Loading...
HomeMy WebLinkAboutContract 34093-A7STATE OF TEXAS § COUNTY OF TARRANT § Amendment No. 7 CITY SECRETARY NO. ? �u � �� �� �� CU ��t? I�l:�i WHEREAS, the City of Fort Worth (City) and Dunaway Associates, L.P. (Engineer) made and entered into City Secretary Contract No. 34093 (the Contract) which was authorized by the City Council by M&C C-21712 on the 26th of September, 2006; and WHEREAS, the Contract involves engineering services for the following project: Street Reconstruction, Water and Sewer Replacement on College Avenue (Page Street to W. Capps �treet), Lipscomb Street (W. Capps Street to W. Berry Street), Orange Street (Stanley Avenue to Townsend Drive) and Wayside Avenue (N. Dead End to W. Cantey Street) 2004 CIP Contract 53, Project No. 00455 WHEREAS, it has become necessary to execute Amendment No. 7 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly-authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in M&C C-25240, adopted by the City Council on the 25th of October, 2011 and further amplified in a proposal letter dated April 12, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $15,020.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $319,188.00. Contract Amendment No. 7 Page 1 of 2 � �FFl�IA� ����RD I CITY SECitETARY � �'f. VIIOIt'TFi, TX ?.� ��-a_.�.�.�� _---�- 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Executed on this the Z day of �V���i���, 2011, in Fort Worth, Tarrant County, Texas. ATTEST: Marty Hendrix City Secretary ,� �a�°��°�°°�p�`a�� ��o a�� � o � e� 0 � r ° o �` � �' ��o� -� , ��_ AP ROVAL RECOMMENDED: �" � � W Dougla . Wiersig, P.E. Director Transportation and Public Works Dunaway Associates, LP ENGINEER By : � 0^�n�.v�. NAME: Stephen R. James, P.E. TITLE: Sr. Principal 550 Bailey Ave. Ste 400 Fort Worth TX 76107 OQUo.. �� b� ���''APPROVED: r� ���ti��� Fernando Costa Assistant City Manager AP�ROVE 5 TO FORM AND LEGALITY: (, ,\,, ;�" f�:�L �- Z S L�i J �1-�� /�% � � �i Douglas lack Assistant City Attorney �F�d��AL �����tD �Nil( SECRETARY ��'� 4AIA�TR�, TX Contract Amendment No. 7 Page2of2 � u��, �� EXHIBIT "A" Dunaway No. 20�6151 April 12, 2011 Mr. Richard Argamaniz, P.E. ciry of Fort Worth Transportation and Puhlic Works Department 1000 Throckmorton Street, 2nd Floor Fort Worth, Texas 76102 Reference: Amendment No. 7 2QQ4 Cf P Project Yrs 4& 5- College Ave, Orange St, Lipscomb St and Wayside Ave. Cantract 53 Project No. 00455 Dear Mr, Argomaniz: Dunaway Associates, L.P. is pieased to present this Amendment No. 7 for additional engineering design servic,es requested by the City that are beyond our original scope of services. The general scope of these additional services is as follows. Description of work: e Ciiy requested the re-design of the Capps/Lipscomb Ave intersection and storm drain improvements within the BNSF RR ROW. The completion of this work will include the following fasks: 1. Design review and field meetings with Ciiy staff and Contractar up to faur (4). 2. Detail intersection re-design at the Capps St/Lipscomb Ave intersection. 3. Design of 200 LF of storm drain and ditch re-grading at the Lipscomb Ave BNSF RR crossing. 4. Traffic Control Detour at the Lipscomb Ave/BNSF RR crossing, 5. Additional reproduction and mi(eage. A sumrnary of the proposed budget for this proposal is as follows (See Exhibit B for a detailed man-hour estimate of fhese tasks): 550 Bolfey Avenue, Suite 400 .� Forf'�Jorlti, Texas 76107 c` Tei: 817,335,1 121 3 fux; 8i 7.335J437 � dunavayassoclates,corn � Amendment No. 7 April 12, 2011 Page 2 MNV�E Participation There are no MWBE participation as a part of this amendment. City MM/BE Goal — 20% MMBE % Provided: Original Contract — 20% Amendment No. 1 —11% Amendment No. 2 — 0% Arnendment No. 3 —11 % Amendment No, 4 — 0% Amendment No. 5 — 0% Amendment No. 6 — 8% Amendment No. 7 — 0% ($40,672 / $208,357) ($1,732/ $15,510) ($0 / $4,440) ($1,200 / $10,570) ($0 / $24,750) ($0 / $8,000) ($2,610 / $32,541) ($0 / $15,020) Revised MMBE % (Original contract �+- Amendments) -- ($46,214/$319,1 ��) -14% Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this amendment. Sincerely, bUNAWAY ASSOCIAT�S, L.P. a Texas I'm�ed partnership :' / j % � 9 �.� /�� �, ' � � ✓ � % / !-'C-'��/,Y j.t � �rr��-'T��� � �, %Kervin Campbell, P.E. Project Manager - PuUlic Seclor Service 2006151 _Amendmenllt7_KArc�omaniz_kmc_d-12-201 1.docx N > a d� v � ro � a c c� � .ta E 0 U Q.. '-1 a� � � � � ��o F- LLI p � Z m � Z � > O V W � a V p Q � a` � — 0 U � o�j 'd� � � w U d �O 0. d i.i � 0 O N � a . s � 0 � m ni � 0 m ti N i � N � M N 0 � �N-i H � � [t �� � H H � � � N ; in ,' N 00 N N � .m-t � � � � � � N m o � V � c f0 ro � � j � a � E � V � ,� ,s�_+ O- � 7 3 = �� d � � o r� '� E � a� L �4 $ o � � � �a�i o a a' W � LL � N � �' N � C. t. y C Q G � OiS � V � L O � ,y .y a � C a ::+ F- .--i N M <t 0 0 0 m v� p � � � � � N � � h y � �' � a .`3 � a c ca b '� � u° o � N 0. � N � � G N N E .�, a ro � � .a .� � ao W M&C Review DATE: CODE: ! � �' COUNCIL ACTION: Approved on 10/25/2011 10/25/2011 REFERENCE NO.. C TYPE: **C-25240 LOG NAME: CONSENT PUBLIC HEARING: Page 1 of 2 Official site of the City of Fort 4^Joith, Texas �t�RT ��'(�Etii1 -�� 202004CIP CONTRACT53 AMEND7 � SUBJECT: Authorize Amendment No. 7 in the Amount of $15,020.00 to City Secretary Contract No. 34093 an Engineering Agreement with Dunaway Associates, L.P., for Street Reconstruction and Water and Sanitary Sewer Main Replacement on College Avenue, Lipscomb Street, Orange Street and Wayside Avenue for a Total Contract Amount of $319,188.00 (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 7 to City Secretary Contract No. 34093 with Dunaway Associates, L.P., in the amount of $15,020.00 to provide additional engineering services and plan preparation for street reconstruction and water and sewer replacement on College Avenue, Orange Street, Lipscomb Street and Wayside Avenue, thereby revising the total contract amount to $319,188.00. DISCUSSION: This project consists of street reconstruction and water and sanitary sewer replacement on College Avenue, Lipscomb Street, Orange Street, and Wayside Avenue. The street reconstruction work is funded by the 2004 Capital Improvement Program (CIP). During the construction of the Lipscomb Street and West Capps Street intersection, the contractor uncovered a damaged pipe under the roadway that provides drainage for a ditch adjacent to the railroad tracks. The pipe had collapsed in a number of places causing damage to the existing roadway. Also, it was discovered that the pipe had been reduced in size at the discharge end thereby causing the storm water to back up at the pipe inlet. The replacement of this drainage pipe was not part of the original design scope. The replacement of this collapsed facility is essential for providing structural support for the new roadway pavement as well as the adequate drainage of the street intersection. Amendment No. 7 provides the following: Additional design of the Lipscomb Street and Capps Street intersection. Design of storm drain and drainage ditch grading at the Lipscomb Avenue railroad crossing. Traffic Control Detour at the Lipscomb Street railroad crossing. On September 26, 2006, (M&C C-21712) City Council authorized the City Manager to execute an Engineering Agreement with Dunaway Associates, L.P., in the amount of $208,357.00 for design services connected with the street reconstruction and water and sanitary sewer main replacement on the street locations listed above. mhtml:file://C:�Documents and Settings�ArgomaR\My Documents\2004 CIP\CONTRACT 53\M... 10/28/2011 M&C Review Page 2 of 2 The Agreement was previously amended to provide additional services not included in the original contract as follows: Amendment No. 1 $15,510.00 Geotechnical Services Amendment No. 2 $ 4,440.00 Additional Storm Drain Desi n Amendment No. 3 $10,570.00 Additional Water Lines Amendment No. 4 $24,750.00 Additional Design in Railroad ROW and Railroad Permit Amendment No. 5 $ 8,000.00 Median Barriers in Railroad ROW and Realignment of Colle e Avenue Amendment No. 6$32,541.00 Draina e Desi n Additional Pavin in Ca s Street Dunaway Associates, L.P., proposes to pertorm tne necessary aesign worK ror a iump sum ree o� $15,020.00. City Staff considers the fee to be fair and reasonable for the scope of services proposed. This project is located in COUNCIL DISTRICT 9, Mapsco 76T, 76V, 76Z and 90C. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements 2004 Overrun Fund. TO Fund/Account/Centers Submitted for City Manager's Office bv: Originatinp Department Head: Additional Information Contact: ATTACHMENTS 20�4CIP CONTRACT53 AMEND7 MAP.pdf FROM Fund/Account/Centers C203 531200 209400045533 $15,020.00 Fernando Costa (6122) Douglas W. Wiersig (7801) Michael Hasler (2442) Richard Argomaniz (8653) mhtml:file://C:�Documents and Settings�ArgomaR\My Documents�2004 CIP\CONTRACT 53�1V1... 10/28/2011