HomeMy WebLinkAboutContract 33939-A6 AMENDMENT NO. 6 TO AGREEMENT
FOR ARCHITECTURAL DESIGN SERVICES
GUINN ELEMENTARY SCHOOL RENOVATION
STATE OF TEXAS _
CITY SECRETARY CONTRACT NO.
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Komatsu Architecture, Inc. (Architect) made and entered into City
Secretary Contract No. 33939 (The Contract)which was authorized by the City Council by M&C C-21619,
the 15th day of August, 2006; and Amendment Nos. 1, 3, 4, and 5 were administratively executed in the
amount of $58,892.51 and Amendment No. 2 was authorized in the amount of $42,845.00 by M&C C-
22884 dated July 8, 2008 for the plaza preliminary design, interior renovation revision as a separate
project, and floor plan revisions for different tenants;and
WHEREAS, further amendment is necessary to reimburse the Architect for interiors build out part of the
project as part of the design services agreement; and
NOW THEREFORE, City and Architect, acting herein by and through their duly authorized
representatives, enter into the following agreement which amends the Contract:
1.
Article 1.1, SECTION I—SERVICES OF THE ARCHITECT, the following paragraph is added to read as
follows:
"Provide additional design and construction phase services to accommodate the replacement of
the existing basement sump pump and install a new exterior french drain and sump pumps. The
cost of this additional service is $9,411.85. The scope of services is described more fully in the
Komatsu email dated May 5,2011, subject: 04.149A Guinn Elementary School Amendment No. 6
Revised 5-5-11,which is attached hereto as Attachment"A"and made a part of this Agreement."
2.
Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows:
"The total compensation for all of the assignments to be performed by Architect as described in
CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of
$280,713.98 plus up to$6,418.00 in reimbursable expenses. °
3.
All other provisions of this Contract which are not expressly amended herein shall remain in full force and
effect.
EXECUTED this the day of : UxYlQ-- , 2011, in Fort Worth,Tarrant County,Texas.
KOMATSU ARC TECTURE, INC APPROVED:
By: By:
arI A. Komats , A Fernando Costa
President Assistant City Manager
APPROVA RECOMMENDED_ RECOR��
By. By:
DouglaW. Wiersig, P.E., Dithctor Ma4>0
rty Hendrix ,oa �q���n
Trans6 rtation& Public Works Department City Secretary p l4 00000*-0-
-40"tfact.
APPROV AS TO M AND LEGALITY: M&C Not Required for this Amendmer�a►oo'A 4
horization Qko �By' FICIAL RECORD Doug asW. ack °
Assistant City Attorney CITY SECRETARY � � 00000000 000
FT. WORM TX ��aa��`EXAgaa
Page Iof1
Clements, Ronald
From: Gordon Marchant[gmarchant@comatsu-inc.coml
Sent: Thursday, May 05, 2011 1:27 PM
To: Clements, Ronald
Subject: 04.149A Guinn Elementary School Amendment No. 6 Revised 5-5-11
Attachments: FINAL Amendment No_6 Add Services Fee Proposal Plan Mods Worksheet Revised 5-5-11.pdf
See attached.Thanks.GM
05/06/2011
A&E PROPOSAL
NAME OF FIRM
Komatsu Architecture,Inc.
PROJECTTn1E DESCRIPTION
Guinn Elementary School Phase Rework of Construction Docs-Amendment No.06-Phase
Two 'Two as directed by City of FW
LOCATION KOMATSU PROJECT NO: TIME(DAYS) EST.COST OF CONSTRUCTION
Fort Worth,Texas 2004.149A
NO.OF EST.NO.OF HOURLY
DRAWINGS HOURS RATE TOTAL ESTIMATED COST
BY A&E BY CONSULTANT
A o
DRAWINGS
A. Project Manager 4.0 $57.02 $228.08
B. Architect 0 8.0 $41.50 $332.00
C. Structural Engineer 0 $0.00
D. MEP Engineer 0 $3,000.00
E_ Interior Design 01 0.0 $0.00
F. ComCheck 0 $800.00
G. Cost Estimator $0.00
H. Landscape Architect $0.00
J. Fire Protectlon Engineer $0.00
K. Civil 0.0 $0.00 $1,000.00
L. Draftsman: (1) Architectural 0 8.0 $40.00 $320.00
(2) Structural $0.00
(3) Mechanical/Elec/Plumb. $0.00
(4) Electrical $0.00
o (5) Civil $0.00
d) (5) Landscape $0.00
(5) Kitchen $0.00
(5) AIV $0.00
(6) Other $pecifications) $0.00
TOTAL DRAWINGS 0 $880.08 $4,800.00
SPECIFICATIONS
A. Spec/Report Wrtters 2.0 $57.02 $114.04
U
B. Typist 0.0 $20.00 $0.00
TOTAL-SPECIFICATIONS 0 $114.04
DOCUMENT REVIEW $0.00
A. Coordination Review 8.0 $57.02 $456.16
TOTAL DESIGN COST $1,450.28 $4,800.00
OVERHEAD 159.0% X $ $1,450.28 $2,305.95
PROFIT 10.0% X $3,756.23 $375.62
TOTAL COLUMN A(Inc].Overhead)+B $8,931.85
PROFIT ON CONSULTANT: 10% X $ $4,800.00 $480.00
TOTAL COLUMNS A(Incl.Overhead)+B+Profd $9,411.85
TOTAL SECTION A. $9,411.85
J:12004.149A1ContractslOwnerlAdditonal Services 3-25-111Amendment No. 6 Add Services Fee Proposal Plan
Mods Worksheet Revised 5-2-11.xlsx
5!5!2011
1 of 3
A&E PROPOSAL
NAME OF FIRM
Komatsu Architecture,Inc.
PROJECTTIL.E DESCRIPTION
Guinn Elementary School Phase Rework of Construction Docs-Amendment No.06-Phase
Two Two as directed by City of FW
LOCATION KOMATSU PROJECT NO: TIME(DAYS) EST.COST OF CONSTRUCTION
Fort Worth,Texas 2004.149A
Construction Administration-
Architectural 0.0 NRS @ $ $45.00 $0.00
OVERHEAD 159.0 % X $0.00 $0.00
c PROFIT 10.0% X $0.00 $0.00
m ¢ TOTAL ARCHITECTURAL $0.00
o i; Structural $0.00
MEP $0.00
rn
c Civil $0.00
0 Fire Protection $0.00
Landscape $0.00
PROFIT ON CONSULTANT: 0 % X $ $0.00 $0.00
TOTAL SECTION B $0.00
As-Buik Sheets 0.0 HRS @ $ $40.00 $0.00
g m 00 OVERHEAD 159.0 % X $0.00 $0.00
N a a PROFIT 0.0 % X $0.00 $0.00
TOTAL SECTION C $0.00
Consultant Printing 0.0 HRS @ $ $0.00 $0.00
o m '
o OVERHEAD 159.0% X $0.00 $0.00
z PROFIT 0.0% X $0.00 $0.00
TOTAL SECTION D $0.00
1. SITE INVESTIGATION
A. Sub-Soil Investigation @ $0.00
B. Surveys: Party Days Days @ $0.00
m C. Field Investigation(TAS) Man Days 0 Days @ $326.00 $0.00
U
m D. Environmental Analysis $0.00
2. CONSULTANTS,SUB-CONTRACTORS OR OTHER SPECIAL COSTS(Specify)
N Renderings @ $0.00
g Reports(TAS) 0 @ $0.00
W Other(Explain) @ $0.00
SUBTOTAL SECTION E(ITEMS 1&2) $0.00
PLUS PROFIT 10% X $0.00 $0.00
TOTAL SECTION E $0.00
J:12004.149A1Contracts\Owner\Additional Services 3-25-111Amendment No. 6 Add Services Fee Proposal Plan
Mods Worksheet Revised 5-2-11.xlsx
5/5/2011
2 of 3
A&E PROPOSAL
NAME OF FIRM
Komatsu Architecture, Inc.
PROJ ECT TITLE DESCRIPTION
Guinn Elementary School Phase Rework of Construction Docs-Amendment No.06-Phase
Two Two as directed by City of FW
LOCATION KOMATSU PROJECT NO: TIME(DAYS) EST,COST OF CONSTRUCTION
Fort.Worth,Texas 2004.149A
ESTIMATE:REPRODUCTION-(See Attached Printing Breakdown)
Bond Printing Full Size
Bond Printing Haff Size
Mylar Full Size Ploting(Final and As Builts)
o Cost Estimate Printing
o Specifications Printing
Review Comments Printing
Design Analysis Printing
CD's(As Builts)
SUBTOTAL SECTION F $0.00
PLUS PROFIT 0% X $0.00 $0.00
TOTAL SECTION F $0.00
TRANSPORTATION
Milage 0 Miles @ $0-51 $0.00 _
Airfair Trips @ $0.00
Per Diem(TAS onsite) 0 Days @ $50.00 $0.00
o :
Rental Car Days @ $0.00
rn ~ Parking Days @ $0.00
Hotel(design review Austin-lased only) 0 $150.00 $0.00
SUBTOTAL SECTION $0.00
PLUS PROFIT 0% X $0.00 $0.00
TOTAL SECTION G $0.00
TOTAL DESIGN(SECTIONA FROM FRONT) $9,411.05
TOTAL SECTIONS B,C,D,E.F&G ABOVE $O.DO -
GRAND TOTAL-FEE PROPOSAL $9,411.85
May 5,2011
SIGNATURE DATE OF PROPOSAL 5-May11
J:12004.149AIContracts\Owner\Additional Services 3-25-11\Amendment No.6 Add Services Fee Proposal Plan
Mods Worksheet Revised 5-2-11.xlsx
5/5/2011
3 of 3