Loading...
HomeMy WebLinkAboutContract 34130� STATE OF TEXAS COUNTY OF TARRANT § § CiTY ���°4��T��R�' � ;�r� ��i ;,�1� :; ;� ��t� , � AMENDMENT NQ. 1 CITY SECRETARY CONTRACT NO. 31490 (No M&C Needed) WHEREAS, the City of Fort Worth (City) and Lockwood, Andrews & Newnam, Inc., (Engineer) made and entered into City Secretary Contract No. 31490 (the Contract) which was authorized by the City Council by M&C C-20484 on the l lth day of January 2005; and WHEREAS, the Contract involves engineering services for the following project: Standard Agreement for engineering Services for Miscellaneous Drainage Improvements to I�ongstraw Channel, Luther Channel, Colonial Channel and Chaddybrook Channel, (2004 CIP Minor Drainage Miscellaneous Structural Improvements Contract E). WHEREAS, it has become necessary to e�ecute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the follov��ing agreement, which amends the Contract: 1 Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 6, 2006, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $17,759.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $75,938.64. 3. All other provisions of the contract, which are not e�pressly amended herein, shall remain in full force and effect. �� ^o ���..� � ������!� �;����'!�� ���ij ��� Rl���l �� �,;.,,,�,r � , ':��'<J�� U�n'� �;�..�, t'4 1 l 7 �� :-• � �O-1��-OhrO�::i=� I�i:VU -- � E�ECUTED on this the �� day of � , 2006, in Fort Worth, Tarrant County, Te�as. APPROVAL RECOMMENDED: A.Douglas Rademaker, P.E. Director, Department of Engineering APP OVED: � � Marc Ott Assistant Cit�� Manager Lockwood Andrews & Newnam. Inc. __ ENGINEER By ::�� � �. yy�� / Na �: J. Anthony Boy , P.E. Senior Vice President, Assistant �S TO F AND L GALITY: ' �� f�, _� ��'_.- � Attorney ��� /. l ATTEST: /� ' . Marty Hend �, City Secretary l�d+CJ 1'��cC: d��:��7�i3��3 i�l����1c,i� �Sd����� ����� ����?[���� ��, '�`"JU°���� ����. Lockwood, Andrew� & Newnam, Inc. A LEO A DALY COMPnVY September 6, 2006 Mr. Gopa1 Sahu, P.E. Project Manager ciry of Fort worth 1000 Throckmorton Street, Fort Worth, Texas, 76102 RE: Misc. Structural Improvements, Project 00097 2004 CIP Minor Drainage Projects Dear Mr. Sahu, Having completed the conceptual design for the above referenced project, it is necessary to z�equest additional funds t� complete the project. Permanent easements are required for the construction and rnaintenance of the Smithfield Channel and the Colonial Channel. Additional design work is required for #he Colonial Channel Ramp. The Colonial Channel Ramp wi11 require an easement from Texas Christian University, as the new ramp is locatecl on property owned by them. The ramp design has also been modified to add an additional access point to the channel. A stilling basin, or energy dissipater creates an inaccessible portion in the channel if the ramp is n4t modified. The design requires additional retaining walls that connect to the existing channel walls. The Smithfield �hanne] Ramp is located on property owned by the Keller Independent School District, on the Riverside Elementary School site. The required easement allows access from their parking lot to the adjacent dra.inage easement and for the constrnction of ari access ramp into the Smitb field Channel. LAN has obtained preliminary approval from KISD for the easemant. T'he final easement document will need to be presented to the school board for their approval. A. Field Surveys and Easement Descriptions: The ENGINEER will provide metes and bounds description of both easement areas. Thexe will be a total of three easement descriptions required. The easements must be staked on #he ground. The easements descriptions or metes and bounds, will be provided for $9,350. B. Revise Colonral Channel Design: The ENGINEER �will design a ramp to the existing channel that connects above and below the e�sting stilling basin. The ramp will allow an"SU" truck with a 20' wheel base to maneuver into the bottom of the channel for maintenance purpvses. The ramp design will include cancrete retaining wa11s reaching heights of up 12' and connecting to the ex.isting Channels walls. The design revisions will be pzovided for $8,409. 1320 South University Drive, Suite 450 • Fort Worth, Texas 76197 • 817.820.0420 • Fax: 817.820.0441 �����;]�?'�l a:��t�J�l'o' r �� 1 �, / ClI� �, vnvw.lan-inc.co " ll '""u � � �t•1: ` .,. U� � � ;�;.„J��, � h « � , � �s��., The total cost to provide all the services shown above is $17,759. Thank you for this opportunity to continue providing our services to the City. Sincerely, Lockwood, Andrews & Newnam, Inc. ��� / Walter Norwood, P.E. Project Manager r� (, ^ r �^' � 2 i�, �����Jw� �°�������.���� �i�R ������;r��� �:;�,, , � ,,, ��,.:,,-,��1� 4 � ��,,�� �, �� i. �`,�. .; L:�l]63351120.10234000�ivfgmt�2_0 ContraaFile�Z_D2 Corttra�Y-Ageement\Cort7ac[Amendmeni�Sahu Ameudmenl l.doc �a°--=�--- -��� �- �