and entered into City Secretary Contract No. 34093, (the Contract) which was authorized by the City Council by M&C C-21712 on the 26�h day of September 2006; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street Reconstruction, Storm Drain Design on College Avenue (Page St. to W. Capps St.), Orange Street (Stanley Avenue to Townsend Dr.), Lipscomb Street (W. Capps St. to W. Berry St.) and Wayside Avenue (N. Dead End to W. Cantey St.), 2004 CIP Year 4& 5, Contract 53, Project No. 00455; DOE 1�10. 5411 WHEREAS, it has become necessary to execute Amendment No. 5 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly- authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services as specified in a proposal letter dated April 28th, 2009 a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $8,000.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $208,357 + $15,510 (Amendment No.l) + $4,440 (Amendment No. 2) + $10,570 (Amendment No. 3) + $24,750 (Amendment No. 4) + $8,000 = $ 271,627. �l�r�°�V�l:�d�� I`r�������� �� � � [� �Ci���"�' �' ���; �� Contract Amendment No. 5 Page 1 of 2 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. � Executed on this the � day of ��, , 2009, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: _Gc..�l�,��� ' , William A. Verkest, P.E. Director, Department of Transpoi�tation and Public Works DunawayAssociates, L.P. ENGINEER By• �. �J�- yi� T by I� Ford, P.E. Vic resident 1501 Merrimac Circle, Suite 100 Fort Worth, Texas 76107 APPROVED: �s•....�..-� �� Fernando Costa Assistant City Manager ATTEST: � �� I)v1 Hendrix, City Sec etary �jr, ���;� �ATr���1����� i ���5 i�,,. z._,'a... - _-" APPROVED AS TO FORM AND LEGALITY: ��� � `��'���I�L i�����[t�'` �y R �Il� ���RE1'�►R�° Assistant Ci Attorney �-a �����i. 'r� Contract Amendment No. 5 Page 2 of 2 � �►u��►w�►y DA No. 2006151 April 28; 2009 Ms. Dena Johnson, P.E. Program Manager City of Fort Worth Department of Engineering Fort VVorth, Texas 76102 Reference: Amendment No. 5 2004 CIP Project Yrs 4& 5- College Ave, Orange St, Lipscomb St and Wayside Ave. Contract 53 Project No. 00455 Dear Ms. Johnson: Dunaway Associates, L.P. is pieased to present ihis Amendment No, 5 for additional engineering design services requested by the City that are beyond our original scope of services, The general scope ofithese additional services is asfollows. Task 1— Median Barrier @ BNSF RR ROW an Lipscomb Street City sfaff requested the design of a raised median to deter cars from driving around the lowered RR gates. Based on the alignment from the Lipscomb Street reconstruction set, the raised median would be 18" to 24° wide and have the following limits: • STA 22+90 Co STA 23+40 . STA 24+50 to STA 24+80 An R4-7 sign would be placed at the northernmost and southernmost points of the medians. This reque5t is for the efFort involved in preparation of details for the new raised median, modification of the RR Exhibif A, and production of revised roadway plan/profile sheets and cross-sections. Task 2� Redesign of College Street East Curbline During the course of construction, property owners along the east side of College Street requested modifications in the alignment of the east curb line to provide additional clearanee between the back of curb and existing trees in the parkway. 1501 MemmacCiicle,fiuife 100 9 Fort Worfh, Tezas 76107 a Tel: 817,335.1 t21 � Meho; 817.429.2135 � Fox: 817,335.7437 3 www.dunawayassociates.Com • Amendment No. 5 April 28, 2009 Page 2 This request is for the additional etfort involved in realignment of the curbline, redesign of cross-sections, and production of revised plan and section sheets. A summary of the proposed budget for this contract amendment is as follows: A summary of the total project is as follows: M1WBE Participation GM Enterprises provided soil borings as a part amendment #1 and Gorrondona & Associates provided topographic survey services as a part amendment #3. M/WBE Goal — 20% M/W6E % Provided: Original Contract — 20% Amendment No. 1 —11 % Amendment No. 2 — 0% Amendment No. 3 —11 % Amendment No. 4 — 0% Amendment No. 5 — 0% ($40,672 / $208,357) ($1,732 / $15,510) ($0 / $4,440) ($1,200 / $10,570) {$0 / $24,750) ($0 / $8,000) Revised M/V1lBE %(Original contract + Amendments} — 16% � Amendment No. 5 April 28, 2009 P��ge 3� Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, L.P. �� . Stephen James, P.E. Principal Director — Public Sector Services 2008151 _Amendment#5-_DJ oh n son_09•o4 o8:docx