Loading...
HomeMy WebLinkAboutContract 33939-A6 AMENDMENT NO. 6 TO AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES GUINN ELEMENTARY SCHOOL RENOVATION STATE OF TEXAS _ CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Komatsu Architecture, Inc. (Architect) made and entered into City Secretary Contract No. 33939 (The Contract)which was authorized by the City Council by M&C C-21619, the 15th day of August, 2006; and Amendment Nos. 1, 3, 4, and 5 were administratively executed in the amount of $58,892.51 and Amendment No. 2 was authorized in the amount of $42,845.00 by M&C C- 22884 dated July 8, 2008 for the plaza preliminary design, interior renovation revision as a separate project, and floor plan revisions for different tenants;and WHEREAS, further amendment is necessary to reimburse the Architect for interiors build out part of the project as part of the design services agreement; and NOW THEREFORE, City and Architect, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article 1.1, SECTION I—SERVICES OF THE ARCHITECT, the following paragraph is added to read as follows: "Provide additional design and construction phase services to accommodate the replacement of the existing basement sump pump and install a new exterior french drain and sump pumps. The cost of this additional service is $9,411.85. The scope of services is described more fully in the Komatsu email dated May 5,2011, subject: 04.149A Guinn Elementary School Amendment No. 6 Revised 5-5-11,which is attached hereto as Attachment"A"and made a part of this Agreement." 2. Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows: "The total compensation for all of the assignments to be performed by Architect as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of $280,713.98 plus up to$6,418.00 in reimbursable expenses. ° 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED this the day of : UxYlQ-- , 2011, in Fort Worth,Tarrant County,Texas. KOMATSU ARC TECTURE, INC APPROVED: By: By: arI A. Komats , A Fernando Costa President Assistant City Manager APPROVA RECOMMENDED_ RECOR�� By. By: DouglaW. Wiersig, P.E., Dithctor Ma4>0 rty Hendrix ,oa �q���n Trans6 rtation& Public Works Department City Secretary p l4 00000*-0- -40"tfact. APPROV AS TO M AND LEGALITY: M&C Not Required for this Amendmer�a►oo'A 4 horization Qko �By' FICIAL RECORD Doug asW. ack ° Assistant City Attorney CITY SECRETARY � � 00000000 000 FT. WORM TX ��aa��`EXAgaa Page Iof1 Clements, Ronald From: Gordon Marchant[gmarchant@comatsu-inc.coml Sent: Thursday, May 05, 2011 1:27 PM To: Clements, Ronald Subject: 04.149A Guinn Elementary School Amendment No. 6 Revised 5-5-11 Attachments: FINAL Amendment No_6 Add Services Fee Proposal Plan Mods Worksheet Revised 5-5-11.pdf See attached.Thanks.GM 05/06/2011 A&E PROPOSAL NAME OF FIRM Komatsu Architecture,Inc. PROJECTTn1E DESCRIPTION Guinn Elementary School Phase Rework of Construction Docs-Amendment No.06-Phase Two 'Two as directed by City of FW LOCATION KOMATSU PROJECT NO: TIME(DAYS) EST.COST OF CONSTRUCTION Fort Worth,Texas 2004.149A NO.OF EST.NO.OF HOURLY DRAWINGS HOURS RATE TOTAL ESTIMATED COST BY A&E BY CONSULTANT A o DRAWINGS A. Project Manager 4.0 $57.02 $228.08 B. Architect 0 8.0 $41.50 $332.00 C. Structural Engineer 0 $0.00 D. MEP Engineer 0 $3,000.00 E_ Interior Design 01 0.0 $0.00 F. ComCheck 0 $800.00 G. Cost Estimator $0.00 H. Landscape Architect $0.00 J. Fire Protectlon Engineer $0.00 K. Civil 0.0 $0.00 $1,000.00 L. Draftsman: (1) Architectural 0 8.0 $40.00 $320.00 (2) Structural $0.00 (3) Mechanical/Elec/Plumb. $0.00 (4) Electrical $0.00 o (5) Civil $0.00 d) (5) Landscape $0.00 (5) Kitchen $0.00 (5) AIV $0.00 (6) Other $pecifications) $0.00 TOTAL DRAWINGS 0 $880.08 $4,800.00 SPECIFICATIONS A. Spec/Report Wrtters 2.0 $57.02 $114.04 U B. Typist 0.0 $20.00 $0.00 TOTAL-SPECIFICATIONS 0 $114.04 DOCUMENT REVIEW $0.00 A. Coordination Review 8.0 $57.02 $456.16 TOTAL DESIGN COST $1,450.28 $4,800.00 OVERHEAD 159.0% X $ $1,450.28 $2,305.95 PROFIT 10.0% X $3,756.23 $375.62 TOTAL COLUMN A(Inc].Overhead)+B $8,931.85 PROFIT ON CONSULTANT: 10% X $ $4,800.00 $480.00 TOTAL COLUMNS A(Incl.Overhead)+B+Profd $9,411.85 TOTAL SECTION A. $9,411.85 J:12004.149A1ContractslOwnerlAdditonal Services 3-25-111Amendment No. 6 Add Services Fee Proposal Plan Mods Worksheet Revised 5-2-11.xlsx 5!5!2011 1 of 3 A&E PROPOSAL NAME OF FIRM Komatsu Architecture,Inc. PROJECTTIL.E DESCRIPTION Guinn Elementary School Phase Rework of Construction Docs-Amendment No.06-Phase Two Two as directed by City of FW LOCATION KOMATSU PROJECT NO: TIME(DAYS) EST.COST OF CONSTRUCTION Fort Worth,Texas 2004.149A Construction Administration- Architectural 0.0 NRS @ $ $45.00 $0.00 OVERHEAD 159.0 % X $0.00 $0.00 c PROFIT 10.0% X $0.00 $0.00 m ¢ TOTAL ARCHITECTURAL $0.00 o i; Structural $0.00 MEP $0.00 rn c Civil $0.00 0 Fire Protection $0.00 Landscape $0.00 PROFIT ON CONSULTANT: 0 % X $ $0.00 $0.00 TOTAL SECTION B $0.00 As-Buik Sheets 0.0 HRS @ $ $40.00 $0.00 g m 00 OVERHEAD 159.0 % X $0.00 $0.00 N a a PROFIT 0.0 % X $0.00 $0.00 TOTAL SECTION C $0.00 Consultant Printing 0.0 HRS @ $ $0.00 $0.00 o m ' o OVERHEAD 159.0% X $0.00 $0.00 z PROFIT 0.0% X $0.00 $0.00 TOTAL SECTION D $0.00 1. SITE INVESTIGATION A. Sub-Soil Investigation @ $0.00 B. Surveys: Party Days Days @ $0.00 m C. Field Investigation(TAS) Man Days 0 Days @ $326.00 $0.00 U m D. Environmental Analysis $0.00 2. CONSULTANTS,SUB-CONTRACTORS OR OTHER SPECIAL COSTS(Specify) N Renderings @ $0.00 g Reports(TAS) 0 @ $0.00 W Other(Explain) @ $0.00 SUBTOTAL SECTION E(ITEMS 1&2) $0.00 PLUS PROFIT 10% X $0.00 $0.00 TOTAL SECTION E $0.00 J:12004.149A1Contracts\Owner\Additional Services 3-25-111Amendment No. 6 Add Services Fee Proposal Plan Mods Worksheet Revised 5-2-11.xlsx 5/5/2011 2 of 3 A&E PROPOSAL NAME OF FIRM Komatsu Architecture, Inc. PROJ ECT TITLE DESCRIPTION Guinn Elementary School Phase Rework of Construction Docs-Amendment No.06-Phase Two Two as directed by City of FW LOCATION KOMATSU PROJECT NO: TIME(DAYS) EST,COST OF CONSTRUCTION Fort.Worth,Texas 2004.149A ESTIMATE:REPRODUCTION-(See Attached Printing Breakdown) Bond Printing Full Size Bond Printing Haff Size Mylar Full Size Ploting(Final and As Builts) o Cost Estimate Printing o Specifications Printing Review Comments Printing Design Analysis Printing CD's(As Builts) SUBTOTAL SECTION F $0.00 PLUS PROFIT 0% X $0.00 $0.00 TOTAL SECTION F $0.00 TRANSPORTATION Milage 0 Miles @ $0-51 $0.00 _ Airfair Trips @ $0.00 Per Diem(TAS onsite) 0 Days @ $50.00 $0.00 o : Rental Car Days @ $0.00 rn ~ Parking Days @ $0.00 Hotel(design review Austin-lased only) 0 $150.00 $0.00 SUBTOTAL SECTION $0.00 PLUS PROFIT 0% X $0.00 $0.00 TOTAL SECTION G $0.00 TOTAL DESIGN(SECTIONA FROM FRONT) $9,411.05 TOTAL SECTIONS B,C,D,E.F&G ABOVE $O.DO - GRAND TOTAL-FEE PROPOSAL $9,411.85 May 5,2011 SIGNATURE DATE OF PROPOSAL 5-May11 J:12004.149AIContracts\Owner\Additional Services 3-25-11\Amendment No.6 Add Services Fee Proposal Plan Mods Worksheet Revised 5-2-11.xlsx 5/5/2011 3 of 3