HomeMy WebLinkAboutContract 33965 AMENDMENT NO. 7
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.. L5
(No M&C Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Lockwood,
Andrews & Newnam, Inc. , (Engineer) made and entered into City
Secretary Contract No. 28790, (the Contract) which was authorized
by the City Council by M&C C-19585 on the 13th day of May, 2003 and
subsequently revised by six previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Rehabilitation Contract LXVII (67) .
WHEREAS, it has become necessary to execute Amendment
No. 7 to said Contract to include an increased scope of work and
revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated April 19,
2006, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be performed
by Engineer total $24,280.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $458,740.00. r �
� '4T`JU°�W9
RIGlNIVIA
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the _ day of _ ' 2006, in Fort
Worth, Tarrant County, Texas.
ATTEST:
Marty Hendr i�p 1�[&C; I�fsIJIR1 D
City Secretary w---- - -
APPROVAL RECOMiENDED: APPROVED:.
T
Douglas Rademaker, P.E. Marc Ott
Director, Department of Assistant City Ma ager
Engineering
LOCKWOOD, ANDREWS & NEWNAM, INC.
Engineer
By: `
Nam - ose h Y Bo d, P.E.
Senior Vice President
307 West 7t' Street, Suite 1250
Fort Worth, TX 76102
APPROVED TO FORM LEGALITY:
Assis ant i Attorne
-2-
CITY El!'PHAP(Y
Lockwood,Andrews
&Newnam, Inc.
A LEO A DALY COMPANY
April 19,2006
Mr. Liam Conlon
City of Fort Worth
Engineering Department—Engineering Services
900 Monroe Street, Suite 201
Fort Worth, Texas 76102
Re: Amendment No. 7
Survey and Engineering Design Services for Sewer Line Replacements
Sanitary Sewer Rehabilitation Contract LXVII (67)
DOE #4800
Water Project No. PW53-060530177970, and
Sewer Project No. PS58-070580175790
Dear Mr. Conlon:
Per your request, this Amendment No. 7 has been prepared for the performance of additional
survey and engineering design services with respect to the above referenc d project. The work
specifically relates to the development of additional construction documents for replacement of
the existing L-3246 sewer line located in the Bailey Industrial Park, and specifically between
Tillar and Cullen Streets, immediately east of Foch Street (see attached exhibit).
The additional work will include meetings and negotiations with Mosites Rubber Company, who
is the main property owner in the area, for the purpose of identifying alternative alignments and
acceptable easement locations. This will be followed by the performance of topographic
surveying of the identified future alignment locations. Construction plans will then be developed
for the replacement of the existing L-3246 line with new sewer lines and services. The project
intent will be to extend the new sewer lines and services to the existing L-3245 sewer line
located in Tillar Street, to the south. Design improvements are to be incorporated into the Part 3
plans for the Contract 67 project that have been previously prepared to a pre-final level of
completion.
In addition to the above listed work, LAN will break out the replacement design for the existing
M-132 sewer main in White Settlement Road, to be performed as an emergency service. Recent
television inspection has revealed that this segment of 24" sewer main is severely deteriorated
and in need of immediate replacement. The plan sheets for this area will be revised accordingly
so that the work can be performed independently of the other segments. A corresponding traffic
control plan for this segment will also be developed.
IrHMS
IN
1320 South University Drive,Suite 450 • Fort Worth,Texas 76107 • 817.820.0420 • Fax:817.820.0441 • www.lan
Mr. Liam Conlon
April 19,2006
Page Two
Further, the portion of the Part 3 plans that include Currie Street and Wimberly Street (south of
Wingate Street) will be separated for incorporation into D.O.E. project no. 4699 which is being
prepared internally by the City. LAN will coordinate with the City as necessary to transfer the
applicable plan sheets to this other project. The remainder of the Part 3 plans will be modified to
coordinate the separation from the adjacent project.
Based upon the work to be performed as described above, a lump sum fee addition of$24,280 is
hereby requested. A summary of the contract values affected by the amendments including this
Amendment No. 7 as proposed herein follows at the bottom of this letter.
Thank you for your consideration. Please contact me should you require any additional
information. We look forward to continuing our work with you on this project.
Sincerely,
LOCKWOOD, ANDREWS, & NEWNAM,INC.
ig P. Schellbach,P.E.
Infrastructure Manager
Original Contract Amour t: $260,706.00
Amendment No. 1 Amo nt: $22,350.00
Amendment No. 2 Amount: $20,410.00
Amendment No. 3 Amoint: $14,900.00
Amendment No. 4 Amount: $80,710.00
Amendment No. 5 Amount: $11,640.00
Amendment No. 6 Amount $23,744.00 (Water Fee $2,522.00)
(Sewer Fee $21,222.00)
Amendment No. 7 Amount $24,280.00
Total Revised Contract: $458,740.00