WHEREAS, the City of Fort Worth (City) and One SR, L.P., Sendera
Ranch, LTD., and Two SR, L.P., (Developer) entered into Community Facility
Agreement, City Secretary Contract No. 33943, authorized by City Council on
the 5th day of September, 2006 via M&C C-21662 (CFA); and
WHEREAS, the bids received for construction of the improvements
contemplated by the CFA did not cover the cost of additional work; and
WHEREAS, it has become necessary to execute Amendment No. 2 to
the CFA to increase participation by the City and the Developer for costs
associated with additional work not contemplated by the CFA.
NOW THEREFORE, City and Developer, acting herein by and through
their duly authorized representatives, enter into the following agreement,
which amends the CFA:
1.
Section II. Water Facilities, is amended to be and read:
OFFICIAL RECORD',
CITY SECRETARY
F'T.WORTH,T>
A. The Developer and the City of Fort Worth shall share in the cost of the
additional work as follows:
One SR, LP* Two SR, LP*
Developer Cost Developer Cost City Cost Total Cost
24% 30% 46%
Retaining Wall $ 16,828.80 $ 21,036.00 $ 32,255.21 $ 70,120.01
180 sq. yds. Of Entrance
Rock $ 1,256.21 $ 1,570.26 $ 2,407.74 $ 5,234.21
Increased Cost for
Power Delivery $ 952.21 $ 1,190.26 $ 1,825.06 $ 3,967.53
Reduced Pavement $ 1,296.00 $ 1,620.00 $ 2,484.00 $ 5,400.00
Reduced Excavation $ 484.97 $ 606.21 $ 929.52 $ 2,020.70
510 ft. Barbed Wire
Fence $ 660.20 $ 825.25 $ 1,265.39 $ 2,750.84
Ladders & Handrails for
access to Pipe Chase $ 1,494.43 $ 1,868.04 $ 2,864.32 $ 6,226.79
Additional Pipe Supports
&Air Valves $ 1,941.72 $ 2,427.15 $ 3,721.63 $ 8,090.50
Tie-in to 42" Pipe $ 4,032.41 $ 5,040.51 $ 7,728.77 $ 16,801.69
Additional Electrical
Circuits $ 2,212.45 $ 2,765.56 $ 4,240.53 $ 9,218.54
Motor Control Center
Storage Costs $ 2,722.44 $ 3,403.04 $ 5,218.00 $ 11,343.48
Overhead & Bonding
Costs for Electrical
Chane $ 601.07 $ 751.34 $ 1,152.06 $ 2,504.47
Total 1 $ 30,920.97 $ 38,651.20 $ 59,265.19 $ 128,837.36
*One SR, LP and Two SR, LP will pay contractor directly.
The costs stated herein are based upon actual construction costs.
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to
be executed in quadruplicate in its name and on its behalf by its Assistant City
Manager, attested by its City Secretary, with the corporate seal of the City
affixed, and said Developer has executed this i trument in the quadruplicate, at
Fort Worth, Texas this the day of , 2009.
Approval Recommended:
Wate Department
Z n j
S. Frank Crumb
Director
ATTEST:
City of Fort Worth
City Secret Assistant City Manager
Marty Hendrix Fernando Costa
Approved as to Form:
Contract Authorization
CI 9
AsAtAt City Attorney 1-2-1 (D
Date
JFFICIAL RECORD
11TV SECRETARY
T.WORTHt T)
ATTEST:
Corporate Secretary
DEVELOPER FOR SENDERA RANCH:
One SR, L.P. Sendera Ranch, Ltd.
By: Centamtar Terras, L.L.C., its general By: Pars Investments, Inc., sole general
Partner partner
By: ..�� By: -��
Mehrdad Moayedi, Manager Mehrdad Moayedi, President
DEVELOPER FOR SENDERA RANCH EAST:
Two SR, L.P.
By: Centamtar Terras, L.L.C., sole general partner
By: --W.
Mehrdad Moayedi, Manager
M&C Review Page 1 of 2
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FORT_�ORTII
COUNCIL ACTION: Approved on 9/2/2008
DATE: 9/2/2008 REFERENCE NO.: **C-23012 LOG NAME: 60SENDERA CFA
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of Amendment No. 2 in the Amount of$59,265.19 to City Secretary
Contract No. 33943, a Community Facilities Agreement with One SR, L.P., Sendera
Ranch, Ltd., and Two SR, L.P., for Construction of a Pump Station and Ground Storage
Tank to Serve Sendera Ranch and Sendera Ranch East
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 in
the amount of$59,265.19 to City Secretary Contract No. 33943, a Community Facilities Agreement
with One SR, L.P., Sendera Ranch, Ltd., and Two SR, L.P., for construction of a pump station and
ground storage tank to serve Sendera Ranch and Sendera Ranch East.
DISCUSSION:
On September 5, 2006, (M&C C-21662) the City Council authorized the City Manager to execute City
Secretary Contract No. 33943, a Community Facilities Agreement with One SR, L.P., Sendera
Ranch, Ltd., and Two SR, L.P., for the construction of a pump station and ground storage tank to
serve Sendera Ranch and Sendera Ranch East, located in far north Fort Worth.
ORIGINAL COST:
PROJECT DEVELOPER CITY TOTAL
Pump Station and Ground Storage Tank $ 5267700.00 $ 4487300.00 $ 9755000.00
Inspection $ 105354.00 $ 89746.00 $ 195100.00
Material Testing $ 105354.00 $ 89746.00 $ 195100.00
Contingency $0.00 $134,619.00 $134,619.00
Total $ 5478408.00 $ 4801411.00 $ 10279819.00
On February 26, 2008, (M&C C-22684) the City Council authorized the City Manager to execute
Amendment No. 1 to City Secretary Contract No. 33943, a Community Facilities Agreement with One
SR, L.P., Sendera Ranch, Ltd., and Two SR, L.P., for the construction of a pump station and ground
storage tank to serve Sendera Ranch and Sendera Ranch East. The executed amendment approved
increasing the City's original participation by $42,975.04.
REVISED COST AFTER AMENDMENT NO. 1:
PROJECT DEVELOPER CITY TOTAL
Pump Station and Ground Storage Tank $ 5318148.96 $ 4530275.04 $ 9848424.00
Inspection $ 105354.00 $ 89746.00 $ 195100.00
http://apps.cfwnet.org/council_packet/mc review.asp?ID=10234&councildate=9/2/2008 07/14/2009
M&C Review Page 2 of 2
Material Testing $ 105354.00 $ 89746.00 $ 195100.00
Contingency $0.00 $134,619.00 $134,619.00
Total $ 5528856.96 $ 4844386.04 $ 10373243.00
The second amendment is in the amount of$59,265.19. The City participation increase is due to the
additional items necessary to construct the pump station, e.g. additional power delivery, requirement
of a barbed wire fence, a retaining wall and a connection to a 42 inch water line. The associated
costs are based on actual construction costs. The cost of the additional work is divided between the
City (46 percent, $59,265.19), the Developer One SR, L.P., (24 percent, $30,920.97) and the
Developer Two SR, L.P., (30 percent, $38,651.20). Additional funding for inspection and materials
testing is not required.
REVISED ESTIMATED COST AFTER AMENDMENT NO. 2:
PROJECT DEVELOPER CITY TOTAL
Pump Station and Ground Storage Tank $ 5387721.13 $ 4589540.23 $ 9977261.36
Inspection $ 105354.00 $ 89746.00 $ 195100.00
Material Testing $ 105354.00 $ 89746.00 $ 195100.00
Contingency $0.00 $134,619.00 $134,619.00
Total $ 5598429.13 $ 4903651.23 $ 10502080.36
This development is located in COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated,
of the Water Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
P264 541200 607160037680 $59,265.19
Submitted for City Manager's Office by: Fernando Costa (8476)
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: Stephanie Francis (7585)
ATTACHMENTS
Sendera Ranch Site Maps.pdf
http://apps.cfwnet.org/council packet/mc review.asp?II=10234&councildate=9/2/2008 07/14/2009